CN110282050A - A kind of assembly method of vehicle dormer window - Google Patents

A kind of assembly method of vehicle dormer window Download PDF

Info

Publication number
CN110282050A
CN110282050A CN201910605608.XA CN201910605608A CN110282050A CN 110282050 A CN110282050 A CN 110282050A CN 201910605608 A CN201910605608 A CN 201910605608A CN 110282050 A CN110282050 A CN 110282050A
Authority
CN
China
Prior art keywords
sliding rail
glass
sunshade
assembly
installation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910605608.XA
Other languages
Chinese (zh)
Other versions
CN110282050B (en
Inventor
李擎
程永海
汤勇刚
孙彬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhu Motiontec Automotive Co Ltd
Original Assignee
Wuhu Motiontec Automotive Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhu Motiontec Automotive Co Ltd filed Critical Wuhu Motiontec Automotive Co Ltd
Priority to CN201910605608.XA priority Critical patent/CN110282050B/en
Publication of CN110282050A publication Critical patent/CN110282050A/en
Application granted granted Critical
Publication of CN110282050B publication Critical patent/CN110282050B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B62LAND VEHICLES FOR TRAVELLING OTHERWISE THAN ON RAILS
    • B62DMOTOR VEHICLES; TRAILERS
    • B62D65/00Designing, manufacturing, e.g. assembling, facilitating disassembly, or structurally modifying motor vehicles or trailers, not otherwise provided for
    • B62D65/02Joining sub-units or components to, or positioning sub-units or components with respect to, body shell or other sub-units or components
    • B62D65/06Joining sub-units or components to, or positioning sub-units or components with respect to, body shell or other sub-units or components the sub-units or components being doors, windows, openable roofs, lids, bonnets, or weather strips or seals therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Transportation (AREA)
  • Mechanical Engineering (AREA)
  • Seal Device For Vehicle (AREA)
  • Power-Operated Mechanisms For Wings (AREA)

Abstract

The invention discloses a kind of assembly methods of vehicle dormer window, it is related to vehicle dormer window production and processing technical field, including 14 installation steps, frame assembling, fill wind-guiding curtain and pushing mechanism, fill sunshade and joint strip shape code, glass assembly with glass and glass motor after installation, front glass assembly and sunshade motor are installed, installation wiring and cleaning glass reverse side, front beam, scotch and sliding rail connection gap glue, initialization and trial operation adjustment, sunshade noise measuring, glass noise measuring, anti- grip force detection and basic performance detection, fill sealing strip, the detection of face difference, skylight assembly cleaning packaging, the invention enables the split run production capacity difference reductions of each process in the main line of vehicle dormer window, so that minimum production capacity is 391 sets in single process, compared to the production capacity that 300 sets before improve 30%, so that be promoted to split run daily for final production capacity 391 sets, process rhythm is reduced, reduces production cost.

Description

A kind of assembly method of vehicle dormer window
Technical field
The present invention relates to vehicle dormer windows to produce and process technical field, and in particular to a kind of assembly method of vehicle dormer window.
Background technique
Many automobiles are fitted with vehicle dormer window, and dog-eat-dog between current each vehicle dormer window production firm, our company is now closed The split run production capacity of each process differs greatly in the main line of vehicle dormer window, and some reaches 600 sets, however some processes are only 300 Set, cause final daily split run production capacity be 300 sets or so, the beat between each process can not be connected smooth, cost can not under Drop is unsatisfactory for the market demand, therefore our company provides one kind about the improved assembly technology of vehicle dormer window, is dedicated to promoting production capacity, Reduce cost.
Summary of the invention
The purpose of the present invention is to provide a kind of assembly methods of vehicle dormer window, solve the existing master about vehicle dormer window of our company The split run production capacity of each process differs greatly in line, causes final production capacity low, and the beat between each process can not be connected smooth, at Originally it can not decline, be unsatisfactory for the defect of the market demand.
A kind of assembly method of vehicle dormer window, includes the following steps,
Step 1: frame assembles, including places front beam, two wood side-guides of installation, front beam and sliding rail locking, sliding rail and spray Oil, installation flexible axle, installing mechanism assembly, installation rear cross beam, rear cross beam and sliding rail are locked;
Step 2: dress wind-guiding curtain, pushing mechanism, including apply dirty oil on the inside of sliding rail, dress wind-guiding curtain, clamp folder wind-guiding curtain, push away machine Structure;
Step 3: dress sunshade, joint strip shape code, including cleaning rear cross beam arc groove, the plastic part of sunshade right/left flexible axle hide Positive curtain access section and sliding rail cleaning, dress sunshade, sunshade installation positioning, joint strip shape code;
Step 4: glass assembly with glass, glass motor after installation;
Step 5: installation front glass assembly, sunshade motor;
Step 6: installation wiring, cleaning glass reverse side;
Step 7: front beam, scotch and sliding rail connection gap glue, including front beam two sides and sliding rail connection gap are mended Glue, scotch and sliding rail connection gap glue;
Step 8: initialization, trial operation adjustment, the detection of sunshade color and vein;
Step 9: sunshade noise measuring;
Step 10: glass noise measuring;
Step 11: anti-grip force detection, basic performance detection;
Step 12: dress sealing strip, sealing strip and frame clamping, without fall off, sealing strip opening and rear glass guiding gutter 10 ± 1.5mm of flange distance;
Step 13: face difference detects, skylight glass assembly and roof face difference are controlled;
Step 14: skylight assembly cleaning packaging.
Preferably, there are three the frame assembling station in the step 1 is set.
Preferably, the frame set harness body installation method in the step 1 is, by front beam accommodating tool positioning pin, It is again that two wood side-guides and front beam plastic flexible pipe rigging position are correct, it is inserted in tool locating pin, is locked using electronic rifle of turning round surely Four screws of front beam and sliding rail, then Krupp grease is sprayed to sliding rail, it is soft to be reloaded into mechanism for all standing lubricating grease in run channel Axis and sunshade flexible axle, notice that left and right part can not be obscured, each sliding angle of inspection is packed into operation groove location, flexible axle discount is clamped position, Whether sunshade plastic flexible pipe rigging position, flexible axle rigging position are correct, then rear cross beam guide post is inserted into sliding rail, and use is electronic Surely four screws of rifle locking rear cross beam and sliding rail are turned round.
Preferably, the specific installation method of the step 2 is to smear dirty oil, wind-guiding curtain two to sliding rail inside using spread pen End fixing seat is caught in sliding rail mounting groove, and positive and negative two sides and corner two sides are smeared black Krupp and moistened at wind-guiding curtain installation torsional spring Both ends are fixed on front beam by consistent lubricant, then wind-guiding curtain is pressed at front beam buckle, are lifted wind-guiding curtain upwards, are heard " click Crash " sound be caught in, altogether everywhere, reuse clamp and clamp two side position of wind-guiding curtain, sunshade flexible axle discount is pushed among sliding rail Position is pushed into front beam direction mechanism spacing place using mechanism push rod pushing mechanism assembly.
Preferably, the specific installation method of the step 4 is that rear glass is placed in tooling, Pen-down detection switch, Whether detection glass LOGO mark, 3C mark, number meet technical definition, are placed on skylight sash after qualified, do not conform to case marker Know isolation, then check motor label, using barcode scanning gun scan module bar code, electricity consumption turns round rifle and installs motor, checks bolt without leakage It beats, Bowden cable engagement dislocation-free, screw number is 3, then by glass mounting bracket in connecting bracket opening size, by 6 A installation band shim screw installation fastening, no misloading neglected loading are qualified when quantity and torque meet the requirements.
Preferably, the specific installation method of the step 7 is to be filled up sealant in front beam two using glue tool Side and the gap of sliding rail link position and sliding rail and scotch connection gap are filled up, it is desirable that guarantee front beam both sides with Sliding rail connection gap is filled up completely and guaranteed by sealant scotch and filled up completely with sliding rail connection gap by sealant, loses Gap, and junction sealant is smoothed out, notice that sealant must not penetrate into flexible axle run channel and mechanism run channel.
Preferably, in the step 9, testing staff runs skylight sunshade curtain and carries out noise measuring, it is desirable that environmental noise Less than 40dB, sunshade is in operating status.
Preferably, abnormal sound detection includes flexible axle abnormal sound, glass run abnormal sound in the step 10.
Preferably, in the step 11, skylight glass is in operating status, and the anti-grip force of glass and the anti-grip force of sunshade are wanted It asks and is less than or equal to 100N.
The present invention has the advantages that the invention enables the split run production capacity difference reduction of each process in the main line of vehicle dormer window, So that minimum production capacity is 391 sets in single process, compared to the production capacity that 300 sets before improve 30%, so that final split run Production capacity is promoted to daily 391 sets, reduces process rhythm, reduces production cost.
Detailed description of the invention
Fig. 1 is flow diagram of the invention.
Fig. 2 is hour norm table of the invention.
Specific embodiment
To be easy to understand the technical means, the creative features, the aims and the efficiencies achieved by the present invention, below with reference to Specific embodiment, the present invention is further explained.
As shown in Figure 1 to Figure 2, a kind of assembly method of vehicle dormer window, includes the following steps,
Step 1: frame assembles, including places front beam, two wood side-guides of installation, front beam and sliding rail locking, sliding rail and spray Oil, installation flexible axle, installing mechanism assembly, installation rear cross beam, rear cross beam and sliding rail are locked;
Step 2: dress wind-guiding curtain, pushing mechanism, including apply dirty oil on the inside of sliding rail, dress wind-guiding curtain, clamp folder wind-guiding curtain, push away machine Structure;
Step 3: dress sunshade, joint strip shape code, including cleaning rear cross beam arc groove, the plastic part of sunshade right/left flexible axle hide Positive curtain access section and sliding rail cleaning, dress sunshade, sunshade installation positioning, joint strip shape code;
Step 4: glass assembly with glass, glass motor after installation;
Step 5: installation front glass assembly, sunshade motor;
Step 6: installation wiring, cleaning glass reverse side;
Step 7: front beam, scotch and sliding rail connection gap glue, including front beam two sides and sliding rail connection gap are mended Glue, scotch and sliding rail connection gap glue;
Step 8: initialization, trial operation adjustment, the detection of sunshade color and vein;
Step 9: sunshade noise measuring;
Step 10: glass noise measuring;
Step 11: anti-grip force detection, basic performance detection;
Step 12: dress sealing strip, sealing strip and frame clamping, without fall off, sealing strip opening and rear glass guiding gutter 10 ± 1.5mm of flange distance;
Step 13: face difference detects, skylight glass assembly and roof face difference are controlled;
Step 14: skylight assembly cleaning packaging.
In the present embodiment, there are three the frame assembling station in the step 1 is set.Frame set in the step 1 Harness body installation method is, assembles position by front beam accommodating tool positioning pin, then by two wood side-guides and front beam plastic flexible pipe It sets correctly, is inserted in tool locating pin, using electronic four screws for turning round rifle locking front beam and sliding rail surely, then to sliding rail spray gram Primary grease is taken prisoner, all standing lubricating grease in run channel is reloaded into mechanism flexible axle and sunshade flexible axle, notices that left and right part can not be obscured, Check that each sliding angle is packed into operation groove location, the clamping of flexible axle discount position, sunshade plastic flexible pipe rigging position, flexible axle rigging position It is whether correct, then rear cross beam guide post is inserted into sliding rail, use electronic four screws for turning round rifle locking rear cross beam and sliding rail surely.
In the present embodiment, the specific installation method of the step 2 is, using spread pen to dirty oil is smeared on the inside of sliding rail, to lead Air curtain both ends fixing seat is caught in sliding rail mounting groove, and black gram is smeared in positive and negative two sides and corner two sides at wind-guiding curtain installation torsional spring Primary lubricating grease is taken prisoner, both ends are fixed on front beam, then wind-guiding curtain is pressed at front beam buckle, wind-guiding curtain is lifted upwards, listens To " clickly " sound be caught in, altogether everywhere, reuse clamp and clamp two side position of wind-guiding curtain, sunshade flexible axle discount is pushed into sliding rail Middle position is pushed into front beam direction mechanism spacing place using mechanism push rod pushing mechanism assembly.The specific installation of the step 4 Method is that rear glass is placed in tooling, Pen-down detection switch, and whether detection glass LOGO mark, 3C mark, number meet Technical definition is placed on skylight sash after qualified, unqualified mark isolation, then checks motor label, is scanned using barcode scanning gun Motor bar code, electricity consumption turn round rifle and install motor, check that bolt engages dislocation-free without no marking, Bowden cable, and screw number is 3, Again by glass mounting bracket in connecting bracket opening size, 6 installation band shim screw installations are fastened, no misloading neglected loading, It is qualified when quantity and torque meet the requirements.
In addition, the specific installation method of the step 7 is, sealant is filled up in front beam both sides using glue tool With the gap of sliding rail link position and sliding rail and scotch connection gap are filled up, it is desirable that guarantee front beam both sides and cunning Rail connection gap is filled up completely and guaranteed by sealant scotch and filled up completely with sliding rail connection gap by sealant, loses seam Gap, and junction sealant is smoothed out, notice that sealant must not penetrate into flexible axle run channel and mechanism run channel.The step 9 In, testing staff runs skylight sunshade curtain and carries out noise measuring, it is desirable that environmental noise is less than 40dB, and sunshade is in operation shape State.Abnormal sound detection includes flexible axle abnormal sound, glass run abnormal sound in the step 10.In the step 11, skylight glass is in Operating status, the anti-grip force of glass and sunshade anti-pinch force request are less than or equal to 100N.
Based on above-mentioned, the invention enables the split run production capacity difference reductions of each process in the main line of vehicle dormer window, so that individually Minimum production capacity is 391 sets in process, compared to the production capacity that 300 sets before improve 30%, so that final split run production capacity is promoted To daily 391 sets, process rhythm is reduced, production cost is reduced.
As known by the technical knowledge, the present invention can pass through the embodiment party of other essence without departing from its spirit or essential feature Case is realized.Therefore, embodiment disclosed above, in all respects are merely illustrative, not the only.Institute Have within the scope of the present invention or is included in the invention in the change being equal in the scope of the present invention.

Claims (9)

1. a kind of assembly method of vehicle dormer window, it is characterised in that: include the following steps,
Step 1: frame assembles, including place front beam, two wood side-guides of installation, front beam and sliding rail locking, sliding rail oil spout, peace Flexible axle, installing mechanism assembly, installation rear cross beam, rear cross beam and sliding rail is filled to lock;
Step 2: dress wind-guiding curtain, pushing mechanism, including apply dirty oil, dress wind-guiding curtain, clamp on the inside of sliding rail and press from both sides wind-guiding curtain, pushing mechanism;
Step 3: dress sunshade, joint strip shape code, including cleaning rear cross beam arc groove, the plastic part sunshade of sunshade right/left flexible axle Access section and sliding rail cleaning, dress sunshade, sunshade installation positioning, joint strip shape code;
Step 4: glass assembly with glass, glass motor after installation;
Step 5: installation front glass assembly, sunshade motor;
Step 6: installation wiring, cleaning glass reverse side;
Step 7: front beam, scotch and sliding rail connection gap glue, including front beam two sides and sliding rail connection gap glue, Scotch and sliding rail connection gap glue;
Step 8: initialization, trial operation adjustment, the detection of sunshade color and vein;
Step 9: sunshade noise measuring;
Step 10: glass noise measuring;
Step 11: anti-grip force detection, basic performance detection;
Step 12: dress sealing strip, sealing strip and frame clamping, without fall off, sealing strip opening and rear glass guiding gutter flange 10 ± 1.5mm of distance;
Step 13: face difference detects, skylight glass assembly and roof face difference are controlled;
Step 14: skylight assembly cleaning packaging.
2. a kind of assembly method of vehicle dormer window according to claim 1, it is characterised in that: the frame in the step 1 There are three assembling station is set.
3. a kind of assembly method of vehicle dormer window according to claim 2, it is characterised in that: the frame in the step 1 Assembling specific installation method is, assembles by front beam accommodating tool positioning pin, then by two wood side-guides and front beam plastic flexible pipe Position is correct, is inserted in tool locating pin, using electronic four screws for turning round rifle locking front beam and sliding rail surely, then sprays to sliding rail Krupp grease, all standing lubricating grease in run channel, is reloaded into mechanism flexible axle and sunshade flexible axle, notices that left and right part can not mix Confuse, checks that each sliding angle is packed into operation groove location, flexible axle discount clamping position, sunshade plastic flexible pipe rigging position, flexible axle assembly Whether position is correct, then rear cross beam guide post is inserted into sliding rail, uses electronic four spiral shells for turning round rifle locking rear cross beam and sliding rail surely Nail.
4. a kind of assembly method of vehicle dormer window according to claim 1, it is characterised in that: the specific peace of the step 2 Dress method is that, using spread pen to dirty oil is smeared on the inside of sliding rail, wind-guiding curtain both ends fixing seat is caught in sliding rail mounting groove, in wind-guiding curtain Positive and negative two sides and corner two sides at torsional spring are installed and smear black Krupp lubricating grease, both ends are fixed on front beam, then will lead Air curtain press at front beam buckle, upwards lift wind-guiding curtain, hear " clickly " sound be caught in, altogether everywhere, reuse clamp and clamp Sunshade flexible axle discount is pushed into sliding rail middle position by two side position of wind-guiding curtain, using mechanism push rod pushing mechanism assembly, before being pushed into Crossbeam direction mechanism spacing place.
5. a kind of assembly method of vehicle dormer window according to claim 1, it is characterised in that: the specific peace of the step 4 Dress method is that rear glass is placed in tooling, Pen-down detection switch, and whether detection glass LOGO mark, 3C mark, number accord with Technical definition is closed, is placed on skylight sash after qualified, unqualified mark isolation, then check motor label, it is swept using barcode scanning gun Motor bar code is retouched, electricity consumption turns round rifle and installs motor, checks that bolt engages dislocation-free, screw number 3 without no marking, Bowden cable It is a, then by glass mounting bracket in connecting bracket opening size, by 6 installation band shim screw installation fastenings, no misloading leakage Dress is qualified when quantity and torque meet the requirements.
6. a kind of assembly method of vehicle dormer window according to claim 1, it is characterised in that: the specific peace of the step 7 Dress method is, using glue tool by sealant fill up gap in front beam both sides and sliding rail link position and to sliding rail with Scotch connection gap is filled up, it is desirable that guarantees that front beam both sides are filled up and protected completely by sealant with sliding rail connection gap Card scotch is filled up with sliding rail connection gap by sealant completely, is loseed gap, and smooth out junction sealant, is paid attention to sealant It must not penetrate into flexible axle run channel and mechanism run channel.
7. a kind of assembly method of vehicle dormer window according to claim 1, it is characterised in that: in the step 9, detection Personnel run skylight sunshade curtain and carry out noise measuring, it is desirable that environmental noise is less than 40dB, and sunshade is in operating status.
8. a kind of assembly method of vehicle dormer window according to claim 1, it is characterised in that: abnormal sound is examined in the step 10 Survey includes flexible axle abnormal sound, glass run abnormal sound.
9. a kind of assembly method of vehicle dormer window according to claim 1, it is characterised in that: in the step 11, day Glass pane is in operating status, and the anti-grip force of glass and sunshade anti-pinch force request are less than or equal to 100N.
CN201910605608.XA 2019-07-05 2019-07-05 Assembly method of automobile skylight Active CN110282050B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910605608.XA CN110282050B (en) 2019-07-05 2019-07-05 Assembly method of automobile skylight

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910605608.XA CN110282050B (en) 2019-07-05 2019-07-05 Assembly method of automobile skylight

Publications (2)

Publication Number Publication Date
CN110282050A true CN110282050A (en) 2019-09-27
CN110282050B CN110282050B (en) 2020-05-08

Family

ID=68020761

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910605608.XA Active CN110282050B (en) 2019-07-05 2019-07-05 Assembly method of automobile skylight

Country Status (1)

Country Link
CN (1) CN110282050B (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104192225A (en) * 2014-09-02 2014-12-10 安徽江淮汽车股份有限公司 Installation auxiliary tool for automobile skylight
CN104589054A (en) * 2015-01-28 2015-05-06 江苏德福来汽车部件有限公司 Vehicle sunroof production equipment and technology
CN104607938A (en) * 2015-01-28 2015-05-13 江苏德福来汽车部件有限公司 Automobile skylight production technology
CN106347086A (en) * 2016-10-21 2017-01-25 奇瑞汽车股份有限公司 Automobile panoramic sunroof assembly and installation method thereof
CN106428297A (en) * 2016-09-22 2017-02-22 奇瑞汽车股份有限公司 Automobile sunroof assembling device and method
JP6104128B2 (en) * 2013-10-24 2017-03-29 プレス工業株式会社 Construction equipment cab roof panel structure
CN107717440A (en) * 2017-10-11 2018-02-23 安徽工程大学 The assembly method and its product line method of a kind of panoramic sunroof of automobile
CN109552449A (en) * 2019-01-29 2019-04-02 华晨鑫源重庆汽车有限公司 A kind of skylight installation auxiliary device and day window mounting method

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6104128B2 (en) * 2013-10-24 2017-03-29 プレス工業株式会社 Construction equipment cab roof panel structure
CN104192225A (en) * 2014-09-02 2014-12-10 安徽江淮汽车股份有限公司 Installation auxiliary tool for automobile skylight
CN104589054A (en) * 2015-01-28 2015-05-06 江苏德福来汽车部件有限公司 Vehicle sunroof production equipment and technology
CN104607938A (en) * 2015-01-28 2015-05-13 江苏德福来汽车部件有限公司 Automobile skylight production technology
CN106428297A (en) * 2016-09-22 2017-02-22 奇瑞汽车股份有限公司 Automobile sunroof assembling device and method
CN106347086A (en) * 2016-10-21 2017-01-25 奇瑞汽车股份有限公司 Automobile panoramic sunroof assembly and installation method thereof
CN107717440A (en) * 2017-10-11 2018-02-23 安徽工程大学 The assembly method and its product line method of a kind of panoramic sunroof of automobile
CN109552449A (en) * 2019-01-29 2019-04-02 华晨鑫源重庆汽车有限公司 A kind of skylight installation auxiliary device and day window mounting method

Also Published As

Publication number Publication date
CN110282050B (en) 2020-05-08

Similar Documents

Publication Publication Date Title
US20190078366A1 (en) Light weight two piece frameless door module with adjustment features
CN104589054A (en) Vehicle sunroof production equipment and technology
CN206171468U (en) High -speed railway cab interior trim
CN110282050A (en) A kind of assembly method of vehicle dormer window
CN1678470A (en) Attachment structure for a weather strip
CN108956102B (en) Installation back car headlamp quality testing frock
US4070055A (en) Fastening of inner roof covering of motor vehicles
CN201105639Y (en) Installation fixing structure for car door inner gib and internal decorative panels
CN206012261U (en) A kind of stabilizer bar arm component
CN107985037A (en) A kind of guide rail structure
CN205890480U (en) Preceding wind window assembly and car
CN212195446U (en) Side window adhesive tape quick replacement structure and side window of rail vehicle with speed of 200 kilometers
CN209146914U (en) A kind of panel lamp mounting structure
CN211808965U (en) Automobile rear door corner window mounting structure
CN208559224U (en) Semitrailer and its tool box
CN217804926U (en) Frameless door pillar seal structure
CN217363546U (en) Waterproof structure of gate case shaft outlet hole
CN105195956B (en) A kind of rear floor body assembly soldering cramping apparatus
CN205273349U (en) Roof trim mounting structure
CN109466576A (en) Run-through channel three-chip type top plate
CN213383842U (en) Sealing structure of automobile sliding window
CN212289704U (en) Bus back board installing support
CN218258002U (en) Camera of double-support vehicle interior and exterior mounting structure
CN218953057U (en) Concealed vehicle door handle
CN217994585U (en) New energy automobile instrument desk tubular beam assembly

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant