CN205206116U - Prestressing force floor - Google Patents

Prestressing force floor Download PDF

Info

Publication number
CN205206116U
CN205206116U CN201520903385.2U CN201520903385U CN205206116U CN 205206116 U CN205206116 U CN 205206116U CN 201520903385 U CN201520903385 U CN 201520903385U CN 205206116 U CN205206116 U CN 205206116U
Authority
CN
China
Prior art keywords
prestressing force
prestressing
force
puller
seat
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520903385.2U
Other languages
Chinese (zh)
Inventor
张跃
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201520903385.2U priority Critical patent/CN205206116U/en
Application granted granted Critical
Publication of CN205206116U publication Critical patent/CN205206116U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model relates to a prestressing force floor, its characterized in that: prestressing force floor inside or bottom are equipped with the prestressing force device, the prestressing force device includes that prestressing force fixing base, prestressing force pulling force seat and prestressing force draw the utensil, draw a slant to link to each other through prestressing force between prestressing force pulling force seat and the prestressing force fixing base. The utility model discloses broken through the prestressed structure of current floor, had the convenience of regulation, installation flexibility, material saving, can show the advantage that improves floor atress performance.

Description

A kind of pre-stress floor
Technical field
The utility model relates to building field, is specifically related to a kind of pre-stress floor.
Background technology
In the building such as Business Building, house, floor is main components wherein and main stressed member.In order to improve the stress performance of floor, saving material, reducing distortion, having minority layer of concrete to have employed the prestressed structure of inner embedded bar.But this prestressed structure exists following shortcoming: (1) structure is too simple, the compressive property of floor improves few, and its combination property is fully excavated.(2) embedded bar pretension floor make before mix up, cannot regulate according to actual loading situation after floor coagulation forming, compliance and adjusting function poor.(3) origin of force at embedded bar two ends is inner at floor, and it is stressed unreasonable, is unfavorable for giving full play to prestressed stressed advantage.Especially for the combined type floor of concrete and steel work, how arranging efficient prestressing apparatus, is a urgent need to solve the problem.
Utility model content
The purpose of this utility model is to overcome the deficiencies in the prior art, provide a kind of novel structure, easy to adjust, flexible for installation, save material, the novel pre-stressed floor of the comprehensive stress performance of floor can be significantly improved.
The utility model is achieved by the following technical programs:
A kind of pre-stress floor, it is characterized in that, described pre-stress floor comprises the girder steel frame of layer of concrete and bottom, described prestressing apparatus is arranged on girder steel frame, described pre-stress floor inside or bottom are provided with prestressing apparatus, described prestressing apparatus comprises prestressing force holder, prestressing force pulling force seat and prestressing force puller, described prestressing force puller is multiply steel cable, round steel, steel plate, shaped steel, one or more in carbon fiber or other retention material, described prestressing apparatus is arranged on two ends or the middle part of pre-stress floor, the origin of force of prestressing apparatus is 2 or 4.
Preferably, described prestressing apparatus is separately positioned in layer of concrete and girder steel frame, the prestressing force pulling force seat of described prestressing apparatus is by advance in layer of concrete, and by precast reinforcedly to link together in the mode of welding and layer of concrete, the below correspondence of described prestressing force pulling force seat is provided with prestressing force holder, described prestressing force holder is fixed on the girder steel frame below layer of concrete, described prestressing force pulling force seat is connected by prestressing force puller with between prestressing force holder, prestressing force puller is oblique installation, prestressing force puller is drawn into pre-tensile stress state.
Preferably, described prestressing apparatus is arranged on girder steel frame two ends, the prestressing force pulling force seat of described prestressing apparatus is arranged on the top of girder steel frame, the prestressing force holder of described prestressing apparatus is arranged on the bottom of girder steel frame, described prestressing force pulling force seat is connected by prestressing force puller with between prestressing force holder, described prestressing force puller is oblique installation, and described prestressing force puller is drawn into pre-tensile stress state.
Preferably, described prestressing force puller adopts screw thread round steel, and its two ends are fastened on prestressing force pulling force seat and prestressing force holder by nut respectively, and described nut and screw thread round steel are spiral connection, by the pre-tensile stress of rotating nut adjustable prestressing force puller.
Technique effect of the present utility model is as follows:
The utility model breaches the prestressed structure of existing floor, employing is arranged on floor outside, band prestressing force holder and pulling force seat, origin of force is arranged on two ends or middle part, in oblique installation, nut screws adjustable new construction, change existing floor prestressed structure too simple, cannot regulate according to actual loading situation, the irrational problem of origin of force, especially the difficult problem that concrete and steel work combined type floor arrange prestressing apparatus is solved, it is a quantum jump innovation of building field, significantly improve the comprehensive stress performance of floor, and can regulate according to actual loading situation, compliance and modulability good, origin of force arranges rationally, prestressed stressed advantage can be given full play to, significantly decrease steel and concrete consumption.
Accompanying drawing explanation
Fig. 1 is the front view of the utility model embodiment 1.
Fig. 2 is the top view after the utility model embodiment 1 removes layer of concrete.
Fig. 3 is A-A sectional view in Fig. 1.
Fig. 4 is the structural representation of the utility model embodiment 2.
In accompanying drawing: 1-layer of concrete, 2-girder steel frame, 3-prestressing apparatus, 31-prestressing force pulling force seat, 32-prestressing force puller, 33-prestressing force holder, 34-nut, 35-strengthen gusset.
Detailed description of the invention
Below in conjunction with accompanying drawing, the utility model is described in further detail.
embodiment 1
As shown in Figure 1 and Figure 2, a kind of pre-stress floor, the girder steel frame 2 comprising layer of concrete 1 and be positioned at bottom it, described girder steel frame 2 is provided with prestressing apparatus 3.
Prestressing apparatus 3 comprises prestressing force holder 33, prestressing force pulling force seat 31 and prestressing force puller 32, and described prestressing force puller 32 is one or more in multiply steel cable, round steel, steel plate, shaped steel, carbon fiber or other retention material.
Prestressing force pulling force seat 31 and prestressing force holder 33 can adopt steel socket or high-strength alloy base or highstrenghtpiston's base or elastic base or other base, and in the present embodiment, prestressing force pulling force seat 31 and prestressing force holder 33 all select steel socket.
As shown in Figure 1, Figure 2, Figure 3 shows, prestressing force pulling force seat 31, or to be linked together by precast reinforced in the mode of welding and layer of concrete 1 by pre-in layer of concrete 1.In the present embodiment, prestressing force pulling force seat 31 has 2 right, is separately positioned on the two ends of layer of concrete 1.Near 2 pairs of prestressing force pulling force seats 31, correspondence is provided with 2 pairs of prestressing force holders, 33,2 pairs of prestressing force holders 33 and is fixed on the girder steel frame 2 below layer of concrete 1 by welding, riveted joint, bolt connection or alternate manner.Often pair of prestressing force pulling force seat 31 is connected by prestressing force puller 32 with between prestressing force holder 33, and prestressing force puller 32 is in oblique installation, and prestressing force puller 32 is drawn into pre-tensile stress state.
In the present embodiment, prestressing force puller 32 selects screw thread round steel, its two ends are fastened on prestressing force pulling force seat 31 with on prestressing force holder 33 respectively by nut 34, and described nut 34 and screw thread round steel are spiral connection, by the pre-tensile stress of rotating nut 34 adjustable prestressing force puller 32.Compared with other prestressing force puller 32, adopt screw thread round steel, there is the advantages such as cost is low, selection is fast, controllability is good.
Prestressing apparatus 3 can be arranged on two ends or the middle part of pre-stress floor, generally using the fixed end of prestressing force holder 33 as prestressing force puller 32, using the free end of prestressing force pulling force seat 31 as prestressing force puller 32.Under pre-tension state, the origin of force of pre-tensile stress is positioned at two ends or the middle part of pre-stress floor, and described origin of force is 2 or 4.Certainly, when applying, also can according to actual conditions other position being arranged on pre-stress floor by prestressing apparatus 3.The origin of force of prestressing apparatus 3 arranges two ends or the middle part of pre-stress floor, and mounted in pairs, it is stressed more rationally, with material more economize, effect is more excellent.
The utility model solves the prestressing force offering question of layer of concrete and steel work combined type floor, prestressing force pulling force seat 31 is by prefabricated and be welded in layer of concrete 1, prestressing force holder 33 is fixed on the girder steel frame 2 below layer of concrete 1, be connected by prestressing force puller 32 is oblique again, on the girder steel frame 2 pre-tensile stress being acted on layer of concrete 1 and be closely connected with layer of concrete 1, combined type floor is made to produce corresponding elastic deformation to strengthen its comprehensive stress performance, the utility model has easy to adjust, flexible for installation, save material, the advantage of the comprehensive stress performance of floor can be significantly improved.
embodiment 2
In the present embodiment, except prestressing apparatus difference, other structure of pre-stress floor is all identical with embodiment 1.
Prestressing apparatus 3 comprises prestressing force holder 33, prestressing force pulling force seat 31 and prestressing force puller 32, and described prestressing force pulling force seat 31 and prestressing force holder 33 all select steel socket.
As shown in Figure 4, prestressing apparatus is arranged on girder steel frame 2 two ends.Prestressing force pulling force seat 31 is fixed on the top of girder steel frame by welding, riveted joint, bolt connection or alternate manner, and is provided with reinforcement gusset 35 in prestressing force pulling force seat 31 installation place, to improve its intensity further.The prestressing force holder 33 of described prestressing apparatus is fixed on the bottom of girder steel frame 2 by welding, riveted joint, bolt connection or alternate manner.Prestressing force pulling force seat 31 is connected by prestressing force puller 32 with between prestressing force holder 33, and described prestressing force puller 32 is in oblique installation, and described prestressing force puller 32 is drawn into pre-tensile stress state.
In the present embodiment, prestressing apparatus is arranged in pairs in girder steel frame 2 two ends, directly be not connected with the layer of concrete 1 on girder steel frame 2 top, but pre-tensile stress is acted on girder steel frame 2, girder steel frame 2 is made to produce corresponding elastic deformation to strengthen its resistance to compression and bending resistance combination property, and then improve the comprehensive stress performance of the whole pre-stress floor that girder steel frame 2 and layer of concrete 1 are connected as a single entity, significantly decrease steel and concrete consumption.
Above embodiment is to explanation of the present utility model, and non-limiting, is more than PART.Prestressing apparatus of the present utility model not only can be applicable to floor, also can be applicable in other building structure.It should be noted that; concerning the technician of the industry; the simple transformation of carrying out according to general principle of the present utility model and structure, combination and improvement; as changed prestressing apparatus 3 for horizontal stretch; or change the materials and structures of each parts of prestressing apparatus 3; or change not mounted in pairs into, or prestressing force pulling force seat 31 and prestressing force holder 33 are exchanged installation etc., these all should be included within protection domain of the present utility model.

Claims (4)

1. a pre-stress floor, it is characterized in that: described pre-stress floor comprises the girder steel frame of layer of concrete and bottom, described prestressing apparatus is arranged on girder steel frame, described pre-stress floor inside or bottom are provided with prestressing apparatus, described prestressing apparatus comprises prestressing force holder, prestressing force pulling force seat and prestressing force puller, described prestressing force puller is multiply steel cable, round steel, steel plate, shaped steel, one or more in carbon fiber or other retention material, described prestressing apparatus is arranged on two ends or the middle part of pre-stress floor, the origin of force of prestressing apparatus is 2 or 4.
2. a kind of pre-stress floor according to claim 1, it is characterized in that: described prestressing apparatus is separately positioned in layer of concrete and girder steel frame, the prestressing force pulling force seat of described prestressing apparatus is by advance in layer of concrete, and by precast reinforcedly to link together in the mode of welding and layer of concrete, the below correspondence of described prestressing force pulling force seat is provided with prestressing force holder, described prestressing force holder is fixed on the girder steel frame below layer of concrete, described prestressing force pulling force seat is connected by prestressing force puller with between prestressing force holder, prestressing force puller is oblique installation, prestressing force puller is drawn into pre-tensile stress state.
3. a kind of pre-stress floor according to claim 1, it is characterized in that: described prestressing apparatus is arranged on girder steel frame two ends, the prestressing force pulling force seat of described prestressing apparatus is arranged on the top of girder steel frame, the prestressing force holder of described prestressing apparatus is arranged on the bottom of girder steel frame, described prestressing force pulling force seat is connected by prestressing force puller with between prestressing force holder, described prestressing force puller is oblique installation, and described prestressing force puller is drawn into pre-tensile stress state.
4. a kind of pre-stress floor according to Claims 2 or 3, it is characterized in that: described prestressing force puller adopts screw thread round steel, its two ends are fastened on prestressing force pulling force seat and prestressing force holder by nut respectively, described nut and screw thread round steel are spiral connection, by the pre-tensile stress of rotating nut adjustable prestressing force puller.
CN201520903385.2U 2015-04-21 2015-11-14 Prestressing force floor Expired - Fee Related CN205206116U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520903385.2U CN205206116U (en) 2015-04-21 2015-11-14 Prestressing force floor

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
CN2015202429098 2015-04-21
CN201520242909 2015-04-21
CN201520903385.2U CN205206116U (en) 2015-04-21 2015-11-14 Prestressing force floor

Publications (1)

Publication Number Publication Date
CN205206116U true CN205206116U (en) 2016-05-04

Family

ID=55843842

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520903385.2U Expired - Fee Related CN205206116U (en) 2015-04-21 2015-11-14 Prestressing force floor

Country Status (1)

Country Link
CN (1) CN205206116U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109184077A (en) * 2018-10-17 2019-01-11 中国铁路设计集团有限公司 One kind, which is casted anchor, applies prestressed girder with rolled steel section en cased in concrete and its construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109184077A (en) * 2018-10-17 2019-01-11 中国铁路设计集团有限公司 One kind, which is casted anchor, applies prestressed girder with rolled steel section en cased in concrete and its construction method
CN109184077B (en) * 2018-10-17 2023-05-09 中国铁路设计集团有限公司 Steel reinforced concrete beam with prestressed lower anchor and construction method thereof

Similar Documents

Publication Publication Date Title
CN201809994U (en) Super-elastic buckling-restrained energy-dissipation brace
CN204386036U (en) A kind of pre-stressed carbon fiber beaverboard anchorage
CN205100547U (en) A stupefied device of aluminum alloy template back of body for shear force wall
CN103388408A (en) External pre-stressed tendon reinforcing steering block for building structure
CN203201146U (en) Gasket for reinforcing column formwork
CN201713959U (en) Novel stretchable pressing reinforced concrete support
CN202323717U (en) Cantilever type pre-stress hoop and special tensioning device thereof
CN204435929U (en) A kind of pre-stressed carbon fiber plate tensioning equipment
CN205206116U (en) Prestressing force floor
CN104790575A (en) Prestressed floor slab
CN203716508U (en) Fork lug pin type anchoring pull cable tensioning device
CN203307736U (en) Reinforced concrete T-shaped beam bridge reinforced structure
CN211113185U (en) Prestressed bending and anchoring device for pre-tensioning method precast beam plate
CN202073364U (en) Quickly-assembled fence
CN202023262U (en) Device for tightening lower-chord panel point of multi-chord support structure
CN202831654U (en) Convenient and quick reinforcement binding device
CN211646943U (en) High-strength wallboard structure
CN201460239U (en) Anchor end plate
CN205046523U (en) Assembled ditch
CN208201862U (en) A kind of anchor device of extrusion type carbon fiber anchor cable
CN204282567U (en) A kind of flexion-proof energy consumption supporting structure
CN206448153U (en) A kind of resistant slide sheet-type support
CN202672343U (en) Long-span steel frame
CN211646973U (en) Prefabricated net muscle structure of ground for prefabricated building
CN211974073U (en) Horizontal and vertical bidirectional truss rib structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160504

Termination date: 20211114

CF01 Termination of patent right due to non-payment of annual fee