CN110264369A - Checking method, device, electronic equipment and the storage medium that expense calculates - Google Patents

Checking method, device, electronic equipment and the storage medium that expense calculates Download PDF

Info

Publication number
CN110264369A
CN110264369A CN201910303087.2A CN201910303087A CN110264369A CN 110264369 A CN110264369 A CN 110264369A CN 201910303087 A CN201910303087 A CN 201910303087A CN 110264369 A CN110264369 A CN 110264369A
Authority
CN
China
Prior art keywords
node
project
computing platform
calculate node
contribution quota
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910303087.2A
Other languages
Chinese (zh)
Other versions
CN110264369B (en
Inventor
王明亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Advanced New Technologies Co Ltd
Advantageous New Technologies Co Ltd
Original Assignee
Alibaba Group Holding Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Alibaba Group Holding Ltd filed Critical Alibaba Group Holding Ltd
Priority to CN201910303087.2A priority Critical patent/CN110264369B/en
Publication of CN110264369A publication Critical patent/CN110264369A/en
Application granted granted Critical
Publication of CN110264369B publication Critical patent/CN110264369B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q40/00Finance; Insurance; Tax strategies; Processing of corporate or income taxes
    • G06Q40/08Insurance
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Abstract

This specification provides checking method, device, electronic equipment and the storage medium that expense calculates, wherein the checking method of the expense calculating includes: the case set that the program member set and project case of the mutual assistance project are participated in the project cycle according to mutual assistance project, and at least two computing platforms is called to carry out the calculating of contribution quota in the project cycle;Judge whether at least two computing platforms calculate the contribution quota obtained equal;If unequal, sequence is executed according to the node that at least two computing platforms calculate the calculate node that contribution quota executes, whether consistent checks the node data that calculate node calculating generates at least two computing platforms;If inconsistent, the inconsistent corresponding calculate node of node data is executed at least two computing platforms respectively;Largely reduce the calculating cost for recalculating contribution quota into calculate node data by being weighed just for the inconsistent corresponding calculate node of node data.

Description

Checking method, device, electronic equipment and the storage medium that expense calculates
Technical field
This specification is related to technical field of data processing, the in particular to checking method that a kind of expense calculates.This specification It is related to a kind of checking device that expense calculates, a kind of calculating equipment and a kind of computer readable storage medium simultaneously.
Background technique
With the development of internet insurance business, it is proposed the insurance coverage of type mutually processed on the market, insures mould herein In formula, insured people can be added in this insurance business after reaching entry criteria as defined in this insurance model, the insurance model Insured people illness or accident occur will be settled a claim during insurance business, Claims Resolution money is shared by other insured people, passes through guarantor Dangerous company is withholdd or is paid the fees by other insured people in addition to being settled a claim.This insures due to low with payment amount of money, The advantages that audient's scale is big, relatively more fair and just, favors by user.
In the prior art, in the case where case Claims Resolution occurs in this insurance model, the corresponding agent platform of insurance coverage Total program member's number in the service platform statistical item period corresponding with insurance coverage, according to the business in the insurance coverage Rule determines the amount of money that every program member should share, in the process, if the corresponding agent platform of insurance coverage and insurance The calculated contribution quota of the corresponding service platform of project is inconsistent, then both sides' platform will need to be adjusted calculating process, Recalculate the contribution quota.
However, since the corresponding agent platform of insurance coverage service platform corresponding with insurance coverage is calculating contribution quota It during this, needs gradually to carry out by multiple calculate nodes to calculate the contribution quota, is occurring to calculate contribution quota not Under unanimous circumstances, the calculating cost that both sides' platform recalculates contribution quota will be a biggish expense.
Summary of the invention
In view of this, this specification embodiment provides a kind of checking method that expense calculates.This specification is related to simultaneously A kind of checking device that expense calculates, a kind of calculating equipment and a kind of computer readable storage medium, to solve the prior art Present in technological deficiency.
According to this specification embodiment in a first aspect, providing a kind of checking method that expense calculates, comprising:
Gather the case with project case according to the program member for participating in the mutual assistance project in the project cycle of mutual assistance project Part set calls at least two computing platforms to carry out the calculating of contribution quota in the project cycle;
Judge whether at least two computing platform calculates the contribution quota obtained equal;
If unequal, the node for the calculate node that the contribution quota executes is calculated according at least two computing platform Sequence is executed, whether consistent checks the node data that the calculating of calculate node described at least two computing platform generates;
If inconsistent, the inconsistent corresponding calculating section of the node data is executed at least two computing platform respectively Point.
Optionally, at least two computing platform carries out the calculating of contribution quota in the project cycle, comprising:
Count the total number that program member's set of the mutual assistance project is participated in the project cycle;
Total Shen is calculated in such a way that the application amount of money to project case described in the case set carries out cumulative summation Lead the amount of money;
According to preset mutual assistance project computation rule to total total number for claiming the amount of money and program member set The two is calculated, using calculated result as the contribution quota.
Optionally, at least two computing platform calculates the calculate node that the contribution quota executes and includes:
Program member counts node, project case calculate node and contribution quota calculate node;
Correspondingly, the node execution that at least two computing platform calculates the calculate node that the contribution quota executes is suitable Sequence includes:
The program member counts node and executes before project case calculate node execution, and the project case Calculate node executes before contribution quota calculate node execution;
Alternatively, the program member counts node and the project case calculate node in the contribution quota calculate node It is executed before executing.
Optionally, if node execution sequence is that the program member counts node in the project case calculate node It is executed before executing, and the project case calculate node executes before contribution quota calculate node execution;
Correspondingly, the section for calculating the calculate node that the contribution quota executes according at least two computing platform Point executes sequence, and whether the node data for checking the calculating generation of calculate node described at least two computing platform is consistent, Include:
Sequence is executed according to the node, program member described at least two computing platform is checked and counts node meter Whether consistent calculate the program member's total number data generated;
If inconsistent, execute described respectively in at least two computing platform execution inconsistent correspondence of node data Calculate node step;
Wherein, described to execute the inconsistent corresponding calculating section of the node data at least two computing platform respectively Point, comprising:
The program member, which is executed, at least two computing platform respectively counts node.
Optionally, if program member described in verification at least two computing platform counts node and calculates generation The checked result of the whether consistent sub-step of program member's total number data be it is consistent, perform the following operations:
Check project case calculate node described at least two computing platform generation project case data whether Unanimously;
If inconsistent, execute described respectively in at least two computing platform execution inconsistent correspondence of node data Calculate node step;
Wherein, described to execute the inconsistent corresponding calculating section of the node data at least two computing platform respectively Point, comprising:
The project case calculate node is executed at least two computing platform respectively.
Optionally, if the project that project case calculate node described in verification at least two computing platform generates The checked result of the whether consistent sub-step of case data be it is consistent, perform the following operations:
Check contribution quota calculate node described at least two computing platform generation contribution quota data whether Unanimously;
If inconsistent, execute described respectively in at least two computing platform execution inconsistent correspondence of node data Calculate node step;
Wherein, described to execute the inconsistent corresponding calculating section of the node data at least two computing platform respectively Point, comprising:
The contribution quota calculate node is executed at least two computing platform respectively.
Optionally, if contribution quota calculate node generation described in verification at least two computing platform is shared The checked result of the whether consistent sub-step of value data be it is consistent, perform the following operations:
It checks mutual in addition to calculating the calculate node that the contribution quota executes at least two computing platform Whether consistent project calculate node is helped to calculate the mutual assistance project data generated;
If inconsistent, execute described respectively in at least two computing platform execution inconsistent correspondence of node data Calculate node step;
Wherein, described to execute the inconsistent corresponding calculating section of the node data at least two computing platform respectively Point, comprising:
The mutual assistance project calculate node is executed at least two computing platform respectively.
Optionally, if node execution sequence is that the program member counts node and the project case calculate node It is executed before contribution quota calculate node execution;
Correspondingly, the section for calculating the calculate node that the contribution quota executes according at least two computing platform Point executes sequence, and whether the node data for checking the calculating generation of calculate node described at least two computing platform is consistent, Include:
Sequence is executed according to the node, program member described at least two computing platform is checked and counts node meter Whether the project case data that the program member's total number data and project case calculate node calculating for calculating generation generate Unanimously;
If inconsistent, execute described respectively in at least two computing platform execution inconsistent correspondence of node data Calculate node step;
Wherein, described to execute the inconsistent corresponding calculating section of the node data at least two computing platform respectively Point, comprising:
The program member, which is executed, at least two computing platform respectively counts node and project case calculating Node.
Optionally, if program member described in verification at least two computing platform counts node and calculates generation Program member's total number data and the project case calculate node calculate the whether consistent sub-step of project case data generated Rapid checked result be it is consistent, perform the following operations:
Check contribution quota calculate node described at least two computing platform generation contribution quota data whether Unanimously;
If inconsistent, execute described respectively in at least two computing platform execution inconsistent correspondence of node data Calculate node step;
Wherein, described to execute the inconsistent corresponding calculating section of the node data at least two computing platform respectively Point, comprising:
The contribution quota calculate node is executed at least two computing platform respectively.
Optionally, at least two computing platform, comprising:
Carry the Projects Agency platform of the mutual assistance project and the project service platform of the mutual assistance project.
Optionally, the program member's set and item of the mutual assistance project are participated in the project cycle according to mutual assistance project The case set of mesh case, the calculating step for calling at least two computing platforms to carry out contribution quota in the project cycle execute Before, further includes:
Extracted in the member information DB participated in the project cycle project of the mutual assistance project at Member's set;
The Projects Agency platform synchronizes project case described in the project service platform within the project cycle Case set.
Optionally, if described judge that at least two computing platform calculates the whether equal step of the contribution quota obtained Rapid judging result be it is equal, perform the following operations:
Program member into program member set sends the prompting for paying the contribution quota.
According to the second aspect of this specification embodiment, a kind of checking device that expense calculates is provided, comprising:
Calling module is configured as participating in program member's collection of the mutual assistance project in the project cycle according to mutual assistance project It closes and the case set of project case, at least two computing platforms of calling carries out the calculating of contribution quota in the project cycle;
Judgment module, be configured as judging at least two computing platform calculate the contribution quota that obtains whether phase Deng;
If unequal, operation verification module;
The verification module is configured as calculating the meter that the contribution quota executes according at least two computing platform The node of operator node executes sequence, checks calculate node described at least two computing platform and calculates the node data generated It is whether consistent;
If inconsistent, execution module is run;
The execution module is configured to inconsistent at least two computing platform execution node data Corresponding calculate node.
According to the third aspect of this specification embodiment, a kind of electronic equipment is provided, comprising:
Memory and processor;
For the memory for storing computer executable instructions, the processor is executable for executing the computer Instruction:
Gather the case with project case according to the program member for participating in the mutual assistance project in the project cycle of mutual assistance project Part set calls at least two computing platforms to carry out the calculating of contribution quota in the project cycle;
Judge whether at least two computing platform calculates the contribution quota obtained equal;
If unequal, the node for the calculate node that the contribution quota executes is calculated according at least two computing platform Sequence is executed, whether consistent checks the node data that the calculating of calculate node described at least two computing platform generates;
If inconsistent, the inconsistent corresponding calculating section of the node data is executed at least two computing platform respectively Point.
According to the fourth aspect of this specification embodiment, a kind of computer readable storage medium is provided, is stored with meter The step of calculation machine executable instruction, the checking method that expense described in realization any one calculates when which is executed by processor.
Compared with prior art, this specification has the advantages that
This specification provides the checking method that a kind of expense calculates, comprising: according to participating in the project cycle of mutual assistance project The case set of the program member set and project case of the mutual assistance project, calls at least two computing platforms to carry out the item The calculating of contribution quota in the mesh period;Judge at least two computing platform calculate the contribution quota that obtains whether phase Deng;If unequal, executed according to the node that at least two computing platform calculates the calculate node that the contribution quota executes Sequentially, whether consistent the node data that the calculating of calculate node described at least two computing platform generates is checked;If different It causes, executes the inconsistent corresponding calculate node of node data at least two computing platform respectively.
The checking method that the expense that this specification provides calculates judges described point that at least two computing platform obtains Whether equal spread out the amount of money, it, will be according to described at least two computing platform calculating in the case where judging result is unequal situation The node of calculate node that contribution quota executes executes sequence, check each calculate node calculate generation node data whether one It causes, the inconsistent calculate node of node data is re-executed, do not occur the inconsistent calculate node of node data and do not need weight It is new to execute, reduce the calculating cost for recalculating the contribution quota.
Detailed description of the invention
Fig. 1 is the flow chart for the checking method that the expense that one embodiment of this specification provides calculates;
Fig. 2 is the schematic diagram for the audit process that the expense that one embodiment of this specification provides calculates;
Fig. 3 is the structural schematic diagram for the checking device that the expense that one embodiment of this specification provides calculates;
Fig. 4 is the structural block diagram for the electronic equipment that one embodiment of this specification provides.
Specific embodiment
Many details are explained in the following description in order to fully understand this specification.But this specification energy Enough to be implemented with being much different from other way described herein, those skilled in the art can be without prejudice to this specification intension In the case where do similar popularization, therefore this specification is not limited by following public specific implementation.
The term used in this specification one or more embodiment be only merely for for the purpose of describing particular embodiments, It is not intended to be limiting this specification one or more embodiment.In this specification one or more embodiment and appended claims The "an" of singular used in book, " described " and "the" are also intended to including most forms, unless context is clearly Indicate other meanings.It is also understood that term "and/or" used in this specification one or more embodiment refers to and includes One or more associated any or all of project listed may combine.
It will be appreciated that though may be retouched using term first, second etc. in this specification one or more embodiment Various information are stated, but these information should not necessarily be limited by these terms.These terms are only used to for same type of information being distinguished from each other It opens.For example, first can also be referred to as second, class in the case where not departing from this specification one or more scope of embodiments As, second can also be referred to as first.Depending on context, word as used in this " if " can be construed to " ... when " or " when ... " or " in response to determination ".
Firstly, being explained to one or more vocabularies of terms for implementing to be related to of the invention.
Mutual insurance: unit or individual with homogeneity risk guarantee demand become member by settling a bargain, and pay Premium forms mutual fund, and the loss caused by being occurred by accident of the fund to contract engagement is born the responsibility to pay compensation, or is worked as Insurant's die, injured or disabled, suffer diseases or while reaching the conditions such as the age of contract engagement, time limit, undertake payment insurance money responsibility Insurance activity.
Computation for apportionment: due to the post-paid characteristic of mutual insurance, each issue of each user premium needs that should share pass through The calculating process of a series of complex generates.This calculating process relies on multi-party data source, for example, share number, compensation case number, The amount for which loss settled of each compensation case, history share surplus etc..
Post-paid system: refer to that user, without paying premium, is received again when insuring after compensation case occurs in insurant It goes bail for expense.
In the present specification, a kind of checking method that expense calculates is provided, this specification is related to a kind of expense meter simultaneously The checking device of calculation, a kind of calculating equipment and a kind of computer readable storage medium, carry out one by one in the following embodiments It is described in detail.
Fig. 1 shows the flow chart of the checking method calculated according to the expense of one embodiment of this specification, including step 102 To step 108.
Step 102: according to the program member's set and project for participating in the mutual assistance project in the project cycle of mutual assistance project The case set of case calls at least two computing platforms to carry out the calculating of contribution quota in the project cycle.
The mutual assistance project as described in the examples of this specification one can be mutual assistance mutual aid project, anti-poverty project or shared item Mesh, wherein the program member be successfully participate in the project of the mutual assistance mutual aid project, anti-poverty project or shared project at Member herein will be by taking the mutual assistance project be mutual assistance mutual aid project as an example, and the checking method calculated the expense is described.
Based on this, the mutual assistance mutual aid project refers to the user with same requirements, will by certain screening criteria It is determined as the program member in the mutual assistance mutual aid project by the user of the screening criteria, when any in all items member As long as the accident that the program member occurs when accident perhaps wants help or the event to want help occur for a program member In the acceptance range of mutual assistance mutual aid project, other members for participating in the mutual assistance mutual aid project can provide one for the program member Fixed mutual aid money or certain help.
When it is implemented, user passes through the request to Projects Agency platform proposition participation mutual assistance project, Projects Agency platform According to the request that user sends, the user for meeting participation condition is determined as program member;In project billing cycle, project generation Platform and project service platform calculate the contribution quota of every program member, by the application for the mutual assistance case that will occur Gold carries out cumulative summation, the total application amount of money identified project in the period, and the number of total program member in the statistical item period, The amount of money that every program member shares, after the completion of calculating, project generation are calculated according to total application amount of money and total program member's number Platform and project service platform check the contribution quota of every program member, if checked result is consistent, to mutual assistance item Mesh member sends payment and reminds, if checked result is inconsistent, re-starts the calculating of contribution quota.
During being recalculated to the contribution quota, in order to reduce the Projects Agency platform and the item The calculating cost of mesh service platform carries out karyomerite to node in such a way that verification calculate node calculates the node data generated Data avoid repetition and carry out recalculating node data to the calculate node for not occurring calculating mistake, reduce and recalculate The time of contribution quota reduces the cost for recalculating the contribution quota.
Specifically, program member's collection is combined into the total program member's group for participating in the mutual assistance project in the current project period At set.For example, the project cycle is one month, in Project Running Process, constantly there is new user that the mutual assistance is added Project, the user that the mutual assistance project is newly added are to be not involved in carry out mutual assistance to the project case in the current project period, When carrying out contribution quota calculating, only statistics does not occur out of the end time time started project cycle to the project cycle this month The program member of variation is determined as program member's set.
The case collection of the project case is combined into the mutual assistance number of cases always occurred in the current project period.For example, project Period is one month, 10 mutual assistance cases has occurred altogether within the project cycle, wherein there is 8 mutual assistance cases that total application has been determined The amount of money, in addition also in processes, then this 8 mutual assistance cases form the case set in project cycles to 2 mutual assistance cases.
In one or more embodiments of the present embodiment, at least two computing platform, comprising: carry the mutual assistance The project service platform of the Projects Agency platform of project and the mutual assistance project.
Based on this, the Projects Agency platform of the mutual assistance project refers to be mentioned for the complete mutual assistance process of the mutual assistance project For the platform of management, and the mutual assistance project can be publicized, improve the known degree of the mutual assistance project.The mutual assistance item Purpose project service platform refers to the platform for serving the program member for participating in the mutual assistance project, provides for the program member The platform of mutual assistance guarantee.
In addition to this, the computing platform can also include that platform is examined in mutual assistance verification platform or mutual assistance, to described point During the booth amount of money is checked, the checking method that the expense that can be provided using this specification is calculated, this specification exists This is repeated no more.
On the basis of the calling of above-mentioned offer at least two computing platform calculates the contribution quota, further , in one or more embodiments of the present embodiment, at least two computing platform calculates the calculating of the contribution quota Process, specific implementation are as described below:
Count the total number that program member's set of the mutual assistance project is participated in the project cycle;
Total Shen is calculated in such a way that the application amount of money to project case described in the case set carries out cumulative summation Lead the amount of money;
According to preset mutual assistance project computation rule to total total number for claiming the amount of money and program member set The two is calculated, using calculated result as the contribution quota.
Specifically, the mutual assistance project computation rule includes the multiple rules such as nut cap rule and surplus rule, wherein described Nut cap rule refers to when carrying out calculating contribution quota to every program member, if the contribution quota is more than default contribution quota Threshold value does not then need the program member in program member's set in the contribution quota in the current project period and pays this pen point Spread out the amount of money.The surplus rule refers to that the contribution quota of every program member only has after the completion of calculating within the last project cycle It is several share money in the case where, contribution quota rounding is carried out according to the requirement of mutual assistance project, every program member will pay several share money and take Contribution quota after whole, by a remaining fund, is counted after carrying out granting mutual aid money to mutual assistance case in the current project period When calculating contribution quota, according to surplus rule using last remaining fund as a part of contribution quota and then calculating every The contribution quota of program member.
For example, total mutual assistance number of cases in the project cycle is 10, every mutual assistance case mutual aid money in mutual assistance project Volume is 30 Wan Yuan, and the program member's number counted within the mutual assistance project cycle is 3,000,000, the knot within the last project cycle Remaining fund is 30 Wan Yuan, also needs to pay total contribution quota two according to the program member determined within the current project period is calculated 1700000, the contribution quota of every program member is 0.9 yuan.
The contribution quota that every program member is calculated by preset mutual assistance project computation rule, ensure that the project at The contribution quota that member pays has been used in mutual assistance case, improves the experience effect of program member.
Above-mentioned according to program member set and the case set, at least two computing platform is called to calculate On the basis of contribution quota, further, in one or more embodiments of the present embodiment, at least two meter is being called Before calculating the platform calculating contribution quota, need to obtain the data for calculating the contribution quota needs, specific acquisition modes are such as It is lower described:
Extracted in the member information DB participated in the project cycle project of the mutual assistance project at Member's set;
The Projects Agency platform synchronizes project case described in the project service platform within the project cycle Case set.
Specifically, the member information DB stores the information for participating in whole program members in the mutual assistance project, The deadline project cycle determines the program member for not exiting the mutual assistance project, extracts in the member information DB The program member for not exiting the mutual assistance project forms program member's set.Record has project in the project service platform The whole mutual assistance cases occurred in period, before calculating the contribution quota in the project cycle, the Projects Agency platform The whole mutual assistance cases for synchronizing the project service platform are formed into the case set.
By obtaining program member set and the case set, and call at least two computing platform according to The preset mutual assistance project computation rule just calculate to both program member set and described case set, determines The contribution quota that the program member of the mutual assistance project is participated within the project cycle, realizing can be to the program member Contribution quota checked, the convenient verification contribution quota in subsequent processes.
Step 104: judging whether at least two computing platform calculates the contribution quota obtained equal.
Specifically, above by calling at least two computing platform to calculate the contribution quota, on this basis, root The contribution quota obtained is calculated according at least two computing platform to be compared, and judges at least two computing platform Whether equal calculate the contribution quota obtained;
If the contribution quota that at least two computing platform obtains is unequal, following step 106 is executed;
If the contribution quota that at least two computing platform obtains is equal, illustrate that described at least two calculate The contribution quota that platform calculates is accurate.
In the whether equal judgement knot of the above-mentioned contribution quota for judging that at least two computing platforms calculating obtains On the basis of fruit is equal, further, in one or more embodiments of the present embodiment, perform the following operations:
Program member into program member set sends the prompting for paying the contribution quota.
Specifically, it is equal in the contribution quota that at least two computing platform calculates acquisition, share described in explanation It is accurate that the amount of money calculates, and the program member in Xiang Suoshu project set sends the prompting for paying the contribution quota, described to pay Take the amount of money number that specific payment time limit and the contribution quota are carried in the prompting of the contribution quota.
In practical application, by taking Projects Agency platform and project service platform are computing platform as an example, to the judgement institute State at least two computing platforms calculate obtain the contribution quota it is whether equal be described, in Projects Agency platform and item In the unequal situation of contribution quota for every program member that mesh service platform calculates, pass through subsequent audit process, detection Calculating contribution quota is caused inconsistent calculate node occur out;It is calculated in Projects Agency platform and project service platform every In the case that the contribution quota of name program member is equal, the contribution quota of every program member is determined, to the ginseng mutual assistance project Program member send and pay the prompting of contribution quota.
It is described mutual to participating in the case where the contribution quota that at least two computing platform calculates acquisition is equal It helps the program member in program member's set of project to send the prompting for paying the contribution quota, avoids the program member It is overdue not pay the contribution quota, improve the success rate for paying the contribution quota.
Step 106: the node for the calculate node that the contribution quota executes is calculated according at least two computing platform Sequence is executed, whether consistent checks the node data that the calculating of calculate node described at least two computing platform generates.
Specifically, whether the above-mentioned contribution quota for judging that at least two computing platforms calculating obtains is equal, On the basis of this, in the case where at least two computing platform calculates the unequal situation of the contribution quota obtained, according to calculating The node for the calculate node that the contribution quota executes executes sequence, checks and calculates section described at least two computing platform Whether the node data that point generates is consistent;
If the node data that calculate node described at least two computing platform generates is inconsistent, execute following Step 108;
If calculate node described at least two computing platform generate node data it is consistent, illustrate described in extremely Few two computing platform others business processions go wrong, and are adjusted according to the business procession problem Whole at least two computing platform, recalculates the contribution quota.
On the basis of the node data that the calculate node of above-mentioned verification at least two computing platform generates, further , in one or more embodiments of the present embodiment, at least two computing platform calculates what the contribution quota executed Calculate node includes:
Program member counts node, project case calculate node and contribution quota calculate node;
Correspondingly, the node execution that at least two computing platform calculates the calculate node that the contribution quota executes is suitable Sequence includes:
The program member counts node and executes before project case calculate node execution, and the project case Calculate node executes before contribution quota calculate node execution;
Alternatively, the program member counts node and the project case calculate node in the contribution quota calculate node It is executed before executing.
Specifically, in the feelings that at least two computing platform is the Projects Agency platform and the project service platform Under condition, the Projects Agency platform and the project service platform include that the program member counts node, project case meter Operator node and contribution quota calculate node.
Based on this, the program member count participated in the project cycle described in node statistics the project of the mutual assistance project at Member's total number, the project case calculate node calculate the application amount of money, total item in the project cycle of each project case Mesh number of cases and in the project cycle total project case total application amount of money, the contribution quota calculate node calculates institute State the contribution quota of each project case in the project cycle and in the project cycle each program member contribution quota.
In addition to this, at least two computing platform can also include other calculate nodes, such as contribution quota judges Node, if being more than, is not necessarily to the project for judging whether the contribution quota of every program member is more than to share threshold value Member pays contribution quota, if not exceeded, the program member needs to pay the contribution quota.In practical application scene, Calculate node at least two computing platform can be set according to practical application, and this specification is not made any herein It limits.
Specifically, the calculate node described at least two computing platform include the program member count node, In the case where the project case calculate node and the contribution quota calculate node, at least two computing platform it is described There are two kinds of possibility for the execution sequence of calculate node;
1) first program member's statistics node is executed, second executes the project case calculate node, and third executes The contribution quota calculate node;
2) first program member's statistics node and the project case calculate node are executed, shared described in the second execution Amount of money calculate node.
What it is in calculate node described above includes that the program member counts node, the project case calculate node, institute On the basis of stating contribution quota calculate node, further, in one or more embodiments of the present embodiment, if first executes The program member counts node, and second executes the project case calculate node, and third executes the contribution quota and calculates section Point;
Based on this, the section that the calculate node that the contribution quota executes is calculated according at least two computing platform Point executes sequence, check calculate node described at least two computing platform calculate the node data generated whether unanimously this One process, in particular to sequence is executed according to the node, check the system of program member described at least two computing platform Whether consistent count program member's total number data that node calculating generates;
If inconsistent, execute following step 108 and execute the node data not at least two computing platform respectively Consistent corresponding calculate node operation;Correspondingly, total checking the program member that program member's statistics node generates In the case that number data is inconsistent, step 108 specifically refers at least two computing platform and executes program member's system Node is counted, counts program member's total number data again;
If consistent, whether consistent the project case data that the project case calculate node generates are checked.
Specifically, illustrating institute in the case where the contribution quota that at least two computing platform calculates acquisition is inconsistent Stating has a side to calculate the contribution quota at least two computing platforms there is mistake.In practical applications, described at least two The execution sequence for the calculate node for including in computing platform is that the first execution program member counts described in node, the second execution In the case that project case calculate node, third execute the contribution quota calculate node, program member's system is checked first It whether consistent counts program member's total number data that node generates, if inconsistent, illustrates that at least two calculating is flat Program member described in platform counts program member's total number data that node generates and mistake occurs, re-executes the project Member counts node;If consistent, illustrate that the program member counts node and mistake of statistics does not occur, further check institute State the project case data of project case calculate node generation.
It in practical applications, is that the program member counts node with the calculate node at least two computing platform For, sequence is executed to the node for calculating the calculate node that the contribution quota executes according at least two computing platform, It checks calculate node described at least two computing platform and calculates whether the node data generated is unanimously described, In, at least two computing platform is project service platform and Projects Agency platform, if the program member of project service platform Count node generate program member's total number data and Projects Agency platform program member count node generate project at Under member's total number data unanimous circumstances, then illustrate that program member counts program member's total number data that node generates and do not occur Mistake carries out subsequent collation process to project service platform and Projects Agency platform;If the program member of project service platform Count node generate program member's total number data and Projects Agency platform program member count node generate project at In the case that member's total number data are inconsistent, then illustrate that program member counts program member's total number data that node generates Mistake occurs, the subsequent membership's mesh number of statistical item again is carried out according to place to project service platform and Projects Agency platform Reason.
The program member described in above-mentioned verification at least two computing platform count node calculate generate project at On the basis of the checked result of the whether consistent sub-step of member's total number data is consistent, further, one of the present embodiment or In multiple embodiments, sequence is executed according to the node, checks project case meter described at least two computing platform Whether the project case data that operator node generates are consistent;
If inconsistent, execute following step 108 and execute the node data not at least two computing platform respectively Consistent corresponding calculate node operation;Correspondingly, in the project case number of packages for checking the project case calculate node generation In the case where inconsistent, step 108 specifically refers at least two computing platform and executes the project case calculate node, Recalculate the project case data;
If consistent, whether consistent the contribution quota data that the contribution quota calculate node generates are checked.
Specifically, illustrating institute in the case where the contribution quota that at least two computing platform calculates acquisition is inconsistent Stating has a side to calculate the contribution quota at least two computing platforms there is mistake.In practical applications, described at least two The execution sequence for the calculate node for including in computing platform is that the first execution program member counts described in node, the second execution In the case that project case calculate node, third execute the contribution quota calculate node, program member's statistics is being checked Under program member's total number data unanimous circumstances that node generates, the project case calculate node is executed, checks institute Whether the project case data for stating the generation of project case calculate node are consistent, if inconsistent, illustrate described at least two There is mistake in the project case data that the calculate node of project case described in computing platform generates, re-execute the project Case calculate node;If consistent, illustrate that the project case calculate node does not occur to calculate mistake, further check institute State the contribution quota data of contribution quota calculate node generation.
It is that the project case calculate node is with the calculate node at least two computing platform in practical application Example executes sequence, core to the node for calculating the calculate node that the contribution quota executes according at least two computing platform Whether the node data generated, which is unanimously described, is calculated to calculate node described at least two computing platform, wherein At least two computing platform is project service platform and Projects Agency platform, if the project case of project service platform calculates The project case data that node generates are consistent with the project case data that the project case calculate node of Projects Agency platform generates In the case where, then illustrate the project case data that project case calculate node generates for mistake occurs, to project service platform and Projects Agency platform carries out subsequent collation process;If the project case that the project case calculate node of project service platform generates In the case that the project case data that data and the project case calculate node of Projects Agency platform generate are inconsistent, then descriptive item Mistake occurs for the project case data that mesh case calculate node generates, and carries out to project service platform and Projects Agency platform subsequent Recalculate project case data processing.
The project case number of packages that the project case calculate node described in above-mentioned verification at least two computing platform generates According to whether the checked result of consistent sub-step be it is consistent on the basis of, further, one or more embodiment party of the present embodiment In formula, if the contribution quota data that generate of contribution quota calculate node described in verification at least two computing platform whether one It causes;
If inconsistent, execute following step 108 and execute the node data not at least two computing platform respectively Consistent corresponding calculate node operation;Correspondingly, in the contribution quota number for checking the contribution quota calculate node generation In the case where inconsistent, step 108 specifically refers at least two computing platform and executes the contribution quota calculate node, Recalculate the contribution quota data;
If consistent, whether consistent the mutual assistance project data that the mutual assistance project calculate node generates is checked.
Specifically, illustrating institute in the case where the contribution quota that at least two computing platform calculates acquisition is inconsistent Stating has a side to calculate the contribution quota at least two computing platforms there is mistake.In practical applications, described at least two The execution sequence for the calculate node for including in computing platform is that the first execution program member counts described in node, the second execution In the case that project case calculate node, third execute the contribution quota calculate node, program member's statistics is being checked Under program member's total number data unanimous circumstances that node generates, the institute that the project case calculate node generates is checked It states under project case data unanimous circumstances, executes the contribution quota calculate node, check the contribution quota calculate node Whether the contribution quota data generated are consistent, if inconsistent, illustrate contribution quota described in described two computing platforms There is mistake in the contribution quota data that calculate node generates, re-execute the contribution quota calculate node;If one It causes, then illustrates that the contribution quota calculate node does not occur to calculate mistake, it is raw further to check the mutual assistance project calculate node At the mutual assistance project data, wherein the mutual assistance project data can be the business rule of the mutual assistance project.
It is that the contribution quota calculate node is with the calculate node at least two computing platform in practical application Example executes sequence, core to the node for calculating the calculate node that the contribution quota executes according at least two computing platform Whether the node data generated, which is unanimously described, is calculated to calculate node described at least two computing platform, wherein At least two computing platform is project service platform and Projects Agency platform, if the contribution quota of project service platform calculates The contribution quota data that node generates are consistent with the contribution quota data that the contribution quota calculate node of Projects Agency platform generates In the case where, then illustrate that mistake occurs for the contribution quota data that contribution quota calculate node generates, to project service platform and item Mesh agent platform carries out subsequent collation process;If the contribution quota number that the contribution quota calculate node of project service platform generates According to the contribution quota data of the contribution quota calculate node of Projects Agency platform generation it is inconsistent in the case where, then explanation is shared Mistake occurs for the contribution quota data that amount of money calculate node generates, and carries out to project service platform and Projects Agency platform subsequent Recalculate contribution quota data processing.
The contribution quota data that the contribution quota calculate node described in above-mentioned verification few two computing platforms generates Whether the checked result of consistent sub-step be it is consistent on the basis of, further, one or more embodiments of the present embodiment In, check the mutual assistance project at least two computing platform in addition to calculating the calculate node that the contribution quota executes Whether calculate node calculates the mutual assistance project data generated consistent;
If inconsistent, execute following step 108 and execute the node data not at least two computing platform respectively Consistent corresponding calculate node operation;Correspondingly, in the mutual assistance item number for checking the mutual assistance project calculate node generation In the case where inconsistent, step 108 specifically refers at least two computing platform and executes the mutual assistance project calculate node, Recalculate the mutual assistance project data;
If consistent, detect at least two computing platform whether hardware fault occurs.
Specifically, illustrating institute in the case where the contribution quota that at least two computing platform calculates acquisition is inconsistent Stating has a side to calculate the contribution quota at least two computing platforms there is mistake.In practical applications, described at least two The execution sequence for the calculate node for including in computing platform is that the first execution program member counts described in node, the second execution It is inconsistent in checked result in the case that project case calculate node, third execute the contribution quota calculate node In the case of, then explanation calculates section except the program member counts node, the project case calculate node and the contribution quota There is mistake in the mutual assistance project data that the mutual assistance project calculate node outside point generates, re-executes the mutual assistance project Calculate node;If consistent, illustrate that the mutual assistance project calculate node does not occur to calculate mistake, further detection is described extremely The problems such as whether hardware fault occurring in few two computing platforms.
What it is in calculate node described above includes that the program member counts node, the project case calculate node, institute On the basis of stating contribution quota calculate node, further, in one or more embodiments of the present embodiment, if first executes The program member counts node and the project case calculate node, and second executes the contribution quota calculate node;
Based on this, the section that the calculate node that the contribution quota executes is calculated according at least two computing platform Point executes sequence, check calculate node described at least two computing platform calculate the node data generated whether unanimously this One process, in particular to sequence is executed according to the node, check the system of program member described at least two computing platform Count the project case that node calculates the program member's total number data generated and the project case calculate node calculates generation Whether data are consistent;
If inconsistent, execute following step 108 and execute the node data not at least two computing platform respectively Consistent corresponding calculate node operation;Correspondingly, total checking the program member that program member's statistics node calculates generation In the case that the project case data that number data and project case calculate node calculating generate are inconsistent, step 108 It specifically refers at least two computing platform and executes program member's statistics node and the project case calculate node, weight Newly count program member's total number data and the project case data;
If consistent, whether consistent the contribution quota data that the contribution quota calculate node generates are checked.
Specifically, being performed simultaneously the program member counts node and the project case calculate node, verification is described extremely Few two computing platforms calculate the program member's total number data generated and whether the project case data are consistent, if different It causes, then illustrates that program member described at least two computing platform counts program member's total number data that node generates and goes out The project case data that project case calculate node described in existing mistake or at least two computing platform generates occur wrong Accidentally or at least two computing platform described in program member count node generate program member's total number data and There is mistake in the project case data that project case calculate node generates, re-execute the program member and count node or institute It states project case calculate node or the program member counts node and the project case calculate node;If consistent, Illustrate that program member counts node and mistake of statistics does not occur, project case calculate node does not occur to calculate mistake, further check The contribution quota data that the contribution quota calculate node generates.
The program member described in above-mentioned verification at least two computing platform count node calculate generate project at Member's total number data and the project case calculate node calculate the core of the whether consistent sub-step of project case data generated On the basis of being consistent to result, further, in one or more embodiments of the present embodiment, verification described at least two Whether the contribution quota data that contribution quota calculate node described in computing platform generates are consistent;
If inconsistent, execute following step 108 and execute the node data not at least two computing platform respectively Consistent corresponding calculate node operation;Correspondingly, in the contribution quota number for checking the contribution quota calculate node generation In the case where inconsistent, step 108 specifically refers at least two computing platform and executes the contribution quota calculate node, Recalculate the contribution quota data;
If consistent, detect at least two computing platform whether hardware fault occurs.
Specifically, being that the program member counts node and the project case calculate node in the node execution sequence It, can to the description content of the contribution quota calculate node in the case where execution before contribution quota calculate node execution It is that program member's statistics node executes before project case calculate node execution referring to above-mentioned node execution sequence, And contribution quota of the project case calculate node before contribution quota calculate node execution under executive condition calculates The description content of node, this explanation are not repeating herein.
In addition to this, there are three computing platforms or more computing platforms, the calculate node is checked The description content for the node data that the node data of generation can be generated according to above-mentioned at least two computing platforms calculate node It executes, this specification is not repeating herein.
It is that the program member counts node in institute by the node execution sequence according at least two computing platform It states before project case calculate node executes and executes, and the project case calculate node is held in the contribution quota calculate node It is executed before row or the program member counts node and the project case calculate node in the contribution quota calculate node It is executed before executing, whether the node data for check the calculate node generation is consistent, even if node data occurs not Under unanimous circumstances, it can carry out recalculating node data just for the inconsistent calculate node of node data, reduce institute State the calculating cost of at least two computing platforms.
Step 108: executing the inconsistent corresponding calculating section of the node data at least two computing platform respectively Point.
Specifically, the above-mentioned section for calculating the calculate node that the contribution quota executes according at least two computing platform Point executes sequence, checks calculate node described at least two computing platform and calculates the node data generated, basic herein On, in the case that the node data that calculate node calculating generates described in verification at least two computing platform is inconsistent, weight Newly execute the inconsistent corresponding calculate node of node data described at least two computing platform.
When it is implemented, generate the inconsistent calculate node of the node data there may be multiple, there are multiple In the case of, it is re-executed to the inconsistent calculate node of the node data is generated.
For example, at least two computing platform is Projects Agency platform and project service platform, passing through contribution quota When calculate node calculates contribution quota data, the Projects Agency platform and project service platform pass through the contribution quota meter The contribution quota data that operator node generates are inconsistent, then illustrate that contribution quota calculate node occurs to calculate mistake, re-execute point Spread out amount of money calculate node.
The checking method that the expense that this specification provides calculates judges described point that at least two computing platform obtains It whether equal spreads out the amount of money, in the case where judging result is equal, the program member is reminded to carry out paying the contribution quota, Payment success rate is improved, in the case where judging result is unequal situation, institute will be calculated according at least two computing platform Two kinds of situations for stating the node execution sequence of the calculate node of contribution quota execution check each calculate node and calculate the section generated Whether point data is consistent, and the inconsistent calculate node of node data is re-executed, and does not occur the inconsistent calculating of node data Node does not need to re-execute, and the inconsistent calculate node of node data can quickly be found by realizing, and improves and counts again The rate for calculating the contribution quota reduces at least two computing platform and recalculates being calculated as the contribution quota This.
Following combination attached drawings 2, checking method the answering in mutual assistance mutual aid project calculated with the expense that this specification provides For, the checking method calculated the expense is further described.Wherein, specific steps include step 202 to step 222。
Step 202: obtaining project member set and case set in the project cycle of mutual assistance mutual aid project.
Specifically, program member's collection is combined into the project cycle of mutual assistance mutual aid project not changed program member's composition Set, case collection is combined into the collection of the whole mutual assistance mutual aid project cases composition occurred in project cycle of mutual assistance mutual aid project It closes.
Step 204: mutual aid Projects Agency platform and mutual aid project service platform being called to carry out sharing in the project cycle The calculating of the amount of money.
Specifically, the calculate node execution sequence for including in mutual aid Projects Agency platform and mutual aid project service platform is First project implementation member counts node, the second project implementation case calculate node, third and executes contribution quota calculate node.
Further, program member counts node statistics program member total number, and project case calculate node calculates project Case total number and project case always claim the amount of money and contribution quota calculate node calculates project member set in the project cycle In every program member contribution quota.
Step 206: judging whether mutual aid Projects Agency platform and mutual aid project service platform calculate the contribution quota that obtains It is equal;If equal, step 208 is executed;If unequal, step 210 is executed.
Step 208: the program member into program member's set sends the prompting for paying contribution quota.
Specifically, paying in the prompting of contribution quota comprising premium received, paying the specific time and pay contribution quota Deadline time.
Step 210: the calculate node of contribution quota is calculated according to mutual aid Projects Agency platform and mutual aid project service platform Sequence is executed, the program member in mutual aid Projects Agency platform and mutual aid project service platform is checked and counts the project that node generates Whether membership's mesh is consistent;If inconsistent, step 212 is executed;If consistent, step 214 is executed.
Step 212: mutual aid Projects Agency platform and mutual aid project service platform project implementation member count node, unite again Count program member's total number.
Step 214: the project case calculate node in verification mutual aid Projects Agency platform and mutual aid project service platform is raw At project case total number and project case whether always claim the amount of money consistent;If inconsistent, step 216 is executed;If consistent, Execute step 218.
Step 216: mutual aid Projects Agency platform and mutual aid project service platform project implementation case calculate node are counted again Calculation project case total number and project case always claim the amount of money.
Step 218: the contribution quota calculate node in verification mutual aid Projects Agency platform and mutual aid project service platform is raw At every program member contribution quota it is whether consistent;If inconsistent, step 220 is executed;If consistent, step 222 is executed.
Step 220: mutual aid Projects Agency platform and mutual aid project service platform execute contribution quota calculate node, count again Calculate the contribution quota of program member.
Step 222: mutual aid Projects Agency platform and mutual aid project service platform reacquire program member's set and case Set.
Specifically, in the case where mutual aid Projects Agency platform and the equal checked result of mutual aid project service platform are unanimous circumstances, Program member's set and case set are then reacquired, collation process is re-started.
The checking method that the expense that this specification provides calculates judges the mutual aid Projects Agency platform and mutual aid project clothes Whether the contribution quota that business platform obtains is equal, will be according to the mutual aid item in the case where judging result is unequal situation The node that mesh agent platform and mutual aid project service platform calculate the calculate node that the contribution quota executes executes sequence, checks Whether the node data that each calculate node calculates generation is consistent, the inconsistent calculate node of node data is re-executed, not There is the inconsistent calculate node of node data not needing to re-execute, realizing can quickly find that node data is inconsistent Calculate node, improve the rate for recalculating the contribution quota, reduce the mutual aid Projects Agency platform and mutual aid Project service platform recalculates the calculating cost of the contribution quota.
Corresponding with above method embodiment, this specification additionally provides the checking device embodiment of expense calculating,
The structural schematic diagram for the checking device that the expense that Fig. 3 shows one embodiment of this specification calculates.As shown in figure 3, The device includes:
Calling module 302, be configured as participating in the project cycle according to mutual assistance project the project of the mutual assistance project at The case set of member set and project case, calls at least two computing platforms to carry out the meter of contribution quota in the project cycle It calculates;
Judgment module 304 is configured as judging that at least two computing platform calculates the contribution quota obtained and is It is no equal;
If unequal, operation verification module 306;
The verification module 306 is configured as calculating the contribution quota execution according at least two computing platform The node of calculate node execute sequence, check calculate node described at least two computing platform and calculate the node generated Whether data are consistent;
If inconsistent, execution module 308 is run;
The execution module 308 is configured to execute the node data not at least two computing platform Consistent corresponding calculate node.
In an optional embodiment, at least two computing platform carries out the meter of contribution quota in the project cycle It calculates, comprising:
Count the total number that program member's set of the mutual assistance project is participated in the project cycle;
Total Shen is calculated in such a way that the application amount of money to project case described in the case set carries out cumulative summation Lead the amount of money;
According to preset mutual assistance project computation rule to total total number for claiming the amount of money and program member set The two is calculated, using calculated result as the contribution quota.
In an optional embodiment, at least two computing platform calculates the calculate node that the contribution quota executes Include:
Program member counts node, project case calculate node and contribution quota calculate node;
Correspondingly, the node execution that at least two computing platform calculates the calculate node that the contribution quota executes is suitable Sequence includes:
The program member counts node and executes before project case calculate node execution, and the project case Calculate node executes before contribution quota calculate node execution;
Alternatively, the program member counts node and the project case calculate node in the contribution quota calculate node It is executed before executing.
In an optional embodiment, if node execution sequence is that the program member counts node in the project Case calculate node executes before executing, and the project case calculate node is before contribution quota calculate node execution It executes;
Correspondingly, the verification module 306, comprising:
First verification unit, is configured as executing sequence according to the node, check at least two computing platform Whether the program member counts program member's total number data that node calculating generates consistent;
If inconsistent, the execution module 308 is run;
Wherein, the execution module 308, comprising:
First execution unit is configured to execute program member's statistics section at least two computing platform Point.
In an optional embodiment, if the checked result of the first verification unit operation is consistent, the second core of operation To unit;
The second verification unit is configured as checking the calculating section of project case described at least two computing platform Whether the project case data that point generates are consistent;
If inconsistent, the execution module 308 is run;
Wherein, the execution module 308, comprising:
Second execution unit is configured to execute the project case calculating section at least two computing platform Point.
In an optional embodiment, if the checked result of the second verification unit operation is consistent, operation third core To unit;
The third checks unit, is configured as checking the calculating section of contribution quota described at least two computing platform Whether the contribution quota data that point generates are consistent;
If inconsistent, the execution module 308 is run;
Wherein, the execution module 308, comprising:
Third execution unit is configured to execute the contribution quota calculating section at least two computing platform Point.
In an optional embodiment, if the checked result of third verification unit operation is consistent, the 4th core of operation To unit;
The 4th verification unit, is configured as checking at least two computing platform except the calculating contribution quota Whether the mutual assistance project calculate node outside the calculate node executed calculates the mutual assistance project data generated consistent;
If inconsistent, the execution module 308 is run;
Wherein, the execution module 308, comprising:
4th execution unit is configured to execute the mutual assistance project calculating section at least two computing platform Point.
In an optional embodiment, if node execution sequence is that the program member counts node and the project Case calculate node executes before contribution quota calculate node execution;
Correspondingly, the verification module 306, comprising:
5th verification unit, is configured as executing sequence according to the node, check at least two computing platform The program member counts node and calculates the program member's total number data generated and project case calculate node calculating Whether the project case data of generation are consistent;
If inconsistent, the execution module 308 is run;
Wherein, the execution module 308, comprising:
5th execution unit is configured to execute program member's statistics section at least two computing platform Point and the project case calculate node.
In an optional embodiment, if the checked result of the 5th verification unit operation is consistent, the 6th core of operation To unit;
The 6th verification unit is configured as checking the calculating section of contribution quota described at least two computing platform Whether the contribution quota data that point generates are consistent;
If inconsistent, the execution module 308 is run;
Wherein, the execution module 308, comprising:
6th execution unit is configured to execute the contribution quota calculating section at least two computing platform Point.
In an optional embodiment, at least two computing platform, comprising:
Carry the Projects Agency platform of the mutual assistance project and the project service platform of the mutual assistance project.
In an optional embodiment, the calling module 302, comprising:
Extraction unit, is configured as extracting in the member information DB and participates in the mutual assistance in the project cycle The program member of project gathers;
Synchronization unit is configured as the Projects Agency platform within the project cycle and synchronizes the project service platform Described in project case case set.
In an optional embodiment, if the judging result that the judgment module 304 is run is equal, operation prompting mould Block;
The reminding module, the program member being configured as in gathering to the program member, which sends to pay, described shares gold The prompting of volume.
In the checking device that the expense that this specification provides calculates, by judging what at least two computing platform obtained Whether the contribution quota is equal, will be according at least two computing platforms meter in the case where judging result is unequal situation Two kinds of situations for calculating the node execution sequence for the calculate node that the contribution quota executes check each calculate node and calculate generation Node data it is whether consistent, the inconsistent calculate node of node data is re-executed, it is inconsistent not occur node data Calculate node does not need to re-execute, and the inconsistent calculate node of node data can quickly be found by realizing, and improves weight The rate for newly calculating the contribution quota reduces the calculating cost for recalculating the contribution quota.
The exemplary scheme for the checking device that a kind of above-mentioned expense for the present embodiment calculates.It should be noted that this takes The technical solution of the checking method calculated with the technical solution and above-mentioned expense of the checking device of calculating belongs to same design, takes The detail content being not described in detail with the technical solution of the checking device of calculating may refer to the verification side that above-mentioned expense calculates The description of the technical solution of method.
Fig. 4 shows the structural block diagram of the electronic equipment 400 according to one embodiment of this specification.The electronic equipment 400 Component includes but is not limited to memory 410 and processor 420.Processor 420 is connected with memory 410 by bus 430, number According to library 450 for saving data.
Electronic equipment 400 further includes access device 440, access device 440 enable electronic equipment 400 via one or Multiple networks 460 communicate.The example of these networks includes public switched telephone network (PSTN), local area network (LAN), wide area network (WAN), the combination of the communication network of personal area network (PAN) or such as internet.Access device 440 may include wired or wireless One or more of any kind of network interface (for example, network interface card (NIC)), such as IEEE802.11 wireless local area Net (WLAN) wireless interface, worldwide interoperability for microwave accesses (Wi-MAX) interface, Ethernet interface, universal serial bus (USB) connect Mouth, cellular network interface, blue tooth interface, near-field communication (NFC) interface, etc..
In one embodiment of this specification, unshowned other component in above-mentioned and Fig. 4 of electronic equipment 400 It can be connected to each other, such as pass through bus.It should be appreciated that electronic devices structure block diagram shown in Fig. 4 is merely for the sake of example Purpose, rather than the limitation to this specification range.Those skilled in the art can according to need, and increase or replace other portions Part.
Electronic equipment 400 can be any kind of static or mobile electronic device, including mobile computer or mobile electricity Sub- equipment (for example, tablet computer, personal digital assistant, laptop computer, notebook computer, net book etc.), movement Phone (for example, smart phone), wearable electronic equipment (for example, smartwatch, intelligent glasses etc.) or other kinds of shifting Dynamic equipment, or the stationary electronic devices of such as desktop computer or PC.Electronic equipment 400 can also be mobile or state type Server.
Wherein, processor 420 is for executing following computer executable instructions:
Gather the case with project case according to the program member for participating in the mutual assistance project in the project cycle of mutual assistance project Part set calls at least two computing platforms to carry out the calculating of contribution quota in the project cycle;
Judge whether at least two computing platform calculates the contribution quota obtained equal;
If unequal, the node for the calculate node that the contribution quota executes is calculated according at least two computing platform Sequence is executed, whether consistent checks the node data that the calculating of calculate node described at least two computing platform generates;
If inconsistent, the inconsistent corresponding calculating section of the node data is executed at least two computing platform respectively Point.
Optionally, at least two computing platform carries out the calculating of contribution quota in the project cycle, comprising:
Count the total number that program member's set of the mutual assistance project is participated in the project cycle;
Total Shen is calculated in such a way that the application amount of money to project case described in the case set carries out cumulative summation Lead the amount of money;
According to preset mutual assistance project computation rule to total total number for claiming the amount of money and program member set The two is calculated, using calculated result as the contribution quota.
Optionally, at least two computing platform calculates the calculate node that the contribution quota executes and includes:
Program member counts node, project case calculate node and contribution quota calculate node;
Correspondingly, the node execution that at least two computing platform calculates the calculate node that the contribution quota executes is suitable Sequence includes:
The program member counts node and executes before project case calculate node execution, and the project case Calculate node executes before contribution quota calculate node execution;
Alternatively, the program member counts node and the project case calculate node in the contribution quota calculate node It is executed before executing.
Optionally, if node execution sequence is that the program member counts node in the project case calculate node It is executed before executing, and the project case calculate node executes before contribution quota calculate node execution;
Correspondingly, the section for calculating the calculate node that the contribution quota executes according at least two computing platform Point executes sequence, and whether the node data for checking the calculating generation of calculate node described at least two computing platform is consistent, Include:
Sequence is executed according to the node, program member described at least two computing platform is checked and counts node meter Whether consistent calculate the program member's total number data generated;
If inconsistent, execute described respectively in at least two computing platform execution inconsistent correspondence of node data Calculate node step;
Wherein, described to execute the inconsistent corresponding calculating section of the node data at least two computing platform respectively Point, comprising:
The program member, which is executed, at least two computing platform respectively counts node.
Optionally, if program member described in verification at least two computing platform counts node and calculates generation The checked result of the whether consistent sub-step of program member's total number data be it is consistent, perform the following operations:
Check project case calculate node described at least two computing platform generation project case data whether Unanimously;
If inconsistent, execute described respectively in at least two computing platform execution inconsistent correspondence of node data Calculate node step;
Wherein, described to execute the inconsistent corresponding calculating section of the node data at least two computing platform respectively Point, comprising:
The project case calculate node is executed at least two computing platform respectively.
Optionally, if the project that project case calculate node described in verification at least two computing platform generates The checked result of the whether consistent sub-step of case data be it is consistent, perform the following operations:
Check contribution quota calculate node described at least two computing platform generation contribution quota data whether Unanimously;
If inconsistent, execute described respectively in at least two computing platform execution inconsistent correspondence of node data Calculate node step;
Wherein, described to execute the inconsistent corresponding calculating section of the node data at least two computing platform respectively Point, comprising:
The contribution quota calculate node is executed at least two computing platform respectively.
Optionally, if contribution quota calculate node generation described in verification at least two computing platform is shared The checked result of the whether consistent sub-step of value data be it is consistent, perform the following operations:
It checks mutual in addition to calculating the calculate node that the contribution quota executes at least two computing platform Whether consistent project calculate node is helped to calculate the mutual assistance project data generated;
If inconsistent, execute described respectively in at least two computing platform execution inconsistent correspondence of node data Calculate node step;
Wherein, described to execute the inconsistent corresponding calculating section of the node data at least two computing platform respectively Point, comprising:
The mutual assistance project calculate node is executed at least two computing platform respectively.
Optionally, if node execution sequence is that the program member counts node and the project case calculate node It is executed before contribution quota calculate node execution;
Correspondingly, the section for calculating the calculate node that the contribution quota executes according at least two computing platform Point executes sequence, and whether the node data for checking the calculating generation of calculate node described at least two computing platform is consistent, Include:
Sequence is executed according to the node, program member described at least two computing platform is checked and counts node meter Whether the project case data that the program member's total number data and project case calculate node calculating for calculating generation generate Unanimously;
If inconsistent, execute described respectively in at least two computing platform execution inconsistent correspondence of node data Calculate node step;
Wherein, described to execute the inconsistent corresponding calculating section of the node data at least two computing platform respectively Point, comprising:
The program member, which is executed, at least two computing platform respectively counts node and project case calculating Node.
Optionally, if program member described in verification at least two computing platform counts node and calculates generation Program member's total number data and the project case calculate node calculate the whether consistent sub-step of project case data generated Rapid checked result be it is consistent, perform the following operations:
Check contribution quota calculate node described at least two computing platform generation contribution quota data whether Unanimously;
If inconsistent, execute described respectively in at least two computing platform execution inconsistent correspondence of node data Calculate node step;
Wherein, described to execute the inconsistent corresponding calculating section of the node data at least two computing platform respectively Point, comprising:
The contribution quota calculate node is executed at least two computing platform respectively.
Optionally, at least two computing platform, comprising:
Carry the Projects Agency platform of the mutual assistance project and the project service platform of the mutual assistance project.
Optionally, the program member's set and item of the mutual assistance project are participated in the project cycle according to mutual assistance project The case set of mesh case, the calculating step for calling at least two computing platforms to carry out contribution quota in the project cycle execute Before, further includes:
Extracted in the member information DB participated in the project cycle project of the mutual assistance project at Member's set;
The Projects Agency platform synchronizes project case described in the project service platform within the project cycle Case set.
Optionally, if described judge that at least two computing platform calculates the whether equal step of the contribution quota obtained Rapid judging result be it is equal, perform the following operations:
Program member into program member set sends the prompting for paying the contribution quota.
The exemplary scheme of the above-mentioned a kind of electronic equipment for the present embodiment.It should be noted that the skill of the electronic equipment The technical solution for the checking method that art scheme and above-mentioned expense calculate belongs to same design, and the technical solution of electronic equipment is not detailed The detail content carefully described may refer to the description of the technical solution for the checking method that above-mentioned expense calculates.
One embodiment of this specification also provides a kind of computer readable storage medium, is stored with computer instruction, this refers to Enable the step of checking method that expense as previously described calculates is realized when being executed by processor.
A kind of exemplary scheme of above-mentioned computer readable storage medium for the present embodiment.It should be noted that this is deposited The technical solution for the checking method that the technical solution of storage media and above-mentioned expense calculate belongs to same design, the skill of storage medium The detail content that art scheme is not described in detail may refer to the description of the technical solution for the checking method that above-mentioned expense calculates.
It is above-mentioned that this specification specific embodiment is described.Other embodiments are in the scope of the appended claims It is interior.In some cases, the movement recorded in detail in the claims or step can be come according to the sequence being different from embodiment It executes and desired result still may be implemented.In addition, process depicted in the drawing not necessarily require show it is specific suitable Sequence or consecutive order are just able to achieve desired result.In some embodiments, multitasking and parallel processing be also can With or may be advantageous.
The computer instruction includes computer program code, the computer program code can for source code form, Object identification code form, executable file or certain intermediate forms etc..The computer-readable medium may include: that can carry institute State any entity or device, recording medium, USB flash disk, mobile hard disk, magnetic disk, CD, the computer storage of computer program code Device, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), Electric carrier signal, telecommunication signal and software distribution medium etc..It should be noted that the computer-readable medium include it is interior Increase and decrease appropriate can be carried out according to the requirement made laws in jurisdiction with patent practice by holding, such as in certain jurisdictions of courts Area does not include electric carrier signal and telecommunication signal according to legislation and patent practice, computer-readable medium.
It should be noted that for the various method embodiments described above, describing for simplicity, therefore, it is stated as a series of Combination of actions, but those skilled in the art should understand that, this specification is not limited by the described action sequence, because For according to this specification, certain steps can use other sequences or carry out simultaneously.Secondly, those skilled in the art also should Know, the embodiments described in the specification are all preferred embodiments, and related actions and modules might not all be this Necessary to specification.
In the above-described embodiments, it all emphasizes particularly on different fields to the description of each embodiment, there is no the portion being described in detail in some embodiment Point, it may refer to the associated description of other embodiments.
This specification preferred embodiment disclosed above is only intended to help to illustrate this specification.Alternative embodiment is not All details of detailed descriptionthe, do not limit the invention to the specific embodiments described.Obviously, according in this specification Hold, can make many modifications and variations.These embodiments are chosen and specifically described to this specification, is in order to preferably explain this theory The principle and practical application of bright book, so that skilled artisan be enable to better understand and utilize this specification.This Specification is limited only by the claims and their full scope and equivalents.

Claims (15)

1. the checking method that a kind of expense calculates characterized by comprising
Gather the case collection with project case according to the program member for participating in the mutual assistance project in the project cycle of mutual assistance project It closes, at least two computing platforms is called to carry out the calculating of contribution quota in the project cycle;
Judge whether at least two computing platform calculates the contribution quota obtained equal;
If unequal, executed according to the node that at least two computing platform calculates the calculate node that the contribution quota executes Sequentially, whether consistent the node data that the calculating of calculate node described at least two computing platform generates is checked;
If inconsistent, the inconsistent corresponding calculate node of node data is executed at least two computing platform respectively.
2. the checking method that expense according to claim 1 calculates, which is characterized in that at least two computing platform into The calculating of contribution quota in the row project cycle, comprising:
Count the total number that program member's set of the mutual assistance project is participated in the project cycle;
Total application gold is calculated in such a way that the application amount of money to project case described in the case set carries out cumulative summation Volume;
According to preset mutual assistance project computation rule to total both total numbers for claiming the amount of money and program member set It is calculated, using calculated result as the contribution quota.
3. the checking method that expense according to claim 1 calculates, which is characterized in that at least two computing platforms meter Calculating the calculate node that the contribution quota executes includes:
Program member counts node, project case calculate node and contribution quota calculate node;
Correspondingly, the node execution sequence that at least two computing platform calculates the calculate node that the contribution quota executes is wrapped It includes:
The program member counts node and executes before project case calculate node execution, and the project case calculates Node executes before contribution quota calculate node execution;
Alternatively, the program member counts node and the project case calculate node is executed in the contribution quota calculate node It executes before.
4. the checking method that expense according to claim 3 calculates, which is characterized in that if node execution sequence is institute It states program member's statistics node to execute before project case calculate node execution, and the project case calculate node exists The contribution quota calculate node executes before executing;
Correspondingly, the node for calculating the calculate node that the contribution quota executes according at least two computing platform is held Whether consistent row sequence checks the node data that the calculating of calculate node described at least two computing platform generates, comprising:
Sequence is executed according to the node, program member described at least two computing platform is checked and counts node calculating life At program member's total number data it is whether consistent;
If inconsistent, execute described respectively in at least two computing platform execution inconsistent corresponding meter of node data Operator node step;
It is wherein, described to execute the inconsistent corresponding calculate node of node data at least two computing platform respectively, Include:
The program member, which is executed, at least two computing platform respectively counts node.
5. the checking method that expense according to claim 4 calculates, which is characterized in that if the verification described at least two Program member described in computing platform counts the core that node calculates the whether consistent sub-step of program member's total number data generated Be to result it is consistent, perform the following operations:
Whether the project case data for checking the generation of project case calculate node described at least two computing platform are consistent;
If inconsistent, execute described respectively in at least two computing platform execution inconsistent corresponding meter of node data Operator node step;
It is wherein, described to execute the inconsistent corresponding calculate node of node data at least two computing platform respectively, Include:
The project case calculate node is executed at least two computing platform respectively.
6. the checking method that expense according to claim 5 calculates, which is characterized in that if the verification described at least two The checked result for the whether consistent sub-step of project case data that the calculate node of project case described in computing platform generates is one It causes, performs the following operations:
Whether the contribution quota data for checking the generation of contribution quota calculate node described at least two computing platform are consistent;
If inconsistent, execute described respectively in at least two computing platform execution inconsistent corresponding meter of node data Operator node step;
It is wherein, described to execute the inconsistent corresponding calculate node of node data at least two computing platform respectively, Include:
The contribution quota calculate node is executed at least two computing platform respectively.
7. the checking method that expense according to claim 6 calculates, which is characterized in that if the verification described at least two The checked result for the whether consistent sub-step of contribution quota data that contribution quota calculate node described in computing platform generates is one It causes, performs the following operations:
Check the mutual assistance item at least two computing platform in addition to calculating the calculate node that the contribution quota executes Whether mesh calculate node calculates the mutual assistance project data generated consistent;
If inconsistent, execute described respectively in at least two computing platform execution inconsistent corresponding meter of node data Operator node step;
It is wherein, described to execute the inconsistent corresponding calculate node of node data at least two computing platform respectively, Include:
The mutual assistance project calculate node is executed at least two computing platform respectively.
8. the checking method that expense according to claim 3 calculates, which is characterized in that if node execution sequence is institute Program member's statistics node and the project case calculate node is stated to execute before contribution quota calculate node execution;
Correspondingly, the node for calculating the calculate node that the contribution quota executes according at least two computing platform is held Whether consistent row sequence checks the node data that the calculating of calculate node described at least two computing platform generates, comprising:
Sequence is executed according to the node, program member described at least two computing platform is checked and counts node calculating life At program member's total number data and the project case calculate node calculate generate project case data whether one It causes;
If inconsistent, execute described respectively in at least two computing platform execution inconsistent corresponding meter of node data Operator node step;
It is wherein, described to execute the inconsistent corresponding calculate node of node data at least two computing platform respectively, Include:
The program member, which is executed, at least two computing platform respectively counts node and the project case calculate node.
9. the checking method that expense according to claim 8 calculates, which is characterized in that if the verification described at least two Program member described in computing platform counts node and calculates the program member's total number data generated and the project case meter Operator node calculate generate the whether consistent sub-step of project case data checked result be it is consistent, perform the following operations:
Whether the contribution quota data for checking the generation of contribution quota calculate node described at least two computing platform are consistent;
If inconsistent, execute described respectively in at least two computing platform execution inconsistent corresponding meter of node data Operator node step;
It is wherein, described to execute the inconsistent corresponding calculate node of node data at least two computing platform respectively, Include:
The contribution quota calculate node is executed at least two computing platform respectively.
10. the checking method that expense according to claim 1 calculates, which is characterized in that at least two computing platform, Include:
Carry the Projects Agency platform of the mutual assistance project and the project service platform of the mutual assistance project.
11. the checking method that expense according to claim 10 calculates, which is characterized in that the item according to mutual assistance project The case set of the program member set and project case of the mutual assistance project is participated in the mesh period, calling at least two calculates flat Before the calculating step that platform carries out contribution quota in the project cycle executes, further includes:
The program member collection that the mutual assistance project is participated in the project cycle is extracted in the member information DB It closes;
The Projects Agency platform synchronizes the case of project case described in the project service platform within the project cycle Set.
12. the checking method that expense according to claim 1 calculates, which is characterized in that if at least two described in the judgement A computing platform calculate the contribution quota that obtains whether phase and etc. judging result be it is equal, perform the following operations:
Program member into program member set sends the prompting for paying the contribution quota.
13. the checking device that a kind of expense calculates characterized by comprising
Calling module, be configured as participating in the project cycle according to mutual assistance project the mutual assistance project program member's set and The case set of project case calls at least two computing platforms to carry out the calculating of contribution quota in the project cycle;
Judgment module is configured as judging whether at least two computing platform calculates the contribution quota obtained equal;
If unequal, operation verification module;
The verification module is configured as calculating the calculating section that the contribution quota executes according at least two computing platform The node of point executes sequence, and whether the node data that calculate node calculating generates described in verification at least two computing platform Unanimously;
If inconsistent, execution module is run;
The execution module is configured to execute the inconsistent correspondence of node data at least two computing platform Calculate node.
14. a kind of electronic equipment characterized by comprising
Memory and processor;
The memory is for storing computer executable instructions, and for executing, the computer is executable to be referred to the processor It enables:
Gather the case collection with project case according to the program member for participating in the mutual assistance project in the project cycle of mutual assistance project It closes, at least two computing platforms is called to carry out the calculating of contribution quota in the project cycle;
Judge whether at least two computing platform calculates the contribution quota obtained equal;
If unequal, executed according to the node that at least two computing platform calculates the calculate node that the contribution quota executes Sequentially, whether consistent the node data that the calculating of calculate node described at least two computing platform generates is checked;
If inconsistent, the inconsistent corresponding calculate node of node data is executed at least two computing platform respectively.
15. a kind of computer readable storage medium, is stored with computer instruction, which is characterized in that the instruction is held by processor The step of checking method that expense described in claim 1 to 12 any one calculates is realized when row.
CN201910303087.2A 2019-04-16 2019-04-16 Checking method and device for fee calculation, electronic equipment and storage medium Active CN110264369B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910303087.2A CN110264369B (en) 2019-04-16 2019-04-16 Checking method and device for fee calculation, electronic equipment and storage medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910303087.2A CN110264369B (en) 2019-04-16 2019-04-16 Checking method and device for fee calculation, electronic equipment and storage medium

Publications (2)

Publication Number Publication Date
CN110264369A true CN110264369A (en) 2019-09-20
CN110264369B CN110264369B (en) 2023-08-08

Family

ID=67913599

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910303087.2A Active CN110264369B (en) 2019-04-16 2019-04-16 Checking method and device for fee calculation, electronic equipment and storage medium

Country Status (1)

Country Link
CN (1) CN110264369B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111222999A (en) * 2020-01-07 2020-06-02 支付宝(杭州)信息技术有限公司 Data processing system, method and device

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006277587A (en) * 2005-03-30 2006-10-12 Daiwa Securities Group Inc Settlement matching system, settlement matching method and settlement matching program
TW201104613A (en) * 2009-07-20 2011-02-01 Shacom Com Inc Mutual insurance method and system thereof
US20120221356A1 (en) * 2011-02-24 2012-08-30 Shacom.Com Inc. Process apparatus and mutual insurance method for use in the process apparatus
TW201250621A (en) * 2011-06-10 2012-12-16 Shacom Com Inc Mutual insurance method and system thereof
US20140351103A1 (en) * 2013-05-22 2014-11-27 Blackbaud Incorporated Reconciliation system in managerial subsidiaries
CN106447567A (en) * 2016-08-29 2017-02-22 上海齐助网络技术有限公司 Block factor-based public mutual fund calculation method and system
CN107545506A (en) * 2016-06-23 2018-01-05 马梅铨 Mutual-aid type insurance method and mutual-aid type insurance system
CN108090824A (en) * 2017-12-30 2018-05-29 平安科技(深圳)有限公司 Verification of data method, apparatus, computer equipment and readable storage medium storing program for executing
CN109242425A (en) * 2018-08-27 2019-01-18 佛山市顺德区创行信息科技有限公司 Project Cost collects methodology, device, computer equipment and storage medium
CN109359939A (en) * 2018-09-26 2019-02-19 中国平安人寿保险股份有限公司 Business datum method of calibration, device, computer equipment and storage medium
CN109493201A (en) * 2018-09-18 2019-03-19 深圳壹账通智能科技有限公司 Account checking method, device, computer equipment and storage medium
CN109558414A (en) * 2018-10-15 2019-04-02 平安科技(深圳)有限公司 Checking method, device, computer equipment and the storage medium of financial data

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006277587A (en) * 2005-03-30 2006-10-12 Daiwa Securities Group Inc Settlement matching system, settlement matching method and settlement matching program
TW201104613A (en) * 2009-07-20 2011-02-01 Shacom Com Inc Mutual insurance method and system thereof
US20120221356A1 (en) * 2011-02-24 2012-08-30 Shacom.Com Inc. Process apparatus and mutual insurance method for use in the process apparatus
TW201250621A (en) * 2011-06-10 2012-12-16 Shacom Com Inc Mutual insurance method and system thereof
US20140351103A1 (en) * 2013-05-22 2014-11-27 Blackbaud Incorporated Reconciliation system in managerial subsidiaries
CN107545506A (en) * 2016-06-23 2018-01-05 马梅铨 Mutual-aid type insurance method and mutual-aid type insurance system
CN106447567A (en) * 2016-08-29 2017-02-22 上海齐助网络技术有限公司 Block factor-based public mutual fund calculation method and system
CN108090824A (en) * 2017-12-30 2018-05-29 平安科技(深圳)有限公司 Verification of data method, apparatus, computer equipment and readable storage medium storing program for executing
CN109242425A (en) * 2018-08-27 2019-01-18 佛山市顺德区创行信息科技有限公司 Project Cost collects methodology, device, computer equipment and storage medium
CN109493201A (en) * 2018-09-18 2019-03-19 深圳壹账通智能科技有限公司 Account checking method, device, computer equipment and storage medium
CN109359939A (en) * 2018-09-26 2019-02-19 中国平安人寿保险股份有限公司 Business datum method of calibration, device, computer equipment and storage medium
CN109558414A (en) * 2018-10-15 2019-04-02 平安科技(深圳)有限公司 Checking method, device, computer equipment and the storage medium of financial data

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
李海军;褚丽娜;刘乡萍;陈碧蕾;韩静;: "基于项目生命周期的造船成本核算管理系统的研究与开发", 上海造船, no. 02 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111222999A (en) * 2020-01-07 2020-06-02 支付宝(杭州)信息技术有限公司 Data processing system, method and device

Also Published As

Publication number Publication date
CN110264369B (en) 2023-08-08

Similar Documents

Publication Publication Date Title
CN110175913A (en) Data processing system, method, calculating equipment and storage medium based on block chain
TWI785271B (en) Project processing method and device, computing device and storage medium
TWI640947B (en) Method and device for obtaining network subject social relationship type
CN107766998A (en) A kind of order reward processing method and server
CN110084705A (en) A kind of item recommendation method and device, a kind of electronic equipment and storage medium
CN110110916A (en) A kind of prediction technique and system of the medical amount of hospital outpatient
WO2018171324A1 (en) Tariff data determination method and device
CN110264369A (en) Checking method, device, electronic equipment and the storage medium that expense calculates
JP4146469B2 (en) Billing method in flat-rate communication system
CN110288334B (en) Project deduction method, apparatus, computing device and computer readable storage medium
CN110276695A (en) Method, apparatus, calculating equipment and the computer readable storage medium that project is deducted fees
CN108241970A (en) Digging ore deposit method, apparatus and computer readable storage medium based on block chain
CN110136002B (en) Payment reminding method and device, computing equipment and computer readable storage medium
CN110163553A (en) A kind of payment amount of money settlement system, the method and device of project
CN110246043A (en) Project fee payment method, device, electronic equipment and storage medium
CN110084707A (en) Fee deduction treatment method, apparatus, electronic equipment and storage medium
CN105246063B (en) Charging method, device and system
CN110245778A (en) Amortization of data detection method and device
CN110197196A (en) Question processing method, device, electronic equipment and storage medium
CN110136005A (en) Mutual assistance program member checking method, device, electronic equipment and storage medium
CN110232148A (en) Item recommendation system, method and device
CN109428732A (en) A kind of call bill processing method and equipment
CN110060020A (en) Project Cost prediction technique and device
CN108964932A (en) A kind of charging method, device and computer readable storage medium
CN110135794A (en) Intelligent checks based reminding method and device, electronic equipment and storage medium

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
REG Reference to a national code

Ref country code: HK

Ref legal event code: DE

Ref document number: 40014391

Country of ref document: HK

TA01 Transfer of patent application right

Effective date of registration: 20200929

Address after: 27 Hospital Road, George Town, Grand Cayman ky1-9008

Applicant after: Advanced innovation technology Co.,Ltd.

Address before: A four-storey 847 mailbox in Grand Cayman Capital Building, British Cayman Islands

Applicant before: Alibaba Group Holding Ltd.

Effective date of registration: 20200929

Address after: 27 Hospital Road, George Town, Grand Cayman ky1-9008

Applicant after: Innovative advanced technology Co.,Ltd.

Address before: 27 Hospital Road, George Town, Grand Cayman ky1-9008

Applicant before: Advanced innovation technology Co.,Ltd.

TA01 Transfer of patent application right
GR01 Patent grant