CN110288325A - A kind of construction problem amelioration method - Google Patents

A kind of construction problem amelioration method Download PDF

Info

Publication number
CN110288325A
CN110288325A CN201910590093.0A CN201910590093A CN110288325A CN 110288325 A CN110288325 A CN 110288325A CN 201910590093 A CN201910590093 A CN 201910590093A CN 110288325 A CN110288325 A CN 110288325A
Authority
CN
China
Prior art keywords
rectification
people
index
rectifying
improving
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910590093.0A
Other languages
Chinese (zh)
Inventor
王志红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Audiocodes Development In Science And Technology Co Ltd
Original Assignee
Wuhan Audiocodes Development In Science And Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Audiocodes Development In Science And Technology Co Ltd filed Critical Wuhan Audiocodes Development In Science And Technology Co Ltd
Priority to CN201910590093.0A priority Critical patent/CN110288325A/en
Publication of CN110288325A publication Critical patent/CN110288325A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • G06Q10/06393Score-carding, benchmarking or key performance indicator [KPI] analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • General Business, Economics & Management (AREA)
  • Marketing (AREA)
  • Physics & Mathematics (AREA)
  • Tourism & Hospitality (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Educational Administration (AREA)
  • Development Economics (AREA)
  • Game Theory and Decision Science (AREA)
  • Data Mining & Analysis (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention relates to a kind of construction problem amelioration methods, comprising: problem pushes step: the problems in problem base being pushed to first problem rectification people in the form of data flow, record problem pushes the time;Problem rectifies and improves step: so that the first problem rectification people is executed rectifying and improving and rectifies and improves to described problem;Problem supervises and manage step: supervising and manage to the problem of not carrying out rectification or unfinished rectification at the appointed time, described problem is sent to Second Problem rectification people in the form of data flow automatically, supervise and manage Second Problem rectification people;Step is checked and accepted in problem rectification: whether check problem rectification result reaches corresponding index requirement, if not up to standard, turn again to problem rectification step, carries out problem rectification;And problem statistic procedure: statistics described problem, problem push, problem rectification, problem supervisor and problem check and accept step, form problem and rectify and improve statistical data;Finally problem rectifying and improving are evaluated.

Description

A kind of construction problem amelioration method
Technical field
The invention belongs to the realm of building construction, and in particular to a kind of construction problem amelioration method.
Background technique
In construction, need to reach relevant construction technology, and to cope with some emergency cases, to guarantee Normal construction reduces unnecessary measure, but existing construction system is all to be manually set, and there is no corresponding supervision Strategy, when encountering emergency case, and artificial reply, there is very big limitation.It is not able to satisfy the generation of emergency situations, holds Accident easily occurs.
Summary of the invention
In order to overcome the drawbacks of the prior art, the purpose of the present invention is to provide a kind of construction problem amelioration method, The problem of it can be to involved in construction records, and is rectified and improved, and guarantees being normally carried out for construction, reduces work The generation of journey event.
1, a kind of construction problem amelioration method, includes the following steps:
S1. problem pushes step: the various problems encountered in construction is collected, by the problems in problem base with data flow Form push to first problem rectification people, record problem push the time;
S2. problem rectifies and improves step: so that the first problem rectification people is executed rectifying and improving, rectifies and improves to described problem;
S3. problem supervises and manage step: supervising and manage to the problem of rectifying and improving is not completed at the appointed time, automatically by described problem It is sent to Second Problem rectification people in the form of data flow, Second Problem rectification people is made to supervise and manage described problem;
S4. step is checked and accepted in problem rectification: whether check problem rectification result reaches corresponding index requirement, if not up to standard, Problem rectification step is then turned again to, problem rectification is carried out;
S5. problem statistic procedure: statistics described problem, problem push, problem rectification, problem supervisor and problem check and accept step Suddenly, it forms problem and rectifies and improves statistical data;And
S6. problem rectifies and improves evaluation procedure: evaluating problem rectifying and improving.
Further,
In S1 problem push step, described problem automatic push to first problem are rectified and improved into people, make first problem Rectification life at, save and upload the precautionary measures, measures to rectify and reform and plan, the precautionary measures are automatically into emergency processing library.
Further,
Making the first problem rectification people by the duty cycle or when being executed in limit, execution regular working plan is corresponding Action;
Make the first problem rectification people according to experimental examination report, qualitative or quantitative test result value and/or statistics Equipment, components or material corresponding to the index beyond threshold range is repaired or replaced in data;
Monitoring indicators value, the index obtained when making the first problem rectification people according to index of performance periodically supervision plan is fixed The index value and real-time oversight for capableing of automatic collection and calculating associated with real time data obtains in the works in the works for phase supervision Measuring point value, to beyond threshold range index value or measuring point value corresponding to equipment, components or material repair or Replacement.
Further,
The stipulated time sets automatically according to the grade of described problem, if Second Problem rectification people is at the appointed time Do not complete supervisor and rectification, then by described problem in the form of data flow automatic push to third problem rectification people continue to supervise and manage, The start of calculation when time limit of supervisor pushes to third problem rectification people from problem.
Further,
S3 problem supervises and manage step further include:
Problem rectify and improve judgment step, obtain first problem rectification people at the appointed time complete rectifying and improving the reason of or Reason judges whether the problem rectifying and improving need other staff's to match synthesis according to the reason or reason, if it is, from The dynamic executor for specifying another problem rectifying and improving.
Further,
The S5 problem statistic procedure further includes that time used and problem supervisor's completion institute's used time are completed to problem rectification Between counted.
Further,
S6 problem rectifies and improves evaluation procedure
S61 sets evaluation index (xn) and weight (ηn): by problem push, problem rectification, problem supervisor, supervisor's number, ask Topic is checked and accepted and problem statistics is set as evaluation index, and is set to the weight of each evaluation index;
S62 defines opinion rating (s): being classified to the score of the evaluation index;
S63 calculates weight function:
Wherein: k=1 ..., s, λ are classification boundary value;
S64 calculates the cluster coefficients of each evaluation index:
S65 according toThe problem rectifying and improving are assessed.
Further,
Continuation is carried out to the weight function.
Further,
The S4 problem rectification checks and accepts in step whether check problem rectification result reaches by the way of index step-by-step calculation To corresponding index requirement.
Compared with prior art, beneficial effects of the present invention are as follows: problem amelioration method provided by the invention passes through data Form control reform advice, the analysis of causes, improvement plan, rectification performance, acceptance evaluation and the problem statistics of stream and etc., The closed loop management of formation problem effectively increases problem rectification efficiency, it is ensured that problem can be solved in time.It is whole to problem Change work and method is evaluated, to improve rectifying and improving effect, improves rectification efficiency and reference is provided and is supported.
Detailed description of the invention
Fig. 1 is the flow diagram of problem base automatic generation method;
Fig. 2 is construction problem amelioration method schematic diagram of the invention;And
Fig. 3 is index schematic diagram of calculation flow when problem rectification of the present invention is checked and accepted.
Specific embodiment
Below with reference to the attached drawing exemplary embodiment that the present invention will be described in detail, feature and aspect.It is identical attached in attached drawing Icon note indicates element functionally identical or similar.Although the various aspects of embodiment are shown in the attached drawings, unless special It does not point out, it is not necessary to attached drawing drawn to scale.
The present invention provides a kind of construction problem amelioration method, for led to the problem of in building operation carry out it is whole Change, as shown in Figure 1, construction appraisal includes: regular working plan 10, index periodically supervision plan 11 and real-time oversight Plan 12, in which: regular working plan is executed by the first specified executor, and regular working plan 10 works including periodic operation 101, preventive maintenance work 102 and work 103 is inspected periodically;The periodic operation work plan according to the first executor work It is allocated, arranges as shift and be periodically executed comprising: work title, action and duty cycle make the first executor Supervised object is maked an inspection tour, is checked, is tested, is chemically examined, overhauled or verified according to the duty cycle, the first executor is received and fills in Code test report and form record;The preventive maintenance work plan is fixed according to maintenance frequency needed for supervised object Phase executes comprising: work title, action and duty cycle make the first executor according to the specified duty cycle to quilt Surveillanced object is detected, is overhauled, is checked, is tested, chemically examined or is verified, and is received the code test that the first executor fills in and is reported simultaneously Form record;The work plan of inspecting periodically includes: work title, action and duty cycle, make the first executor by Supervised object is detected according to the specified duty cycle, checks, overhaul, testing, verifying, testing, chemically examining or verifying work, Receive the code test that the first executor fills in and report and formed record, code test report template include: experimental examination report, Qualitative or quantitative test result value and statistical data, the action include: supervised object, supervision profession and supervision item Mesh;The real-time oversight plan 12 includes: supervised object oriented, supervises profession, third class supervision project and measuring point information, The measuring point information includes measuring point title, measuring point description and measuring point expression;The index periodically supervises plan 11 by specified Second executor executes, and the index periodically supervision plan includes: supervised object information, the second class supervision project, index prison It superintends and directs and executes period, index name and code test report template;The index periodically supervision plan further includes and the real-time prison The identical supervision project of the plan of superintending and directing, the identical supervision project is in real-time oversight automatic collection and calculating in the works.
" plan " word that is above-mentioned and hereinafter occurring refers to " plan and its related letter unless otherwise specified It further includes various aspects information involved in the plan that breath " had both included plan in itself, such as: regular working plan, index are regular Supervision plan, real-time oversight plan and problem rectifying and improving plan have respectively represented regular working plan and regular working plan Related various aspects information, index periodically supervise plan and index periodically supervises various aspects information, reality involved in plan When supervision plan and real-time oversight plan involved in various aspects information and problem rectifying and improving plan and problem rectify and improve work Various aspects information involved in making a plan.
It exercises supervision to the executive condition of above-mentioned construction appraisal, the implementing result of acquisition, comprising:
Whether whether the first executor performs regular working plan, i.e., perform by the duty cycle or when being executed in limit Corresponding action, the first executor execute experimental examination report, the qualitative or quantitative examination filled in when regular working plan Monitoring indicators value, the index obtained when testing end value and statistical data, second executor's index of performance periodically supervision plan is regular The index value and real-time oversight for capableing of automatic collection and calculating associated with real time data obtains in the works in the works for supervision Measuring point value.
Above-mentioned implementing result is judged, generation problem is input to problem base, comprising:
The record that regular working plan is executed according to the first executor, determines whether to execute regular working plan, such as automatically The first executor of fruit be not carried out or not by execute the period execute periodic operation work plan, preventive maintenance work plan or Work plan is inspected periodically, then above-mentioned regular working is intended to be problem and is automatically entered into problem base;
It is reported according to the experimental examination that the first executor fills in upload, qualitative or quantitative test result value and statistical number According to, and the time of upload is filled in, it is automatic to determine whether the first executor executes and whether by the regular work of execution period execution It makes a plan, and whether determines any one of experimental examination report, qualitative or quantitative test result value or statistical data automatically Threshold range beyond corresponding index in regular working supervision policy library, exceeds, automatically by regular working plan and accordingly Experimental examination report, qualitative or quantitative test result value or statistical data are input to problem base as problem;
When the index of performance periodically supervision plan for uploading or reporting according to the second executor the monitoring indicators value that obtains and Corresponding warning strategies are determined automatically, if this refers to that target value periodically supervises the threshold of corresponding index in policy library beyond index It is worth range, then the title of the monitoring indicators and its value is input to problem base automatically, it is preferred that and reported according to warning strategies It is alert;
Monitoring indicators corresponding measuring point value in the works is periodically supervised according to the index periodically obtained from real time data to count Index value is calculated, and is determined automatically in conjunction with corresponding warning strategies, if the calculated value of the index is periodically supervised beyond index The threshold range of corresponding index in policy library, then be input to problem base for the title of the monitoring indicators and its calculated value automatically, excellent Choosing, and alarmed according to warning strategies;
According to real-time oversight work in the measuring point value that automatically obtains and corresponding warning strategies determined automatically, if should Threshold range of the measuring point value beyond corresponding index in real-time oversight policy library, then automatically by the measuring point value and its corresponding measuring point name The information such as title are input to problem base as problem, it is preferred that and alarmed according to warning strategies.
As shown in Fig. 2, the present invention provides a kind of construction problem amelioration method, for being rectified and improved to the above problem, The problem amelioration method inputs problem in the form of data flow, according to the problem of presetting allocation rule, automatically generates and asks Topic amelioration method, main push, rectification, supervisor, examination and statistics including problem and etc., it is specific as follows:
S1. problem pushes step: if a job is within the defined working time without completion or corresponding index It is unqualified, then it can generate problem and enter problem base, enter the problems in problem base, automatic push are extremely in the form of data flow First problem rectifies and improves people Z1, and automatically records the problem push time, and above-mentioned data flow includes problem title, problem magnitude, problem It rectifies and improves the time limit and problem rectifies and improves people, it is preferred that by above problem automatic push to " my the problem of library " of first problem rectification people In, so that first problem rectification people generated according to the above problem, saved and upload the precautionary measures, measures to rectify and reform and plan, determines After the precautionary measures, measures to rectify and reform and plan that receive upload, described problem enters waiting processing state, it is preferred that described anti- Model measure automatically into emergency processing library for future use;
S2. problem rectifies and improves step: carrying out first problem rectification people to problem according to above-mentioned measures to rectify and reform and plan and rectifies and improves Work, problem rectifying and improving include: the regular working plan that executes and should execute, and by the duty cycle or when being executed in limit, execution is fixed The corresponding action of phase work plan, it is right according to experimental examination report, qualitative or quantitative test result value and statistical data Equipment corresponding to index beyond threshold range, components or material are repaired or replaced, and are periodically supervised according to index of performance Superintend and direct the monitoring indicators value obtained when plan, index periodically supervise it is associated with real time data in the works being capable of automatic collection and meter The measuring point value that the index value and real-time oversight of calculation obtain in the works, to corresponding to index value or measuring point value beyond threshold range Equipment, components or material repair, handle or replace, complete above problem rectifying and improving after enter problem rectification check and accept Step S4;
S3. problem supervises and manage step: if not carrying out rectifying and improving or not completing rectification, institute at the appointed time after problem push Problem auto-returned problem base is stated, and generates record, and described problem is sent to Second Problem rectification in the form of data flow People Z2 supervisor, the above-mentioned stipulated time, the preferably above-mentioned stipulated time was 24 hours using the problem push time as starting point, i.e. problem pushes 24 hours later, or set or be adjusted automatically according to problem magnitude, problem magnitude was higher, it is specified that the time is shorter, such as When problem magnitude is three-level, the stipulated time is set as 48 hours, when problem magnitude is level-one, sets the stipulated time as 6 hours;Such as Fruit Second Problem rectifies and improves people and does not complete supervisor and rectification within another regulation time limit (such as 24 hours), automatically by described problem It pushes to third problem rectification people Z3 in the form of data flow to continue to supervise and manage, until problem rectification is completed, (the n-th problem rectifies and improves people Zn), after start of calculation when the time limit supervised and manage every time pushes from problem, such as problem push in 24 hours.
Preferably, when making Second Problem rectification people's executive problem supervisor, problem rectification judgment step is initially entered, obtains the One problem rectify and improve people at the appointed time complete rectifying and improving the reason of or reason, it is preferred that the reason or reason may is that First problem rectification people fills in and uploads, and judges whether the rectification of the problem needs first problem to rectify and improve other professions except people Personnel carry out cooperation could complete, if it is, need specify the rectifying and improving of next step problem executor Zn.
For example, the test of Architectural Equipment machine oil, when planning problem rectifying and improving, when (first problem is whole by chemical examination class personnel Change people Z1) by the data filling laboratory report of laboratory indexes and after uploading, whether automatic parameter is qualified, if unqualified, sentences Break underproof reason or reason, if necessary to filter or replacement machine oil, then will filtering or replacement machine oil work push to it is next The executor Zn of step problem rectifying and improving, according to progress oil strain operation is required after making the executor be connected to task, oil strain is grasped Assay step is jumped to automatically after the completion of making, and chemically examines the personnel Z1 for chemically examining class, result of laboratory test is finally filled up to report In, system can judge automatically whether it qualified, and it is unqualified, continue the executor Zn for being pushed to next step problem rectifying and improving, directly Until qualification.If appointed executor did not had to carry out the processing of next step in 24 hours, this can enter if work The problem of being designated executor library.
S4. step is checked and accepted in problem rectification: each problem checks and accepts step, inspection into problem rectification after the completion of rectifying and improving step It tests whether rectification result reaches corresponding index request, if not up to standard, skipped back to and asked again by problem rectification examination step Topic rectification step, is pushed to problem rectification people (Z1, Z2...Zn) for problem, continues to rectification problem, constantly recycle, until Index of correlation is up to standard.
Preferably, as shown in figure 3, to that mutually whether up to standard to index should be calculated and be judged, using index step-by-step calculation Mode, include the following steps: to start, read index definition information, calculate the computation levels of each index, opened from most last level Begin to calculate, extract calculation formula, load index real data, index real data is cached, extract and calculate the factor, utilizes The calculating factor of extraction and the calculation formula of extraction carry out index calculating, judge whether to need to count step by step, if being, into each The step of dimension counts step by step if no, is directly entered the calculating of one layer of index.
S5. problem statistic procedure: the problem of by involved in above step, the push of the record of generation and problem, rectification, The processes such as supervisor, examination are counted, and are counted to the precautionary measures, measures to rectify and reform and plan, are formed problem and are rectified and improved statistical number According to, for contingency question rectification reference is provided.
Preferably, is completed to problem rectification the time used and problem supervisor completes the time used and counts, as asking The examination standard of topic rectification people.
Preferably, when executive problem pushes step, according to concrete conditions such as the significance level of problem rectification or degree of urgency Important or urgent problem rectifying and improving are pushed to examination by (such as problem magnitude, problem source or Resolving probiems time limit require) As a result preferable problem rectifies and improves people.
S6. problem rectifies and improves evaluation procedure: the step is used to carry out above problem rectifying and improving whole evaluation, to propose Improvement direction and specifically need improved aspect.Problem rectifies and improves evaluation procedure
The first step sets evaluation index (xn) and evaluation index weight (ηn): problem push, problem rectification, problem are superintended and directed It does, supervise and manage number, problem is checked and accepted and problem statistics is respectively set as evaluation index x1, x2... x6, and each evaluation is referred to Target weight is set: η1, η2..., η6,
Wherein, the sum of weight of each index is equal to 1, it may be assumed that
It preferably, can also be using other links in problem rectifying and improving as commenting in order to keep evaluation more comprehensively accurate Valence index (xn), and corresponding weight is set, the overall work of problem rectification is evaluated.
Preferably, to index weights by way of the analysis or expert investigation demonstration of rectifying and improving historical data to problem (η1, η2..., ηn) be determined,
For example, problem rectifies and improves x2It is a step of most critical in problem rectification overall work, therefore, weight setting is higher Value, η2=0.24, problem supervises and manage x3Take second place, problem pushes x1Third, weight is respectively set as η3=0.23, η1=0.21, In one embodiment of the invention, η is set1, η2..., η6Respectively equal to 0.21,0.24,0.23,0.14,0.1,0.08.
Second step defines opinion rating: to the evaluation index x1, x2... x6Score be classified, be divided into s grades;
Preferably, hundred-mark system or 5 points of systems are converted by the score of each index, for example, s=4, can be classified as " excellent 4 classifications (determining depending on the concrete condition of evaluation demand) of good middle difference ";
In one embodiment of the invention, problem push, problem rectification, problem supervisor, supervisor number, problem check and accept and Problem counts (x1, x2... x6) this six evaluation indexes score (hundred-mark system) it is as shown in table 1:
1 evaluation index Score Lists of table
Index name x1 x2 x3 x4 x5 x6
Numerical value 83 90 93 78 74 63
Third step, calculates weight function, and formula is as follows
Wherein, (k=1 ..., s), in the present embodiment, s=4, i.e. k=1,2,3,4, λkFor the classification boundary of opinion rating Value, for example, λ1=90, i.e., excellent grade is divided with 90 for boundary.Obtain following 4 weight functions:
Preferably, the weight function can also be to " more excellent " or " worse " direction continuation, after obtaining continuation as needed Weight function is as follows:
4th step calculates each evaluation index (x1, x2... x6) cluster coefficients, formula is as follows:
It is as shown in table 2 according to the numerical result given in table 1:
Table 2
Classification x1 x2 x3 x4 x5 x6 x
It is more excellent 0 0 0.1 0 0 0 0.023
It is excellent 0.3 0.9 0.9 0 0 0 0.496
It is good 0.7 0.1 0 0.8 0.4 0 0.323
In 0 0 0 0.2 0.6 0.3 0.112
Difference 0 0 0 0 0 0.7 0.056
It is worse 0 0 0 0 0 0 0
5th step, basisThe overall evaluation is carried out to the problem rectifying and improving.
Through this embodiment as can be seen that in general, which belongs to this excellent rank, classification (because For 0.496 maximum, correspond to excellent), illustrate problem amelioration method of the invention be effectively it is good, from each evaluation index come It sees, problem rectifies and improves x2X is supervised and manage with problem3Reach excellent, problem pushes x1With supervisor number x4It is good, problem examination x5In being, ask Topic statistics x6Be it is poor, therefore, problem is checked and accepted and problem counts the two links and needs to improve.
Problem amelioration method provided by the invention passes through the form control reform advice of data flow, the analysis of causes, rectification meter Draw, rectification performance, acceptance evaluation and problem statistics and etc., form the closed loop management of problem, it is whole to effectively increase problem Change efficiency, it is ensured that problem can be solved in time.Problem rectifying and improving and method are evaluated, to improve rectifying and improving Effect improves rectification efficiency and provides reference and support.
Finally, it should be noted that above-described embodiments are merely to illustrate the technical scheme, rather than to it Limitation;Although the present invention is described in detail referring to the foregoing embodiments, those skilled in the art should understand that: It can still modify to technical solution documented by previous embodiment, or to part of or all technical features into Row equivalent replacement;And these modifications or substitutions, it does not separate the essence of the corresponding technical solution various embodiments of the present invention technical side The range of case.

Claims (9)

1. a kind of construction problem amelioration method, which comprises the steps of:
S1. problem pushes step: the various problems encountered in construction is collected, by the problems in problem base with the shape of data flow Formula pushes to first problem rectification people, and record problem pushes the time;
S2. problem rectifies and improves step: so that the first problem rectification people is executed rectifying and improving, rectifies and improves to described problem;
S3. problem supervises and manage step: supervising and manage to the problem of rectifying and improving is not completed at the appointed time, automatically by described problem with number It is sent to Second Problem rectification people according to the form of stream, Second Problem rectification people is made to supervise and manage described problem;
S4. step is checked and accepted in problem rectification: whether check problem rectification result reaches corresponding index requirement, if it is not up to standard, then It is secondary to go to problem rectification step, carry out problem rectification;
S5. problem statistic procedure: statistics described problem, problem push, problem rectification, problem supervisor and problem check and accept step, shape Problematic rectification statistical data;And
S6. problem rectifies and improves evaluation procedure: evaluating problem rectifying and improving.
2. problem amelioration method as described in claim 1, which is characterized in that
In S1 problem push step, described problem automatic push to first problem are rectified and improved into people, rectify and improve first problem Life at, save and upload the precautionary measures, measures to rectify and reform and plan, the precautionary measures are automatically into emergency processing library.
3. problem amelioration method as described in claim 1, which is characterized in that the rectifying and improving include:
Making the first problem rectification people by the duty cycle or when being executed in limit, execution regular working plan works accordingly Content;
Report the first problem rectification people according to experimental examination, qualitative or quantitative test result value and/or statistical data, Equipment, components or material corresponding to index beyond threshold range are repaired or replaced;
Monitoring indicators value, the index obtained when making the first problem rectification people according to index of performance periodically supervision plan is periodically supervised Superintend and direct what the index value and real-time oversight for capableing of automatic collection and calculating associated with real time data in the works obtained in the works Equipment, components or material corresponding to index value or measuring point value beyond threshold range is repaired or replaced in measuring point value.
4. problem amelioration method as described in claim 1, which is characterized in that
The stipulated time sets automatically according to the grade of described problem, if Second Problem rectification people is not complete at the appointed time At supervisor and rectification, then by described problem, automatic push continue to supervise and manage to third problem rectification people in the form of data flow, supervise and manage Time limit from problem push to third problem rectification people when start of calculation.
5. problem amelioration method as described in claim 1, which is characterized in that S3 problem supervises and manage step further include:
Problem rectifies and improves judgment step, obtains the reason of first problem rectification people does not complete rectifying and improving at the appointed time or reason By judging whether the problem rectifying and improving need other staff's to match synthesis according to the reason or reason, if it is, automatically Specify the executor of another problem rectifying and improving.
6. problem amelioration method as described in claim 1, which is characterized in that
The S5 problem statistic procedure further include complete the time used to problem rectification and problem supervisor complete the time used into Row statistics.
7. problem amelioration method as described in claim 1, which is characterized in that S6 problem rectifies and improves evaluation procedure and includes:
S61, setting evaluation index (xn) and weight (ηn): by problem push, problem rectification, problem supervisor, supervisor number, problem It checks and accepts and problem statistics is set as evaluation index, and the weight of each evaluation index is set;
S62, it defines opinion rating (s): the score of the evaluation index is classified;
S63, weight function is calculated:
Wherein: k=1 ..., s, λ are classification boundary value;
S64, the cluster coefficients for calculating each evaluation index:
S65, basisThe problem rectifying and improving are assessed.
8. problem amelioration method as claimed in claim 7, which is characterized in that carry out continuation to the weight function.
9. problem amelioration method as described in claim 1, which is characterized in that the S4 problem rectification, which is checked and accepted to use in step, to be referred to Whether the mode check problem rectification result of mark step-by-step calculation reaches corresponding index requirement.
CN201910590093.0A 2019-07-02 2019-07-02 A kind of construction problem amelioration method Pending CN110288325A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910590093.0A CN110288325A (en) 2019-07-02 2019-07-02 A kind of construction problem amelioration method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910590093.0A CN110288325A (en) 2019-07-02 2019-07-02 A kind of construction problem amelioration method

Publications (1)

Publication Number Publication Date
CN110288325A true CN110288325A (en) 2019-09-27

Family

ID=68021742

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910590093.0A Pending CN110288325A (en) 2019-07-02 2019-07-02 A kind of construction problem amelioration method

Country Status (1)

Country Link
CN (1) CN110288325A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111105167A (en) * 2019-12-24 2020-05-05 河南祥辰工程管理有限公司 Steel structure engineering visual testing and accepting method based on BIM technology
CN111222775A (en) * 2019-12-31 2020-06-02 嘉兴太美医疗科技有限公司 Problem management method, system and computer readable medium

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108154291A (en) * 2017-12-19 2018-06-12 国网冀北电力有限公司张家口供电公司 A kind of electric power supply plant performance indicator evaluation method and system based on policy library
CN108830501A (en) * 2018-06-28 2018-11-16 林冠眉 One kind being based on the depositary management of the problem of wechat enterprise public platform and manages method and system
CN109583771A (en) * 2018-12-04 2019-04-05 北京诺士诚国际工程项目管理有限公司 A kind of engineering supervisor method and device

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108154291A (en) * 2017-12-19 2018-06-12 国网冀北电力有限公司张家口供电公司 A kind of electric power supply plant performance indicator evaluation method and system based on policy library
CN108830501A (en) * 2018-06-28 2018-11-16 林冠眉 One kind being based on the depositary management of the problem of wechat enterprise public platform and manages method and system
CN109583771A (en) * 2018-12-04 2019-04-05 北京诺士诚国际工程项目管理有限公司 A kind of engineering supervisor method and device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111105167A (en) * 2019-12-24 2020-05-05 河南祥辰工程管理有限公司 Steel structure engineering visual testing and accepting method based on BIM technology
CN111222775A (en) * 2019-12-31 2020-06-02 嘉兴太美医疗科技有限公司 Problem management method, system and computer readable medium

Similar Documents

Publication Publication Date Title
CN106384210B (en) A kind of power transmission and transforming equipment maintenance prioritization method based on maintenance risk income
CN110320892A (en) The sewage disposal device fault diagnosis system and method returned based on Lasso
CN106327062A (en) Method for evaluating state of power distribution network equipment
CN103793859B (en) A kind of wind power plant operation monitoring and event integrated evaluating method
CN106600095A (en) Reliability-based maintenance evaluation method
CN110865924B (en) Health degree diagnosis method and health diagnosis framework for internal server of power information system
CN109034483B (en) Detection planning method based on quality function configuration
CN111626372B (en) On-line teaching supervision and management method and system
Jafarpisheh et al. A hybrid reliability-centered maintenance approach for mining transportation machines: a real case in Esfahan
CN110288325A (en) A kind of construction problem amelioration method
CN112417627A (en) Power distribution network operation reliability analysis method based on four-dimensional index system
CN117670028A (en) Dust removal system risk dynamic assessment and grading early warning method based on Internet of things monitoring
Li et al. A validation research on fuzzy logic-AHP-based assessment method of operator’s situation awareness reliability
CN114862267A (en) Evaluation method and system of oil and gas pipeline alarm management system
CN114879619A (en) Digital workshop energy optimization method and system
CN114298590A (en) Medical institution hospital infection management quality evaluation system and method
CN110348676A (en) A kind of automation of transformation substations equipment state evaluation method and system
CN111553581B (en) Equipment maintainability evaluation model based on entropy value
CN116452154A (en) Project management system suitable for communication operators
CN114861973B (en) Wind power generation system risk assessment method considering multiple source factors
CN110766248B (en) Workshop artificial factor reliability assessment method based on SHEL and interval intuitionistic fuzzy assessment
CN109242330A (en) Digitize measurement method, device and the storage medium of nuclear power plant's individual context-aware
CN111091292A (en) Real-time risk dynamic modeling analysis system for nuclear power station
CN115936663A (en) Maintenance method and device for power system
CN114091811A (en) Maintenance decision system for circulating water pump of nuclear power plant and design method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190927

RJ01 Rejection of invention patent application after publication