CN110281382B - Truss rib sheath for PC component - Google Patents

Truss rib sheath for PC component Download PDF

Info

Publication number
CN110281382B
CN110281382B CN201910674420.0A CN201910674420A CN110281382B CN 110281382 B CN110281382 B CN 110281382B CN 201910674420 A CN201910674420 A CN 201910674420A CN 110281382 B CN110281382 B CN 110281382B
Authority
CN
China
Prior art keywords
clamping
sheath
clamping end
truss
truss rib
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201910674420.0A
Other languages
Chinese (zh)
Other versions
CN110281382A (en
Inventor
于四青
于浩
顾师伟
杜江
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wantefu Building Components Co ltd
Original Assignee
Wantefu Building Components Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wantefu Building Components Co ltd filed Critical Wantefu Building Components Co ltd
Priority to CN201910674420.0A priority Critical patent/CN110281382B/en
Publication of CN110281382A publication Critical patent/CN110281382A/en
Application granted granted Critical
Publication of CN110281382B publication Critical patent/CN110281382B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B23/00Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
    • B28B23/02Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members

Abstract

The invention discloses a truss rib sheath for a PC component, which comprises two clamping plates, wherein two ends of each clamping plate are respectively provided with a handheld end and a clamping end, a hinge part is arranged between the handheld ends and the clamping ends of the clamping plates, the hinge parts of the two clamping plates are connected, and an elastic device for driving the two clamping ends to mutually extrude is arranged between the two clamping plates; the clamping end is also provided with a clamping assembly, the clamping assembly comprises a rubber layer and a brush which are connected to the end part of the clamping end, the rubber layer and the brush are respectively detachably connected to the inner surface and the outer surface of the clamping end, and the length of the brush is larger than the width of the rubber layer. The invention can play a certain protection function on the upper main reinforcement, provides a reasonable solution for the protection of the upper main reinforcement in the truss reinforcement in the prior art, can avoid upward sliding when clamping the chord reinforcement, and can also avoid tilting with the horizontal plane in the clamping process.

Description

Truss rib sheath for PC component
Technical Field
The invention relates to a truss rib sheath for a PC component, and belongs to the technical field of PC component protection.
Background
The assembled truss rib is formed by three straightened steel bars through resistance spot welding connection of two long-wave-shaped bent web member steel bars, the steel bars are various in model and stable in distance, the assembled truss rib is suitable for being used as a connecting rib between a connecting concrete sheet and sandwich concrete for secondary pouring, and a laminated floor slab adopting the steel bar truss can bear larger shear stress.
In the manufacturing process of PC components (precast concrete), the assembled truss ribs are required to be used, in the prefabrication process of certain products, only two of three straightened steel bars are required to be pre-buried in a construction member, and the uppermost straightened steel bar is required to be used for secondary pouring. The truss rib cannot be stained with concrete in the first pouring process, otherwise, secondary pouring quality is affected, and the steel bar stained with concrete cannot be fully contacted with the concrete in the secondary pouring process, so that the binding force between the steel bar and the concrete is reduced.
At present, the special protective clothing for the uppermost straightened steel bar is lacking in the prior art, and is often wrapped by plastic films, newspapers and the like in the field construction process so as to achieve the aim of isolating concrete, and the practical use effect is poor.
Disclosure of Invention
In order to solve the defects in the prior art, the invention aims to provide a truss rib sheath for a PC component.
In order to achieve the above object, the present invention adopts the following technical scheme:
the truss rib sheath for the PC component is characterized by comprising two clamping plates, wherein two ends of each clamping plate are respectively provided with a handheld end and a clamping end, a hinge part is further arranged between the handheld ends and the clamping ends of the clamping plates, the hinge parts of the two clamping plates are connected, and an elastic device for driving the two clamping ends to mutually extrude is further arranged between the two clamping plates;
the clamping end is also provided with a clamping assembly, the clamping assembly comprises a rubber layer and a brush which are connected to the end part of the clamping end, the rubber layer and the brush are respectively detachably connected to the inner surface and the outer surface of the clamping end, and the length of the brush is larger than the width of the rubber layer.
As an optimization scheme, the truss rib sheath for the PC component is characterized in that an inner pressing plate is arranged on the inner surface of the clamping end, the rubber layer is arranged between the clamping end and the inner pressing plate, and the inner pressing plate is connected to the clamping end through screws.
As an optimization scheme, the truss rib sheath for the PC component is characterized in that an outer pressing plate is arranged on the outer surface of the clamping end, the hairbrush is arranged between the outer pressing plate and the clamping end, and the outer pressing plate is connected to the clamping end through a screw.
As an optimization scheme, the truss rib sheath for the PC component is characterized in that the screw is further connected with a nut, and the nut is a butterfly nut.
As an optimization scheme, the truss rib sheath for the PC component is characterized in that the clamping end is further provided with a limiting protrusion, and the limiting protrusion is connected with the end parts of the inner pressing plate and the outer pressing plate.
As an optimization scheme, the truss rib sheath for the PC component is characterized in that two hinge parts are connected through an intermediate plate, the end parts of the hinge parts are further provided with fan-shaped ends, the outer side parts of the fan-shaped ends are provided with gears, the gears of the two fan-shaped ends are kneaded, the intermediate plate is further connected with a magnet, and the magnet is used for being connected with an upper main rib.
As an optimization scheme, the truss rib sheath for the PC component is characterized in that the middle plate is connected with the magnet through the middle separation rod and the magnet seat in sequence.
As an optimization scheme, the truss rib sheath for the PC component is characterized in that the upper main rib connecting surface of the magnet is further provided with a chute parallel to the axis of the upper main rib.
As an optimization scheme, the truss rib sheath for the PC component is characterized in that the elastic device is a spring, and two ends of the spring are respectively connected with two handheld ends.
As an optimization scheme, the truss rib sheath for the PC component is characterized in that the spring connecting surface of the handheld end is further provided with a positioning protrusion, and the positioning protrusion is connected with the end part of the spring.
The invention has the beneficial effects that:
the invention can play a certain protection function on the upper main rib, the brush can form effective shielding on the upper main rib, meanwhile, as the brush has larger flexibility, softer material and a dispersion structure, the concrete is not easy to adhere to the brush, and the length of the embodiment can be designed according to actual requirements in actual use, and a plurality of embodiments can be connected in series for use when the truss rib is longer.
The embodiment provides a reasonable solution for the protection of the upper main reinforcement in the truss reinforcement in the prior art, and when the chord reinforcement is clamped, upward sliding can be avoided, and inclination with the horizontal plane can be avoided in the clamping process.
Drawings
FIG. 1 is a block diagram of a prior art truss rib;
FIG. 2 is a cross-sectional view of the overall structure of the present invention;
FIG. 3 is an enlarged partial view of FIG. 2 (two hinges) of the present invention;
FIG. 4 is a partial enlarged view of FIG. 2 (two clamping ends) of the present invention;
meaning of reference numerals in the drawings: 1-lower main ribs; 2-upper main ribs; 3-chord steel bars; 4-clamping plates; 5-a rubber layer; 6-hinge; 7-an intermediate plate; 8-hairbrush; 41-a hand-held end; 42-clamping end; 51-an inner platen; 61-scalloped ends; 62-gear; 71-a middle dividing rod; 72-a magnet holder; 73-magnet; 411-positioning projections; 421-limit bump; 81-an outer platen; 9-a screw; 91-nut.
Description of the embodiments
The invention is further described below with reference to the accompanying drawings. The following examples are only for more clearly illustrating the technical aspects of the present invention, and are not intended to limit the scope of the present invention.
As shown in fig. 1: fig. 1 is a truss rib structure diagram in the prior art, in some prefabricated parts, only two lower main ribs 1 at the lower end of three straightened steel bars need to be pre-buried in a construction member, and an upper main rib 2 is used for secondary pouring. In order to ensure that the concrete can be fully contacted with the upper main rib 2 during secondary pouring and enhance the connection tightness between the two, the concrete needs to be ensured not to be adhered to the upper main rib 2 during the first pouring process. In view of the above, this embodiment discloses a truss rib sheath for a PC member, including two clamping plates 4, two ends of the clamping plates 4 are respectively provided with a holding end 41 and a clamping end 42, a hinge part 6 is further provided between the holding ends 41 and the clamping ends 42 of the clamping plates 4, the hinge parts 6 of the two clamping plates 4 are connected, and an elastic device for driving the two clamping ends 42 to press each other is further provided between the two clamping plates 4; the clamping end 42 is further provided with a clamping assembly, the clamping assembly comprises a rubber layer 5 and a hairbrush 8 which are connected to the end part of the clamping end 42, the rubber layer 5 and the hairbrush 8 are respectively detachably connected to the inner surface and the outer surface of the clamping end 42, and the length of the hairbrush 8 is larger than the width of the rubber layer 5.
The rubber layer 5 is connected with the clamping end 42 in the following manner: an inner pressure plate 51 is provided on the inner surface of the clamping end 42, and a rubber layer 5 is provided between the clamping end 42 and the inner pressure plate 51, the inner pressure plate 51 being connected to the clamping end 42 by screws 9.
The brush 8 is connected with the clamping end 42 in the following manner: the outer surface of the clamping end 42 is provided with an outer pressing plate 81, the hairbrush 8 is arranged between the outer pressing plate 81 and the clamping end 42, and the outer pressing plate 81 is connected to the clamping end 42 through a screw 9.
The screw 9 is further connected to a nut 91 by means of threads, the nut 91 preferably being a wing nut which can be easily rotated manually. When the brush 8 and the rubber layer 5 need to be replaced, the outer pressure plate 81 and the inner pressure plate 51 can be released.
The clamping end 42 is further provided with a limiting protrusion 421, and the limiting protrusion 421 is connected with the ends of the inner pressing plate 51 and the outer pressing plate 81, and is used for preventing the inner pressing plate 51 and the outer pressing plate 81 from sliding, and is also beneficial to positioning the inner pressing plate 51 and the outer pressing plate 81 during installation.
Specifically, the two hinge parts 6 are connected through the middle plate 7, the two hinge parts 6 are hinged to the middle plate 7 through a central shaft, the end parts of the hinge parts 6 are further provided with fan-shaped ends 61, the outer side parts of the fan-shaped ends 61 are provided with gears 62, the gears 62 of the two fan-shaped ends 61 are kneaded, the middle plate 7 is further connected with a magnet 73, and the magnet 73 is used for connecting the upper main rib 2.
Specifically, the intermediate plate 7 is connected to the magnet 73 via the intermediate lever 71 and the magnet holder 72 in this order.
The upper main rib 2 connecting surface of the magnet 73 is also provided with a chute parallel to the axis of the upper main rib 2. The diagonal grooves can increase the contact area between the magnet 73 and the upper main rib 2, and increase the magnetism therebetween.
Specifically, the elastic device is a spring 43, two ends of the spring 43 are respectively connected with two handheld ends 41, a spring connecting surface of the handheld ends 41 is also provided with a positioning protrusion 411, and the positioning protrusion 411 is connected with the end of the spring 43 and is used for positioning the spring 43.
When in use, when two holding ends 41 are pressed to open two holding ends 42, the holding ends 42 can be held on the upper main rib 2, and the hairbrush 8 is softer and has larger flexibility, and the length of the hairbrush 8 is larger than the width of the rubber layer 5, so that when the rubber layer 5 is contacted with the chord steel bar 3, the hairbrush 8 can penetrate the chord steel bar 3 to play a certain protection role on the chord steel bar 3, and the holding plates 4 on two sides can play a protection role to prevent concrete from being stained on the upper main rib 2.
Although the chord steel bar 3 and the rubber layer 5 have a certain friction force, the chord steel bar 3 and the rubber layer 5 can be fixed by the friction force, the interface of the truss steel bar is triangular, so that the clamping end 42 may slide up the main steel bar 2 in actual use, and the service efficiency of the truss steel bar is reduced. For this reason, the present embodiment further includes a magnet 73 provided in the hinge portion 6, and the magnet 73 is magnetically connected to the upper main bar 2 to fix the distance between the hinge portion 6 and the upper main bar 2.
As shown in connection with fig. 2 and 3: in order to ensure that the distance between the magnet 73 and the two clamping plates 4 is equal, in this embodiment, the two hinging portions 6 are connected through the middle plate 7, and the two hinging portions 6 are connected through the gear 62, and the middle separating rod 71 is vertically and fixedly connected to the middle plate 7, so that when the two clamping plates 4 are opened (the distance between the two clamping ends 42 is increased), the middle separating rod 71 is always positioned at the middle point of the two clamping ends 42, and thus the inclination (the inclination direction is shown by an arrow in fig. 2) of the embodiment in the clamping process can be avoided, so that the two clamping plates 4 are always clamped on the chord steel bar 3 (the middle separating rod 71 is equivalent to the bisector of the included angle between the two clamping plates 4).
According to the invention, a certain protection function can be achieved on the upper main rib 2, the hairbrush 8 can effectively shield the upper main rib 2, meanwhile, as the hairbrush 8 is larger in flexibility, softer in material and of a dispersion structure, concrete is not easy to adhere to the hairbrush 8, the length of the embodiment can be designed according to actual requirements in actual use, and a plurality of embodiments can be connected in series for use when the truss rib is longer. The embodiment provides a reasonable solution for the protection of the upper main bar 2 in the truss bar in the prior art, when the chord bar 3 is clamped, upward sliding can be avoided, and inclination between the upper main bar and a horizontal plane (the horizontal plane where the two lower main bars 1 are positioned) can be avoided in the clamping process.
The foregoing is merely a preferred embodiment of the present invention, and it should be noted that modifications and variations could be made by those skilled in the art without departing from the technical principles of the present invention, and such modifications and variations should also be regarded as being within the scope of the invention.

Claims (10)

1. The truss rib sheath for the PC component is characterized by comprising two clamping plates (4), wherein two ends of each clamping plate (4) are respectively provided with a handheld end (41) and a clamping end (42), a hinge part (6) is further arranged between the handheld ends (41) and the clamping ends (42) of the clamping plates (4), the hinge parts (6) of the two clamping plates (4) are connected, and an elastic device for driving the two clamping ends (42) to mutually extrude is further arranged between the two clamping plates (4);
the clamping end (42) is further provided with a clamping assembly, the clamping assembly comprises a rubber layer (5) and a brush (8) which are connected to the end part of the clamping end (42), the rubber layer (5) and the brush (8) are detachably connected to the inner surface and the outer surface of the clamping end (42) respectively, and the length of the brush (8) is larger than the width of the rubber layer (5).
2. The truss rib sheath for a PC component according to claim 1, wherein an inner surface of the clamping end (42) is provided with an inner pressure plate (51), the rubber layer (5) is disposed between the clamping end (42) and the inner pressure plate (51), and the inner pressure plate (51) is connected to the clamping end (42) by screws (9).
3. Truss rib sheath for PC components according to claim 1 or 2, characterized in that the outer surface of the clamping end (42) is provided with an outer pressure plate (81), the brush (8) is arranged between the outer pressure plate (81) and the clamping end (42), and the outer pressure plate (81) is connected to the clamping end (42) by means of screws (9).
4. A truss rib sheath for PC components according to claim 3, characterized in that the screw (9) is further connected to a nut (91), the nut (91) being a wing nut.
5. A truss rib sheath for a PC component according to claim 3, wherein the clamping end (42) is further provided with a limiting protrusion (421), and the limiting protrusion (421) is connected with the ends of the inner pressing plate (51) and the outer pressing plate (81).
6. Truss rib sheath for PC components according to claim 1, characterized in that the two hinge parts (6) are connected by means of an intermediate plate (7), the ends of the hinge parts (6) are further provided with sector ends (61), the outer side of the sector ends (61) is provided with gears (62), the gears (62) of the two sector ends (61) are kneaded, the intermediate plate (7) is further connected with a magnet (73), and the magnet (73) is used for connecting the upper main rib (2).
7. The truss rib sheath for a PC component according to claim 6, wherein the intermediate plate (7) is connected to the magnet (73) through the intermediate lever (71) and the magnet holder (72) in this order.
8. The truss rib sheath for a PC component according to claim 6, wherein the upper main rib (2) connecting surface of the magnet (73) is further provided with a chute parallel to the axis of the upper main rib (2).
9. A truss rib sheath for PC components according to claim 1, characterized in that the elastic means are springs (43), both ends of the springs (43) being connected to two hand-held ends (41), respectively.
10. A truss rib sheath for PC components according to claim 9, characterized in that the spring connection surface of the hand-held end (41) is further provided with a positioning protrusion (411), said positioning protrusion (411) connecting the ends of the springs (43).
CN201910674420.0A 2019-07-25 2019-07-25 Truss rib sheath for PC component Active CN110281382B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910674420.0A CN110281382B (en) 2019-07-25 2019-07-25 Truss rib sheath for PC component

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910674420.0A CN110281382B (en) 2019-07-25 2019-07-25 Truss rib sheath for PC component

Publications (2)

Publication Number Publication Date
CN110281382A CN110281382A (en) 2019-09-27
CN110281382B true CN110281382B (en) 2024-01-23

Family

ID=68022345

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910674420.0A Active CN110281382B (en) 2019-07-25 2019-07-25 Truss rib sheath for PC component

Country Status (1)

Country Link
CN (1) CN110281382B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111571093B (en) * 2020-05-25 2022-03-22 邵东智能制造技术研究院有限公司 Steel bar welding position correcting device
CN113263613B (en) * 2021-06-04 2022-11-29 浙江宝红建筑工业化制造有限责任公司 Anti-cracking concrete and preparation process thereof

Citations (28)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008075290A (en) * 2006-09-20 2008-04-03 Fujisho Giken:Kk Spacer for reinforcing bar, and deck plate with reinforced truss
CN102926295A (en) * 2012-10-10 2013-02-13 中铁十局集团有限公司 Dual-block-type sleeper preset steel bar truss fixing device
CN103741889A (en) * 2013-12-23 2014-04-23 潍坊昌大建设集团有限公司 Cushion block for reinforced concrete protective layer
JP2015067852A (en) * 2013-09-27 2015-04-13 住友金属鉱山株式会社 Chemical treatment apparatus
CN104695629A (en) * 2015-03-23 2015-06-10 天津大学 Clamping piece type CFRP rib clamping anchorage device
CN204685911U (en) * 2015-04-28 2015-10-07 浙江大道建设工程有限公司 A kind of reinforcing bar pincers applicator
CN204712464U (en) * 2015-04-16 2015-10-21 中国矿业大学 Five degree of freedom rapid shaping processing unit (plant)
DE102014012531A1 (en) * 2014-08-28 2016-03-03 Durtrack Gmbh Method for producing a prestressed concrete track sill
CN205829062U (en) * 2016-06-23 2016-12-21 大唐向阳风电有限公司 Blower fan cable protecting device
CN107119922A (en) * 2017-06-28 2017-09-01 中国华西企业股份有限公司 Support component for pre-stress floor post-cast strip stretching end
CN206477497U (en) * 2016-12-12 2017-09-08 中建钢构有限公司 A kind of trussing for exempting to support steel form
CN107414359A (en) * 2017-09-06 2017-12-01 湖南三快而居住宅工业有限公司 A kind of clamping jaw and material fetching mechanism
CN206815873U (en) * 2017-03-21 2017-12-29 中建三局第一建设工程有限责任公司 Safety device
CN107574725A (en) * 2017-08-04 2018-01-12 东南大学 A kind of double-block type ballastless track plate and preparation method thereof
CN206888564U (en) * 2017-05-19 2018-01-16 重庆市南川区宏安建筑有限公司 A kind of Rebar bonding device
CN206883075U (en) * 2016-12-23 2018-01-16 明达海洋工程有限公司 Steel reinforcement cage welding positioner
CN107901197A (en) * 2017-11-07 2018-04-13 内蒙古路桥集团有限责任公司 A kind of prefabricated case beam square steel tube core
CN207451431U (en) * 2017-08-16 2018-06-05 杨晓龙 A kind of architectural engineering lifts clamping device with reinforcing bar
CN108193825A (en) * 2018-02-12 2018-06-22 山东中新绿色建筑科技有限公司 A kind of prestressed cored slab
CN207830715U (en) * 2018-02-08 2018-09-07 河南科建建设工程有限公司 A kind of concrete horizontal pump line antifriction shock bracket
CN108584691A (en) * 2018-04-28 2018-09-28 宁波英赫机电科技有限公司 A kind of stone tongs
CN208430789U (en) * 2018-07-09 2019-01-25 中建八局第三建设有限公司 A kind of nothing, delayed bonding prestressed tendon stretching end sheath cleaning plant
CN109413249A (en) * 2018-11-29 2019-03-01 歌尔科技有限公司 A kind of clamping device and helmet
CN109435047A (en) * 2018-12-18 2019-03-08 中铁十四局集团大盾构工程有限公司 A kind of cover to reinforcement construction auxiliary device of precast concrete
CN208981528U (en) * 2018-10-12 2019-06-14 宁波海达远大建筑工业有限公司 Assembled overlaps board wall grouting behind shaft or drift lining connecting joint structure
CN208996277U (en) * 2018-08-20 2019-06-18 四川新恒钢建材有限公司新津分公司 A kind of steel bar truss floor support plate structure of removable bed die
CN210552094U (en) * 2019-07-25 2020-05-19 万特福建筑构件有限公司 Truss rib sheath for PC component
CN210651206U (en) * 2019-07-22 2020-06-02 万特福建筑构件有限公司 Groove sealing device for PC component mold

Patent Citations (28)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008075290A (en) * 2006-09-20 2008-04-03 Fujisho Giken:Kk Spacer for reinforcing bar, and deck plate with reinforced truss
CN102926295A (en) * 2012-10-10 2013-02-13 中铁十局集团有限公司 Dual-block-type sleeper preset steel bar truss fixing device
JP2015067852A (en) * 2013-09-27 2015-04-13 住友金属鉱山株式会社 Chemical treatment apparatus
CN103741889A (en) * 2013-12-23 2014-04-23 潍坊昌大建设集团有限公司 Cushion block for reinforced concrete protective layer
DE102014012531A1 (en) * 2014-08-28 2016-03-03 Durtrack Gmbh Method for producing a prestressed concrete track sill
CN104695629A (en) * 2015-03-23 2015-06-10 天津大学 Clamping piece type CFRP rib clamping anchorage device
CN204712464U (en) * 2015-04-16 2015-10-21 中国矿业大学 Five degree of freedom rapid shaping processing unit (plant)
CN204685911U (en) * 2015-04-28 2015-10-07 浙江大道建设工程有限公司 A kind of reinforcing bar pincers applicator
CN205829062U (en) * 2016-06-23 2016-12-21 大唐向阳风电有限公司 Blower fan cable protecting device
CN206477497U (en) * 2016-12-12 2017-09-08 中建钢构有限公司 A kind of trussing for exempting to support steel form
CN206883075U (en) * 2016-12-23 2018-01-16 明达海洋工程有限公司 Steel reinforcement cage welding positioner
CN206815873U (en) * 2017-03-21 2017-12-29 中建三局第一建设工程有限责任公司 Safety device
CN206888564U (en) * 2017-05-19 2018-01-16 重庆市南川区宏安建筑有限公司 A kind of Rebar bonding device
CN107119922A (en) * 2017-06-28 2017-09-01 中国华西企业股份有限公司 Support component for pre-stress floor post-cast strip stretching end
CN107574725A (en) * 2017-08-04 2018-01-12 东南大学 A kind of double-block type ballastless track plate and preparation method thereof
CN207451431U (en) * 2017-08-16 2018-06-05 杨晓龙 A kind of architectural engineering lifts clamping device with reinforcing bar
CN107414359A (en) * 2017-09-06 2017-12-01 湖南三快而居住宅工业有限公司 A kind of clamping jaw and material fetching mechanism
CN107901197A (en) * 2017-11-07 2018-04-13 内蒙古路桥集团有限责任公司 A kind of prefabricated case beam square steel tube core
CN207830715U (en) * 2018-02-08 2018-09-07 河南科建建设工程有限公司 A kind of concrete horizontal pump line antifriction shock bracket
CN108193825A (en) * 2018-02-12 2018-06-22 山东中新绿色建筑科技有限公司 A kind of prestressed cored slab
CN108584691A (en) * 2018-04-28 2018-09-28 宁波英赫机电科技有限公司 A kind of stone tongs
CN208430789U (en) * 2018-07-09 2019-01-25 中建八局第三建设有限公司 A kind of nothing, delayed bonding prestressed tendon stretching end sheath cleaning plant
CN208996277U (en) * 2018-08-20 2019-06-18 四川新恒钢建材有限公司新津分公司 A kind of steel bar truss floor support plate structure of removable bed die
CN208981528U (en) * 2018-10-12 2019-06-14 宁波海达远大建筑工业有限公司 Assembled overlaps board wall grouting behind shaft or drift lining connecting joint structure
CN109413249A (en) * 2018-11-29 2019-03-01 歌尔科技有限公司 A kind of clamping device and helmet
CN109435047A (en) * 2018-12-18 2019-03-08 中铁十四局集团大盾构工程有限公司 A kind of cover to reinforcement construction auxiliary device of precast concrete
CN210651206U (en) * 2019-07-22 2020-06-02 万特福建筑构件有限公司 Groove sealing device for PC component mold
CN210552094U (en) * 2019-07-25 2020-05-19 万特福建筑构件有限公司 Truss rib sheath for PC component

Also Published As

Publication number Publication date
CN110281382A (en) 2019-09-27

Similar Documents

Publication Publication Date Title
CN110281382B (en) Truss rib sheath for PC component
CN210552094U (en) Truss rib sheath for PC component
CN114400134A (en) Three-dimensional iron core transformer convenient to maintain
CN209545086U (en) It is a kind of convenient for fixed cable processing tensioning apparatus
CN208545621U (en) Floating ballast bed plate end large span shear hinge
CN213930370U (en) Steel grating convenient to dismouting
CN110962225A (en) Concrete feeding track system for precast slab processing and application method thereof
CN203901786U (en) Travel structure for ram of pressing machine working platform
CN205206116U (en) Prestressing force floor
CN219716589U (en) Detachable aluminum electrode of square harmonic elimination resistor
CN216868153U (en) Corrosion-resistant grating plate
CN216587797U (en) Steel lattice column positioning device
CN215546187U (en) Welding alignment device of steel skeleton light plate
CN218970428U (en) Exhibition hall truss
CN213979590U (en) Prestressed carbon fiber plate anchoring device
CN219011475U (en) Steel structure supporting truss with strong torsion resistance
CN212176242U (en) Prefabricated coincide floor
CN216739281U (en) High-speed railway prestressed anchorage utensil
CN114922055B (en) Limiting energy consumption damping device based on mortise and tenon constraint and construction and installation method
CN217890949U (en) Fixed subassembly of transport reinforcing bar
CN213953081U (en) Reinforced concrete roof beam glues steel reinforcement test device
CN212927582U (en) Concrete door leaf convenient to pour
CN214439947U (en) Integral rubber wear-resistant table concentrator
CN216787586U (en) Prefabricated reinforced concrete composite floor slab
CN214749423U (en) Adjustable reinforced concrete mechanical property detection device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant