CN110264070A - A kind of quality detecting system based on BIM - Google Patents

A kind of quality detecting system based on BIM Download PDF

Info

Publication number
CN110264070A
CN110264070A CN201910531614.5A CN201910531614A CN110264070A CN 110264070 A CN110264070 A CN 110264070A CN 201910531614 A CN201910531614 A CN 201910531614A CN 110264070 A CN110264070 A CN 110264070A
Authority
CN
China
Prior art keywords
module
construction
unit
bim
building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910531614.5A
Other languages
Chinese (zh)
Inventor
程琤
李星震
戎晓红
程建伟
曹倩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xuzhou College of Industrial Technology
Original Assignee
Xuzhou College of Industrial Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xuzhou College of Industrial Technology filed Critical Xuzhou College of Industrial Technology
Priority to CN201910531614.5A priority Critical patent/CN110264070A/en
Publication of CN110264070A publication Critical patent/CN110264070A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/13Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • G06Q10/06395Quality analysis or management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Abstract

The invention discloses a kind of quality detecting systems based on BIM, it is related to Building Information Model technical field, solve the problems such as quality testing accuracy that existing building is constructed is lower, input cost is higher, its key points of the technical solution are that: including construction speed input module, model modification module, database module, weighing module, detection judgment module, result output module;The construction speed input module and the model modification module communicate to connect;The database module stores construction normal data;The model modification module and the database module communicate to connect;The detection judgment module and the database module communicate to connect;The result output module and the detection judgment module communicate to connect, and have the effect of enhancing quality testing accuracy in building construction process, reduce quality testing input cost, improve quality testing efficiency, lay a good foundation to improve Construction Quality.

Description

A kind of quality detecting system based on BIM
Technical field
The present invention relates to Building Information Model technical fields, more specifically, it relates to a kind of quality testing based on BIM System.
Background technique
Building Information Model, abbreviation BIM are the new tools of architecture, engineering science and civil engineering, it can help to realize Integrated, the termination from the design of building, construction, operation up to building life cycle management of architecture information, various information are whole always Together in a three-dimensional model information database, all parties such as design team, unit in charge of construction, installation fishery department and owner can To be cooperated based on BIM, working efficiency is effectively improved, resource is saved, reduces cost, to realize sustainable development.
The detection of existing construction quality, it is general to be detected by manually acquisition data, due to construction be with compared with Long construction period, construction speed are to constantly update, and go deep into construction speed, and construction building scale increases, The input cost of quality testing will be increased by artificial detection construction quality under certain frequency, a large amount of manpower wasted with Material resources;If reducing quality testing frequency carrys out save the cost, the accuracy of quality testing, interim construction speed are necessarily reduced If the hidden danger occurred in the process is handled not in time, bigger hidden danger may be brought.
Therefore, a kind of enhancing quality testing accuracy how is designed, quality testing input cost is reduced, improves quality testing The quality detecting system based on BIM of efficiency is our technical problems in the urgent need to address at present, to improve construction matter Amount is laid a good foundation.
Summary of the invention
The object of the present invention is to provide a kind of quality detecting systems based on BIM, and having enhances in building construction process Quality testing accuracy, the effect for reducing quality testing input cost, improving quality testing efficiency, to improve Construction Quality It lays a good foundation.
Above-mentioned technical purpose of the invention has the technical scheme that a kind of quality inspection based on BIM Examining system, including construction speed input module, model modification module, database module, weighing module, detection judge mould Block, result output module;
The construction speed input module is communicated to connect with the model modification module, for inputting construction speed information, And the construction speed information is transmitted to the model modification module;
The database module stores construction normal data;
The model modification module is communicated to connect with the database module, for being obtained according to the construction speed information Corresponding construction normal data is taken, and BIM model is updated according to the construction normal data;
The weighing module, for acquiring the practice of construction data of building to be detected, and by the practice of construction number According to BIM model is transmitted to realize that BIM model improves construction;
The detection judgment module, with the database module communicate to connect, for obtain in the database module with The corresponding standard construction data of the practice of construction data, and the BIM model according to the standard construction data and after improving Judge whether quality testing is qualified;
The result output module, communicates to connect with the detection judgment module, obtains for will test judgment module Quality measurements output.
By using above-mentioned technical proposal, after construction speed variation, according to the BIM mould of construction speed information update standard Then whether up to standard type judges automatically collected practice of construction data according to updated standard BIM model, so that judgement is applied Whether working medium amount is qualified;Quality testing accuracy is enhanced in building construction process, is reduced quality testing input cost, is mentioned The high effect of quality testing efficiency.
The present invention is further arranged to: the weighing module includes the first acquisition unit and the second acquisition unit;Institute Stating detection judgment module includes the first judging unit, second judgment unit and corrigendum unit;
First acquisition unit, for acquiring the practical building body tectonic information of construction building;
Second acquisition unit, for acquiring the practical electrical equipment mount message of construction building;
First judging unit, for according to the standard in the BIM model and the database module after described improve Building body tectonic information judges whether the main body construction of construction building is qualified, and the first judging result is transmitted to the result Output module;If unqualified, start corrigendum unit;If qualified, start the second judgment unit;
The corrigendum unit is communicated to connect with first judging unit, for according to the Modular building main-body structure Information corrects the BIM model after described improve, so that second judgment unit is judged;
The second judgment unit, for according in the BIM model after described improve and the BIM model after the corrigendum Standard electrical equipment mount message in one and the database module judge construction building electrical equipment construction whether Qualification, and the second judging result is transmitted to the result output module.
By using above-mentioned technical proposal, avoid that electrical equipment being installed in the case where building body constructs and constructs wrong Situation is detected, and the accuracy and reliability of electrical equipment installation situation detection is enhanced.
The present invention is further arranged to: the result output module communication link is connected to result data memory module.
By using above-mentioned technical proposal, testing result is consulted convenient for subsequent.
The present invention is further arranged to: the result data memory module communication link is connected to warning module;The early warning mould Block includes timing unit and frequency judging unit;
The timing unit, for the frequency judging unit according to the timing information start by set date pre-seted;
The frequency judging unit does not conform to for calculating the inspection result in the timing information pre-seted after starting Lattice frequency, and judge whether the unqualified frequency of the inspection result is exceeded according to the pass frequency pre-seted;It is defeated if exceeded Pre-warning signal out.
By using above-mentioned technical proposal, supervised convenient for the construction quality to construction team.
The present invention is further arranged to: the result output module is connect with the communication of extraneous quality testing department.
By using above-mentioned technical proposal, exercise supervision convenient for extraneous quality testing department to construction situation.
In conclusion the invention has the following advantages: construction speed variation after, according to construction speed information update Then the BIM model of standard judges automatically whether collected practice of construction data reach according to updated standard BIM model Mark, to judge whether construction quality is qualified;Quality testing accuracy is enhanced in building construction process, reduces quality inspection The effect surveyed input cost, improve quality testing efficiency;It avoids in the case where building body constructs and constructs wrong to electrical Equipment installation situation is detected, and the accuracy and reliability of electrical equipment installation situation detection is enhanced;Convenient for construction group The construction quality of team is supervised.
Detailed description of the invention
Fig. 1 is the block architecture diagram in the embodiment of the present invention.
In figure: 1, construction speed input module;2, model modification module;3, database module;4, weighing module; 41, the first acquisition unit;42, the second acquisition unit;5, judgment module is detected;51, the first judging unit;52, the second judgement is single Member;53, unit is corrected;6, result output module;7, result data memory module;8, warning module;81, timing unit;82, frequency Rate judging unit;9, management system.
Specific embodiment
Below in conjunction with attached drawing, invention is further described in detail.
Embodiment: a kind of quality detecting system based on BIM, as shown in Figure 1, including construction speed input module 1, model Update module 2, database module 3, weighing module 4, detection judgment module 5 and result output module 6.
Construction speed input module 1 and model modification module 2 communicate to connect, and for inputting construction speed information, and will apply Work progress msg is transmitted to model modification module 2.Database module 3 stores construction normal data.Model modification module 2 It is communicated to connect with database module 3, for according to the corresponding construction normal data of construction speed acquisition of information, and according to building Construction reference data are built to be updated BIM model.Weighing module 4 is used to acquire the practice of construction number of building to be detected According to, and practice of construction data are transmitted to BIM model to realize that BIM model improves construction, the acquisition of practice of construction data includes But the instrument and equipment for being not limited by work progress use is acquired, after the completion of construction by measuring instrument and video camera into Row acquisition.Judgment module 5 and database module 3 is detected to communicate to connect, for obtain in database module 3 with practice of construction data Corresponding standard construction data, and the BIM model according to standard construction data and after improving judges whether quality testing is qualified. As a result output module 6 and detection judgment module 5 communicate to connect, defeated for will test the quality measurements that judgment module 5 obtains Out.After construction speed variation, according to the BIM model of construction speed information update standard, then according to updated standard BIM Whether model judges automatically collected practice of construction data up to standard, to judge whether construction quality is qualified.In construction The effect for enhancing quality testing accuracy in the process, reducing quality testing input cost, improving quality testing efficiency.
Weighing module 4 includes the first acquisition unit 41 and the second acquisition unit 42.Detecting judgment module 5 includes first Judging unit 51, second judgment unit 52 and corrigendum unit 53.First acquisition unit 41 is for acquiring actually building for construction building Main-body structure information is built, practical building body tectonic information includes but is not limited to main-body structure information, wall leveling information, level Smooth information.Second acquisition unit 42 is used to acquire the practical electrical equipment mount message of construction building, electrical equipment installation letter Breath includes but is not limited to drainpipe mount message, HVAC mount message, electrical equipment mount message.First judging unit 51 is used for Judge that the main body of construction building is applied according to the Modular building main-body structure information in the BIM model and database module 3 after improving Whether work is qualified, and the first judging result is transmitted to result output module 6;If unqualified, start corrigendum unit 53;If closing Lattice then start second judgment unit 52.It corrects unit 53 and the first judging unit 51 communicates to connect, for according to Modular building master Body tectonic information corrects the BIM model after improving, so that second judgment unit 52 is judged.Second judgment unit 52 For according to improve after BIM model with correct after BIM model in one and database module 3 in standard electrical set Standby mount message judges whether the electrical equipment construction of construction building is qualified, and the second judging result is transmitted to result output mould Block 6.It avoids detecting electrical equipment installation situation in the case where building body constructs and constructs wrong, enhances and electrically set The accuracy and reliability of standby installation situation detection.
As a result 6 communication link of output module is connected to result data memory module 7, consults convenient for subsequent testing result.
7 communication link of result data memory module is connected to warning module 8.Warning module 8 includes that timing unit 81 and frequency are sentenced Disconnected unit 82.Timing unit 81 is used for according to the timing information start by set date frequency judging unit 82 pre-seted.Frequency judgement is single Unqualified frequency of the member 82 for calculating inspection result in the timing information pre-seted after starting, and according to the qualification pre-seted Frequency judges whether the unqualified frequency of inspection result is exceeded;If exceeded, pre-warning signal is exported, convenient for applying to construction team Working medium amount is supervised.
As a result the management system 9 of output module 6 and extraneous quality testing department communicates to connect, convenient for extraneous quality testing department to building Condition of construction exercises supervision.
Working principle: after construction speed variation, according to the BIM model of construction speed information update standard, then basis Whether updated standard BIM model judges automatically collected practice of construction data up to standard, to whether judge construction quality It is qualified.Quality testing accuracy is enhanced in building construction process, is reduced quality testing input cost, is improved quality inspection Survey the effect of efficiency.
This specific embodiment is only explanation of the invention, is not limitation of the present invention, those skilled in the art Member can according to need the modification that not creative contribution is made to the present embodiment after reading this specification, but as long as at this All by the protection of Patent Law in the scope of the claims of invention.

Claims (5)

1. a kind of quality detecting system based on BIM, it is characterized in that: including construction speed input module (1), model modification module (2), database module (3), weighing module (4), detection judgment module (5), result output module (6);
The construction speed input module (1) communicates to connect with the model modification module (2), for inputting construction speed letter Breath, and the construction speed information is transmitted to the model modification module (2);
The database module (3), stores construction normal data;
The model modification module (2) communicates to connect with the database module (3), for according to the construction speed information Corresponding construction normal data is obtained, and BIM model is updated according to the construction normal data;
The weighing module (4), for acquiring the practice of construction data of building to be detected, and by the practice of construction data BIM model is transmitted to realize that BIM model improves construction;
The detection judgment module (5) communicates to connect with the database module (3), for obtaining the database module (3) In standard construction data corresponding with the practice of construction data, and according to the standard construction data and improve after BIM Model judges whether quality testing is qualified;
The result output module (6) communicates to connect with the detection judgment module (5), obtains for will test judgment module (5) Quality measurements output out.
2. a kind of quality detecting system based on BIM according to claim 1, it is characterized in that: the weighing module It (4) include the first acquisition unit (41) and the second acquisition unit (42);The detection judgment module (5) includes the first judging unit (51), second judgment unit (52) and corrigendum unit (53);
First acquisition unit (41), for acquiring the practical building body tectonic information of construction building;
Second acquisition unit (42), for acquiring the practical electrical equipment mount message of construction building;
First judging unit (51), for according to the mark in the BIM model and the database module (3) after described improve Quasi- building body tectonic information judges whether the main body construction of construction building is qualified, and the first judging result is transmitted to the knot Fruit output module (6);If unqualified, start corrigendum unit (53);If qualified, start the second judgment unit (52);
The corrigendum unit (53) communicates to connect with first judging unit (51), for according to the Modular building main body Tectonic information corrects the BIM model after described improve, so that second judgment unit (52) is judged;
The second judgment unit (52), for according in the BIM model after described improve and the BIM model after the corrigendum Standard electrical equipment mount message in one and the database module (3) judges that the electrical equipment construction of construction building is No qualification, and the second judging result is transmitted to the result output module (6).
3. a kind of quality detecting system based on BIM according to claim 1, it is characterized in that: the result output module (6) communication link is connected to result data memory module (7).
4. a kind of quality detecting system based on BIM according to claim 3, it is characterized in that: the result data stores Module (7) communication link is connected to warning module (8);The warning module (8) includes timing unit (81) and frequency judging unit (82);
The timing unit (81), for frequency judging unit (82) according to the timing information start by set date pre-seted;
The frequency judging unit (82) does not conform to for calculating the inspection result in the timing information pre-seted after starting Lattice frequency, and judge whether the unqualified frequency of the inspection result is exceeded according to the pass frequency pre-seted;It is defeated if exceeded Pre-warning signal out.
5. a kind of quality detecting system based on BIM according to any one of claims 1-4, it is characterized in that: the knot The management system (9) of fruit output module (6) and extraneous quality testing department communicates to connect.
CN201910531614.5A 2019-06-19 2019-06-19 A kind of quality detecting system based on BIM Pending CN110264070A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910531614.5A CN110264070A (en) 2019-06-19 2019-06-19 A kind of quality detecting system based on BIM

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910531614.5A CN110264070A (en) 2019-06-19 2019-06-19 A kind of quality detecting system based on BIM

Publications (1)

Publication Number Publication Date
CN110264070A true CN110264070A (en) 2019-09-20

Family

ID=67919359

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910531614.5A Pending CN110264070A (en) 2019-06-19 2019-06-19 A kind of quality detecting system based on BIM

Country Status (1)

Country Link
CN (1) CN110264070A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111061797A (en) * 2019-12-20 2020-04-24 四川鑫锐投资有限公司 Inspection and detection data management system
CN111562042A (en) * 2020-05-28 2020-08-21 关蕙 Safety information monitoring method and system in underground garage construction
CN111833016A (en) * 2020-07-08 2020-10-27 惠州市筑成工程管理有限公司 Infrastructure building supervision method based on BIM
CN111861160A (en) * 2020-07-04 2020-10-30 广东粤源工程咨询有限公司 Construction engineering quality information management method and system
CN113435757A (en) * 2021-06-30 2021-09-24 中建华帆建筑设计院有限公司 BIM-based building masonry design and construction method
CN113642906A (en) * 2021-08-19 2021-11-12 贵州百胜工程建设咨询有限公司 BIM-based construction progress management method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108388711A (en) * 2018-02-07 2018-08-10 深圳群伦项目管理有限公司 A kind of engineering design based on BIM and management system
CN108446889A (en) * 2018-02-11 2018-08-24 北京市轨道交通建设管理有限公司 A kind of exchange method of construction site and construction speed platform
CN108732979A (en) * 2018-05-15 2018-11-02 浙江大学 A kind of construction safety managing and control system based on BIM technology

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108388711A (en) * 2018-02-07 2018-08-10 深圳群伦项目管理有限公司 A kind of engineering design based on BIM and management system
CN108446889A (en) * 2018-02-11 2018-08-24 北京市轨道交通建设管理有限公司 A kind of exchange method of construction site and construction speed platform
CN108732979A (en) * 2018-05-15 2018-11-02 浙江大学 A kind of construction safety managing and control system based on BIM technology

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111061797A (en) * 2019-12-20 2020-04-24 四川鑫锐投资有限公司 Inspection and detection data management system
CN111562042A (en) * 2020-05-28 2020-08-21 关蕙 Safety information monitoring method and system in underground garage construction
CN111861160A (en) * 2020-07-04 2020-10-30 广东粤源工程咨询有限公司 Construction engineering quality information management method and system
CN111833016A (en) * 2020-07-08 2020-10-27 惠州市筑成工程管理有限公司 Infrastructure building supervision method based on BIM
CN113435757A (en) * 2021-06-30 2021-09-24 中建华帆建筑设计院有限公司 BIM-based building masonry design and construction method
CN113642906A (en) * 2021-08-19 2021-11-12 贵州百胜工程建设咨询有限公司 BIM-based construction progress management method

Similar Documents

Publication Publication Date Title
CN110264070A (en) A kind of quality detecting system based on BIM
CN103293536B (en) A kind of batch-automated method of testing of navigation terminal receiver
CN109555979A (en) A kind of water supply network leakage monitoring method
CN106646142B (en) Grounding grid breakpoint diagnosis method and transient electromagnetic detection device
CN105512011B (en) A kind of electronics testability modeling appraisal procedure
CN109579726B (en) Long-gauge-length distributed optical fiber Brillouin sensing-demodulating system and strain measuring method
CN106090629A (en) Urban Underground piping lane water supply line leak detection system and method
CN107817207B (en) Method for calculating foundation pit permeability coefficient and automatic monitoring device thereof
CN114659621B (en) Bridge vibration monitoring device
CN208420246U (en) A kind of CFST Arch Bridge pipe inner concrete monitoring system of stress and strain
CN103017672A (en) Non-contact nondestructive testing method for bridge structure
CN109738014A (en) The intelligent diagnosing method and system of city integrated piping lane equipment fault
CN110939873A (en) Water supply pipeline leakage point detection system and method based on flexible pipeline robot
CN105407496B (en) A kind of method of erroneous measurements in identification wireless sensor network
CN102998367B (en) Damage identification method based on virtual derivative structure
CN206095356U (en) Differential pressure water level measuring apparatu
Crisnapati et al. Earthquake damage intensity scaling system based on raspberry Pi and Arduino Uno
CN109557284B (en) Tunnel surrounding rock level intelligent rapid determination system and method
CN208383337U (en) A kind of arch bridge stiff skeleton external wrapping concrete temperature acquisition system
CN110361687A (en) A kind of electric power metering system fault testing method
CN113074694B (en) Automatic monitoring device for tunnel section deformation
CN104048745A (en) Network vibration meter
JP2006105862A (en) Method for predicting real-time earthquake risk
CN210766915U (en) Foundation pit real-time monitoring system based on HTM (high-speed transmission) hierarchical time memory algorithm
CN110399258A (en) A kind of stability test method, system and device of server system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190920