CN110263049A - General railway technology operation confirmation and information reporting display system and method - Google Patents
General railway technology operation confirmation and information reporting display system and method Download PDFInfo
- Publication number
- CN110263049A CN110263049A CN201910368489.0A CN201910368489A CN110263049A CN 110263049 A CN110263049 A CN 110263049A CN 201910368489 A CN201910368489 A CN 201910368489A CN 110263049 A CN110263049 A CN 110263049A
- Authority
- CN
- China
- Prior art keywords
- information
- module
- display system
- data
- line
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/20—Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
- G06F16/23—Updating
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/20—Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
- G06F16/24—Querying
- G06F16/248—Presentation of query results
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F40/00—Handling natural language data
- G06F40/10—Text processing
- G06F40/166—Editing, e.g. inserting or deleting
- G06F40/177—Editing, e.g. inserting or deleting of tables; using ruled lines
- G06F40/18—Editing, e.g. inserting or deleting of tables; using ruled lines of spreadsheets
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
Landscapes
- Engineering & Computer Science (AREA)
- Theoretical Computer Science (AREA)
- Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Physics & Mathematics (AREA)
- Human Resources & Organizations (AREA)
- Strategic Management (AREA)
- Data Mining & Analysis (AREA)
- General Engineering & Computer Science (AREA)
- Entrepreneurship & Innovation (AREA)
- Databases & Information Systems (AREA)
- Computational Linguistics (AREA)
- General Business, Economics & Management (AREA)
- Tourism & Hospitality (AREA)
- Quality & Reliability (AREA)
- Operations Research (AREA)
- Marketing (AREA)
- Economics (AREA)
- Health & Medical Sciences (AREA)
- Artificial Intelligence (AREA)
- Audiology, Speech & Language Pathology (AREA)
- General Health & Medical Sciences (AREA)
- Train Traffic Observation, Control, And Security (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
A kind of general railway technology operation confirmation and information reporting display system and method, it is related to a kind of information reporting display system and method, system includes database management module, main control module, system interface module, simulated operating system, operation display system, electronics the line is busy plate system;Database management module carries out typing storage, and real-time update data to all railway operation information using database;Simulated operating system is used to complete the simulated operation of every operation;Electronics the line is busy plate system provides the Dynamically Announce of subpage frame, and main yard figure is formed by the data pre-entered, changes electronics by data variation in post-production the line is busy the main graphical of plate;Operation display system is used to show the position of operation.The present invention can solve the problems, such as that information reporting is complicated, report content confused, record difficult, and the efficiency of railway operation and information reporting can be improved, can ensure the safety of production operation, realize electronics the line is busy plate generalization, use easy to spread.
Description
Technical field
The present invention relates to a kind of information reporting display system and method, especially a kind of general railway technology operation confirmation and
Information reporting display system and method.
Background technique
Rail yard, as the primary location for ensureing railway system's normal operation, is the starting of all transport tasks to hair line
Point, midway anchor point and end point, and the place that the numerous necessary formalities of handover are indispensable.When carrying out railway technology operation
It requires to carry out accordingly planning layout to preparation, personnel assignment transfers management, and grasps the real-time of items operation completion
Situation, these important informations are all usually at present by the way of manual record.But manual record is easy that there are information reporting is multiple
Problem that is miscellaneous, reporting content confused, record difficult.
Summary of the invention
The technical problem to be solved by the present invention is providing a kind of general railway technology operation confirmation and information reporting display system
System and method, to solve the problems, such as that information reporting existing in the prior art is complicated, report content confused, record difficult.
The technical solution for solving above-mentioned technical problem is: a kind of general railway technology operation confirmation and information reporting display system
System, the system include database management module, main control module, system interface module, simulated operating system, operation display system
System, electronics the line is busy plate system, in which:
The database management module includes database, which believes all railway operations using database
Breath carries out typing storage, and real-time update data;
The main control module is the control core of system, is responsible for the control to modules;
The system interface module is human-computer interaction module, is shown including periodic plan, station track information, yard line arrangement
Various information including situation and operation performance;
The simulated operating system is used to complete the simulated operation of every operation;
The electronics the line is busy plate system is formed main for providing the Dynamically Announce of subpage frame by the data pre-entered
Yard figure, change electronics by data variation in post-production the line is busy the main graphical of plate;
The operation display system is used to show the position of operation;
The input/output terminal of above-mentioned database management module is connect with main control module, and the input/output terminal of main control module is also
Connect with system interface module, the input terminal of main control module is connect with simulated operating system, the output end of main control module with
The line is busy the plate system connection of operation display system, electronics.
A further technical solution of the present invention is: all railway operation information include certain station to hair field station track cloth
Set figure, certain station to hair field category of trains, certain station period train arrival and leaving moment and related job content, graphical control
Coordinate data, job information control status data, operation performance, electronics the line is busy plate actual job process data.
A further technical solution of the present invention is: the simulated operating system is used for directly by operation simulation system
The real-time upload of every job information schedule is completed in the click of button, and the database positioning of addition modification at the same time is completed
Modification and update to station track information, and be classification standard to railway periodic plan and station skill using operation station track, job content
Art production plan is sorted out, by the typing of database and to not carrying out the reserved empty position of job information to field personnel
It assigns unified job command and constrains related operation limitation.
A further technical solution of the present invention is: selected each of the electronics the line is busy plate system is also used to show addition
Job content, and its position is arranged according to the good yard figure of preparatory drawing, and according to the variation of system time, timing
Interface is refreshed, the state of Lai Gengxin table and modules, reflects real time data content.
A further technical solution of the present invention is: the operation shown in the operation display system include pick up operation,
Column inspection operation, upper water operation, blowdown operation, anti-slip operation, changes and hangs locomotive shunting, operation of dispatching a car, the operation at the handling operation of row packet
The position of display system is all shown in main interface control system according to coordinate position, can intuitively show it is specific
Which station track has carried out every job content of the train number.
A further technical solution of the present invention is: the general railway technology operation confirmation and information reporting display system
It further include thering is big data to collect and survey module, big data collects and surveys module and is used for being collected into from database management module
Data are pre-processed, and using big data algorithm, the operation information of railroader's needs is excavated from big data, is established
The analysis model of science;Simultaneously sequentially in time, analysis model data are saved to database, and by the analysis of preservation
Model data is uploaded to cloud computation data center progress comprehensive analysis and summarizes, which collects and surveys the input/output terminal of module
It is connect with data inventory management module.
A further technical solution of the present invention is: the general railway technology operation confirmation and information reporting display system
It further include having time environment module, time environment module includes railroad track sensor, clock, which utilizes iron
Rail road sensor is acquired transmission to the temperature humidity of railway, provides accurately outdoor yard environment letter to staff
Breath, and time environment module also provides for system correct time;The input/output terminal of the time environment module and master control molding
The input/output terminal of block connects.
A further technical solution of the present invention is: the general railway technology operation confirmation and information reporting display system
Further include having speech player, for making other railroaders recognize the performance of operation, the speech player with
The output end of main control module connects.
It is of the invention another solution is that a kind of general railway technology operation confirmation and information reporting display methods, should
Method the following steps are included:
S1. login system interface;
S2. enter system interface, show on system interface including periodic plan, station track information, yard line arrangement situation with
And the various information including operation performance, simulated operating system button is clicked by selection and enters the work post for wanting to carry out;
S2. enter the station track selected where oneself in the simulated operating system of subpage frame, the job requirement according to system
Enter next interface, a certain train number and its it is relevant stop and after operation station track clicks " allow operation " button control,
Start Ground Operation operation;
S3. after the confirmation for carrying out a station track job information, according to operating condition arbitrarily open on simulated operating system interface
All operations on station track from the time after environment module recognizes environmental information, start to carry out operation confirmation message;At this time at this
The staff of station track operates the operation according to the prompt of oneself work post and production plan, if the module operation is not tied
Beam then limits, and can not return to an interface, and gives the prompt of working specification;Meanwhile if all make in the industry
Hold, then ACK button can not be operated again, avoids repeating to click, and give normative operation prompt;Voice is also utilized simultaneously
Player broadcasts handling situations, other railroad personnels is allowed to recognize the performance of operation;
S4. information personnel is received in electronics the line is busy plate system it can be clearly seen that showing to hair line according to line holding situation
Different conditions, idle route, passes through the variation of information in database according to the variation of system time, main interface is according to fixed originally
When be set for updating, which is become into occupied state from idle state;
S5. database management module is collected storage to data after fulfiling assignment, and operation performance is fed back to electronics
On the line is busy plate and operation display system, while passing through big data and collect and survey module and carrying out job analysis.
A further technical solution of the present invention is: in step s 4, line idle state is according to the aobvious of rail yard interface
It is shown as grey, line holding state is then red according to rail yard interface display.
Due to using the above structure, the general railway technology operation confirmation of the present invention and information reporting display system and method
Compared with prior art, it has the advantages that
1. can solve the problems, such as that information reporting is complicated, report content confused, record difficult
The present invention includes database management module, main control module, system interface module, simulated operating system, operation display system
System, electronics the line is busy plate system, in which: database management module carries out typing to all railway operation information using database and deposits
Storage, and real-time update data;Main control module is the control core of system, is responsible for the control to modules;System interface
Module is human-computer interaction module, shows and completes feelings including periodic plan, station track information, yard line arrangement situation and operation
Various information including condition;Simulated operating system is used to complete the simulated operation of every operation;The line is busy that plate system can mention for electronics
For the Dynamically Announce of subpage frame, main yard figure is formed by the data pre-entered, passes through number in post-production
Change electronics according to variation the line is busy the main graphical of plate;Operation display system is used to show the position of operation.Therefore, this hair
Bright is to carry out typing storage, and the data of real-time update to all railway operation information using database, can at any time effectively
Ground is modified and is constrained to standing state, provides effective real time information for field personnel, changes in conventional information
The storage of the mode and information of display and the update mode of every terms of information are reported, is deposited to solve traditional artificial recording mode
Information reporting is complicated, the problem that reports content confused, record difficult.
2. the efficiency of railway operation and information reporting can be improved
The present invention is to carry out typing storage, and the data of real-time update to all railway operation information using database, can
Effectively standing state is modified and constrained at any time, provides effective real time information for field personnel, greatly improves
The efficiency of railway operation, while the efficiency of information reporting is also improved, optimize the operation and management of the railway system, ensures operation
Safety.
3. the safety of production operation can be ensured
The present invention is classification standard to 3~4 hours periodic plans of original railway and station technology using operation station track, job content
Production plan is sorted out, by the typing of database and to not carrying out the reserved empty position of job information to field personnel
It assigns unified job command and constrains related operation limitation, can ensure the safety of production operation.
4. electronics can realize the line is busy plate generalization
The yard figure of the present invention the line is busy by writing electronics plate main interface, can be compiled according to the coordinate information in database
System, and be connected with database;And the specific coordinate of yard, and export acquisition can be carried out from CAD diagram, and in excel table
In lattice, reasonable dotted line coordinate data is sorted out by simple algorithm, it is final to import in database, form electronics the line is busy Ban Zhu circle
Face figure.By database and electronics the line is busy board interface and operation simulation system three's synchronized links, all data is via data
Library is fed back, and is mutually restricted, influence each other state.
5. realizing yard route and operation module generalization
All railway operation information can be saved and be embodied with the set of system page by the present invention, will be helped to a greater degree
The related personnel such as scheduling, car checker recognize hair line production plan, train arrival and leaving information and related handling situations, data
Deposit is convenient, perfect in shape and function, provides convenience for Railway Site person works and other posies car checker or dispatcher work, can be real
Existing yard route and operation module generalization.
In the following, in conjunction with the accompanying drawings and embodiments to the general railway technology operation confirmation of the present invention and information reporting display system
And the technical characteristic of method is further described.
Detailed description of the invention
Fig. 1: the general railway technology operation confirmation of the present invention described in embodiment one and the structure of information reporting display system
Block diagram,
Fig. 2: the general railway technology operation confirmation of the present invention described in embodiment two and the flow diagram of information reporting display methods.
Specific embodiment
Embodiment one:
A kind of general railway technology operation confirmation and information reporting display system, including database management module, big data are collected
Analysis module, main control module, system interface module, simulated operating system, operation display system, electronics the line is busy plate system, when
Between environment module, speech player;Wherein:
The database management module includes database, which believes all railway operations using database
Breath carries out typing storage, and real-time update data;All railway operation information include certain station to hair field station track cloth
Set figure, certain station to hair field category of trains, certain station period train arrival and leaving moment and related job content, graphical control
Coordinate data, job information control status data, operation performance, electronics the line is busy plate actual job process data.It is
The database management module by certain station to hair field station track arranging graphic, certain station to send out field category of trains, certain station time
Section train arrival and leaving moment and related job content etc. information are pre-stored into database;For entire electronics, the line is busy that plate system mentions
For the support in data, the status data and operation performance of coordinate data, job information control including graphical control
Storing data space;Actual job process of the database management module also for electronics the line is busy plate system provides depositing for record simultaneously
Storage, modification, the data space updated.The input/output terminal of the database management module is connect with main control module.
The big data collects and surveys module and is used for from carrying out in advance from the data being collected into database management module
Reason excavates the operation information of railroader's needs using big data algorithm from big data, establishes the analysis mould of science
Type;Simultaneously sequentially in time, analysis model data are saved to database, and the analysis model data of preservation is uploaded
It carries out comprehensive analysis to cloud computation data center to summarize, which collects and surveys the input/output terminal and data inventory pipe of module
Manage module connection.
The main control module is the control core of system, is responsible for the control to modules.
The system interface module is human-computer interaction module, is shown including periodic plan, station track information, yard route
Various information including deployment scenarios and operation performance;The input/output terminal and main control module of the system interface module
Input/output terminal connection.
The simulated operating system: learning after railroad personnel recognizes field condition, using operation simulation system into
Row information reports, directly by the click to operation simulation system button, complete every job information schedule it is real-time on
It passes, the database positioning of addition modification at the same time completes the modification and update to station track information, and in the industry with operation station track, work
Holding is that classification standard sorts out railway periodic plan and station technical operation plan, by the typing of database and to not into
The reserved empty position of row job information assigns unified job command to field personnel and constrains related operation limitation;Pass through system
One job command and plan target assign the operation validation testing, it is specified that unified, so that the same page of information, same
Mode uploads to the same database, and carries out unified processing, fixes data source.The output of the simulated operating system
End is connect with the input terminal of main control module.
The line is busy that plate system is writes electronics the line is busy plate main interface using programming language by main control module for the electronics
Yard figure, can be worked out according to the coordinate information in database, and the specific coordinate of yard, and can be from CAD diagram
In carry out export acquisition, and in excel table, reasonable dotted line coordinate data is sorted out by well known simple algorithm, most
It imports in database eventually, forms electronics the line is busy plate main interface figure.Electronics the line is busy plate system is used to be capable of providing the dynamic of subpage frame
State is shown, is formed main yard figure by the data pre-entered, is changed in post-production by data variation
The main graphical of electronics the line is busy plate;It may also display the selected each job content of addition in operation later, and according to
The preparatory good yard figure of drawing arranges its position, and according to the variation of system time, periodically refreshes to interface, come more
The state of new table and modules, reflects real time data content.The input terminal and main control module of the electronics the line is busy plate system
Output end connection.
The operation display system is used to show the position of operation;Eight controls are shared in the operation display system
Part is to pick up operation, column inspection operation, the handling operation of row packet, upper water operation, blowdown operation, anti-slip operation, change on-hook vehicle work respectively
Industry, operation of dispatching a car;The position of these operations is all shown in main interface control system according to coordinate position, can be intuitively
Show it is every job content which specific station track has carried out the train number;Eight above-mentioned operations, in addition to sending and receiving vehicle it
Outside, it can carry out operation simultaneously, according to depending on concrete condition, therefore not need to compile according to certain sequence in figure module arrangement
Row, it is only necessary to which consideration picks up operation before it, and operation of dispatching a car is last job content.The operation display system
The connection of the output end of input terminal and main control module.
The time environment module includes railroad track sensor, clock, which utilizes railroad track
Sensor is acquired transmission to the temperature humidity of railway, provides accurately outdoor yard environmental information to staff, and when
Between environment module also provide for system correct time;The input of the input/output terminal and main control module of the time environment module
Output end connection.Time environment module temporal information can help to watch when being grasped in real time using the staff of electronics the line is busy plate
Between dynamic, compare the production plan in hand;And the information such as temperature and humidity then will affect some valuable cargos, or related operation regulation
In it should be noted that item, be staff when assigning traffic order or production plan, be important to note that these environmental factors
Variation on bring job content ensures railway operation specification safety.
The speech player, for making other railroaders recognize the performance of operation, which is broadcast
Putting device is the microphone carried in mobile device, the output end connection of the speech player and main control module.
Embodiment two:
A kind of general railway technology operation confirmation and information reporting display methods, method includes the following steps:
S1. staff's login system interface;
S2. enter system interface, show on system interface including periodic plan, station track information, yard line arrangement situation with
And the various information including operation performance, simulated operating system button is clicked by selection and enters the work post for wanting to carry out;
S2. enter the station track selected where oneself in the simulated operating system of subpage frame, the job requirement according to system
Enter next interface, a certain train number and its it is relevant stop and after operation station track clicks " allow operation " button control,
Start Ground Operation operation;
S3. after the confirmation for carrying out a station track job information, according to operating condition arbitrarily open on simulated operating system interface
All operations on station track from the time after environment module recognizes environmental information, start to carry out operation confirmation message;At this time at this
The staff of station track operates the operation according to the prompt of oneself work post and production plan, if the module operation is not tied
Beam then limits, and can not return to an interface, and gives the prompt of working specification;Meanwhile if all make in the industry
Hold, then ACK button can not be operated again, avoids repeating to click, and give normative operation prompt;Voice is also utilized simultaneously
Player broadcasts handling situations, other railroad personnels is allowed to recognize the performance of operation;
S4. information personnel is received in electronics the line is busy plate system it can be clearly seen that showing to hair line according to line holding situation
Different conditions, idle route, passes through the variation of information in database according to the variation of system time, main interface is according to fixed originally
When be set for updating, which is become into occupied state from idle state;Line idle state is according to Railways Stations
Boundary face appears dimmed, and line holding state is then red according to rail yard interface display.
S5. database management module is collected storage to data after fulfiling assignment, and operation performance is fed back to
On electronics the line is busy plate and operation display system, while passing through big data and collect and survey module and carrying out job analysis.
Claims (10)
1. a kind of general railway technology operation confirmation and information reporting display system, it is characterised in that: the system includes database
Management module, main control module, system interface module, simulated operating system, operation display system, electronics the line is busy plate system,
In:
The database management module includes database, which believes all railway operations using database
Breath carries out typing storage, and real-time update data;
The main control module is the control core of system, is responsible for the control to modules;
The system interface module is human-computer interaction module, is shown including periodic plan, station track information, yard line arrangement
Various information including situation and operation performance;
The simulated operating system is used to complete the simulated operation of every operation;
The electronics the line is busy plate system is formed main for providing the Dynamically Announce of subpage frame by the data pre-entered
Yard figure, change electronics by data variation in post-production the line is busy the main graphical of plate;
The operation display system is used to show the position of operation;
The input/output terminal of above-mentioned database management module is connect with main control module, and the input/output terminal of main control module is also
Connect with system interface module, the input terminal of main control module is connect with simulated operating system, the output end of main control module with
The line is busy the plate system connection of operation display system, electronics.
2. general railway technology operation confirmation according to claim 1 and information reporting display system, it is characterised in that: institute
All railway operation information stated include certain station to hair field station track arranging graphic, certain station to sending out field category of trains, certain station
Certain period train arrival and leaving moment and related job content, job information control status data, are made the coordinate data of graphical control
Industry performance, electronics the line is busy plate actual job process data.
3. general railway technology operation confirmation according to claim 1 and information reporting display system, it is characterised in that: institute
The simulated operating system stated is for directly by the click to operation simulation system button, completing every job information schedule
Real-time upload, the database positioning of addition modification at the same time completes modification and update to station track information, and with operation stock
Road, job content are that classification standard sorts out railway periodic plan and station technical operation plan, pass through the record of database
Enter and unified job command is assigned to field personnel to the reserved empty position for not carrying out job information and constrains related operation
Limitation.
4. general railway technology operation confirmation according to claim 1 and information reporting display system, it is characterised in that: institute
The electronics stated the line is busy plate system is also used to the show selected each job content of addition, and the yard good according to preparatory drawing
Figure arranges its position, and according to the variation of system time, periodically refreshes to interface, Lai Gengxin table and modules
State, reflect real time data content.
5. general railway technology operation confirmation according to claim 1 and information reporting display system, it is characterised in that: institute
The operation shown in the operation display system stated includes picking up operation, column inspection operation, the handling operation of row packet, upper water operation, blowdown
Operation, anti-slip operation change and hang locomotive shunting, operation of dispatching a car, and the position of the operation display system is all aobvious according to coordinate position
Show in main interface control system can intuitively show it is which specific station track has carried out every work of the train number in the industry
Hold.
6. general railway technology operation confirmation according to claim 1 and information reporting display system, it is characterised in that: institute
The general railway technology operation confirmation stated and information reporting display system further include having big data to collect and survey module, and big data is received
Set analysis module is for pre-processing the data being collected into from database management module, using big data algorithm, from big
The operation information that railroader's needs are excavated in data, establishes analysis model;Simultaneously sequentially in time, mould will be analyzed
Type data are saved to database, and the analysis model data of preservation are uploaded to cloud computation data center and carry out comprehensive analysis
Summarize, the input/output terminal which collects and surveys module is connect with data inventory management module.
7. general railway technology operation confirmation according to claim 1 and information reporting display system, it is characterised in that: institute
The general railway technology operation confirmation stated and information reporting display system further include having time environment module, time environment module packet
Railroad track sensor, clock are included, which is adopted using temperature humidity of the railroad track sensor to railway
Collection transmission provides accurately outdoor yard environmental information to staff, and to also provide for system accurate for time environment module
Time;The input/output terminal of the time environment module and the input/output terminal of main control module connect.
8. general railway technology operation confirmation according to claim 1 and information reporting display system, it is characterised in that: institute
The general railway technology operation confirmation stated and information reporting display system further include having speech player, for making other railway works
The performance of operation is recognized as personnel, the output end connection of the speech player and main control module.
9. a kind of general railway technology operation confirmation and information reporting display methods, it is characterised in that: this method includes following step
It is rapid:
S1. login system interface;
S2. enter system interface, show on system interface including periodic plan, station track information, yard line arrangement situation with
And the various information including operation performance, simulated operating system button is clicked by selection and enters the work post for wanting to carry out;
S2. enter the station track selected where oneself in the simulated operating system of subpage frame, the job requirement according to system
Enter next interface, a certain train number and its it is relevant stop and after operation station track clicks " allow operation " button control,
Start Ground Operation operation;
S3. after the confirmation for carrying out a station track job information, according to operating condition arbitrarily open on simulated operating system interface
All operations on station track from the time after environment module recognizes environmental information, start to carry out operation confirmation message;At this time at this
The staff of station track operates the operation according to the prompt of oneself work post and production plan, if the module operation is not tied
Beam then limits, and can not return to an interface, and gives the prompt of working specification;Meanwhile if all make in the industry
Hold, then ACK button can not be operated again, avoids repeating to click, and give normative operation prompt;Voice is also utilized simultaneously
Player broadcasts handling situations, other railroad personnels is allowed to recognize the performance of operation;
S4. information personnel is received in electronics the line is busy plate system it can be clearly seen that showing to hair line according to line holding situation
Different conditions, idle route, passes through the variation of information in database according to the variation of system time, main interface is according to fixed originally
When be set for updating, which is become into occupied state from idle state;
S5. database management module is collected storage to data after fulfiling assignment, and operation performance is fed back to electronics
On the line is busy plate and operation display system, while passing through big data and collect and survey module and carrying out job analysis.
10. general railway technology operation confirmation according to claim 8 and information reporting display methods, it is characterised in that:
In step s 4, line idle state appearing dimmed according to rail yard interface, line holding state is then according to Railways Stations
Boundary face is shown in red.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910368489.0A CN110263049B (en) | 2019-05-05 | 2019-05-05 | General railway technology operation confirmation and information reporting display system and method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910368489.0A CN110263049B (en) | 2019-05-05 | 2019-05-05 | General railway technology operation confirmation and information reporting display system and method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110263049A true CN110263049A (en) | 2019-09-20 |
CN110263049B CN110263049B (en) | 2022-10-04 |
Family
ID=67914197
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910368489.0A Active CN110263049B (en) | 2019-05-05 | 2019-05-05 | General railway technology operation confirmation and information reporting display system and method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110263049B (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110920689A (en) * | 2019-10-16 | 2020-03-27 | 北京万相融通科技股份有限公司 | Operation progress monitoring method and system |
CN110920688A (en) * | 2019-10-16 | 2020-03-27 | 北京万相融通科技股份有限公司 | Operation progress monitoring method and system |
CN114537475A (en) * | 2022-04-27 | 2022-05-27 | 北京北交信通科技有限公司 | Train anti-running method and device |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002132881A (en) * | 2000-10-27 | 2002-05-10 | East Japan Railway Co | Railroad maintaining operation support system |
CN101879909A (en) * | 2010-06-07 | 2010-11-10 | 中铁信弘远(北京)软件科技有限责任公司 | Railway station internal and external work control system |
CN109278811A (en) * | 2018-09-27 | 2019-01-29 | 北京全路通信信号研究设计院集团有限公司 | Comprehensive automatic implementation system and method for transportation organization of railway passenger station |
-
2019
- 2019-05-05 CN CN201910368489.0A patent/CN110263049B/en active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002132881A (en) * | 2000-10-27 | 2002-05-10 | East Japan Railway Co | Railroad maintaining operation support system |
CN101879909A (en) * | 2010-06-07 | 2010-11-10 | 中铁信弘远(北京)软件科技有限责任公司 | Railway station internal and external work control system |
CN109278811A (en) * | 2018-09-27 | 2019-01-29 | 北京全路通信信号研究设计院集团有限公司 | Comprehensive automatic implementation system and method for transportation organization of railway passenger station |
Non-Patent Citations (2)
Title |
---|
唐曼: "车站列车到达出发作业信息管理系统的设计与实现", 《铁道通信信号》 * |
苗长俊: "铁路技术站技术作业综合管理系统设计研究", 《铁道运输与经济》 * |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110920689A (en) * | 2019-10-16 | 2020-03-27 | 北京万相融通科技股份有限公司 | Operation progress monitoring method and system |
CN110920688A (en) * | 2019-10-16 | 2020-03-27 | 北京万相融通科技股份有限公司 | Operation progress monitoring method and system |
CN110920689B (en) * | 2019-10-16 | 2022-03-11 | 北京万相融通科技股份有限公司 | Operation progress monitoring method and system |
CN110920688B (en) * | 2019-10-16 | 2022-05-06 | 北京万相融通科技股份有限公司 | Operation progress monitoring method and system |
CN114537475A (en) * | 2022-04-27 | 2022-05-27 | 北京北交信通科技有限公司 | Train anti-running method and device |
CN114537475B (en) * | 2022-04-27 | 2022-07-15 | 北京北交信通科技有限公司 | Train anti-running method and device |
Also Published As
Publication number | Publication date |
---|---|
CN110263049B (en) | 2022-10-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110263049A (en) | General railway technology operation confirmation and information reporting display system and method | |
CN105278379B (en) | A kind of MTU depot centralized control system | |
CN111353705A (en) | Urban rail transit multi-field route management unit and comprehensive management and control system | |
CN108082224A (en) | Train preparation method based on AFC time-varying passenger flows | |
CN111353645A (en) | Automatic handling method and system for driving plan of urban rail transit vehicle base | |
CN109491735B (en) | Integrated data generation and verification integrated monitoring human-computer interface configuration implementation method | |
CN110070284A (en) | A kind of wisdom beam course management system based on BIM technology | |
CN113415322A (en) | High-speed train operation adjusting method and system based on Q learning | |
CN106897838A (en) | A kind of station passenger flow pressure prediction and statistical analysis technique and its system | |
CN113212503B (en) | Detection method for rail transit vehicle shunting plan conflict | |
CN114715228B (en) | Railway passenger station shunting plan comprehensive management method and system | |
CN110163501A (en) | A kind of system and method for automatic establishment urban track traffic driver's cross-channel table | |
CN106447789A (en) | Method and system of line data and GIS combination of train operation monitoring system | |
EP4406814A1 (en) | Method for compiling multi-depot coordinated urban rail transit departing/garaging operation lines | |
CN107097811A (en) | A kind of emulation mode and system based on bottle-neck section track space-time conflict prediction | |
JP2001278052A (en) | Train planned schedule preparation method and preparation support device | |
CN113978515A (en) | Centralized dispatching command system for transportation production operation of railway vehicle service section | |
RU2662351C1 (en) | Railway section traffic activity operational control system | |
KR102351979B1 (en) | System for scheduling management of raiload car | |
CN110949459A (en) | Railway wagon vehicle section shunting operation system | |
CN104442929A (en) | Complex network structure based railway station technical operation planning method | |
CN117371611A (en) | Subway train operation plan programming method, medium and system | |
RU2541551C1 (en) | Control over scheduled freight train traffic in railway communication | |
Middelkoop et al. | Simulation of traffic management with FRISO | |
CN111222660A (en) | Rail transit riding traffic generation method and system based on full-line two-dimensional cutting |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |