CN110274375A - A kind of pipeline fixed block, air-conditioner outdoor unit and air conditioner - Google Patents
A kind of pipeline fixed block, air-conditioner outdoor unit and air conditioner Download PDFInfo
- Publication number
- CN110274375A CN110274375A CN201910652367.4A CN201910652367A CN110274375A CN 110274375 A CN110274375 A CN 110274375A CN 201910652367 A CN201910652367 A CN 201910652367A CN 110274375 A CN110274375 A CN 110274375A
- Authority
- CN
- China
- Prior art keywords
- pipeline
- pore
- hole
- fixed part
- fixed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 239000011148 porous material Substances 0.000 claims abstract description 140
- 230000003447 ipsilateral effect Effects 0.000 claims description 6
- 238000009434 installation Methods 0.000 abstract description 37
- 230000009286 beneficial effect Effects 0.000 abstract description 3
- 230000000694 effects Effects 0.000 description 15
- 238000010586 diagram Methods 0.000 description 5
- 238000004519 manufacturing process Methods 0.000 description 4
- 239000007787 solid Substances 0.000 description 4
- 238000004378 air conditioning Methods 0.000 description 3
- 210000004262 dental pulp cavity Anatomy 0.000 description 3
- 230000006978 adaptation Effects 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 241000208340 Araliaceae Species 0.000 description 1
- 235000005035 Panax pseudoginseng ssp. pseudoginseng Nutrition 0.000 description 1
- 235000003140 Panax quinquefolius Nutrition 0.000 description 1
- 235000008331 Pinus X rigitaeda Nutrition 0.000 description 1
- 235000011613 Pinus brutia Nutrition 0.000 description 1
- 241000018646 Pinus brutia Species 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 235000008434 ginseng Nutrition 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000000465 moulding Methods 0.000 description 1
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F13/00—Details common to, or for air-conditioning, air-humidification, ventilation or use of air currents for screening
- F24F13/02—Ducting arrangements
- F24F13/0254—Ducting arrangements characterised by their mounting means, e.g. supports
Abstract
The present invention provides a kind of pipeline fixed block, air-conditioner outdoor unit and air conditioners, the pipeline fixed block includes the first fixed part, the second fixed part and interconnecting piece, first fixed part is fixedly installed on above the interconnecting piece, and second fixed part is fixedly installed below the interconnecting piece;First through hole is provided on first fixed part, the second through-hole is provided on second fixed part, being arranged side by side on the interconnecting piece has third through-hole and fourth hole, the first through hole is suitable for passing through for same pipeline with the third through-hole, and second through-hole is suitable for passing through for same pipeline with the fourth hole.Beneficial effects of the present invention: installation fixation preferably can be carried out to pipeline, when fixed block has vacant pore excessively, it will not be because of the pulling force of the tightening pieces such as band, elastic, vacant pore of crossing is caused to deform, cause to be not fixed firmly tightening for pipeline in pore excessively, and prevents fixed block from damaging.
Description
Technical field
The present invention relates to air-conditioning technical fields, in particular to a kind of pipeline fixed block, air-conditioner outdoor unit and air-conditioning
Device.
Background technique
Currently, in order to which the pipeline in air conditioner to be fixed, and the pipeline reduced in air conditioner generates at work
Vibration, can by be arranged pipeline fixed block more root canal roads are fixed, by opened up side by side on fixed block it is multiple cross manage
Through-hole is tightened pipeline and fixed block by tightening structures such as band, elastics so that air-conditioning duct to be threaded through in pipe through-hole,
But in general, the relatively simple fixation of the production mould of fixed block, the pipeline of portion is consolidated in the air conditioner
Periodically, cross pipe through-hole often there is a situation where it is vacant, vacant, open up side by side in the related art, on fixed block 3 cross manage it is logical
Hole, and in actual use is crossed in pipe through-hole there are one without pipeline, by the tightening structures such as band, elastic by pipeline with
When fixed block tightens, wherein crossing pipe through-hole due to the tightening force of tightening structure without pipeline, pipe through-hole was caused to deform, on the one hand
It causes fixed block to damage, on the other hand, will lead to and pipeline and tightening for fixed block are not fixed firmly.
Summary of the invention
Problems solved by the invention how is prevented when carrying out installing fixed to air-conditioner hose by pipeline fixed block
When occurring vacant pore excessively in pipeline fixed block, it is easy the case where deformation is shriveled by tightening piece.
To solve the above problems, the present invention provides a kind of pipeline fixed block, including fixed part, the fixed part includes first
Fixed part, the second fixed part and interconnecting piece, first fixed part are set to above the interconnecting piece, and second fixed part is set
It is placed in below the interconnecting piece;It is provided with first through hole on first fixed part, is provided with second on second fixed part
Through-hole, being arranged side by side on the interconnecting piece has third through-hole and fourth hole, and the first through hole is suitable for the third through-hole
It is passed through for same pipeline, second through-hole is suitable for passing through for same pipeline with the fourth hole, can be single to more root canal roads
It solely carries out tightening fixation, prevents the deformation that is flattened due to the vacant pore excessively of the tightening force appearance of tightening structure, while can be even
The outside of socket part and around be located at the interconnecting piece on third through-hole and the second through-hole setting tightening piece to two pipelines simultaneously
It carries out tightening fixation, so as to improve the fixed installation effect of pipeline fixed block and pipeline, makes to fix stronger.
Optionally, the fixed part side setting is fluted, and the groove, which is suitable for matching with a tightening piece, is encircled into tensioning sleeve
Circle forms tensioning lasso by setting groove and cooperation tightening piece, the pipeline of different tube diameters can be preferably adapted to, to pipe
Road carries out installation fixation, improves the versatility of pipeline fixed block, reduces production cost.
Optionally, it is provided with recessed portion on the ipsilateral side of first fixed part, the second fixed part, interconnecting piece, respectively
The recessed portion is in turn connected to form the groove, can carry out the two with the pipeline on the groove to the first fixed part and combine
Fixed and/or the second fixed part and the pipeline on the groove both carry out combine fixation and/or the first fixed part, second fix
The combination that pipeline in portion and groove carries out three is fixed, and is adapted to various forms of pipeline fixed forms and pipeline with this
When more, can fixation to pipeline it is stronger.
Optionally, the groove is arc-shaped structure, can preferably agree with the pipeline surface shape of fixation to be installed, with
And the pipeline of adaptation different diameter specifications, make the installation fixation of pipeline stronger with this.
Optionally, the radius of curvature of the groove is greater than the aperture of the first through hole and the third through-hole, and described the
The aperture of one through-hole and the third through-hole is greater than the aperture of second through-hole and the fourth hole, passes through different holes with this
The biggish groove of through-hole and radius of curvature of diameter, can cooperatively form the tensioning lasso being relatively large in diameter, with tightening piece with this energy
Enough pipelines for different-diameter pass through to the pipeline of fixed different-diameter.
Optionally, first fixed part is fixedly connected with the interconnecting piece, the first through hole and the third through-hole
It is formed with first and crosses pore, second fixed part is fixedly connected with the interconnecting piece, second through-hole and the four-way
Hole is formed with second and crosses pore, and in the technical scheme, the first fixed part is fixedly connected with interconnecting piece, thus first through hole and the
Three through-holes are directly connected to, and form an entirety first crosses pore, and corresponding second fixed part is fixedly connected with the interconnecting piece,
Second through-hole is directly connected to third through-hole, and form an entirety second crosses pore, so that pipeline fixed block is whole
Body is stronger, more stable and firm to the fixation of pipeline.
Optionally, it described first crosses pore and described second and crosses pore and all have respectively along the first mistake pore and described
Second crosses the axially extending notch of pore, pipeline can be crossed pore and second from merging first in notch and crossed in pore, square with this
Just the installation of pipeline and pipeline fixed block is fixed.
Optionally, it is provided with the first binding groove for crossing pore around described first on first fixed part, facilitates setting
Corresponding tightening piece, to facilitate the subsequent fixed installation to pipeline, while binding groove can prevent tightening piece from slipping, can with this
Improve the fixed installation effect of pipeline.
Optionally, it is provided with the second binding groove for crossing pore around described second on second fixed part, facilitates setting
Corresponding tightening piece, to facilitate the subsequent fixed installation to pipeline, while binding groove can prevent tightening piece from slipping, can with this
Improve the fixed installation effect of pipeline.
Optionally, it is provided on the interconnecting piece and is fastened around the described first third of pore and the described second pore excessively excessively
Slot facilitates the corresponding tightening piece of setting, and to facilitate the subsequent fixed installation to pipeline, while binding groove can prevent tightening piece sliding
It is de-, it can be improved the fixed installation effect of pipeline with this.
A kind of air-conditioner outdoor unit, including above-mentioned pipeline fixed block.
Optionally, the air-conditioner outdoor unit further includes tightening piece, and the tightening piece is suitable for fixed described first and crosses pore
And/or the pipeline placed in the second mistake pore.
Optionally, it is provided with recessed portion on the ipsilateral side of first fixed part, the second fixed part, interconnecting piece, respectively
The recessed portion is in turn connected to form fluted, is provided with pipeline in the groove, the tightening piece is suitable for fixed described first
It crosses pore and described second and crosses the pipeline being arranged in pore, and/or
Described first crosses the pipeline being arranged in pore and the groove, and/or
Described second crosses the pipeline being arranged in pore and the groove.
Optionally, be provided on first fixed part around it is described first cross pore the first binding groove, described second
It is provided with the second binding groove for crossing pore around described second on fixed part, is provided on the interconnecting piece around first mistake
The third binding groove of pore and the second mistake pore, the tightening piece includes a plurality of band, and first binding groove, second are tightly
Gu being provided at least one band in slot, third binding groove.
Air-conditioner outdoor unit of the present invention and above-mentioned pipeline fixed block compared with the existing technology in beneficial effect
It is identical, it is not repeating herein.
A kind of air conditioner, including above-mentioned air-conditioner outdoor unit.
Air conditioner of the present invention and above-mentioned air-conditioner outdoor unit compared with the existing technology in beneficial effect it is identical,
It is not repeating herein.
Detailed description of the invention
Fig. 1 is that the overall structure of pipeline fixed block of the present invention is illustrated;
Fig. 2 is the main view of pipeline fixed block of the present invention;
Fig. 3 is the top view of Fig. 2;
Fig. 4 is top view when being mounted with pipeline in Fig. 2;
Fig. 5 is the structural schematic diagram one when pipeline fixed block of the present invention fixes pipeline;
Fig. 6 is the top view of Fig. 5;
Fig. 7 is the structural schematic diagram two when pipeline fixed block of the present invention fixes pipeline;
Fig. 8 is the top view of Fig. 7;
Fig. 9 is the structural schematic diagram three when the invention pipeline fixed block fixes pipeline
Figure 10 is the top view of Fig. 9;
Figure 11 is the structural schematic diagram four when pipeline fixed block of the present invention fixes pipeline;
Figure 12 is the top view of Figure 11.
Description of symbols:
The first fixed part of 1-;The first binding groove of 101-;The second fixed part of 2-;The second binding groove of 201-;3- interconnecting piece;301-
Third binding groove;4- first crosses pore;401- first through hole;402- third through-hole;5- second crosses pore;The second through-hole of 501-;
502- fourth hole;6- groove;601- recessed portion;7- tightening piece;The first band of 701-;The second band of 702-;703- third is pricked
Band;8- is tensioned lasso;9- notch.
Specific embodiment
To make the above purposes, features and advantages of the invention more obvious and understandable, with reference to the accompanying drawing to the present invention
Specific embodiment be described in detail.
It is briefly described to orientation is related in following specific embodiments: the "front", "rear" that is previously mentioned in embodiment,
The direction of the instructions such as "upper", "lower", "left", "right" or positional relationship refer to orientation or positional relationship shown in the drawings, these
Orientation is merely for convenience of description, and this is described with simplified, rather than the device of indication or suggestion meaning must have specific side
Position is constructed and operated in a specific orientation, therefore should not be understood as the limitation to this.
Simultaneously, it is to be noted that, description and claims of this specification and term " first " in above-mentioned attached drawing,
" second " etc. is to be used to distinguish similar objects, without being used to describe a particular order or precedence order.It should be understood that in this way
The data used are interchangeable under appropriate circumstances, so that the embodiment of the present invention described herein can be in addition to scheming herein
Sequence other than those of showing or describe is implemented.
Referring to Fig.1 shown in -12, the invention proposes a kind of pipeline fixed blocks comprising fixed part, the fixed part include
First fixed part 1, the second fixed part 2 and interconnecting piece 3, first fixed part 1 are set to 3 top of the interconnecting piece, and described the
Two fixed parts 2 are set to 3 lower section of interconnecting piece;First through hole 401 is provided on first fixed part 1, described second is solid
To determine to be provided with the second through-hole 501 in portion, being arranged side by side on the interconnecting piece has a third through-hole 402 and fourth hole 502, and described the
One through-hole 401 is suitable for passing through for same pipeline with the third through-hole 402, second through-hole 501 and the fourth hole 502
Suitable for being passed through for same pipeline.
In the related art, pipeline fixed block, which is applied in the outer machine of air conditioner, fixes a plurality of outer machine pipeline, corresponding,
It needs to open up multiple pores excessively side by side on pipeline fixed block, and pipeline was correspondingly arranged in pore, pass through tightening piece
Pipeline and fixed block are tightened into fixation, and in actual use, it may appear that occur in part installation site pipeline fixed block
Vacant crosses pore, and at this time when being tightened pipeline and fixed block by tightening structures such as band, elastics, wherein without pipeline
Tightening force of the pipe through-hole due to tightening structure is crossed, caused pipe through-hole to deform, and on the one hand fixed block was caused to damage, on the other hand,
It will lead to and pipeline and tightening for fixed block are not fixed firmly.
In the present invention, pipeline fixed block includes that multiple pipeline fixed parts connect stacking formation, the present embodiment with interconnecting piece
In, specific fixed part includes the first fixed part 1, the second fixed part 2 and interconnecting piece 3, wherein first fixed part 1 is set to
3 top of interconnecting piece, the second fixed part 2 is set to 3 lower section of interconnecting piece, is when pipeline fixed block entirety is placed vertically in Fig. 2
Schematic diagram opens up first through hole 401 and the second through-hole on first fixed part 1 and second fixed part 2 vertically respectively
501, third through-hole is opened up for passing through for pipeline to be installed, while in interconnecting piece 3 and 401 corresponding position of first through hole
402, and fourth hole 502 is offered with the corresponding position of second through-hole 501.
In the present invention, the through-holes such as first through hole 401, the second through-hole 501, third through-hole 402, fourth hole 502 are circular hole
When each through-hole diameter, when the section of each through-hole is abnormity, what aperture referred to through hole section most descends the straight of inscribed circle
Diameter, according to the aperture, to limit the round pipe road for wearing special diameter, wherein the optionally first through hole 401 and described the
The aperture of three through-holes 402 is identical, and second through-hole 501 is identical as the aperture of the fourth hole 502, in the present invention, institute
It states the first fixed part 1 to be fixedly connected with the interconnecting piece 3, the first through hole 401 is formed with first with the third through-hole 402
Pore 4 is crossed, second fixed part 2 is fixedly connected with the interconnecting piece 3, second through-hole 501 and the fourth hole 502
It is formed with second and crosses pore 5, in the technical scheme, the first fixed part 1 is directly fixedly connected with interconnecting piece 3, so that first is logical
Hole 401 is directly connected to third through-hole 402, formed an entirety first cross pore 4, corresponding second fixed part 2 with it is described
Interconnecting piece 3 is fixedly connected, and the second through-hole 501 is directly connected to third through-hole 502, and form an entirety second crosses pore 5, from
And enable to pipeline fixed block globality stronger, it is more stable and firm to the fixation of pipeline.
In the present embodiment, the first fixed block 1, the second fixed block 2, link block 3 are fixedly connected with, and can be integrated
Molding, with this can fixation when air-conditioner hose is installed between pipeline and pipeline fixed block it is more firm, be not in pine
It is dynamic, wherein to be movably connected with link block 3 and the first fixed block 1 and the second fixed block 2, such as in the mobile positioning of link block 3
Setting makes first through hole 401 be mutually matched corresponding and the second through-hole 501 and third through-hole 502 with the position of third through-hole 402
Position is mutually matched correspondence, so that pipeline passes through, is also able to solve technical problem of the invention, while can flexibly adapt to not
Same occasion.
Based on this, on the fixed part of pipeline fixed block, it is formed integrally with the first pore 4 and second excessively and crosses pore 5, wherein
First pore 4 and the second stacking of pore 5 excessively excessively is staggered, and in 3 part of interconnecting piece, there are laps, solid by pipeline
When determining block installation is fixed to pipeline, be provided with pipeline if crossing in pore 4 first, and second cross pore 5 be it is vacant, at this time
Can the first fixed part 1 outside and cross pore 4 around described first band, the tightening pieces such as elastic be set, limited by tightening piece
Fixed first aperture for crossing pore 4 carries out tightening fixation, and the setting of the tightening piece will not cross pore 5 to second and impact, energy
The tightening force due to tightening structure is enough avoided, causes second to cross pore 5 while stress and deform, causes pipeline fixed block whole
Body, which damages, and the subsequent pipeline crossed in pore 4 to first is fixed loosens, and corresponding cross in pore 5 second is provided with pipe
Road, and described first when to cross pore 4 be vacant, also only in second fixed part, 2 outside and need to cross pore 5 around described second
Tightening piece is set.
Wherein, when pipeline being set in first excessively pore 4 and the second mistake pore 5 when simultaneously, and being fixedly mounted, a side
Face can first fixed part 1 outside and cross pore 4 around described first band, the tightening pieces such as elastic be set, then in institute
It states the outside of the second fixed part 2 and crosses pore 5 around described second and tightening piece is set, pore 4 and described is crossed to described first with this
Second pipeline crossed in pore 5 individually carries out tightening fixation, at the same can interconnecting piece 3 outside and around being located at the connection
In portion 3 first cross pore 4 and second cross pore 5 be arranged tightening piece to it is described first cross pore 4 and it is described second cross pore 5 in
Pipeline simultaneously carry out tightening fixation, so as to improve the fixed installation effect of pipeline fixed block and pipeline, make to fix stronger.
Wherein, the first fixed part 1, the second fixed part 2 and interconnecting piece 3 can be multiple and be sequentially connected, with can be to more
More pipelines carries out installation fixation.
In of the invention one optionally embodiment, the fixed part side setting fluted 6, the groove 6 is suitable for
Match with a tightening piece 7 and is encircled into tensioning sleeve circle 8.
Under normal conditions, outer machine pipeline has plurality of specifications, simultaneously for the air conditioner of different model, the diameter of pipeline
There are differences, cause the versatility of pipeline fixed block not strong, need to be arranged various types of pipeline fixed blocks to different air conditioners
Or the pipeline of different location is fixed in air conditioner.
In the present invention, the fixed part side setting fluted 6, the groove 6, which is suitable for matching with a tightening piece 7, to be encircled into
It is tensioned lasso 8, wherein be used to prevent air-conditioner hose to be installed in the groove 6, when carrying out installing fixed to pipeline,
Pipeline is placed in the groove 6, carries out tightening fixation with fixed part by the pipeline in the groove 6 by tightening piece 7, wherein
Specifically, when such as using band or elastic, band or elastic are arranged with around fixed part when tightening piece 7 is arranged on fixed part,
The tensioning lasso 8 of pipeline can be accommodated by surrounding one between tightening piece 7 and groove 6 at this time, when tightening piece 7 is using elastic, this
The size of fixed circle 8, as the deformation of elastic is changed, uses band in tightening piece 7 according to the diameter of pipeline to be fixed
When, the size of the tensioning lasso 8 according to the diameter of pipeline to be fixed can change the control of band with user, with
This can preferably be adapted to the pipeline of different size, in actual use, can cross pore 4 and described for described first
Two apertures for crossing pore 5 are set as the caliber slightly larger than the stronger pipeline of versatility, to be adapted to most installation situations, Qi Taguan
Road can carry out tightening fixation by the tensioning lasso 8 that groove 6 and tightening piece 7 are formed, with this one side lift line fixed block
Versatility, reduce production cost, on the other hand pore in conjunction with groove by way of installation fixation is carried out to pipeline, also can
Enough play the role of preferably fixing pipeline.
In of the invention one optionally embodiment, first fixed part 1, the second fixed part 2, interconnecting piece 3 are ipsilateral
Side on be provided with recessed portion 601, each recessed portion 601 is in turn connected to form the groove 6.
Shown in referring to Fig.1, in the present invention, the groove 6 is multiple recessed portions 601 composition, wherein each recessed portion
601 are arranged on the side of 3 the same side of the first fixed part 1, the second fixed part 2 and interconnecting piece, are individually tightened with this one
When part 7 individually fixes the pipeline on the first fixed part 1 or the second fixed part 2 or interconnecting piece 3, which simultaneously can be with
The groove 6 surrounds the tensioning lasso 8, can be carried out to the pipeline being located in the groove 6 with this by the tensioning lasso 8
Fixation is tightened, fixed and/or second is solid so as to combine to the first fixed part 1 with both pipeline progress on the groove 6
Determine portion 2 and combines fixed and/or the first fixed part 1, the second fixed part 2 and groove 6 with both pipeline progress on the groove 6
On pipeline carry out three combination fix, can when being adapted to various forms of pipeline fixed forms and more pipeline with this
It is stronger to the fixation of pipeline.
In of the invention one optionally embodiment, the radius of curvature of the groove 6 be greater than the first through hole 401 with
The aperture of the third through-hole 402, the first through hole 401 and the aperture of the third through-hole 402 are greater than second through-hole
501 are greater than the first through hole in the radius of curvature of the groove 6 in the present embodiment with the aperture of the fourth hole 502
401 with the aperture of the third through-hole 402 when, the diameter for the tensioning lasso 8 that the groove 6 and tightening piece 7 surround is greater than described
The aperture of first through hole 401 and the third through-hole 402 is tensioned with this and is placed the diameter of fixed pipeline in lasso 8 and be greater than the
The pipeline diameter for passing through and fixing in one through-hole 401 and the third through-hole 402, the corresponding first through hole 401 with it is described
When the aperture of third through-hole 402 is greater than the aperture of second through-hole 501 and the fourth hole 502, first through hole 401 and institute
It states the pipeline diameter that passes through and fix in third through-hole 402 and is greater than in second through-hole 501 and the fourth hole 502 and pass through
Pipeline diameter, in production, can set identical for the first through hole 401 and the aperture of the third through-hole 402, and for compared with
For the diameter of general pipeline, it is corresponding can be worn in second through-hole 501 and the fourth hole 502 it is fixed compared with
The pipeline of small dimension can prevent from fixing the pipeline of larger specification in tensioning lasso 8, with this by the through-hole of different pore size, with
And the biggish groove 6 of radius of curvature, the tensioning lasso 8 being relatively large in diameter can be cooperatively formed with tightening piece 7, it can be for difference with this
The pipeline of diameter passes through to the pipeline of fixed different-diameter.
Consolidated by the described first installation that pore 4, described second pore 5, the groove 6 excessively can be realized single conduit excessively
It is fixed, and the pipeline of any combination of two carries out installation fixation in such as Fig. 5-10, the pore of crossing without will lead to vacant is flattened,
And fixation is installed on three root canal roads simultaneously in such as Figure 11 and 12, and by more bands, as the first band 701, second is pricked in figure
The pipeline of combination of two is carried out tightening fixation respectively with 702, third band 703, tying up for pipeline can be improved preferably with this
Fasten effect.
Wherein, the first binding groove 101 for crossing pore 4 around described first, reference are provided on first fixed part 1
Shown in Fig. 5,6,11 and 12, the first fixed part 1 outside and around it is described first cross pore 4 be provided with the first binding groove 101,
By the way that the first binding groove 101 is arranged, can be more convenient that tightening piece 7 is arranged in the first binding groove 101, in Fig. 5,6,11 and 12
The first band 701, can be shifted to an earlier date with this when being fixed on pipeline after the first band 701 is set on pipeline fixed block to facilitate
The continuous fixed installation to pipeline, while when the first band 701 is arranged in the first binding groove 101, after pipeline fixed installation,
First binding groove 101 can limit the first band 701, to prevent the first band 701 from slipping, can be improved pipe with this
The fixed installation effect on road.
Optionally, the second binding groove 201 for crossing pore 5 around described second, ginseng are provided on second fixed part 2
According to shown in Fig. 7,8,11 and 12, the second fixed part 2 outside and cross pore 5 around described second and be provided with the second binding groove
201, by the way that the second binding groove 201 is arranged, can be more convenient that tightening piece 7 is arranged in the second binding groove 201, such as the and of Fig. 7,8,11
The second band 702 in 12 can be shifted to an earlier date when being fixed on pipeline with this and the second band 702 be arranged on pipeline fixed block with side
Continue the fixed installation to pipeline after an action of the bowels, while when the second band 702 is arranged in the second binding groove 201, in the fixed peace of pipeline
After dress, the second binding groove 201 can limit the second band 702, thus prevent the second band 702 from slipping, it can with this
Improve the fixed installation effect of pipeline.
Optionally, the third that pore 5 is crossed around the first mistake pore 4 and described second is provided on the interconnecting piece 3
Binding groove 301, referring to shown in Fig. 9-12, interconnecting piece 3 outside and cross pore 4 and described second around described first and cross pore
5 are provided with third binding groove 301, by the way that third binding groove 301 is arranged, can be more convenient that beam is arranged in third binding groove 301
Tight part 7 can be shifted to an earlier date when being fixed on pipeline with this and the is arranged on pipeline fixed block such as the third band 703 in Fig. 9-12
Three bands 703 to facilitate the subsequent fixed installation to pipeline, first cross pore 4 and second cross pore 5 or first cross pore 4,
When being provided with pipeline in the second mistake pore 5 and groove 6, its whole further progress can be tightened by third band 703
It is fixed, so as to improve fixed effect is tightened, while when third band 703 is arranged in third binding groove 301, being fixed in pipeline
After installation, third binding groove 301 can limit third band 703, to prevent third band 703 from slipping, with this energy
Enough improve the fixed installation effect of pipeline.
In of the invention one optionally embodiment, the groove 6 is arc-shaped structure, can preferably be agreed with wait pacify
Fixed pipeline surface shape, and the pipeline of adaptation different diameter specifications are filled, makes the installation fixation of pipeline more firm with this
Gu.
In of the invention one optionally embodiment, described first, which crosses pore 4 and described second, crosses pore 5 and all has point
Pore 4 and described second is not crossed along described first and crosses the axially extending notch 9 of pore 5, wherein referring to shown in Fig. 2, first crosses pipe
The axial direction of hole 4 and the second pore 5 excessively is that the first mistake pore 4 and second cross the length direction of pore 5, i.e. upper and lower direction in figure,
Pipeline is placed in it is described first cross pore 4 and it is described second cross pore 5 in when, pipeline can be placed in from notch 9 described in
First, which crosses pore 4 and described second, crosses in pore 5, with this, pipeline and the installation of pipeline fixed block is facilitated to fix.
The invention also provides a kind of air-conditioner outdoor units, including above-mentioned pipeline fixed block, the air-conditioner outdoor unit
It further include tightening piece 7, the tightening piece 7 is suitable for fixed described first and crosses pore 4 and/or described second cross and place in pore 5
Pipeline, can to it is described first cross pore 4 and it is described second cross pore 5 in pipeline individually carry out tightening fixation, prevent due to
There is vacant pore of crossing and is flattened deformation in the tightening force of tightening structure, at the same can interconnecting piece 3 outside and around positioned at institute
It states the on interconnecting piece 3 first pore 4 and second excessively and crosses the setting tightening piece of pore 5 to the first mistake pore 4 and second mistake
Pipeline in pore 5 carries out tightening fixation simultaneously, so as to improve the fixed installation effect of pipeline fixed block and pipeline, makes to fix more
Add securely.
In of the invention one optionally embodiment, first fixed part 1, the second fixed part 2, interconnecting piece 3 are ipsilateral
Side on be provided with recessed portion 601, each recessed portion 601 is in turn connected to form fluted 6, is arranged in the groove 6
There is pipeline, the tightening piece 7 crosses pore 4 and described second suitable for fixed described first and crosses the pipeline being arranged in pore 5, and/or,
The pipeline being arranged in the first mistake pore 4 and the groove 6, and/or, it is arranged in the second mistake pore 5 and the groove 6
Pipeline.Referring to shown in Fig. 5-12, the tightening piece includes such as the first band 701, the second band 702, third band in figure
703, the pipeline of combination of two is carried out tightening fixation respectively by the first band 701, the second band 702, third band 703,
Fixed effect is tightened with what this can preferably improve pipeline, various forms of pipeline fixed forms and pipeline are adapted to this
When more, can fixation to pipeline it is stronger, while also can be avoided vacant pore of crossing and being flattened.
In of the invention one optionally embodiment, it is provided with to cross around described first on first fixed part 1 and manages
First binding groove 101 in hole 4 is provided with the second binding groove 201 for crossing pore 5 around described second on second fixed part 2,
The third binding groove 301 that pore 5 is crossed around the first mistake pore 4 and described second, the beam are provided on the interconnecting piece 3
Tight part 7 includes a plurality of band, and first binding groove 101, the second binding groove 201 are provided at least in third binding groove 301
One band, referring in Fig. 5-12, can shift to an earlier date when being fixed on pipeline be arranged on pipeline fixed block the first band 701 with
Facilitate the subsequent fixed installation to pipeline, while when the first band 701 is arranged in the first binding groove 101, being fixed in pipeline
After installation, the first binding groove 101 can limit the first band 701, thus prevent the first band 701 from slipping, it is corresponding,
When the second band 702 is arranged in the second binding groove 201, after pipeline fixed installation, the second binding groove 201 can be to second
Band 702 is limited, thus prevent the second band 702 from slipping, it is corresponding, it can shift to an earlier date when being fixed on pipeline solid in pipeline
Determine to be arranged on block third band 703 to facilitate the subsequent fixed installation to pipeline, crosses pore 4 and second first and cross pore 5, or
First, which crosses pore 4, second, crosses when being provided with pipeline in pore 5 and groove 6, can by third band 703 to its entirety into
One step carries out tightening fixation, so as to improve fixed effect is tightened, while being arranged in third binding groove 301 in third band 703
When, after pipeline fixed installation, third binding groove 301 can limit third band 703, to prevent third band
703 slip, and can be improved the fixed installation effect of pipeline with this.
The invention also provides a kind of air conditioners can cross pore 4 to described first including above-mentioned air-conditioner outdoor unit
The pipeline crossed in pore 5 with described second individually carries out tightening fixation, prevents the tightening force due to tightening structure from vacant mistake occur
Pore is flattened, at the same can interconnecting piece 3 outside and around be located at the interconnecting piece 3 on first cross pore 4 and second
Pore 5 is crossed tightening piece is arranged to the pipeline in described first excessively pore 4 and the second mistake pore 5 while carrying out tightening fixation,
So as to improve the fixed installation effect of pipeline fixed block and pipeline, make to fix stronger.
Although present disclosure is as above, present invention is not limited to this.Anyone skilled in the art are not departing from this
It in the spirit and scope of invention, can make various changes or modifications, therefore protection scope of the present invention should be with claim institute
Subject to the range of restriction.
Claims (13)
1. a kind of pipeline fixed block, which is characterized in that including fixed part, the fixed part is consolidated including the first fixed part (1), second
Determine portion (2) and interconnecting piece (3), first fixed part (1) is set to above the interconnecting piece (3), second fixed part (2)
It is set to below the interconnecting piece (3);It is provided with first through hole (401) on first fixed part (1), second fixed part
On be provided with the second through-hole (501), on the interconnecting piece (3) be arranged side by side have third through-hole (402) and fourth hole (502),
The first through hole (401) is suitable for passing through for same pipeline with the third through-hole (402), second through-hole (501) and institute
Fourth hole (502) are stated to be suitable for passing through for same pipeline.
2. pipeline fixed block according to claim 1, which is characterized in that fluted (6) are arranged in the fixed part side, institute
It states groove (6) and is encircled into tensioning sleeve circle (8) suitable for matching with a tightening piece (7).
3. pipeline fixed block according to claim 2, which is characterized in that first fixed part (1), the second fixed part
(2), it is provided with recessed portion (601) on the ipsilateral side of interconnecting piece (3), each recessed portion (601) is in turn connected to form institute
State groove (6).
4. pipeline fixed block according to claim 1, which is characterized in that first fixed part (1) and the interconnecting piece
(3) it being fixedly connected, the first through hole (401) and the third through-hole (402) are formed with first and cross pore (4), and described second
Fixed part (2) is fixedly connected with the interconnecting piece (3), and second through-hole (501) and the fourth hole (502) are formed with the
Two cross pore (5).
5. pipeline fixed block according to claim 4, which is characterized in that described first crosses pore (4) and second mistake
Pore (5), which all has, crosses pore (5) axially extending notch (9) along first mistake pore (4) and described second respectively.
6. according to any pipeline fixed block of claim 4 or 5, which is characterized in that be arranged on first fixed part (1)
There is the first binding groove (101) for crossing pore (4) around described first.
7. pipeline fixed block according to claim 6, which is characterized in that be provided with and surround on second fixed part (2)
Described second crosses second binding groove (201) of pore (5).
8. pipeline fixed block according to claim 7, which is characterized in that be provided on the interconnecting piece (3) around described
First, which crosses pore (4) and described second, crosses the third binding groove (301) of pore (5).
9. a kind of air-conditioner outdoor unit, which is characterized in that including any pipeline fixed block of claim 1-8.
10. air-conditioner outdoor unit according to claim 9, which is characterized in that the air-conditioner outdoor unit further includes tightening
Part (7), the tightening piece (7) are suitable for fixed described first and cross pore (4) and/or described second cross the pipe placed in pore (5)
Road.
11. air-conditioner outdoor unit according to claim 10, which is characterized in that first fixed part (1), second are fixed
Portion (2), interconnecting piece (3) are provided with recessed portion (601) on ipsilateral side, and each recessed portion (601) is in turn connected to form
Fluted (6), pipeline is provided in the groove (6), and the tightening piece (7) is suitable for fixed described first and crosses pore (4) and institute
It states second and crosses the pipeline being arranged in pore (5), and/or
Described first crosses the pipeline being arranged in pore (4) and the groove (6), and/or
Described second crosses the pipeline being arranged in pore (5) and the groove (6).
12. air-conditioner outdoor unit according to claim 11, which is characterized in that be provided on first fixed part (1)
Around the first binding groove (101) of first mistake pore (4), it is provided on second fixed part (2) around described second
The second binding groove (201) of pore (5) is crossed, is provided on the interconnecting piece (3) and crosses pore (4) and described the around described first
Two cross the third binding groove (301) of pore (5), and the tightening piece (7) includes a plurality of band, first binding groove (101), the
At least one band is provided in two binding grooves (201), third binding groove (301).
13. a kind of air conditioner, which is characterized in that including any air-conditioner outdoor unit of claim 9-12.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910652367.4A CN110274375A (en) | 2019-07-18 | 2019-07-18 | A kind of pipeline fixed block, air-conditioner outdoor unit and air conditioner |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910652367.4A CN110274375A (en) | 2019-07-18 | 2019-07-18 | A kind of pipeline fixed block, air-conditioner outdoor unit and air conditioner |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110274375A true CN110274375A (en) | 2019-09-24 |
Family
ID=67964804
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910652367.4A Pending CN110274375A (en) | 2019-07-18 | 2019-07-18 | A kind of pipeline fixed block, air-conditioner outdoor unit and air conditioner |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110274375A (en) |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH08247579A (en) * | 1995-03-14 | 1996-09-27 | Matsushita Refrig Co Ltd | Vibration isolator for tube |
EP1753075A1 (en) * | 2005-08-08 | 2007-02-14 | Luigi Pillosio | Mast snap fit support for radio communication antenna |
CN101427977A (en) * | 2002-03-11 | 2009-05-13 | 弗雷森纽斯医疗护理德国有限责任公司 | Connector, container with such a connector and fluid preperation device with a mating connector for such a container |
CN101482201A (en) * | 2007-12-03 | 2009-07-15 | 万国引擎知识产权有限责任公司 | Multiple tube clip |
KR20110125086A (en) * | 2010-05-12 | 2011-11-18 | 이태하 | The pipe fixing device |
CN102282402A (en) * | 2008-12-03 | 2011-12-14 | Aims国际股份有限公司 | Apparatus and methods for supporting an elongated member |
CN206145271U (en) * | 2016-09-13 | 2017-05-03 | 上海仪达空调有限公司 | Air conditioner is supporting structure for pipeline |
CN107228230A (en) * | 2017-06-19 | 2017-10-03 | 芜湖侨云友星电气工业有限公司 | A kind of body harness fixture |
CN208458233U (en) * | 2018-06-29 | 2019-02-01 | 广东美的暖通设备有限公司 | The vibration absorber of pipeline and air conditioner with it |
CN210532637U (en) * | 2019-07-18 | 2020-05-15 | 宁波奥克斯电气股份有限公司 | Pipeline fixed block, air conditioner outdoor unit and air conditioner |
-
2019
- 2019-07-18 CN CN201910652367.4A patent/CN110274375A/en active Pending
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH08247579A (en) * | 1995-03-14 | 1996-09-27 | Matsushita Refrig Co Ltd | Vibration isolator for tube |
CN101427977A (en) * | 2002-03-11 | 2009-05-13 | 弗雷森纽斯医疗护理德国有限责任公司 | Connector, container with such a connector and fluid preperation device with a mating connector for such a container |
EP1753075A1 (en) * | 2005-08-08 | 2007-02-14 | Luigi Pillosio | Mast snap fit support for radio communication antenna |
CN101482201A (en) * | 2007-12-03 | 2009-07-15 | 万国引擎知识产权有限责任公司 | Multiple tube clip |
CN102282402A (en) * | 2008-12-03 | 2011-12-14 | Aims国际股份有限公司 | Apparatus and methods for supporting an elongated member |
KR20110125086A (en) * | 2010-05-12 | 2011-11-18 | 이태하 | The pipe fixing device |
CN206145271U (en) * | 2016-09-13 | 2017-05-03 | 上海仪达空调有限公司 | Air conditioner is supporting structure for pipeline |
CN107228230A (en) * | 2017-06-19 | 2017-10-03 | 芜湖侨云友星电气工业有限公司 | A kind of body harness fixture |
CN208458233U (en) * | 2018-06-29 | 2019-02-01 | 广东美的暖通设备有限公司 | The vibration absorber of pipeline and air conditioner with it |
CN210532637U (en) * | 2019-07-18 | 2020-05-15 | 宁波奥克斯电气股份有限公司 | Pipeline fixed block, air conditioner outdoor unit and air conditioner |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP5848349B2 (en) | Rail suspension device, especially rail for elevated conveyor or rail suspension device for lifting machine | |
CN102596679B (en) | For the hose support strap of railway car brake line | |
US9145907B2 (en) | Pipe connector | |
CN110274375A (en) | A kind of pipeline fixed block, air-conditioner outdoor unit and air conditioner | |
CN106090432B (en) | Pipe clamp and the pipeline assembly for including the pipe clamp | |
CN202691353U (en) | V-shaped clamp hoop | |
CN208457391U (en) | A kind of air hose quickly couples anchor ear | |
CN210532637U (en) | Pipeline fixed block, air conditioner outdoor unit and air conditioner | |
CN208846658U (en) | Pipe fixed block and air conditioner | |
CN205991238U (en) | Pipe clamp and the pipeline assembly including this pipe clamp | |
CN202507207U (en) | Improved rotating spanner | |
CN205896402U (en) | Pipe joint fixed plate and fixed knot construct | |
CN205065047U (en) | A pipe clamp for high pressure hose fixed mounting | |
CN104534173A (en) | Automobile air conditioner pipe clamp | |
CN105299323B (en) | A kind of pipe clamp being fixedly mounted for high-pressure hose | |
CN207921493U (en) | A kind of underground multi-pipeline fixing hoop | |
CN211082706U (en) | Stainless steel wire rope turnbuckle | |
CN208363428U (en) | A kind of steel wire bundle docking structure | |
ATE292770T1 (en) | COUPLING SLEEVE FOR CORRUPTED PIPES | |
CN209556368U (en) | The double quarter bends of fastener integration overlap back cord | |
CN109340463A (en) | A kind of clamp device and the electric appliance using the clamp device | |
CN208652856U (en) | Pipeline fixing piece and air-conditioning | |
CN109869525A (en) | Pipeline fixing structure, pipeline mechanism and air conditioner | |
CN207554980U (en) | A kind of quick-release type detects line fixing clamp hoop for pipelines | |
US20040151534A1 (en) | Fixing device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |