CN110264066A - A kind of automobile industry transition and upgrade information monitoring system - Google Patents

A kind of automobile industry transition and upgrade information monitoring system Download PDF

Info

Publication number
CN110264066A
CN110264066A CN201910527238.2A CN201910527238A CN110264066A CN 110264066 A CN110264066 A CN 110264066A CN 201910527238 A CN201910527238 A CN 201910527238A CN 110264066 A CN110264066 A CN 110264066A
Authority
CN
China
Prior art keywords
information
data
automobile
upgrade
automobile industry
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910527238.2A
Other languages
Chinese (zh)
Inventor
熊晓琴
刘伟
钟延珍
熊世权
张梅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Motorcycle (automobile) Intellectual Property Information Center
Original Assignee
Chongqing Motorcycle (automobile) Intellectual Property Information Center
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Motorcycle (automobile) Intellectual Property Information Center filed Critical Chongqing Motorcycle (automobile) Intellectual Property Information Center
Priority to CN201910527238.2A priority Critical patent/CN110264066A/en
Publication of CN110264066A publication Critical patent/CN110264066A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/25Integrating or interfacing systems involving database management systems
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/29Geographical information databases
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/90Details of database functions independent of the retrieved data types
    • G06F16/95Retrieval from the web
    • G06F16/951Indexing; Web crawling techniques
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06313Resource planning in a project environment
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services
    • G06Q50/26Government or public services

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Theoretical Computer Science (AREA)
  • Databases & Information Systems (AREA)
  • General Physics & Mathematics (AREA)
  • Physics & Mathematics (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • Data Mining & Analysis (AREA)
  • General Business, Economics & Management (AREA)
  • Marketing (AREA)
  • General Engineering & Computer Science (AREA)
  • Game Theory and Decision Science (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Biodiversity & Conservation Biology (AREA)
  • Remote Sensing (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention provides a kind of automobile industry transition and upgrade information monitoring system, including data acquisition module, automobile information database, data processing module, evaluation module and visualization model, wherein data acquisition module for acquiring the information data of charging pile in multiple map softwares, the hydrogenation stations information data in hydrogenation stations management system, related patents information in government affairs information relevant to automobile industry transition and upgrade and patent database in government system;Automobile information database is used to store the data of acquisition module acquisition;Data processing module Extracting Information and is merged from automobile information database, and fused data are established analysis model;Evaluation module is used for all kinds of automobile industry transition and upgrade indexes of Calculation Estimation;Mode of the visualization model for figure or table is shown.The data for joining automobile by monitoring, fusion, a variety of dimensions of evaluation, a plurality of types of orthodox cars, new energy and intelligent network, guarantee the accuracy and reliability of monitoring and evaluation.

Description

A kind of automobile industry transition and upgrade information monitoring system
Technical field
The present invention relates to information monitoring technical fields, and in particular to automobile industry transition and upgrade information monitoring system.
Background technique
In the world, the combination of automotive engineering and generation information technology is increasingly close, information-based, intelligent, net Network has started the dramatic change of automobile and related industry in design, research and development, manufacture, management, marketing model, and automobile industry is just Joining automobile fast transformation from orthodox car to new-energy automobile, intelligent network.
But it is existing that personal monitoring's number is relied primarily on to automobile transition and upgrade information automobile industry transition and upgrade information monitoring According to the then screening and processing of progress data.With the mass of information processing, as the manufacture of high-performance computer is so that place Reason massive information is getting faster, and manual identified is increasingly regarded as a cumbersome and time consuming job, it is therefore desirable to establish One automatic monitoring, processing, the system evaluated are to replace current personal monitoring.
Summary of the invention
For the defects in the prior art, the present invention provides a kind of automobile industry transition and upgrade information monitoring system, can lead to Cross a variety of dimensions, a plurality of types of data are monitored automatically, handled and evaluated to automobile industry transition and upgrade information.
A kind of automobile industry transition and upgrade information monitoring system provided by the invention, including at data acquisition module, data Manage module, evaluation module and visualization model;Data acquisition module is used to acquire the Information Number of charging pile in multiple map softwares According to the hydrogenation stations information data in, hydrogenation stations management system, the government affairs relevant to automobile industry transition and upgrade in government system Related patents information in information and patent database;The data of acquisition are transmitted and are deposited into automobile information database by acquisition module Storage;Data processing module Extracting Information and is merged from automobile information database, and fused data are established analysis mould Type;The weight of data and pre-stored all types of data that evaluation module is used to obtain after being handled according to data processing module Calculation Estimation is carried out, and is shown evaluation result in such a way that visualization model is by figure or table.
It is monitored by the data to a variety of dimensions, a plurality of types of new-energy automobiles, and is directed to different types of number According to different weights is assigned, to improve the accuracy and reliability that automobile industry transition and upgrade is monitored and is evaluated.In addition, It due to acquiring the other data of four types by acquisition module, and stores into automobile information database, is establishing analysis model When directly can extract data from automobile information database, the speed and efficiency of modeling can be increased.
Further, acquisition module input urban addresses and keyword, to obtain cluster range from urban addresses, in electricity Map image is progressively scanned in sub- map, to find the coordinate position in map image including keyword, by the coordinate position Point is used as cluster centre point, and by coordinate storage value array, as array element;Preset the minimax of horizontal direction Value Max X and Min X, maximin Max Y and the Min Y of vertical direction;Utilize the maximin Max X of horizontal direction A box is drawn with maximin Max Y and the Min Y of Min X, vertical direction, box position mark is shown.
Further, acquisition unit is also used to acquire the specification information of charging pile in box position, and by box position and The specification information of charging pile is transmitted to automobile information database.
Further, acquisition unit acquires the information in multiple map softwares, and the box position of label display is stored in Into relevant database;Data processing module by the information extracted in multiple map softwares in an electronic map template into Row Overlapping display.There may be differences for the data for being included by different map softwares, soft by acquiring multiple maps Information in part, row information of going forward side by side data investigation, to improve the integrality of data.
Further, acquisition module carries out data traversal in hydrogenation stations management system and government system and crawls, with acquisition Hydrogenation stations information and government affairs information relevant to automobile industry transition and upgrade.
Further, data processing module is from the information extracted in automobile information database in following four classification information It is one or more, four kinds of classification informations be respectively as follows: map software acquisition information of charging pile, hydrogenation stations management system obtain The patent information that the government affairs information and patent database that hydrogenation stations information, government system obtain obtain.
Further, data processing module first checks for the triple of information and the amplification of each element to the information of extraction Whether Knowledge Element meets the category attribute constraint of its definition, to judge the validity and integrality of information;Then comparison information Characteristic similarity, to carry out information fusion.
Further, evaluation module obtains each by the data collection value of two-level appraisement index divided by corresponding monitoring standard The monitor value of two-level index;The monitor value of two-level index is weighted according to corresponding flexible strategy, obtains evaluation result.
As shown from the above technical solution, beneficial effects of the present invention:
1. it is of the invention by a kind of automobile industry transition and upgrade information monitoring system, including at data acquisition module, data Manage module, evaluation module and visualization model;Data acquisition module is used to acquire the Information Number of charging pile in multiple map softwares According to the hydrogenation stations information data in, hydrogenation stations management system, the government affairs relevant to automobile industry transition and upgrade in government system Related patents information in information and patent database;The data of acquisition are transmitted and are deposited into automobile information database by acquisition module Storage;Data processing module Extracting Information and is merged from automobile information database, and fused data are established analysis mould Type;The weight of data and pre-stored all types of data that evaluation module is used to obtain after being handled according to data processing module Calculation Estimation is carried out, and is shown evaluation result in such a way that visualization model is by figure or table.By to more Kind dimension, the data of a plurality of types of new-energy automobiles are monitored, and assign different weights for different types of data, To improve the accuracy and reliability that automobile industry transition and upgrade is monitored and is evaluated.
2. the present invention is by a kind of automobile industry transition and upgrade information monitoring system, due to acquiring four kinds by acquisition module The data of classification, and store into automobile information database, it can be directly from automobile information number when establishing analysis model According to data are extracted in library, the speed and efficiency of modeling can be increased.
Detailed description of the invention
It, below will be to specific in order to illustrate more clearly of the specific embodiment of the invention or technical solution in the prior art Embodiment or attached drawing needed to be used in the description of the prior art are briefly described.In all the appended drawings, similar element Or part is generally identified by similar appended drawing reference.In attached drawing, each element or part might not be drawn according to actual ratio.
Fig. 1 is a kind of structural block diagram of automobile industry transition and upgrade information monitoring system of the present invention.
Specific embodiment
It is described in detail below in conjunction with embodiment of the attached drawing to technical solution of the present invention.Following embodiment is only used for Clearly illustrate technical solution of the present invention, therefore be only used as example, and cannot be used as a limitation and limit protection model of the invention It encloses.
It should be noted that unless otherwise indicated, technical term or scientific term used in this application should be this hair The ordinary meaning that bright one of ordinary skill in the art are understood.
Embodiment 1
As shown in Figure 1, a kind of automobile industry transition and upgrade information monitoring system provided in this embodiment, including data acquisition Module, data processing module, evaluation module and visualization model;New energy in the present embodiment is electric energy and Hydrogen Energy.
Data acquisition module is for acquiring the information data of charging pile in multiple map softwares, in hydrogenation stations management system Related in government affairs information relevant to automobile industry transition and upgrade and patent database in hydrogenation stations information data, government system Patent information;
The information data of charging pile includes the location information of charging pile and the specification information of charging pile, charging pile specification information Including quantity, port model and power;Hydrogenation stations information includes the quantity of hydrogenation stations and the memory capacity of hydrogenation stations;Automobile industry The relevant government affairs information of transition and upgrade includes new-energy automobile Innovation Main Body, new-energy automobile sales volume, new-energy automobile and biography System sale of automobile amount ratio, new-energy automobile sales volume average growth rate, new-energy automobile R&D put into intensity;Related patents letter Breath includes new-energy automobile patent inventor quantity, new-energy automobile patent application total amount, new-energy automobile application for a patent for invention Amount, new-energy automobile amount of the application for patent growth rate, orthodox car and new-energy automobile amount of the application for patent ratio, intelligent network join automotive Sharp total amount, intelligent network connection automobile application for a patent for invention amount, intelligent network connection automobile amount of the application for patent growth rate and orthodox car Join automobile amount of the application for patent ratio with intelligent network.
The data of acquisition are transmitted and are stored into automobile information database by acquisition module;Data collecting module collected map The business datum of middle charging pile is specific are as follows: urban addresses and keyword is inputted by acquisition module, to obtain from urban addresses To cluster range, map image is progressively scanned, in electronic map to find the coordinate bit in map image including keyword It sets, using the coordinate position point as cluster centre point, and by coordinate storage value array, as array element;Preset water Square to maximin Max X and Min X, maximin Max Y and the Min Y of vertical direction;Utilize horizontal direction Maximin Max X and Min X, vertical direction maximin Max Y and Min Y draw a box, by box Position mark is shown.
In the present embodiment, from urban addresses available cluster body of a map or chart, it is assumed that have in the body of a map or chart 10 location points comprising keyword: x1, x2 ... x9, x10.Enabling any point x1 is the first cluster centre, utilizes horizontal direction Maximin Max X and Min X, vertical direction maximin Max Y and Min Y draw the first cluster centre point One box, then indicia framing selects the 1st information of charging pile point in the city scope.And so on, frame is selected remaining 9 and is filled Electric stake information point.
Acquisition unit is also used to acquire the specification information of charging pile in box position, and by the rule of box position and charging pile Lattice information package is sent to automobile information database.
Acquisition unit acquires the information in multiple map softwares, and the box position of label display is deposited into relationship type number According in library;The information extracted in multiple map softwares is overlapped aobvious by data processing module in an electronic map template Show.
Acquisition module carries out data traversal in hydrogenation stations management system and government system and crawls, to acquire hydrogenation stations information With government affairs information relevant to automobile industry transition and upgrade.
The information that data processing module is extracted from automobile information database includes four kinds of classifications, is respectively as follows: map software The government affairs information and patent of hydrogenation stations information, government system acquisition that information of charging pile, the hydrogenation stations management system of acquisition obtain The patent information that database obtains.Since data source itself is possible to and imperfect, there is also not for the data collected Complete or invalid Knowledge Element.It is different additionally, due to the channel of different types of acquisition of information, meeting is defined to the information of data It has differences, it is therefore desirable to which the similar information of feature is merged.
Data processing module first checks for the triple of information of acquisition and whether the amplification Knowledge Element of each element meets Its category attribute defined constraint, to judge the validity and integrality of information.The triple of information is entity, the attribute of information And value;The category attribute of definition is pre-set multiple attribute sets.If the triple or amplification Knowledge Element of the information of acquisition It is unsatisfactory for the category attribute constraint of its definition, then processing is abandoned to the data;If meeting the triple of the information of acquisition or drawing Shen Knowledge Element meets the category attribute constraint of its definition, then enters the characteristic similarity of next step comparison information, to carry out information Fusion.
The characteristic similarity of comparison information specifically: one similarity model of setting, shown in following formula:
In above-mentioned formula, a is reference object, and b is comparison other, and A, B are object a, the characteristic set of b, and f (A-B) is Belong to A in the characteristic set A, B of object a, b, and belongs to the number of B.F (A-B) is for belonging to set A and being not belonging to set B Number;F (B-A) is to belong to the number that set B is not belonging to set A.A, β are to compare the target attention rate different with target is compareed.If Critical value is u, 0 < u < 1;As Sim (a, b) > u, show that a possibility that two Knowledge Elements are the same objective information is compared It greatly, then is the higher information of similarity.The judgement that characteristic similarity can be then carried out by above-mentioned formula, by the higher letter of similarity Breath is merged, and fused data are established analysis model.
Evaluation module is used for the data and pre-stored all types of data obtained after handling according to data processing module Weight carry out Calculation Estimation, and evaluation result is shown in such a way that visualization model is by figure or table.It comments Valence module Calculation Estimation method particularly includes: by the data collection value of two-level appraisement index divided by corresponding monitoring standard, obtain The monitor value of each two-level index;The monitor value of two-level index is weighted according to corresponding flexible strategy, obtains evaluation result.
In the present embodiment by taking Chongqing City as an example, the weight and monitoring standard of evaluation index are pre-entered, level-one is evaluated Target setting is basic facility, market manifestation and technological innovation.Two-level index under level-one evaluation index is as shown in the table:
By the data collection value of each two-level appraisement index divided by corresponding monitoring standard, the monitoring of each two-level index is obtained Value, i.e. index, calculation method are as follows:
The x in formula (1)ijkFor the collection value of k-th of index under i-th of first class index, under j-th of two-level index; x…kFor k-th of sub- corresponding monitoring standard of index;Work as dijkWhen >=100, taking 100 is its upper limit value.
The evaluation of estimate (second level index) of two-level appraisement index is formed by the monitor value weighted comprehensive of each two-level index, it may be assumed that
W in formula (2)ijkFor each corresponding flexible strategy of two-level index monitor value;njFor sub- index under j-th of two-level index Number.
Technological innovation, infrastructure, market manifestation first class index evaluation of estimate (monoexponential) are added by two-level index monitor value Power synthesis forms, it may be assumed that
W in formula (3)ijFor each corresponding flexible strategy of two-level index monitor value;niThe second level divided into for i-th of first class index refers to Mark number.
Automobile industry transition and upgrade general comment value (combined index) is formed by first class index weighted comprehensive, i.e.,.
W in formula (4)iFor each corresponding flexible strategy of first class index monitor value;N is first class index number.
Embodiment 2
Level-one evaluation index and two-level appraisement index be not limited to the above embodiments disclosed in each coefficient.As level-one is evaluated Index may be arranged as investment ability, development support and output capacity.Two-level index under level-one evaluation index investment ability It may be configured as patent inventor's quantity, core patent inventor quantity, patented invention number accounting, new-energy automobile R&D investment Funds expenditure is transformed in intensity, new-energy automobile R&D investment annual growth, automotive engineering;Under the development support of level-one evaluation index Two-level index may be configured as hydrogenation stations quantity, charging pile quantity;Two-level index under level-one evaluation index output capacity is settable For new-energy automobile amount of the application for patent, new energy vapour license accounting, new-energy automobile application for a patent for invention amount, new energy vapour Vehicle invention patent mandate accounting, new-energy automobile sale accounting, intelligent network connection automobile amount of the application for patent, intelligent network join automobile patent Accounting, intelligent network connection automobile application for a patent for invention amount, intelligent network is authorized to join automobile invention patent mandate accounting.Evaluate calculation method It is identical as 1 the method for embodiment.
Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention., rather than its limitations;To the greatest extent Pipe present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that: its according to So be possible to modify the technical solutions described in the foregoing embodiments, or to some or all of the technical features into Row equivalent replacement;And these are modified or replaceed, various embodiments of the present invention technology that it does not separate the essence of the corresponding technical solution The range of scheme should all cover within the scope of the claims and the description of the invention.

Claims (8)

1. a kind of automobile industry transition and upgrade information monitoring system, it is characterised in that: including data acquisition module, data processing mould Block, evaluation module and visualization model;
The data acquisition module is for acquiring the information data of charging pile in multiple map softwares, in hydrogenation stations management system Related in government affairs information relevant to automobile industry transition and upgrade and patent database in hydrogenation stations information data, government system Patent information;
The data of acquisition are transmitted and are stored into automobile information database by the acquisition module;
The data processing module Extracting Information and is merged from automobile information database, and fused data are established point Analyse model;
The evaluation module is used to carry out Calculation Estimation according to the weight of analysis model and pre-stored all types of data, and Evaluation result is shown in such a way that visualization model is by figure or table.
2. a kind of automobile industry transition and upgrade information monitoring system according to claim 1, it is characterised in that: the acquisition Module inputs urban addresses and keyword, and to obtain cluster range from urban addresses, map is progressively scanned in electronic map Image, to find the coordinate position in map image including keyword, using the coordinate position point as cluster centre point, and will In coordinate storage value array, as array element;Preset maximin Max X and the Min X of horizontal direction, Vertical Square To maximin Max Y and Min Y;Most using maximin the Max X and Min X of horizontal direction, vertical direction Big minimum M ax Y and Min Y draws a box, and box position mark is shown.
3. a kind of automobile industry transition and upgrade information monitoring system according to claim 2, it is characterised in that: the acquisition Unit is also used to acquire the specification information of charging pile in box position, and the specification information of box position and charging pile is packaged and is sent out It send to automobile information database.
4. a kind of automobile industry transition and upgrade information monitoring system according to claim 3, it is characterised in that: the acquisition Unit acquires the information in multiple map softwares, and the box position of label display is deposited into relevant database;It is described The information extracted in multiple map softwares is overlapped display in an electronic map template by data processing module.
5. a kind of automobile industry transition and upgrade information monitoring system according to claim 1, it is characterised in that: the acquisition Module carries out data traversal in hydrogenation stations management system and government system and crawls, to acquire hydrogenation stations information and and automobile industry The relevant government affairs information of transition and upgrade.
6. a kind of automobile industry transition and upgrade information monitoring system according to claim 1, it is characterised in that: the data Processing module from the information extracted in automobile information database be following four classification information in it is one or more, described four kinds Classification information is respectively as follows: the information of charging pile of map software acquisition, the hydrogenation stations information that hydrogenation stations management system obtains, government affairs system The patent information that the government affairs information obtained of uniting and patent database obtain.
7. a kind of automobile industry transition and upgrade information monitoring system according to claim 6, it is characterised in that: the data Processing module first checks for the triple of information to the information of extraction and whether the amplification Knowledge Element of each element meets its definition Category attribute constraint, to judge the validity and integrality of information;Then the characteristic similarity of comparison information, to carry out information Fusion.
8. a kind of automobile industry transition and upgrade information monitoring system according to claim 7, it is characterised in that: the evaluation The data collection value of two-level appraisement index divided by corresponding monitoring standard, is obtained the monitor value of each two-level index by module;By two The monitor value of grade index is weighted according to corresponding flexible strategy, obtains evaluation result.
CN201910527238.2A 2019-06-18 2019-06-18 A kind of automobile industry transition and upgrade information monitoring system Pending CN110264066A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910527238.2A CN110264066A (en) 2019-06-18 2019-06-18 A kind of automobile industry transition and upgrade information monitoring system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910527238.2A CN110264066A (en) 2019-06-18 2019-06-18 A kind of automobile industry transition and upgrade information monitoring system

Publications (1)

Publication Number Publication Date
CN110264066A true CN110264066A (en) 2019-09-20

Family

ID=67919039

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910527238.2A Pending CN110264066A (en) 2019-06-18 2019-06-18 A kind of automobile industry transition and upgrade information monitoring system

Country Status (1)

Country Link
CN (1) CN110264066A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110927486A (en) * 2019-11-19 2020-03-27 国网智能科技股份有限公司 Electric automobile wireless charging interoperability test system and method thereof
CN113408843A (en) * 2021-05-06 2021-09-17 华电电力科学研究院有限公司 Energy enterprise digital transformation management method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103106788A (en) * 2013-01-09 2013-05-15 众联智领科技(北京)有限公司 Road condition collecting and service system and method
CN105676843A (en) * 2016-04-13 2016-06-15 中国汽车技术研究中心 New energy automobile benchmarking analysis and evaluation system and method thereof
CN108932255A (en) * 2017-05-25 2018-12-04 北京万集科技股份有限公司 A kind of vehicle integration capability analysis method and device

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103106788A (en) * 2013-01-09 2013-05-15 众联智领科技(北京)有限公司 Road condition collecting and service system and method
CN105676843A (en) * 2016-04-13 2016-06-15 中国汽车技术研究中心 New energy automobile benchmarking analysis and evaluation system and method thereof
CN108932255A (en) * 2017-05-25 2018-12-04 北京万集科技股份有限公司 A kind of vehicle integration capability analysis method and device

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110927486A (en) * 2019-11-19 2020-03-27 国网智能科技股份有限公司 Electric automobile wireless charging interoperability test system and method thereof
CN113408843A (en) * 2021-05-06 2021-09-17 华电电力科学研究院有限公司 Energy enterprise digital transformation management method
CN113408843B (en) * 2021-05-06 2022-07-05 华电电力科学研究院有限公司 Energy enterprise digital transformation management method

Similar Documents

Publication Publication Date Title
CN112270027B (en) Paperless intelligent interactive examination method for city design based on entity model
CN111222661B (en) Urban planning implementation effect analysis and evaluation method
CN100416584C (en) Road traffic flow data quality controlling method and apparatus
CN109816581A (en) A kind of urban land automatic recognition system of comprehensive industry situation big data and Form of Architecture
CN110298553A (en) A kind of National land space planing method, system and equipment based on GIS
CN110796354A (en) Enterprise electric charge recovery risk portrait method and system
CN105844602A (en) Airborne LIDAR point cloud 3D filtering method based on volume elements
CN107067781B (en) GIS road black spot map generation method for advanced driving assistance system application
CN108021683A (en) A kind of scale model retrieval implementation method based on three-dimensional labeling
CN112990976A (en) Commercial network site selection method, system, equipment and medium based on open source data mining
CN107590638A (en) Match the acquisition methods and relevant device of the track traffic product model of user&#39;s request
CN113360587B (en) Land surveying and mapping equipment and method based on GIS technology
CN106503178A (en) A kind of automatic mode of land ecology quality evaluation and device
CN110264066A (en) A kind of automobile industry transition and upgrade information monitoring system
CN110362640B (en) Task allocation method and device based on electronic map data
CN116010612A (en) River basin flood control knowledge graph construction method and device and electronic equipment
CN111190982A (en) Shared bicycle management method and system based on big data
CN104598548B (en) A kind of method and device of anal yzing agricul products price space relevance
CN117575635B (en) Carbon index tracing method and system
CN115239211A (en) Method, device and system for researching and examining photovoltaic power generation project and electronic equipment
CN105404858A (en) Vehicle type recognition method based on deep Fisher network
Cui et al. Design of highway intelligent transportation system based on the internet of things and artificial intelligence
CN113609842A (en) Method for obtaining scenic spot comment data and travel experience evaluation
CN111639672B (en) Deep learning city function classification method based on majority voting
CN106815320B (en) Investigation big data visual modeling method and system based on expanded three-dimensional histogram

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190920

RJ01 Rejection of invention patent application after publication