CN208045360U CN201820580528.4U CN201820580528U CN208045360U CN 208045360 U CN208045360 U CN 208045360U CN 201820580528 U CN201820580528 U CN 201820580528U CN 208045360 U CN208045360 U CN 208045360U
Authority
CN
China
Prior art keywords
chassis
pole
circuit breaker
mechanism supports
mobile platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820580528.4U
Other languages
Chinese (zh)
Inventor
马廷宏
黄鑫
杜瑞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NINGXIA KAICHEN ELECTRIC GROUP CO Ltd
Original Assignee
NINGXIA KAICHEN ELECTRIC GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NINGXIA KAICHEN ELECTRIC GROUP CO Ltd filed Critical NINGXIA KAICHEN ELECTRIC GROUP CO Ltd
Priority to CN201820580528.4U priority Critical patent/CN208045360U/en
Application granted granted Critical
Publication of CN208045360U publication Critical patent/CN208045360U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Trip Switchboards (AREA)

Abstract

The utility model is related to a kind of positioning used in circuit breaker polar installation, support, the auxiliary devices for transporting cooperation, especially circuit breaker polar installation auxiliary device.Its main feature is that:Including the pole chassis (1) being fixed together and mechanism supports chassis (14), the closed slide mechanism of two equal lengths is wherein installed at the top of pole chassis (1), mobile platform (4) is installed on the sliding block (5) of two guide rail mechanisms, one end far from mechanism supports chassis (14) is installed with axle sleeve (2) on the mobile platform (4), night bolt (3) is installed on the axle sleeve (2), it is also equipped with roller supporting block (15) between two guide rail mechanisms, the auxiliary wheel (7) contacted with mobile platform (4) bottom is installed on the roller supporting block (15).It can easily be assembled using after utility model device, reduce labor intensity, reduce operating personnel, improve efficiency.

Description

Circuit breaker polar installation auxiliary device
Technical field
The utility model is related to a kind of positioning used in circuit breaker polar installation, support, the auxiliary device coordinated is transported, Especially circuit breaker polar installation auxiliary device.
Background technology
At present when assembling circuit breaker polar, due to pole volume is larger, more than quantity and weight weight, a people can not fill It with completion, needs two people to cooperate with and completes, a people holds up corresponding mounting hole on pole alignment breaker mechanism, another person The two connection is tightened up with screw rod, when making due to breaker structure assembling work person works in operation process Posture distorts, it is difficult to efficiently accomplish assembly;And so that muscular fatigue is led to the trembling of installation process due to weight is big, Fastening bolt is harder, has seriously affected efficiency of assembling.
Utility model content
The purpose of this utility model is to provide a kind of circuit breaker polar installation auxiliary device, can improve efficiency of assembling, Mitigate the working strength of operating personnel and reduces operating personnel.
A kind of circuit breaker polar installation auxiliary device, is particular in that:Including the pole being fixed together Chassis and mechanism supports chassis, wherein be equipped with the closed slide mechanism of two equal lengths at the top of pole chassis, this two Mobile platform is installed on the sliding block of root guide rail mechanism, one end far from mechanism supports chassis on the mobile platform is fixedly mounted There is axle sleeve, night bolt is installed on the axle sleeve, roller supporting block is also equipped between two guide rail mechanisms, in the rolling The auxiliary wheel contacted with mobile platform bottom is installed in wheel supporting block, close to mechanism supports chassis on the mobile platform One end is equipped with pole supporting rack, and pole positioning rubber support plate is equipped on the pole supporting rack;Wherein in mechanism supports It is installed with elevating mechanism on chassis, lifting platform is installed at the top of the elevating mechanism, in each self installation in lifting platform both sides There is one piece of mechanism limit support board.
Wherein elevating mechanism include according to rectangle four angles be distributed four cylinders, four cylinders by tracheae group with Lifting air supply changeover device is connected to, and lifting air supply changeover device is mounted on mechanism supports chassis, and in four cylinder bottoms Mechanism supports chassis on cylinder mounting plate is installed.
Pre-installation hole is wherein had on pole chassis and mechanism supports chassis, and by the pre-installation hole and tightly Firmware connects pole chassis with mechanism supports chassis.
Two guide rail mechanism ends wherein at the top of pole chassis are equipped with bolt limiting plate.
It is equipped with 3 parallel U-type grooves wherein on pole supporting rack, pole positioning rubber is equipped in each U-type groove Glue support plate.
Test proves that using only pole and mechanism need to be placed on auxiliary device after utility model device, lead to It crosses auxiliary device for moving part-structure to be positioned, the corresponding installation screw of alignment function mechanism then can be assembled easily, be subtracted Small labor intensity reduces operating personnel, improves efficiency.The advantages of utility model device further includes:1, present apparatus solution is resolved The problem of road device pole can not be assembled with mechanism;2, the present apparatus effectively raises efficiency of assembling;3, alleviate operating personnel's Working strength;4, the present apparatus reduces operating personnel.
Description of the drawings
Attached drawing 1 is the front view of the utility model;
Attached drawing 2 is the left view of the utility model;
Attached drawing 3 is the vertical view of the utility model;
Attached drawing 4 is the shaft side figure of the utility model.
Specific implementation mode
As shown in Fig. 1,2,3 and 4, the utility model provides a kind of circuit breaker polar installation auxiliary device, including solid Surely the pole chassis 1 and mechanism supports chassis 14 to link together, wherein being equipped with two equal lengths at 1 top of pole chassis 18 mechanism of closed slide, mobile platform 4 is installed on the sliding block 5 of two 18 mechanisms of guide rail, it is remote on the mobile platform 4 Disembark one end of structure support underframe 14 is installed with axle sleeve 2, night bolt 3 is equipped on the axle sleeve 2, in two guide rails It is also equipped with roller supporting block 15 between 18 mechanisms, is equipped on the roller supporting block 15 and contacts with 4 bottom of mobile platform Auxiliary wheel 7 is equipped with pole supporting rack 6, in the pole branch on the mobile platform 4 close to one end of mechanism supports chassis 14 Pole positioning rubber support plate 19 is installed on support 6;It wherein is installed with elevating mechanism on mechanism supports chassis 14, It is installed with lifting platform 9 at the top of the elevating mechanism, one piece of mechanism limit support board 8 is respectively installed in 9 both sides of lifting platform.
Wherein elevating mechanism uses pneumatic mechanism, specifically includes four cylinders 12 of four angles distribution according to rectangle, should Four cylinders 12 are connected to by tracheae group 11 with lifting air source converter device, and lifting air source converter device is mounted on mechanism supports bottom Cylinder mounting plate 16 is installed on frame 14 and on the mechanism supports chassis 14 of four 12 bottoms of cylinder.
Pre-installation hole is wherein had on pole chassis 1 and mechanism supports chassis 14, and passes through the pre-installation hole Pole chassis 1 and mechanism supports chassis 14 are connected with fastener.In addition, wherein in two guide rail machines at 1 top of pole chassis Structure end is equipped with bolt limiting plate 20.It is equipped with 3 parallel U-type grooves on pole supporting rack 6, is spread in each U-type groove Equipped with pole positioning rubber support plate 19.
The application method and principle of the utility model be:
Utility model device is moved using preceding by 20 limited spring bolt 3 of bolt limiting plate, final to limit mobile platform 4 Movement;Pole is placed in the present apparatus in pole positioning rubber support plate 19 when use, mechanism is placed on mechanism limit branch It above fagging 8 and mechanism tail portion limited support foot 10, then pulls up night bolt 3 and pushes mobile platform 4 forward so that pole is installed Hole is directed at fitting with mechanism pilot hole, then carries out bolt fastening, and assembly is completed;Rotation and lifting air source conversion equipment after completion 13 make lifting platform 9 rise to shelves are risen, and the pole then assembled is raised above therewith is detached from pole positioning rubber support plate 19, it pulls back mobile platform 4 and is inserted into 20 limitation locking of bolt limiting plate using night bolt 3 to original position, finally rotation rises Sending down abnormally ascending supply changeover device 13 makes lifting platform 9 restore origin-location to shelves are reduced, and assembly work is completed.
Pole chassis 1 is connected by pre-installation hole with mechanism supports chassis 14 and fastens, and is fixed on ground;Bolt Limiting plate 20 is fixed on pole chassis 1;Two equal length guide rails 18 are parallel to be fixed on pole chassis 1;Four sliding blocks 5 are equal It is divided to and is matched with two guide rails 18;Mobile platform 4 is fixed on four sliding blocks 5;Axle sleeve 2 is mounted on mobile platform 4;Spring is inserted Pin 3 is fitted on axle sleeve 2;Roller supporting block 15 is fixed on pole chassis 1;Auxiliary wheel 7 is fitted to idler wheel branch On bracer 15;Four rubber limited blocks 17 are fixed on the pole chassis 1 on two 18 two ends positions of guide rail;Pole Supporting rack 6 is mounted on mobile platform 4, and pole positioning rubber support plate 19 is mounted on pole supporting rack 6;Cylinder mounting plate 16 On mechanism supports chassis 14;Four cylinders 12 are fixed on mechanism supports chassis 14;11 one end of tracheae group connects four 12 other end of cylinder connection lifting air source converter device 13;Lifting platform 9 is mounted on four cylinders 12;Liang Kuai mechanisms limited support Plate 8 is mounted on lifting platform 9;Liang Zhi mechanisms tail portion limited support foot 10 is mounted on lifting platform 9;Lift air source converter device 13 On mechanism supports chassis 14.
The technical essential of the utility model is:
1, pole supporting rack 6 plays support and positioning action with pole positioning rubber support plate 19 to preassembled pole, Accurate fit mechanism mounting hole;
2,10 supporting mechanism of mechanism limit support board 8 and mechanism tail portion limited support foot, and mechanism positioning is carried out, accurately match Close pole mounting hole;
3, it pushes mobile platform 4 to convey pole to mechanism mating surface by guide rail 18, sliding block 5 to assemble;
4, cylinder 12 is controlled so that the realization lifting of lifting platform 9, rises when completing assembly by operating air source conversion equipment 13 Lifting platform 9, pole are detached from pole positioning rubber support plate 19, can remove mobile platform 4, carry out next step operation.

Claims (5)

1. a kind of circuit breaker polar installation auxiliary device, it is characterised in that:Including the pole chassis (1) being fixed together With mechanism supports chassis (14), wherein the closed slide mechanism of two equal lengths is equipped at the top of the pole chassis (1), at this Mobile platform (4) is installed on the sliding block (5) of two guide rail mechanisms, far from mechanism supports chassis on the mobile platform (4) (14) one end is installed with axle sleeve (2), and night bolt (3) is equipped on the axle sleeve (2), two guide rail mechanisms it Between be also equipped with roller supporting block (15), be equipped on the roller supporting block (15) contacted with mobile platform (4) bottom it is auxiliary Idler wheel (7) is helped, one end close to mechanism supports chassis (14) on the mobile platform (4) is equipped with pole supporting rack (6), at this Pole positioning rubber support plate (19) is installed on pole supporting rack (6);Wherein it is fixedly mounted on mechanism supports chassis (14) There is elevating mechanism, lifting platform (9) is installed at the top of the elevating mechanism, one piece of machine is respectively installed in lifting platform (9) both sides Structure limit support board (8).
2. circuit breaker polar installation auxiliary device as described in claim 1, it is characterised in that:Wherein elevating mechanism includes pressing According to four cylinders (12) of four angles distribution of rectangle, which passes through tracheae group (11) and lifting air source converting means (13) connection is set, lifting air supply changeover device (13) is mounted on mechanism supports chassis (14), and at four cylinder (12) bottoms Cylinder mounting plate (16) is installed on the mechanism supports chassis (14) in portion.
3. circuit breaker polar installation auxiliary device as described in claim 1, it is characterised in that:Wherein in pole chassis (1) And have pre-installation hole on mechanism supports chassis (14), and by the pre-installation hole and fastener by pole chassis (1) It is connected with mechanism supports chassis (14).
4. circuit breaker polar installation auxiliary device as described in claim 1, it is characterised in that:Wherein in pole chassis (1) Two guide rail mechanism ends at top are equipped with bolt limiting plate (20).
5. circuit breaker polar installation auxiliary device as described in claim 1, it is characterised in that:Wherein in pole supporting rack (6) 3 parallel U-type grooves are equipped with, pole positioning rubber support plate (19) is equipped in each U-type groove.
CN201820580528.4U 2018-04-23 2018-04-23 Circuit breaker polar installation auxiliary device Expired - Fee Related CN208045360U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820580528.4U CN208045360U (en) 2018-04-23 2018-04-23 Circuit breaker polar installation auxiliary device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820580528.4U CN208045360U (en) 2018-04-23 2018-04-23 Circuit breaker polar installation auxiliary device

Publications (1)

Publication Number Publication Date
CN208045360U true CN208045360U (en) 2018-11-02

Family

ID=63927691

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820580528.4U Expired - Fee Related CN208045360U (en) 2018-04-23 2018-04-23 Circuit breaker polar installation auxiliary device

Country Status (1)

Country Link
CN (1) CN208045360U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110289185A (en) * 2019-06-24 2019-09-27 山东泰开高压开关有限公司 Arc-chutes level with switching-on resistance is into tank assembly tooling and its assembly method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110289185A (en) * 2019-06-24 2019-09-27 山东泰开高压开关有限公司 Arc-chutes level with switching-on resistance is into tank assembly tooling and its assembly method

Similar Documents

Publication Publication Date Title
CN201161902Y (en) Hydraulic twin-tub drive elevator apparatus
CN201234073Y (en) Assembly cart apparatus for current mutual inductor
CN208045360U (en) Circuit breaker polar installation auxiliary device
CN108438761B (en) Fermented bean curd transfer and conveying device
CN204123054U (en) Piston automatic assembling machine
CN207481872U (en) A kind of chassis repair hoisting tool
CN204549941U (en) Electric power communication device installs handcart
CN108501634A (en) A kind of modified rail convertible car base apparatus
CN107717310A (en) Height adjustable holding fixed mechanism is used in a kind of metal plates combine welding
CN203144034U (en) Lift trolley for disassembly and assembly of locomotive coupler
CN216421569U (en) Online moving non-avoiding press-fitting mechanism
CN201087033Y (en) Front and rear bridge follower climbing mechanism
CN204997316U (en) CRH3 type EMUs bogie resolving device
CN211178887U (en) Engineering brake cylinder detection device
CN211417345U (en) Multifunctional carrier for constructional engineering
CN208290883U (en) A kind of modified rail convertible car base apparatus
CN216403609U (en) EMS hoist receiving and centering device
CN206966463U (en) Transverse tube turns over riveting equipment
CN201656300U (en) Frame circuit breaker installing trolley
CN2900606Y (en) Hydraulic three-way jack
CN205341709U (en) Manipulator end effector is installation device in advance
CN207200092U (en) Circuit breaker chassis installation servicing unit
CN205614295U (en) Amorphous transformer assembly bench
CN103909411B (en) The exterior pallet of a kind of engine
CN209007824U (en) One kind using stamping device for rubber product production

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181102

Termination date: 20210423

CF01 Termination of patent right due to non-payment of annual fee