CN108082224A - Train preparation method based on AFC time-varying passenger flows - Google Patents
Train preparation method based on AFC time-varying passenger flows Download PDFInfo
- Publication number
- CN108082224A CN108082224A CN201711340513.7A CN201711340513A CN108082224A CN 108082224 A CN108082224 A CN 108082224A CN 201711340513 A CN201711340513 A CN 201711340513A CN 108082224 A CN108082224 A CN 108082224A
- Authority
- CN
- China
- Prior art keywords
- train
- passenger
- data
- afc
- time
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000002360 preparation method Methods 0.000 title claims abstract description 11
- 239000011159 matrix material Substances 0.000 claims abstract description 19
- 241001269238 Data Species 0.000 claims abstract description 15
- 238000000034 method Methods 0.000 claims abstract description 14
- 238000005457 optimization Methods 0.000 claims abstract description 7
- 230000008878 coupling Effects 0.000 claims abstract description 6
- 238000010168 coupling process Methods 0.000 claims abstract description 6
- 238000005859 coupling reaction Methods 0.000 claims abstract description 6
- 238000012545 processing Methods 0.000 claims abstract description 6
- 238000006243 chemical reaction Methods 0.000 claims abstract description 5
- 230000000694 effects Effects 0.000 claims description 5
- 238000003860 storage Methods 0.000 claims description 4
- 238000004891 communication Methods 0.000 claims description 3
- 238000000354 decomposition reaction Methods 0.000 claims description 3
- 230000003203 everyday effect Effects 0.000 claims description 3
- 239000012634 fragment Substances 0.000 claims description 3
- 238000010438 heat treatment Methods 0.000 claims description 3
- 238000005096 rolling process Methods 0.000 claims description 3
- 238000013519 translation Methods 0.000 claims description 3
- 230000001680 brushing effect Effects 0.000 abstract description 2
- 238000010586 diagram Methods 0.000 description 3
- 230000002354 daily effect Effects 0.000 description 2
- 238000009826 distribution Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000007781 pre-processing Methods 0.000 description 2
- 230000002123 temporal effect Effects 0.000 description 2
- 239000011800 void material Substances 0.000 description 2
- 238000013459 approach Methods 0.000 description 1
- 238000012512 characterization method Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 230000000977 initiatory effect Effects 0.000 description 1
- 230000010354 integration Effects 0.000 description 1
- 238000012546 transfer Methods 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L27/00—Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
- B61L27/10—Operations, e.g. scheduling or time tables
- B61L27/12—Preparing schedules
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L27/00—Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
- B61L27/10—Operations, e.g. scheduling or time tables
- B61L27/16—Trackside optimisation of vehicle or train operation
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/40—Business processes related to the transportation industry
Landscapes
- Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- Theoretical Computer Science (AREA)
- Physics & Mathematics (AREA)
- Mechanical Engineering (AREA)
- Marketing (AREA)
- General Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- Tourism & Hospitality (AREA)
- Quality & Reliability (AREA)
- Game Theory and Decision Science (AREA)
- Operations Research (AREA)
- Development Economics (AREA)
- Entrepreneurship & Innovation (AREA)
- Health & Medical Sciences (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Train Traffic Observation, Control, And Security (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a kind of Train preparing methods based on AFC time-varying passenger flows, it includes configuration road net data and establishment service chart basic data, the conversion and processing of AFC passenger flow datas, time-table intelligent optimization and route map of train and relevant information are shown.The present invention utilizes the high-precision passenger flow data of magnanimity, realizes that the Train based on AFC data is worked out automatically with reference to unbalanced train operation pattern, has broken traditional service chart preparation method, by converting passenger's brushing card data(AFC passenger flow datas), the Node OD matrix data based on minute are obtained, using the route map of train obtained by optimization algorithm using unequal interval pattern, train can reach height coupling for giving passenger flow demand, and peak period train ability makes full use of, and offpeak period ability avoids wasting.Route map of train caused by the present invention has the service level of high quality, and passenger waiting time can be greatly reduced, convenient to carry out, easily operated.
Description
Technical field
The present invention relates to urban rail transit technology fields, specifically a kind of city rail based on AFC time-varying passenger flows
Road traffic train diagram establishment method.
Background technology
Train(The graphic form of time-table)Define arriving for train station on the way
The moment is sent out, is the premise and basis coordinated all departments' work, ensure train operating safety and customer service quality.Existing city
Rail transit train service chart preparation method is primarily present following deficiency:
1st, the passenger flow data for working out service chart institute foundation is not fine enough.In City Rail Transit System, AFC system
(Automatic Fare Collection System, AFC)The information and outbound of arriving at a station of each passenger can be recorded in detail
Information, it is hereby achieved that the passenger flow OD matrixes of each minute.However, existing preparation method statistics is a long period
Passenger flow OD data in section, such as most of network operator, using 1 OD data when small, some is even longer.Such passenger flow number
According to cannot embody passenger trip accuracy, it is impossible to accurately reflect 1 it is small when interior or longer time section in passenger situation of change, make
Obtaining high-precision A FC passenger flow datas cannot be applied well.
2nd, the making mode of service chart can not effectively couple time-varying passenger flow demand.Existing making mode mainly around
That the balanced and stage is balanced, the former is that all trains are dispatched a car at equal intervals, can cause peak period passenger's queue waiting time it is long,
The phenomenon that off-peak period ability void is wasted;The latter is that operation is divided into day several periods, and each period, equilibrium was sent out at equal intervals
Vehicle can be alleviated and wait in line to waste phenomenon with ability void to a certain extent, but still cannot reach height with the passenger flow demand of time-varying
Coupling.
The content of the invention
The object of the present invention is to provide a kind of Train establishment sides based on AFC time-varying passenger flows
Method can quickly generate the unbalanced route map of train coupled with actual passenger flow height, to meet the requirement of passenger's trip.
In order to achieve the above objectives, the technical solution used in the present invention is:
A kind of Train preparation method based on AFC time-varying passenger flows, it comprises the following steps:
Step 1, configuration road net data and establishment service chart basic data;
The conversion and processing of step 2, AFC passenger flow datas
The initial data of AFC passenger flows is converted into the Node OD matrix based on minute, accurately portrays the dynamic of passenger's trip, specifically
Translation process be:
(1)Obtain the original passenger flow datas of AFC of whole day:By network communication or with AFC connections, read AFC system
The passenger of the every day automatically generated passes in and out information record file;
(2)Pretreatment operation:According to the acquired original passenger flow datas of AFC, arriving and leaving moment to each passenger, get to the station and
Go out three information of tours start here and carry out class statistic, obtain the road network OD matrixes based on minute;
(3)Passenger flow data distributes:The road network OD matrix decompositions based on minute are obtained to each circuit using bus traveler assignment method
Several Node OD matrixes based on minute;The Node OD matrix based on minute on every circuit is stored, in case display and volume
Timetable processed uses;
Step 3, time-table intelligent optimization
Selection needs to work out the circuit of service chart, according to service chart basic data is worked out in step 1, calls the base of circuit a couple of days
In the Node OD matrix of minute, pass through dynamic programming method and the detailed timetable and car of the calculating of business solver and train
Number of getting on or off the bus, ensure train by regulation safe operation while, make train supply and passenger flow demand between reach highly
Coupling;Storage calculates the time-table of gained, is used in case drawing route map of train;
Step 4, route map of train and relevant information are shown
(1)Network topology structure is shown using subway network data, by the circuit OD squares based on minute of every circuit in step 2
Arrive at a station the heating power of number for battle array data Dynamic Announce on network structure, the dynamic trajectory of display content including passenger flow and station
Thus figure further analyzes the space lack of uniformity of passenger flow;
(2)The display of time-table;
(3)Train congestion information is shown, is included in the display of vehicle number, number of waiting, stranded crowd number;
(4)Gained time-table data in step 3 are subjected to the drawing of route map of train, while it is shown;Train
The transverse axis of service chart is the time, the longitudinal axis is station.
Preferably, the subway network data include station coordinate, station name, station track, stop type, entrance
Circuit, line name, circuit mileage and vehicle fragment position, are opened up by network where position, section title, section course, section
Structure connection passenger flow data is flutterred, convenient for the management and display of data;The establishment service chart basic data includes the maximum hair of train
Workshop is when, minimum departure interval, the activity duration of turning back, the rolling stock section's time that comes in and goes out, turn-back departure interval, section operation
Between, the dwell time first final vehicle hour, number of allocated passenger trains, train marshalling list length and type of vehicle.
The present invention utilizes the high-precision passenger flow data of magnanimity, is realized with reference to unbalanced train operation pattern based on AFC numbers
According to Train work out automatically, broken traditional service chart preparation method, summarized advantageous effect such as
Under:
(1)The present invention is by converting passenger's brushing card data(AFC passenger flow datas), the Node OD matrix data based on minute are obtained,
It can accurately react the trip information of each passenger;
(2)Using unequal interval pattern, train can be reached route map of train as obtained by optimization algorithm for giving passenger flow demand
It is coupled to height, peak period train ability makes full use of, and offpeak period ability avoids wasting;
(3)Route map of train caused by the present invention has the service level of high quality, and passenger's wait can be greatly reduced
Time;
(4)The present invention is realized by computer automation, convenient to carry out, easily operated, has good versatility.
Description of the drawings
Fig. 1 is to be used in the present invention based on AFC time-varying passenger flow data train diagram establishment flow charts;
Fig. 2 is basic data schematic diagram in the present invention;
Fig. 3 is the conversion and processing of passenger flow data in the present invention;
Fig. 4 is the unequal interval timetable flow chart that demand response is generated in the present invention.
Specific embodiment
The present invention will be further described in detail below in conjunction with the accompanying drawings.
A kind of Train preparation method based on AFC time-varying passenger flows as shown in Figures 1 to 4,
It comprises the following steps:
Step 1, configuration road net data and establishment service chart basic data;
As shown in Fig. 2, subway network data include station coordinate, station name, station track, stop type, entrance,
Circuit, line name, circuit mileage and vehicle fragment position, pass through network topology structure where section title, section course, section
Passenger flow data is associated, convenient for the management and display of data.
Working out service chart basic data includes train maximum departure interval, minimum departure interval, the activity duration of turning back, discrepancy
Rolling stock section's time, turn-back departure interval, section run time, dwell time first final vehicle hour, number of allocated passenger trains, train marshalling list
Length and type of vehicle.
Train maximum interval refers to that the moment of setting out of adjacent two train no more than certain time period, avoids passenger long
The wait of time;Minimum interval is the safe tracking interval of train, ensures the safe operation of train.According to circuit and the object at station
Structure is managed, mode of turning back, activity duration of turning back, section run time and station residence time can be given in advance.First and last class
Train should provide at the moment of setting out of initiating station according to operation characteristic and relevant regulations.Each circuit uplink and downlink operation line number can be with
Period passenger flow is simply calculated or is used for reference data with existing.Can be the main of limitation operation line number amount with EMU quantity
One of factor, final route map of train must have the feasible EMU application plan to match.
The conversion and processing of step 2, AFC passenger flow datas
The initial data of AFC passenger flows is converted into the Node OD matrix based on minute, accurately portrays the dynamic of passenger's trip, specifically
Translation process be:
(1)Obtain the original passenger flow datas of AFC of whole day:By network communication or with AFC connections, read AFC system
The passenger of the every day automatically generated passes in and out information record file;
Metro AFC system can accurately record each passenger arrival AT STATION and leave message.Each record can
Accurately represent a passenger trip information, it include card number, card type, number of arriving at a station, arrival time, it is outbound number,
Outbound time etc..The passenger flow data that AFC system is recorded is the basis of the present invention, it is necessary to it is former intactly to read daily AFC
Beginning data.
(2)Pretreatment operation:According to the acquired original passenger flow datas of AFC, arriving and leaving moment, arrival vehicle to each passenger
It stands and goes out three information of tours start here and carry out class statistic, obtain the road network OD matrixes based on minute;
Preprocessing process is on the basis of every passenger's arrival time, and all records in AFC are counted, obtain each point
The network OD matrixes of clock.In other words, in preprocessing process the present invention only need the arrival time of AFC initial data, volume of arriving at a station
Number and outbound three information of number, passenger is classified by arrival time by the passenger flow based on minute from time dimension, simultaneously
The OD data that passenger in each minute is sorted out with outbound number, i.e., the network OD matrixes based on minute are numbered according to arriving at a station.Value
It obtains it is to be noted that the obtained network OD matrixes based on minute can not mark transfer information, therefore can not also count every
Time-varying OD matrix of the circuit based on minute, it is necessary to which the Node OD matrix based on minute is calculated by bus traveler assignment module.
(3)Passenger flow data distributes:Using bus traveler assignment method by the road network OD matrix decompositions based on minute to each circuit,
Obtain several Node OD matrixes based on minute;The Node OD matrix based on minute on every circuit is stored, in case display
It is used with establishment timetable;
Multiple bus traveler assignment algorithms, such as shortest path distribution, multipath assignment etc. are embedded in this step.Every circuit is every
It the OD passenger flows table based on minute carries out classification storage, for subsequently using.It can be shown herein in the form of thermodynamic chart first
Show the spatial and temporal distributions that passenger arrives at a station;Secondly, Spatial And Temporal Characteristics are carried out to the obtained circuit OD passenger flow datas based on minute.
Step 3, time-table intelligent optimization
Selection needs to work out the circuit of service chart, according to service chart basic data is worked out in step 1, calls the base of circuit a couple of days
In the Node OD matrix of minute, pass through dynamic programming method and the detailed timetable and car of the calculating of business solver and train
Number of getting on or off the bus, ensure train by regulation safe operation while, make train supply and passenger flow demand between reach highly
Coupling;Storage calculates the time-table of gained, is used in case drawing route map of train;
Weigthed sums approach may be employed to the Data Integration of the Node OD matrix based on minute of circuit a couple of days.
The Node OD matrix for giving minute for calling a couple of days is because the space-time characterisation of daily passenger flow is not exactly the same, still
Certain rule is presented.Therefore need to be overlapped processing using the passenger flow data of a couple of days.
Step 4, route map of train and relevant information are shown
(1)Network topology structure is shown using subway network data, by the circuit OD squares based on minute of every circuit in step 2
Arrive at a station the heating power of number for battle array data Dynamic Announce on network structure, the dynamic trajectory of display content including passenger flow and station
Thus figure further analyzes the space lack of uniformity of passenger flow;
(2)The display of time-table;
(3)Train congestion information is shown, is included in the display of vehicle number, number of waiting, stranded crowd number;
(4)Gained time-table data in step 3 are subjected to the drawing of route map of train, while it is shown;Train
The transverse axis of service chart is the time, the longitudinal axis is station.
The present invention utilizes the high-precision passenger flow data of magnanimity, is realized with reference to unbalanced train operation pattern based on AFC numbers
According to Train work out automatically, broken traditional service chart preparation method, by convert passenger brush
Card data(AFC passenger flow datas), the Node OD matrix data based on minute are obtained, using the route map of train obtained by optimization algorithm
Using unequal interval pattern, train can reach height coupling for giving passenger flow demand, and peak period train ability makes full use of,
Offpeak period ability avoids wasting.
Claims (2)
1. a kind of Train preparation method based on AFC time-varying passenger flows, it is characterised in that:It include with
Lower step:
Step 1, configuration road net data and establishment service chart basic data;
The conversion and processing of step 2, AFC passenger flow datas
The initial data of AFC passenger flows is converted into the Node OD matrix based on minute, accurately portrays the dynamic of passenger's trip, specifically
Translation process be:
(1)Obtain the original passenger flow datas of AFC of whole day:By network communication or with AFC connections, read AFC system
The passenger of the every day automatically generated passes in and out information record file;
(2)Pretreatment operation:According to the acquired original passenger flow datas of AFC, arriving and leaving moment to each passenger, get to the station and
Go out three information of tours start here and carry out class statistic, obtain the road network OD matrixes based on minute;
(3)Passenger flow data distributes:The road network OD matrix decompositions based on minute are obtained to each circuit using bus traveler assignment method
Several Node OD matrixes based on minute;The Node OD matrix based on minute on every circuit is stored, in case display and volume
Timetable processed uses;
Step 3, time-table intelligent optimization
Selection needs to work out the circuit of service chart, according to service chart basic data is worked out in step 1, calls the base of circuit a couple of days
In the Node OD matrix of minute, calculated by dynamic programming method and business solver and the detailed timetable of output train and
The number of getting on or off the bus respectively stood while train is ensured by regulation safe operation, supplies train and reaches between passenger flow demand
The coupling of height;Storage calculates the time-table of gained, is used in case drawing route map of train;
Step 4, route map of train and relevant information are shown
(1)Network topology structure is shown using subway network data, by the circuit OD squares based on minute of every circuit in step 2
Arrive at a station the heating power of number for battle array data Dynamic Announce on network structure, the dynamic trajectory of display content including passenger flow and station
Thus figure further analyzes the space lack of uniformity of passenger flow;
(2)The display of time-table;
(3)Train congestion information is shown, is included in the display of vehicle number, number of waiting, stranded crowd number;
(4)Gained time-table data in step 3 are subjected to the drawing of route map of train, while it is shown;Train
The transverse axis of service chart is the time, the longitudinal axis is station.
2. the Train preparation method according to claim 1 based on AFC time-varying passenger flows, special
Sign is:The subway network data include station coordinate, station name, station track, stop type, entrance, area
Between title, section course, circuit, line name, circuit mileage and vehicle fragment position where section, closed by network topology structure
Join passenger flow data, convenient for the management and display of data;The establishment service chart basic data includes train maximum departure interval, most
Small departure interval, the activity duration of turning back come in and go out rolling stock section's time, turn-back departure interval, section run time, dwell time
First final vehicle hour, number of allocated passenger trains, train marshalling list length and type of vehicle.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711340513.7A CN108082224B (en) | 2017-12-14 | 2017-12-14 | Urban rail transit train running chart compiling method based on AFC time-varying passenger flow |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711340513.7A CN108082224B (en) | 2017-12-14 | 2017-12-14 | Urban rail transit train running chart compiling method based on AFC time-varying passenger flow |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108082224A true CN108082224A (en) | 2018-05-29 |
CN108082224B CN108082224B (en) | 2020-04-21 |
Family
ID=62175878
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711340513.7A Active CN108082224B (en) | 2017-12-14 | 2017-12-14 | Urban rail transit train running chart compiling method based on AFC time-varying passenger flow |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108082224B (en) |
Cited By (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2019184724A1 (en) * | 2018-03-30 | 2019-10-03 | 卡斯柯信号有限公司 | Real-time passenger flow-based intelligent operation adjustment system and method for trains |
CN112078633A (en) * | 2020-08-28 | 2020-12-15 | 通号城市轨道交通技术有限公司 | Rail transit train dispatching method and system |
CN112163981A (en) * | 2020-09-14 | 2021-01-01 | 交控科技股份有限公司 | Line passenger flow calculation method and system |
CN112215475A (en) * | 2020-09-24 | 2021-01-12 | 交控科技股份有限公司 | Driving organization scheme design system of rail transit |
CN113408914A (en) * | 2021-06-25 | 2021-09-17 | 交控科技股份有限公司 | Method and device for compiling train planned operation diagram, electronic equipment and storage medium |
CN113442974A (en) * | 2021-08-19 | 2021-09-28 | 湖南中车时代通信信号有限公司 | Train operation diagram compiling method and device based on flat peak conversion algorithm |
CN113503886A (en) * | 2021-06-09 | 2021-10-15 | 中国国家铁路集团有限公司 | Rapid path search optimization method under condition of large-scale complex road network |
CN113723731A (en) * | 2020-05-26 | 2021-11-30 | 中车株洲电力机车研究所有限公司 | Urban rail transit operation chart compiling method and system based on passenger flow characteristics |
CN114148382A (en) * | 2021-12-08 | 2022-03-08 | 中车工业研究院有限公司 | Train operation diagram compiling method facing virtual formation |
CN114348062A (en) * | 2021-12-29 | 2022-04-15 | 中国铁道科学研究院集团有限公司通信信号研究所 | Urban rail transit interconnection and interworking operation diagram synchronization method |
WO2022174588A1 (en) * | 2021-02-18 | 2022-08-25 | 卡斯柯信号有限公司 | System and method for automatic adjustment of planned train operation chart |
CN115352502A (en) * | 2022-08-30 | 2022-11-18 | 东南大学 | Train operation scheme adjusting method and device, electronic equipment and storage medium |
CN116639168A (en) * | 2023-04-15 | 2023-08-25 | 北京思维实创科技有限公司 | Method and device for determining speed of railway vehicle, electronic equipment and storage medium |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20040111309A1 (en) * | 1994-09-01 | 2004-06-10 | Matheson William L. | Resource schedule for scheduling rail way train resources |
CN104376624A (en) * | 2014-07-22 | 2015-02-25 | 西南交通大学 | Urban rail transit passenger flow analysis method based on AFC (Automatic Fare Collection) passenger ticket data |
CN105740556A (en) * | 2016-02-02 | 2016-07-06 | 北京交通大学 | Automatic compilation method for passenger flow demand based train working diagram |
CN107330539A (en) * | 2017-05-18 | 2017-11-07 | 北京交通大学 | Train schedule chart and the scheme cooperative optimization method that stops based on bus traveler assignment |
-
2017
- 2017-12-14 CN CN201711340513.7A patent/CN108082224B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20040111309A1 (en) * | 1994-09-01 | 2004-06-10 | Matheson William L. | Resource schedule for scheduling rail way train resources |
CN104376624A (en) * | 2014-07-22 | 2015-02-25 | 西南交通大学 | Urban rail transit passenger flow analysis method based on AFC (Automatic Fare Collection) passenger ticket data |
CN105740556A (en) * | 2016-02-02 | 2016-07-06 | 北京交通大学 | Automatic compilation method for passenger flow demand based train working diagram |
CN107330539A (en) * | 2017-05-18 | 2017-11-07 | 北京交通大学 | Train schedule chart and the scheme cooperative optimization method that stops based on bus traveler assignment |
Non-Patent Citations (3)
Title |
---|
HUIMIN NIU ET AL.: ""Optimizing urban rail timetable under time-dependent demand and oversaturated conditions"", 《TRANSPORTATION RESEARCH PART C》 * |
丁世顺: ""基于动态客流需求的市域轨道交通列车运行图优化模型研究"", 《中国优秀硕士学位论文全文数据库 工程科技II辑》 * |
孟慧慧: ""基于双重启发式动态规划算法的列车运行调整研究"", 《中国优秀硕士学位论文全文数据库 工程科技II辑》 * |
Cited By (20)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US11958517B2 (en) | 2018-03-30 | 2024-04-16 | Casco Signal Co., Ltd. | Intelligent train operation adjustment system and method based on real-time passenger flow |
WO2019184724A1 (en) * | 2018-03-30 | 2019-10-03 | 卡斯柯信号有限公司 | Real-time passenger flow-based intelligent operation adjustment system and method for trains |
CN113723731B (en) * | 2020-05-26 | 2024-05-28 | 中车株洲电力机车研究所有限公司 | Urban rail transit running chart compiling method and system based on passenger flow characteristics |
CN113723731A (en) * | 2020-05-26 | 2021-11-30 | 中车株洲电力机车研究所有限公司 | Urban rail transit operation chart compiling method and system based on passenger flow characteristics |
CN112078633B (en) * | 2020-08-28 | 2022-08-16 | 通号城市轨道交通技术有限公司 | Rail transit train dispatching method and system |
CN112078633A (en) * | 2020-08-28 | 2020-12-15 | 通号城市轨道交通技术有限公司 | Rail transit train dispatching method and system |
CN112163981A (en) * | 2020-09-14 | 2021-01-01 | 交控科技股份有限公司 | Line passenger flow calculation method and system |
CN112215475A (en) * | 2020-09-24 | 2021-01-12 | 交控科技股份有限公司 | Driving organization scheme design system of rail transit |
WO2022174588A1 (en) * | 2021-02-18 | 2022-08-25 | 卡斯柯信号有限公司 | System and method for automatic adjustment of planned train operation chart |
CN113503886A (en) * | 2021-06-09 | 2021-10-15 | 中国国家铁路集团有限公司 | Rapid path search optimization method under condition of large-scale complex road network |
CN113408914A (en) * | 2021-06-25 | 2021-09-17 | 交控科技股份有限公司 | Method and device for compiling train planned operation diagram, electronic equipment and storage medium |
CN113442974B (en) * | 2021-08-19 | 2022-08-02 | 湖南中车时代通信信号有限公司 | Train operation diagram compiling method and device based on flat peak conversion algorithm |
CN113442974A (en) * | 2021-08-19 | 2021-09-28 | 湖南中车时代通信信号有限公司 | Train operation diagram compiling method and device based on flat peak conversion algorithm |
CN114148382B (en) * | 2021-12-08 | 2023-10-13 | 中车工业研究院有限公司 | Train running chart compiling method for virtual formation |
CN114148382A (en) * | 2021-12-08 | 2022-03-08 | 中车工业研究院有限公司 | Train operation diagram compiling method facing virtual formation |
CN114348062A (en) * | 2021-12-29 | 2022-04-15 | 中国铁道科学研究院集团有限公司通信信号研究所 | Urban rail transit interconnection and interworking operation diagram synchronization method |
CN115352502A (en) * | 2022-08-30 | 2022-11-18 | 东南大学 | Train operation scheme adjusting method and device, electronic equipment and storage medium |
CN115352502B (en) * | 2022-08-30 | 2023-11-24 | 东南大学 | Train operation scheme adjustment method and device, electronic equipment and storage medium |
CN116639168A (en) * | 2023-04-15 | 2023-08-25 | 北京思维实创科技有限公司 | Method and device for determining speed of railway vehicle, electronic equipment and storage medium |
CN116639168B (en) * | 2023-04-15 | 2024-05-07 | 北京磁浮有限公司 | Method and device for determining speed of railway vehicle, electronic equipment and storage medium |
Also Published As
Publication number | Publication date |
---|---|
CN108082224B (en) | 2020-04-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108082224A (en) | Train preparation method based on AFC time-varying passenger flows | |
CN108090668B (en) | Time-varying passenger flow driven urban rail transit passenger flow matching and schedule adjusting method | |
Ali et al. | Travel behavior analysis using smart card data | |
CN105740556B (en) | The automatic preparation method of route map of train based on passenger flow demand | |
CN104021667B (en) | Integrate subscription services and the taxi dispatching system called a taxi in real time and scheduling method | |
Chowdhury et al. | Intermodal transit system coordination | |
Aziz et al. | Examining suitability of the integrated public transport system: A case study of Lahore | |
CN111815189A (en) | Modular bus dispatching system | |
Bischoff et al. | Simulation-based optimization of service areas for pooled ride-hailing operators | |
CN108831149A (en) | One kind starting method and system based on history OD information customization public bus network | |
CN105575108A (en) | Intelligent bus dispatching operation method | |
CN106530677B (en) | A kind of school bus dispatching method and system based on real time information | |
CN111161560B (en) | Bus corridor operation order management method and device | |
Cao et al. | Robust and optimized urban rail timetabling using a marshaling plan and skip-stop operation | |
CN104477217B (en) | There is the train operation turnover method of single end parking lot urban rail circuit | |
CN109255972A (en) | A kind of optimization method of the fixed route timetable of the routine bus system based on big data | |
CN103956042A (en) | Public bike scheduling area intelligent partition method based on graph theory | |
CN110570656A (en) | Method and device for customizing public transport line | |
CN109523064B (en) | Intelligent micro-hub based on multi-network fusion | |
Li et al. | Optimal track utilization in electric multiple unit maintenance depots | |
CN106295868A (en) | Traffic trip data processing method and device | |
CN116386305A (en) | Riding method based on information feedback | |
Chin et al. | Nonadditive public transit fare pricing under congestion with policy lessons from a case study in Toronto, Ontario, Canada | |
CN105528890A (en) | A taxi carpooling method suitable for large-scale transportation hubs | |
Caropreso et al. | A long-term analysis of passenger flows on a regional rail line |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |