CN110284497A - A kind of control soft soil foundation pit underlies the foundation reinforcement method of existing tunnel malformation - Google Patents

A kind of control soft soil foundation pit underlies the foundation reinforcement method of existing tunnel malformation Download PDF

Info

Publication number
CN110284497A
CN110284497A CN201910553513.8A CN201910553513A CN110284497A CN 110284497 A CN110284497 A CN 110284497A CN 201910553513 A CN201910553513 A CN 201910553513A CN 110284497 A CN110284497 A CN 110284497A
Authority
CN
China
Prior art keywords
underlies
existing tunnel
tunnel
existing
newly
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910553513.8A
Other languages
Chinese (zh)
Other versions
CN110284497B (en
Inventor
童立元
王占生
叶海霞
庄群虎
刘建国
胡诗韬
陈秀鸣
潘皇宋
杨涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Southeast University
Original Assignee
Southeast University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southeast University filed Critical Southeast University
Priority to CN201910553513.8A priority Critical patent/CN110284497B/en
Publication of CN110284497A publication Critical patent/CN110284497A/en
Application granted granted Critical
Publication of CN110284497B publication Critical patent/CN110284497B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/02Handling of bulk concrete specially for foundation or hydraulic engineering purposes
    • E02D15/04Placing concrete in mould-pipes, pile tubes, bore-holes or narrow shafts
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/46Concrete or concrete-like piles cast in position ; Apparatus for making same making in situ by forcing bonding agents into gravel fillings or the soil

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

Underlie the foundation reinforcement method of existing tunnel malformation the invention discloses a kind of control soft soil foundation pit, by in existing tunnel structure two sides, intermediate position and top use varying depth, ash quantity is mixed in change and variable-diameter cement-soil stirring piles carry out foundation stabilization, and single-layer or multi-layer plate soil cement reinforcing layer is formed by expanding reinforcing body diameter at position below newly-built underground structure bottom plate, pass through uplift pile simultaneously, newly-built underground structure bottom plate effectively couples the whole door case type safeguard structure of formation with plate soil cement reinforcing layer three's, protect the existing tunnel structure therein that underlies, influence of the top Underground Construction disturbance to the existing tunnel structure that underlies can be greatly reduced, ensure its safe operation.

Description

A kind of control soft soil foundation pit underlies the foundation reinforcement method of existing tunnel malformation
Technical field
The invention belongs to civil construction technical field of transportation, and in particular to a kind of control soft soil foundation pit underlies existing tunnel knot The foundation reinforcement method of structure deformation.
Background technique
With the large-scale development of urban underground space, when different depth level, different spatial relationship, difference are developed Phase the old and new's underground engineering structure of construction influences each other generation, wherein (such as town road tunnel, underground are comprehensive for newly-built underground engineering Close piping lane etc.) influence of the open cut deep basal pit to the existing tunnel structure that underlies be a kind of typical operating condition.Existing processing method packet Including to be formed using bored concrete pile or sheet pile in existing tunnel structure two sides and top protects wall (frame) to protect existing underground structure, Carry out full hall stiffening basic ground above existing tunnel simultaneously, the former cost is huge, and the construction off-load disturbance of the latter is to underliing The engineering structures such as subterranean tunnel are affected, cases show that the foundation stabilization staged construction carried out above existing tunnel is disturbed Subway tunnel deflection caused by dynamic reaches 50% or more of total protuberance deflection, even more than grand caused by the later period excavation stage Deflection is played, therefore is badly in need of proposing that a kind of control soft soil foundation pit underlies the foundation stabilization side of existing underground engineering structure protuberance deformation The foundation treatment mode that method replaces existing full hall to reinforce, to reduce the construction disturbance in foundation stabilization stage, and it is subsequent to reach control Excavate the effect that the underground structure deformation that causes to underlie is swelled in ground off-load.
Summary of the invention
To solve the above problems, underliing the ground of existing tunnel malformation the invention discloses a kind of control soft soil foundation pit Reinforcement means, influence of the foundation stabilization construction to the existing tunnel that underlies when can greatly reduce the construction of top underground structure, it is ensured that Underlie the operation security of existing tunnel.
In order to achieve the above objectives, technical scheme is as follows:
A kind of control soft soil foundation pit underlies the foundation reinforcement method of existing tunnel malformation, includes the following steps:
(1) it is required according to existing tunnel malformation control of underliing, calculates and determine ground reinforcing scope and Design of Reinforcement parameter;
(2) the cement mixing method strengthening construction on the outside of existing tunnel structure both sides that underlies is completed first;Secondly, completing in two tunnels Between position cement mixing method strengthening construction;Existing tunnel superstructure position cement mixing method reinforcing of underliing finally is carried out again Construction;
(3) construction of newly-built underground structure uplift pile is completed, and stake side is carried out with lower portion in newly-built underground structure bottom plate Grouting behind shaft or drift lining;
(4) foundation pit enclosure structure construction is completed, is excavated to projected depth, casting concrete bottom plate, and couple with uplift pile;
(5) newly-built underground structure side wall, top board construction are completed;Backfill, and restore road surface, complete construction.
Preferably, it in step (1), is analyzed using finite element numerical computational methods and creates underground under different ground Scheme of Strengthening Influence of the structure construction to the tunnel structure that underlies determines therefrom that foundation stabilization design parameter, including reinforcing scope, different parts add Gu depth, cement mixing method stake spacing, cement earth pile variable diameter parameter (variable diameter position, reinforcing body enlarged diameter and height).
Preferably, in step (2), on the outside of the existing tunnel structure that underlies both sides and intermediate position cement mixing method should be reinforced 5m depth is no less than below to the existing tunnel structural base that underlies;The existing tunnel superstructure position cement mixing method that underlies adds Gu deep-controlled in 1m depth many at the top of tunnel structure.
Preferably, in step (2), control different depth cement mixing method mixes grey (cement) amount, from earth's surface to newly-builtly Flowering structure ceiling location is that low-mix ash quantity reinforces section, mixes ash quantity to control and be advisable 5%;It is between newly-built underground structure roof and floor Medium ash quantity of mixing reinforces section, and mix ash content control is advisable in 10%-15%;The following are highly doped ash quantity to reinforce for newly-built underground structure bottom plate Section, mix ash content control is advisable in 25-40%.
Preferably, in step (2), creating the following cement mixing method reinforcing body raised-diameter segment of underground structure bottom plate should be by Certain size overlaps (250mm), to form certain thickness plate reinforcing layer.
Preferably, in step (3), after resistance to plucking pile driving construction, by behind the stake side for passing through soil cement plate reinforcing layer position Slip casting effectively couples with plate reinforcing layer and newly-built underground structure concrete floor, to form the reinforcing knot of whole door case type Structure, and then play a protective role to the existing tunnel structure therein that underlies is located at.
A kind of control soft soil foundation pit underlies the foundation reinforcement method of existing tunnel malformation, and foundation reinforcing structure includes Newly-built underground structure;Underlie existing tunnel structure;Prime stratum;The uplift pile of newly-built underground structure;Cement mixing method; Mixing pile low-mix ash quantity segment;Mixing pile is medium to mix ash quantity segment;The highly doped ash quantity of mixing pile and variable diameter segment;The a variety of changes of reducer Diameter mode;Existing underground tunnel structure two sides stabilization zone;Stabilization zone among existing underground tunnel structure;Existing underground tunnel structure Top stabilization zone;Reducer overlaps the plate reinforcing layer to be formed.
Preferably, create underground structure and be located at and underlie existing tunnel superstructure, in the two plane can it is orthogonal thereto or Oblique, newly-built underground structure can for urban municipal road tunnel, subway tunnel, pipe gallery, humanoid underpass or its Its underground structure, existing tunnel structure can be the works such as town road tunnel, subway tunnel or pipe gallery.
Preferably, the following are highly doped ash quantity and variable diameter segment three can use different variable diameter moulds for newly-built underground structure bottom plate Formula forms the direct expanding reach of reinforcing body, including top variable diameter, middle part variable diameter, lower part variable diameter or upper middle lower part variable diameter in different location Combination.
Preferably, reducer segment three can apply pillar raised-diameter segment using different construction machineries or sawtooth pattern is straight Diameter expanding reach or other possible stake diameters expand mode (including screw-type, screw, spherical etc.).
Preferably, uplift pile and newly-built underground structure bottom plate, plate reinforcing layer are coupled to each other that form whole door case type anti- Protection structure.
Beneficial effects of the present invention:
The present invention is by mixing ash quantity and variable diameter cement using varying depth, change in existing tunnel structure two sides, intermediate position and top Native mixing pile carries out foundation stabilization, and forms single layer by expanding reinforcing body diameter at position below newly-built underground structure bottom plate Or multilayer plate soil cement reinforcing layer, while being reinforced by uplift pile, newly-built underground structure concrete bottom plate and plate book soil Effective connection of layer three forms whole door case type safeguard structure, protects existing tunnel structure therein, can greatly reduce Influence of the square Underground Construction to the existing tunnel structure that underlies, it is ensured that its safe operation.
Detailed description of the invention
Fig. 1 is positional structure schematic diagram of the invention.
Fig. 2 is cement mixing method different structure schematic diagram of the invention.
Fig. 3 is different parts cement mixing method reinforcing scope schematic diagram of the invention.
Fig. 4 is that cement mixing pile variable diameter of the invention overlaps the plate reinforcing layer schematic diagram to be formed.
Fig. 5 is diameter changeable agitation plane bridging method schematic diagram.
Wherein, 1, newly-built underground structure;2, underlie existing tunnel structure;3, prime stratum;4, uplift pile;5, soil cement Mixing pile;6, mixing pile low-mix ash quantity segment one;7, mixing pile is medium mixes ash quantity segment two;8, the highly doped ash quantity of mixing pile and variable diameter Segment three;9, a variety of variable diameter modes of reducer;10, existing underground tunnel structure two sides stabilization zone;11, existing underground tunnel structure Intermediate stabilization zone;12, stabilization zone above existing underground tunnel structure;13, plate reinforcing layer.
Specific embodiment
With reference to the accompanying drawings and detailed description, the present invention is furture elucidated, it should be understood that following specific embodiments are only For illustrating the present invention rather than limiting the scope of the invention.It should be noted that word " preceding " used in the following description, " rear ", "left", "right", "up" and "down" refer to that the direction in attached drawing, word "inner" and "outside" refer respectively to direction or remote Direction from geometric center of specific component.
The foundation reinforcement method of existing tunnel malformation as shown in Figure 1, a kind of control soft soil foundation pit underlies, structure packet It includes: newly-built underground structure 1;Underlie existing tunnel structure 2;Prime stratum 3;The uplift pile 4 of newly-built underground structure;Cement Native mixing pile 5;Mixing pile low-mix ash quantity segment 6;Mixing pile is medium to mix ash quantity segment 7;The highly doped ash quantity of mixing pile and variable diameter segment 8;The a variety of variable diameter modes 9 of reducer;Existing underground tunnel structure two sides stabilization zone 10;Stabilization zone among existing underground tunnel structure 11;Stabilization zone 12 above existing underground tunnel structure;Reducer overlaps the plate reinforcing layer 13 to be formed.
A kind of control soft soil foundation pit underlies the foundation reinforcement method of existing tunnel malformation, specifically comprise the following steps:
(1) according to the requirement of the Deformation control for the existing tunnel structure 2 that underlies, carry out Finite Element Numerical Simulation analysis, to different grounds Top creates the deformation of existing tunnel structure 2 of underliing caused by underground structure 1 is constructed and carries out analysis comparison under the conditions of Scheme of Strengthening, Ground reinforcement design scheme is selected accordingly, specifies ground reinforcing scope and Design of Reinforcement parameter;
(2) it according to ground reinforcement design scheme, carries out subregion strengthening construction: carrying out underlie outside 2 both sides of existing tunnel structure first 10 cement mixing method strengthening construction of side;It is stirred secondly, carrying out two intermediate 11 soil cements of position of existing tunnel structure 2 that underlie Mix a strengthening construction;Finally, carrying out 2 top position of existing tunnel structure, the 12 cement mixing method strengthening construction that underlies.Newly-built ground When the following cement-soil stirring pile construction of 1 bottom plate of flowering structure object, overlap mixing pile to form single-layer or multi-layer different depth is expanding Plate reinforcing layer 13;
(3) it constructs and creates the uplift pile 4 of underground structure, and after newly-built 1 bottom plate of underground structure carries out stake side with lower portion Uplift pile 4 is coupled the first road entirety door case type safeguard structure of formation by slip casting with single-layer or multi-layer plate reinforcing layer 13;
(4) carry out open-cut foundation ditch building enclosure construction, excavation pit to projected depth, pour underground structure bottom plate and by its with The connection of uplift pile 4 forms secondary protection structure;
(5) continue construct newly-built 1 side wall of underground structure and top plate;The soil body is backfilled, and restores road surface, completes construction.
In step (1), Finite Element Numerical Simulation analysis is carried out to different ground Scheme of Strengthening, under the conditions of obtaining different reinforcings Underlie tunnel structure deformation numerical value caused by newly-built Underground Construction, and then is required according to deformation controlling standards, selectes ground Scheme of Strengthening and its Design of Reinforcement parameter, including foundation stabilization planar range, different parts reinforcement depth, cement mixing method stake Spacing, cement earth pile variable diameter parameter (reinforcing body enlarged-diameter position and enlarged diameter expand height).
In step (2), 2 two sides of the existing tunnel structure that underlies and intermediate portion position cement mixing method depth should reach and underlie both There is 2 bottom plate of tunnel structure or less 5m or more;2 top cement mixing method depth of the existing tunnel structure that underlies should distance underlie existing tunnel It is not less than 1m above 2 top plate of road structure.
In step (2), cement mixing method 5 is mixed ash quantity and is changed from top to bottom, and creating 1 top plate of underground structure, the above are low Ash quantity segment 1 is mixed, mixes ash quantity no more than 5%;Be between newly-built underground structure roof and floor it is medium mix ash quantity segment 27, mix ash quantity Control is advisable in 10%-15%;The following are highly doped ash quantity segments 38 to mix ash quantity according to characteristics of soft clay and answer for newly-built underground structure bottom plate Control is advisable in 25-40%.
In step (2), the following direct expanding reach of cement mixing method reinforcing body of 1 bottom plate of underground structure is created with a scale Very little overlap joint (general 250mm) forms plate horizontal reinforcing layer 13.
In step (3), uplift pile 4 and plate horizontal reinforcing layer 13, newly-built 1 bottom plate connecting of underground structure form integral door The ruggedized construction of frame.
The present invention mixes ash quantity using varying depth, change by the position among existing tunnel structure two sides, two tunnels and top And variable-diameter cement-soil stirring piles carry out foundation stabilization, and pass through expansion reinforcing body at position below newly-built underground structure bottom plate Diameter forms single-layer or multi-layer plate soil cement reinforcing layer, while passing through uplift pile, newly-built underground structure concrete bottom plate and plate Effective connection of shape soil cement reinforcing layer three forms whole door case type safeguard structure, protects the existing tunnel knot therein that underlies Structure can greatly reduce influence of the top Underground Construction to the existing tunnel structure that underlies, it is ensured that its safe operation.
The technical means disclosed in the embodiments of the present invention is not limited only to technological means disclosed in above embodiment, further includes Technical solution consisting of any combination of the above technical features.

Claims (10)

  1. The foundation reinforcement method of existing tunnel malformation 1. a kind of control soft soil foundation pit underlies, which is characterized in that including as follows Step:
    (1) according to the deformation controlling standards of existing tunnel structure, the method analyzed using Finite Element Numerical Simulation, to different ground Base Scheme of Strengthening is compared, and specifies ground reinforcing scope and Design of Reinforcement parameter;
    (2) existing tunnel structure two sides, centre and the construction of top different parts Reinforcement with Cement-mixed Piles are completed;
    (3) resistance to plucking pile driving construction is completed, and carries out a side grouting behind shaft or drift lining;
    (4) foundation pit enclosure structure construction is completed, is excavated to projected depth, casting concrete bottom plate, and couple with uplift pile;
    (5) newly-built underground structure side wall, top board construction are completed;Backfill, and restore road surface, complete construction.
  2. The foundation stabilization side of existing underground tunnel structure protuberance deformation 2. control soft soil foundation pit as described in claim 1 underlies Method,
    It is characterized in that, foundation stabilization design parameter specifically includes plane reinforcing scope, different parts are reinforced deeply in step (1) Degree, cement mixing method stake spacing, cement earth pile variable diameter parameter, reinforcing body enlarged-diameter position and enlarged diameter expand height.
  3. The foundation stabilization side of existing underground tunnel structure protuberance deformation 3. control soft soil foundation pit as described in claim 1 underlies Method,
    It is characterized in that, existing tunnel two sides position cement mixing method strengthening construction is completed first, secondly, complete in step (2) At intermediate position cement mixing method strengthening construction;Finally, completing position cement mixing method strengthening construction above existing tunnel; The construction of cement mixing method variable diameter is completed by design requirement in newly-built underground structure bottom plate following depth, and passes through expanding reach Overlap joint forms complete plate reinforcing layer.
  4. The foundation reinforcement method of existing tunnel malformation 4. a kind of control soft soil foundation pit underlies, which is characterized in that its ground adds Fixing structure includes:
    Newly-built underground structure (1);The existing tunnel structure that underlies (2);Prime stratum (3);The uplift pile of newly-built underground structure (4);Cement mixing method (5);Mixing pile low-mix ash quantity segment (6);Mixing pile is medium to mix ash quantity segment (7);Mixing pile is highly doped Ash quantity and variable diameter segment (8);The a variety of variable diameter modes (9) of reducer;Existing underground tunnel structure two sides stabilization zone (10);Existingly Among lower tunnel structure stabilization zone (11);Above existing underground tunnel structure stabilization zone (12);Reducer overlaps the plate to be formed Reinforcing layer (13).
  5. The foundation reinforcement method of existing tunnel malformation 5. control soft soil foundation pit as claimed in claim 4 underlies, feature It is, orthogonal thereto or oblique in newly-built underground structure (1) and existing tunnel structure (2) plane that underlies creates underground structure (1) include urban municipal road tunnel, subway tunnel, pipe gallery, humanoid underpass or other underground structures, underlie both Having tunnel structure (2) includes town road tunnel, subway tunnel, pipe gallery or other underground structures.
  6. The foundation reinforcement method of existing tunnel malformation 6. control soft soil foundation pit as claimed in claim 4 underlies, feature It is, the existing tunnel structure that underlies (2) two sides, centre and top position are respectively adopted cement mixing method (5) and carry out at reinforcing Reason;The existing tunnel structure that underlies (2) two sides stabilization zone (10) and intermediate stabilization zone (11) reinforcement depth are to the existing tunnel knot that underlies 5m is no less than below structure (2) bottom;Existing tunnel superstructure stabilization zone (12) distance that underlies underlie existing tunnel structure (2) top Portion is no less than 1m depth.
  7. The foundation reinforcement method of existing tunnel malformation 7. control soft soil foundation pit as described in claim 1 underlies, feature It is, the ash quantity of mixing of cement mixing method (5) is segmented adjustment from earth's surface down: from earth's surface to newly-built underground structure (1) top plate Position is low-mix ash quantity segment one (6), and mixing ash quantity is 5%;It is medium to mix ash quantity section between newly-built underground structure (1) roof and floor Two (7) of section, mixing ash quantity is 10%-15%;Underground structure (1) bottom plate is created the following are highly doped ash quantity and variable diameter segment three (8), is mixed Ash quantity is 25-40%.
  8. The foundation reinforcement method of existing tunnel malformation 8. control soft soil foundation pit as described in claim 1 underlies, feature It is, creating underground structure (1) bottom plate, the following are cement mixing method reducer (9), according to underlie existing tunnel structure (2) Deformation control requirement, different depth position expand stake diameter, by adjacent studs raised-diameter segment it is mutual overlap formed single layer or Multilayer plate horizontal reinforcing layer (13).
  9. The foundation reinforcement method of existing tunnel malformation 9. control soft soil foundation pit as described in claim 1 underlies, feature It is, the highly doped ash quantity of cement mixing method and variable diameter segment three (8) are formed in different location using different variable diameter modes and reinforced Body raised-diameter segment, including top variable diameter, middle part variable diameter, lower part variable diameter or the combination of upper middle lower part variable diameter;Cement mixing method is high Mix ash quantity and variable diameter segment three (8) using different construction machineries apply pillar raised-diameter segment or sawtooth pattern raised-diameter segment or Screw-type, screw, spherical stake diameter expand mode.
  10. The foundation reinforcement method of existing tunnel malformation 10. control soft soil foundation pit as described in claim 1 underlies, feature Be, uplift pile (4) couples position with single-layer or multi-layer plate reinforcing layer (13) in stake side grouting behind shaft or drift lining, it is ensured that uplift pile (4) with Effectively connection forms whole door case type safeguard structure between each other for newly-built underground structure (1) bottom plate, plate reinforcing layer (13).
CN201910553513.8A 2019-06-25 2019-06-25 Foundation reinforcing method for controlling deformation of existing tunnel structure under soft soil foundation pit Active CN110284497B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910553513.8A CN110284497B (en) 2019-06-25 2019-06-25 Foundation reinforcing method for controlling deformation of existing tunnel structure under soft soil foundation pit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910553513.8A CN110284497B (en) 2019-06-25 2019-06-25 Foundation reinforcing method for controlling deformation of existing tunnel structure under soft soil foundation pit

Publications (2)

Publication Number Publication Date
CN110284497A true CN110284497A (en) 2019-09-27
CN110284497B CN110284497B (en) 2021-07-02

Family

ID=68005622

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910553513.8A Active CN110284497B (en) 2019-06-25 2019-06-25 Foundation reinforcing method for controlling deformation of existing tunnel structure under soft soil foundation pit

Country Status (1)

Country Link
CN (1) CN110284497B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110670631A (en) * 2019-10-16 2020-01-10 宏润建设集团股份有限公司 Supporting structure and excavation method of comprehensive pipe gallery foundation pit
CN112942300A (en) * 2021-02-07 2021-06-11 杭州市市政工程集团有限公司 Reinforcing structure of soil body above existing tunnel and construction method thereof
CN113802564A (en) * 2021-09-24 2021-12-17 中水珠江规划勘测设计有限公司 Construction method of deep foundation pit between existing operation tunnels
CN115450252A (en) * 2022-09-05 2022-12-09 中铁四局集团第二工程有限公司 Road tunnel construction structure above existing subway tunnel, foundation slab cushion layer and waterproof manufacturing method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11152762A (en) * 1997-11-21 1999-06-08 Toda Constr Co Ltd Structure and its construction method
CN101538855A (en) * 2009-04-01 2009-09-23 东南大学 Method for treating three-layer soft foundation by using I-shaped mixing pile
CN101550698A (en) * 2009-05-05 2009-10-07 上海隧道工程股份有限公司 Constructing method for basic pit at the upper part of shield tunnel
CN102839674A (en) * 2012-09-19 2012-12-26 中国水电顾问集团华东勘测设计研究院 Foundation pit excavation supporting structure on near end well shield tunnel and construction method of foundation pit excavation supporting structure

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11152762A (en) * 1997-11-21 1999-06-08 Toda Constr Co Ltd Structure and its construction method
CN101538855A (en) * 2009-04-01 2009-09-23 东南大学 Method for treating three-layer soft foundation by using I-shaped mixing pile
CN101550698A (en) * 2009-05-05 2009-10-07 上海隧道工程股份有限公司 Constructing method for basic pit at the upper part of shield tunnel
CN102839674A (en) * 2012-09-19 2012-12-26 中国水电顾问集团华东勘测设计研究院 Foundation pit excavation supporting structure on near end well shield tunnel and construction method of foundation pit excavation supporting structure

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
戴金水: "水泥土搅拌桩在海堤淤泥质地基加固中的应用", 《南水北调与水利科技》 *
闫澍旺等: "基坑开挖引起坑底地铁隧道回弹的有限元分析", 《勘察科学技术》 *
魏巍 等: "大断面地下通道结构施工对既有下卧盾构隧道影响研究分析", 《公路》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110670631A (en) * 2019-10-16 2020-01-10 宏润建设集团股份有限公司 Supporting structure and excavation method of comprehensive pipe gallery foundation pit
CN112942300A (en) * 2021-02-07 2021-06-11 杭州市市政工程集团有限公司 Reinforcing structure of soil body above existing tunnel and construction method thereof
CN113802564A (en) * 2021-09-24 2021-12-17 中水珠江规划勘测设计有限公司 Construction method of deep foundation pit between existing operation tunnels
CN113802564B (en) * 2021-09-24 2022-09-02 中水珠江规划勘测设计有限公司 Construction method of deep foundation pit between existing operation tunnels
CN115450252A (en) * 2022-09-05 2022-12-09 中铁四局集团第二工程有限公司 Road tunnel construction structure above existing subway tunnel, foundation slab cushion layer and waterproof manufacturing method

Also Published As

Publication number Publication date
CN110284497B (en) 2021-07-02

Similar Documents

Publication Publication Date Title
CN110284497A (en) A kind of control soft soil foundation pit underlies the foundation reinforcement method of existing tunnel malformation
Liu et al. Numerical analysis on the mechanical performance of supporting structures and ground settlement characteristics in construction process of subway station built by Pile-Beam-Arch method
CN104264688A (en) Manual hole digging non-uniform pile support construction technology
CN105672356B (en) A kind of municipal pipeline group's Underground Construction method of spanning over subway tunnel
CN102943479A (en) System and method for controlling deformation of deep and large foundation pit through partition unloading
CN104060615B (en) Newly-built foundation pit supporting construction is utilized to remove the construction method of underground obstacle
CN107012871B (en) A kind of suspension type goes along with sb. to guard him the deep reversed construction method for greatly enhancing foundation pit fabricated construction
CN110409418A (en) Control the foundation reinforcing structure and construction method of existing subway tunnel deformation
CN108343059A (en) The two walls unification half that underground pipe gallery combines prefabricated socket inverse makees method of construction
CN105464685A (en) Cave-pile method bored tunnel waterproof curtain and construction method thereof
CN103911996A (en) Construction method for pulling out steel sheet piles close to existing buildings
Zheng et al. Field measurements and analysis of real-time capsule grouting to protect existing tunnel adjacent to excavation
JP2024007536A (en) Projection type air duct structure perpendicular to vertical direction at large depth subway station, and construction method
CN207862942U (en) A kind of hard and soft stake of assembled is come of age beam module foundation pit supporting construction
CN1196426A (en) Construction method for inversion underground continuous wall
CN107143149A (en) A kind of existing masonry structure building sets up the construction method of basement
CN208763446U (en) Increase the supporting construction for building the underground space under a kind of existing building group
CN202954367U (en) System for controlling deformation of deep and big foundation pit by utilizing divisional unloading
CN106917331B (en) Water-stopping reinforced roadbed structure for deep-buried karst region and construction method thereof
CN105986830A (en) Underground-excavation building method for roadside strip-shaped underground garage
CN113236309A (en) Shallow tunnel arch-up open-construction arch-down underground excavation construction method
CN209704560U (en) Build the scaffolding structure that an ultra shallow buries Large Underground space
CN110219304A (en) Foundation ditch excavation method for soft modeling soil
CN217438963U (en) Supporting structure for excavation of tunnel foundation pit near top of subway
CN1350109A (en) Unopened construction method of underground building

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant