CN110286931A - A kind of electric power terminal and electric power terminal system - Google Patents
A kind of electric power terminal and electric power terminal system Download PDFInfo
- Publication number
- CN110286931A CN110286931A CN201910569434.6A CN201910569434A CN110286931A CN 110286931 A CN110286931 A CN 110286931A CN 201910569434 A CN201910569434 A CN 201910569434A CN 110286931 A CN110286931 A CN 110286931A
- Authority
- CN
- China
- Prior art keywords
- electric power
- power terminal
- server
- maintenance
- maintenance system
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000012423 maintenance Methods 0.000 claims abstract description 99
- 238000004891 communication Methods 0.000 claims abstract description 8
- 230000005611 electricity Effects 0.000 claims description 6
- 230000004044 response Effects 0.000 claims description 6
- 239000007787 solid Substances 0.000 claims 1
- 230000000694 effects Effects 0.000 abstract description 4
- 230000006870 function Effects 0.000 description 12
- 230000008439 repair process Effects 0.000 description 8
- 230000002159 abnormal effect Effects 0.000 description 5
- 230000005540 biological transmission Effects 0.000 description 4
- 230000006378 damage Effects 0.000 description 4
- 230000008901 benefit Effects 0.000 description 3
- 238000003745 diagnosis Methods 0.000 description 3
- 238000000034 method Methods 0.000 description 3
- 238000001514 detection method Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000007689 inspection Methods 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 230000008569 process Effects 0.000 description 2
- 230000001419 dependent effect Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 230000007717 exclusion Effects 0.000 description 1
- 230000003993 interaction Effects 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 238000011160 research Methods 0.000 description 1
- 230000009897 systematic effect Effects 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F8/00—Arrangements for software engineering
- G06F8/60—Software deployment
- G06F8/65—Updates
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/20—Administration of product repair or maintenance
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
-
- H02J13/0013—
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Landscapes
- Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Theoretical Computer Science (AREA)
- Economics (AREA)
- Human Resources & Organizations (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Tourism & Hospitality (AREA)
- Strategic Management (AREA)
- Software Systems (AREA)
- Health & Medical Sciences (AREA)
- Marketing (AREA)
- General Business, Economics & Management (AREA)
- General Engineering & Computer Science (AREA)
- Quality & Reliability (AREA)
- Computer Security & Cryptography (AREA)
- Operations Research (AREA)
- Entrepreneurship & Innovation (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The present invention provides a kind of electric power terminals and electric power terminal system, are related to ammeter O&M technical field.The electric power terminal system includes electric power terminal and server, and electric power terminal is provided with main system and maintenance system, and electric power terminal is connect with server communication;Wherein, server is for responding an operational order to generate maintenance system selection instruction, and maintenance system selection instruction is sent to electric power terminal;Electric power terminal is used to enter maintenance system according to maintenance system selection instruction, so that server upgrades main system, replaced or checked by maintenance system.Electric power terminal provided by the invention and electric power terminal system have the effect of keeping staff more convenient for the maintenance of electric power terminal and be arranged more convenient.
Description
Technical field
The present invention relates to ammeter O&M technical fields, in particular to a kind of electric power terminal and electric power terminal system.
Background technique
Currently, with the continuous development of science and technology, the electric power terminal of effect detection user power consumption also achieves huge hair
Exhibition.
Wherein, electric power terminal system principle is the same with computer, includes startup program, operating system, file system, data adopt
Collection amount is big, outdoor remote operation, depends on electric power networks, but since terminal installation environment is different, it is affected by environment, it was running
It may be from the destruction of natural force or non-natural power in journey, natural force may be high temperature, frost, high humidity, electric shock etc., non-natural power
It may be the extruding in calculating process, hit, the attack of live pseudo-base station, because usage amount is big, the covering whole nation just has certain
Probability causes terminal operating abnormal or can not restart.Such case staff needs to safeguard to restore work electric power terminal
Make.
However, staff overhauls to scene after generally going wrong for the maintenance of electric terminal at present, very
The terminal at the scene of extremely can only first dismantling returns research staff's analysis, return post during, secondary damage may be met, be unfavorable for pair
The analysis of problem;Secondly, problem terminal returns company, due to environment difference, scene can not be simulated, problem cannot be reappeared, it is difficult to
Problem analysis and tracking root;Simultaneously again because the maintenance of product, sending and also increasing the cost of serving of product.In addition, due to
The upgrading of customer demand needs upgrading terminals acquisition system, but may be because that faulty operation causes system crash that can not start.
To sum up, more complicated operation is required to for the maintenance of electric power terminal at present.
Summary of the invention
The object of the present invention is to provide a kind of electric power terminals, to solve in the prior art for the maintenance of electric power terminal
Complex problem.
Another object of the present invention is to provide a kind of electric power terminal systems, to solve in the prior art for electric power end
The complex problem of the maintenance at end.
To achieve the goals above, the embodiment of the present application the technical solution adopted is as follows:
On the one hand, the embodiment of the present application provides a kind of electric power terminal system, and the electric power terminal system includes electric power end
End and server, the electric power terminal are provided with main system and maintenance system, and the electric power terminal and the server communication
Connection;
The server selects the maintenance system for responding an operational order to generate maintenance system selection instruction
It selects instruction and is sent to the electric power terminal;
The electric power terminal is used to enter maintenance system according to the maintenance system selection instruction, so that the server is logical
The maintenance system is crossed to upgrade the main system, replaced or checked.
Further, the electric power terminal is also used to after receiving the maintenance system selection instruction, to the service
Device sends password request instruction, and receives the server and respond the encrypted message that the password request instruction is sent;
When the encrypted message is consistent with presetting encrypted message, the electric power terminal is used for according to maintenance system
Selection instruction of uniting enters the maintenance system.
Further, after the electric power terminal enters maintenance system, the server is for passing through the maintenance system pair
The data of the electric power terminal storage are downloaded, copy or delete.
Further, the server is also used to send data requesting instructions, the electric power terminal to the electric power terminal
For entering the main system after receiving the data requesting instructions.
Further, binding has electric power acquisition firmware in the main system, and the electric power acquisition firmware is used to believe electric power
It number is acquired and stores.
Further, the server is also used to sending the data requesting instructions and do not receiving the electric power terminal
When the response message of transmission, Xiang Suoshu electric power terminal sends the maintenance system selection instruction, and right under the maintenance system
The main system is upgraded, replaced or is checked.
Further, the server is also used to check by block area of the maintenance system to the main system,
When trouble-free piece of area of the main system and when kernel can not be repaired, the main system is upgraded or replaced, to restore
State the operation of main system.
Further, the server is also used to after the main system is repaired, and finger is restarted in the transmission of Xiang Suoshu electric power terminal
It enables, so that the electric power terminal enters the main system.
Further, the system memory block of the electric power terminal includes the firstth area and the secondth area, wherein the main system is deposited
It is stored in firstth area, the maintenance system storage and secondth area.
On the other hand, the embodiment of the present application also provides a kind of electric power terminal, the electric power terminal is applied to above-mentioned electricity
Power terminal system.
Compared with the existing technology, the application has the advantages that
This application provides a kind of electric power terminal and electric power terminal system, which includes electric power terminal and clothes
Business device, electric power terminal is provided with main system and maintenance system, and electric power terminal is connect with server communication;Wherein, server is used
In one operational order of response to generate maintenance system selection instruction, and maintenance system selection instruction is sent to electric power terminal;Electricity
Power terminal is used to enter maintenance system according to maintenance system selection instruction, so that server carries out main system by maintenance system
Upgrading, replacement check.On the one hand, since electric power terminal provided by the present application includes main system and maintenance system, in master
When the failure of system, server can start maintenance system, to repair to main system, reached and also can in remote operation
The effect for repairing electric power terminal, keeps staff more convenient for the maintenance of electric power terminal.On the other hand, since the application mentions
The maintenance system of confession is only used for upgrading main system, replaced or being checked, therefore it is without handling data, needed for
Memory space it is smaller, be arranged it is more convenient.
Detailed description of the invention
Fig. 1 is the interaction schematic diagram of electric power terminal system provided by the present application.
Fig. 2 is the module diagram of electric power terminal provided by the present application.
Description of symbols:
1- electric power terminal system;2- electric power terminal;21- main system;22- maintenance system;23- electric power acquisition firmware;3- clothes
Business device.
Specific embodiment
To make the above purposes, features and advantages of the invention more obvious and understandable, with reference to the accompanying drawing to the present invention
Specific embodiment be described in detail.
First embodiment
Referring to Fig. 1, the embodiment of the present application provides a kind of electric power terminal system 1, which includes electric power
Terminal 2 and server 3, referring to Fig. 2, electric power terminal 2 is provided with main system 21 and maintenance system 22, and electric power terminal 2 and clothes
Business device 3 communicates to connect.By the way that maintenance system 22 is arranged, so that staff can be by remote when main system 21 breaks down
Journey mode enables maintenance system 22, at the same the diagnosis of failure is carried out to electric power terminal 2 by maintenance system 22, repair hidden danger and
Also original system etc. operates, so that staff can remotely safeguard electric power terminal 2, without being tieed up to scene
Shield, the operation of staff are simpler.Wherein, electric power terminal 2 described in the present embodiment is to be provided simultaneously with electrical energy measurement function
With the terminal of data acquisition function, such as has the electric energy meter of data acquisition function, of course, in some other embodiments
In, electric power terminal 2 or other devices, the present embodiment do not do any restriction to this.
Wherein, electric power terminal 2 can be the acquisition to arbitrary data to the acquisition of data, such as whether electric energy meter is gone out
Existing failure or information about power are acquired, and the present embodiment does not do any restriction to this.Also, electric power terminal 2 can also acquire it
The data of its electric energy meter, for example, other is provided with an electric energy meter to each household in a cell, to realize to user power utilization
The acquisition of amount, meanwhile, at topological structure, electric power terminal 2 can be obtained in topological structure for electric power terminal 2 and associated power meter group
Each electric energy meter data information, such as obtain the information whether each electric energy meter breaks down.
Specifically, in the present embodiment, maintenance system 22 is not strongly dependent upon external configuration file, and function is simplified, and props up
Necessary super order is held, what which can be blunt is construed to easy kernel (operating system nucleus)+rootfs
The file system of (root file system of simple function) mode, can normally start, and do not use under non-abnormal conditions, only
Have and enter and use when exception, its starting is to carry out the diagnosis of failure to terminal system, repairs hidden danger, goes back original system
Deng operation.
Relative to maintenance system 22, main system 21 is a system for having consummating function.Also, in the present embodiment, maintenance
System 22 is to be cut on the basis of the kernel of main system 21 and root file system, and retain main and necessary function
Can, the core system that the height of small size is simplified is formed, and download to electric power terminal 2 together with main system 21, to make when abnormal
With.
Also, in order to make to be independent of each other between main system 21 and maintenance system 22, in the present embodiment, by electric power terminal 2
System memory block be set as the firstth area and the secondth area, wherein main system 21 is stored in the firstth area, and maintenance system 22 is stored in
2nd area.
The main system 21 of electric power terminal 2 is specifically introduced with maintenance system 22 below:
In the present embodiment, staff can send data requesting instructions to electric power terminal 2 by server 3.It is receiving
After the data requesting instructions arrived, in normal state when, electric power terminal 2 be defaulted as enter main system 21.Also, in electric power terminal
After 2 normally enter main system 21, by kernel setup file, and start application program, app etc..
Also, power collection systems are installed, and power collection systems and electric power acquisition in the main system 21 of electric power terminal 2
Firmware 23 is bound, and can be called to electric power acquisition firmware 23 by power collection systems, and then adopt to electric power signal
Collect and stores.Wherein, electric power signal described in the present embodiment can be the power information of electric power terminal, or with electric power end
The electric power signal of other electric energy meters of connection is held, and electric power signal includes electricity consumption information and electric energy meter, electric power terminal itself
Running state information, for example whether the information such as failure.Also, the devices such as interface, CPU are integrated in electric power acquisition firmware 23
Or module, wherein interface can be realized the communication connection between electric power terminal 2 and server 3.
After electric power terminal 2 enters the operation of main system 21, power collection systems starting, server 3 can be with electric power terminal 2
Communication is to obtain the related data that power collection systems acquire.For example, power collection systems can be to the electric signal currently flowed through
Voltage, electric current and electricity consumption are acquired, and can also be acquired to the data of other electric energy meters, server 3 is obtained
Take current electrical signal data.Simultaneously, it should be noted that power collection systems are after acquiring data, the number that can also will acquire
According to being stored in the memory of electric power terminal 2, since the capacity of the memory of electric power terminal 2 is limited, when electric power terminal 2
It, can be due to the work of power collection systems, so that the data in memory are in constantly variation after the capacity of storage is filled.
It further, may be non-natural by high temperature, frost, high humidity, electric shock etc. due in 2 course of work of electric power terminal
The active force of power, or by hitting or live pseudo-base station is attacked leads to the damage of main system 21.Wherein, staff passes through clothes
The foundation that business device 3 judges that the main system 21 of electric power terminal 2 is damaged is to send request of data to electric power terminal 2 when passing through server 3
After instruction, when not receiving response message of the electric power terminal 2 according to the transmission of the data requesting instructions, then electric power end is judged
The main system 21 at end 2 is damaged.Furthermore, it is desirable to which explanation, for electric power terminal 2, is asked when electric power terminal 2 receives data
After asking instruction, main system 21 can be entered, after main system 21 breaks down, electric power terminal 2 enters main system 21 and fails, and electric power
Terminal 2 can continue to refresh the process for entering main system 21, but electric power terminal 2 can't be to 3 feedback information of server during this.
When main system 21 breaks down, since server 3 can not receive the data information of the feedback of electric power terminal 2,
Therefore when server 3 is after sending data requesting instructions, if can not receive the data of the feedback of electric power terminal 2 in the long period
When, that is, it can determine that electric power terminal 2 breaks down.At this point, if the failure of exclusion electric power terminal 2 itself, such as electric power terminal 2 are in
The failures such as arrearage state or the damage of the communication module of electric power terminal 2 then show that the system of the electric power terminal 2 breaks down.At this point,
The main system 21 that staff may start 22 pairs of maintenance system is safeguarded.
Specifically, when main system 21 breaks down, staff can be to what electric power terminal 2 was sent by server 3
System selection request, for example, staff is realized by operation Esc key returns to the interface boot, i.e. Systematic selection interface, it should when entering
Behind interface, staff can select to start the kernel in which area by server 3, i.e. which control electric power terminal 2 be into
System.Wherein, it can be directly entered the main system 21 of global function version after normal condition starts boot, and broken down in main system 21
When, into after boot, has interface or which system prompt enters.
Specifically, after entering the interface boot, staff can send maintenance system to electric power terminal 2 by server 3
It unites 22 selection instructions, so that electric power terminal 2 enters maintenance system 22, and main system 21 is upgraded under maintenance system 22,
The maintenance such as replacement or inspection.
It should be noted that preventing its non-working person connection by setting to guarantee safety that electric power terminal 2 uses
Standby realize with electric power terminal 2 communicates to connect, and then leads to the data information even main system of modification electric power terminal 2 of electric power terminal
21, in the present embodiment, electric power terminal 2 is also used to after receiving 22 selection instruction of maintenance system, sends password to server 3
Request instruction, and receive the encrypted message of 3 response cryptogram request instruction of server transmission;When encrypted message and presetting password
When information is consistent, electric power terminal 2 is used to enter maintenance system 22 according to 22 selection instruction of maintenance system.And when encrypted message and in advance
When the encrypted message of setting is inconsistent, then show to operate for non-working person, electric power terminal 2 can't enter maintenance at this time
System 22.By way of device password, maintenance system 22 provided in this embodiment is used as a security system.
After electric power terminal 2 enters maintenance system 22, on the one hand, since spare system is with can only realize simple function, because
This server 3 is only capable of being downloaded, copy or deleting by the data that maintenance system 22 stores electric power terminal 2.That is server 3
Power collection systems can not be started by maintenance system 22, and then data can not be carried out to electric power signal by maintenance system 22
Acquisition.But server 3 can carry out shirtsleeve operation to the stored data of electric power terminal 2 by maintenance system 22, such as right
The data that electric power terminal 2 stores, which are copied, downloaded and deleted etc., to be operated, to realize that server 3 is needed to maintenance system 22
It when the data of storage are analyzed and processed, can be realized by maintenance system 22, to realize necessary operation under abnormal conditions
Instruction.
On the other hand, after entering maintenance system 22, server 3 can be carried out electric power terminal 2 by maintenance system 22
Maintenance.Specifically, server 3 can be checked by block area of the maintenance system 22 to main system 21, when main system 21 without reason
The area Zhang Kuai and when kernel can not be repaired, is upgraded or is replaced to main system 21, to restore the operation of main system 21.
The inspection in block area can be carried out, to the main system 21 of electric power terminal 2 first by server 3 to check in main system 21
There is bad block, when there is bad block, bad block is repaired.When detection is without bad block, and kernel can not be repaired, then staff can benefit
Main system 21 is upgraded or replaced by maintenance system 22 with server 3, to restore the normal work of main system 21.
It should be noted that upgrading described in the present embodiment, refers to that the version to main system 21 is updated, to make principal series
The version of system 21 is promoted;Replacement described in the present embodiment refers to and carries out reproduction installation to main system 21 by maintenance system 22.
After repairing to main system 21, instruction of restarting can be sent to electric power terminal 2 again by server 3, from
And restart electric power terminal 2.Specifically, after the completion of reparation, server 3 controls electric power terminal 2 and exits in scaled-down version
Core exits maintenance system 22, restarts boot.And electric power terminal 2 restarting after, electric power terminal 2 can attempt whether
It is able to enter main system 21.When electric power terminal 2 can smoothly enter into main system 21, and power collection systems can be normally entered
When, i.e. expression 21 fault restoration of main system success;When electric power terminal 2 can not can smoothly enter into main system 21, or cannot be normal
When into power collection systems, electric power terminal 2 still without 3 feedback data information of normal direction server when, i.e., expression main system 21 is not
It repairs successfully.
Meanwhile after electric power terminal 2 is able to enter and repairs successful main system 21, staff can also pass through server 3
The function of the main system 21 of electric power terminal 2 is tested, for example, electric power terminal 2 is sent a command to by server 3, so that
Electric power terminal 2 feeds back current information of voltage, to judge whether the function of repairing successful main system 21 is complete.
The electric power terminal system 1 provided through this embodiment, can be in abnormal cases using maintenance system 22 to principal series
System 21 carries out quick diagnosis and repairs, so that the stability of system is stronger, the maintainability of system is higher.
Second embodiment
The embodiment of the present invention provides a kind of electric power terminal 2, wherein be provided in the electric power terminal 2 main system 21 with
Maintenance system 22, while electric power terminal 2 and server 3 are communicated to connect to build electric power terminal system 1 described in first embodiment.
Since electric power terminal 2 has been specifically described in first embodiment, the present embodiment no longer carries out the function of electric power terminal 2
It repeats.
In conclusion the electric power terminal system includes electricity this application provides a kind of electric power terminal and electric power terminal system
Power terminal and server, electric power terminal is provided with main system and maintenance system, and electric power terminal is connect with server communication;Its
In, maintenance system selection instruction is sent to by server for responding an operational order to generate maintenance system selection instruction
Electric power terminal;Electric power terminal is used to enter maintenance system according to maintenance system selection instruction, so that server passes through maintenance system
Main system is upgraded, replaced or is checked.On the one hand, since electric power terminal provided by the present application includes main system and maintenance is
System, therefore in the failure of main system, server can start maintenance system, to repair to main system, reach remote
Journey operates the effect that can also repair electric power terminal, keeps staff more convenient for the maintenance of electric power terminal.On the other hand,
Since maintenance system provided by the present application is only used for upgrading main system, replaced or being checked, without to data into
Row processing, needed for memory space it is smaller, be arranged it is more convenient.
Although present disclosure is as above, present invention is not limited to this.Anyone skilled in the art are not departing from this
It in the spirit and scope of invention, can make various changes or modifications, therefore protection scope of the present invention should be with claim institute
Subject to the range of restriction.
Claims (10)
1. a kind of electric power terminal system, which is characterized in that the electric power terminal system includes electric power terminal and server, the electricity
Power terminal is provided with main system and maintenance system, and the electric power terminal is connect with the server communication;
The server generates maintenance system selection instruction for responding an operational order, and maintenance system selection is referred to
Order is sent to the electric power terminal;
The electric power terminal is used to enter maintenance system according to the maintenance system selection instruction, so that the server passes through institute
Maintenance system is stated to upgrade the main system, replaced or checked.
2. electric power terminal system according to claim 1, which is characterized in that the electric power terminal is also used to receiving
After stating maintenance system selection instruction, Xiang Suoshu server sends password request instruction, and it is described close to receive the server response
The encrypted message that code request instruction is sent;
When the encrypted message is consistent with presetting encrypted message, the electric power terminal is used to select according to the maintenance system
It selects instruction and enters the maintenance system.
3. electric power terminal system according to claim 1, which is characterized in that after the electric power terminal enters maintenance system,
The server is for being downloaded, copying or being deleted by the data that the maintenance system stores the electric power terminal.
4. electric power terminal system according to claim 1, which is characterized in that the server is also used to whole to the electric power
End sends data requesting instructions, and the electric power terminal is used to enter the main system after receiving the data requesting instructions.
5. electric power terminal system according to claim 4, which is characterized in that binding has electric power acquisition solid in the main system
Part, the electric power acquisition firmware is for being acquired and storing to electric power signal.
6. electric power terminal system according to claim 4, which is characterized in that the server is also used to sending the number
When not receiving according to request instruction and the response message that the electric power terminal is sent, Xiang Suoshu electric power terminal sends the maintenance system
System selection instruction, and the main system is upgraded, replaced or checked under the maintenance system.
7. electric power terminal system according to claim 6, which is characterized in that the server is also used to through the maintenance
System checks the block area of the main system, when trouble-free piece of area of the main system and when kernel can not be repaired, to institute
It states main system to be upgraded or replaced, to restore the operation of the main system.
8. electric power terminal system according to claim 7, which is characterized in that the server is also used in the main system
After reparation, Xiang Suoshu electric power terminal sends instruction of restarting, so that the electric power terminal enters the main system.
9. electric power terminal system according to claim 1, which is characterized in that the system memory block of the electric power terminal includes
Firstth area and the secondth area, wherein the main system is stored in firstth area, the maintenance system storage and secondth area.
10. a kind of electric power terminal, which is characterized in that the electric power terminal is applied to as claimed in any one of claims 1 to 9
Electric power terminal system.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910569434.6A CN110286931A (en) | 2019-06-27 | 2019-06-27 | A kind of electric power terminal and electric power terminal system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910569434.6A CN110286931A (en) | 2019-06-27 | 2019-06-27 | A kind of electric power terminal and electric power terminal system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110286931A true CN110286931A (en) | 2019-09-27 |
Family
ID=68019270
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910569434.6A Pending CN110286931A (en) | 2019-06-27 | 2019-06-27 | A kind of electric power terminal and electric power terminal system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110286931A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN116009926A (en) * | 2023-03-27 | 2023-04-25 | 广东电网有限责任公司中山供电局 | Remote upgrading method, device and system for relay protection device |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106604138A (en) * | 2016-12-08 | 2017-04-26 | Tcl集团股份有限公司 | Remote restoration method and system for intelligent television |
CN109688427A (en) * | 2018-12-14 | 2019-04-26 | 广州市科虎电子有限公司 | A kind of smart television and its system repair |
-
2019
- 2019-06-27 CN CN201910569434.6A patent/CN110286931A/en active Pending
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106604138A (en) * | 2016-12-08 | 2017-04-26 | Tcl集团股份有限公司 | Remote restoration method and system for intelligent television |
CN109688427A (en) * | 2018-12-14 | 2019-04-26 | 广州市科虎电子有限公司 | A kind of smart television and its system repair |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN116009926A (en) * | 2023-03-27 | 2023-04-25 | 广东电网有限责任公司中山供电局 | Remote upgrading method, device and system for relay protection device |
CN116009926B (en) * | 2023-03-27 | 2023-06-02 | 广东电网有限责任公司中山供电局 | Remote upgrading method, device and system for relay protection device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106649173B (en) | The in-orbit self-correction system and method for highly reliable spaceborne computer based on 1553B bus | |
CN113064747A (en) | Fault positioning method, system and device in server starting process | |
CN103314359A (en) | System and method for updating firmware | |
CN108984349B (en) | Method and device for electing master node, medium and computing equipment | |
CN109144789A (en) | A kind of method, apparatus and system for restarting OSD | |
CN114116280B (en) | Interactive BMC self-recovery method, system, terminal and storage medium | |
CN104081311A (en) | Apparatus and method for managing operation of a mobile device | |
JP7275490B2 (en) | CAPACITY ESTIMATION SYSTEM, CAPACITY ESTIMATION METHOD, AND COMMUNICATION DEVICE | |
CN105354102B (en) | A kind of method and apparatus of file system maintenance and reparation | |
CN116154765A (en) | Power topological relation identification method and device, computer equipment and storage medium | |
CN110286931A (en) | A kind of electric power terminal and electric power terminal system | |
CN109002305A (en) | A kind of update method and its system of device program | |
CN105573872A (en) | Hardware maintenance method and device of data storage system | |
CN113608930A (en) | System chip and electronic device | |
CN111309388B (en) | Automatic rollback system and method for system software version of equipment | |
WO2020192669A1 (en) | Gas meter intelligent controller and firmware upgrade start-up method therefor | |
CN110096226B (en) | Disk array deployment method and device | |
CN111176878A (en) | Server BBU (building base band Unit) standby power diagnosis method, system, terminal and storage medium | |
CN111552584A (en) | Test system, method and device for primary fault diagnosis isolation and recovery functions of satellite | |
CN111258608A (en) | Software upgrading method and device for terminal equipment and electronic system | |
CN110928492A (en) | Hard disk replacement method, system, terminal and storage medium of distributed file system | |
CN113568768B (en) | Energy controller container state monitoring method | |
CN115904773A (en) | Memory fault information collection method and device and storage medium | |
CN110162320B (en) | Uninterruptible power supply system upgrading method, device, computer equipment and storage medium | |
CN114528555A (en) | ARM server firmware safety check starting management method, device and medium |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190927 |