CN110262337A - Electric Intelligent Monitoring System and method - Google Patents
Electric Intelligent Monitoring System and method Download PDFInfo
- Publication number
- CN110262337A CN110262337A CN201910537700.7A CN201910537700A CN110262337A CN 110262337 A CN110262337 A CN 110262337A CN 201910537700 A CN201910537700 A CN 201910537700A CN 110262337 A CN110262337 A CN 110262337A
- Authority
- CN
- China
- Prior art keywords
- acquisition equipment
- real time
- acquisition
- edge device
- electric power
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Programme-control systems
- G05B19/02—Programme-control systems electric
- G05B19/04—Programme control other than numerical control, i.e. in sequence controllers or logic controllers
- G05B19/042—Programme control other than numerical control, i.e. in sequence controllers or logic controllers using digital processors
- G05B19/0428—Safety, monitoring
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B2219/00—Program-control systems
- G05B2219/20—Pc systems
- G05B2219/24—Pc safety
- G05B2219/24024—Safety, surveillance
Abstract
This application involves a kind of Electric Intelligent Monitoring System and method, above system includes: multiple acquisition equipment, edge device and background devices;Each acquisition equipment and edge device communicate to connect;Edge device and background devices communicate to connect, and acquisition equipment is used to acquire the real time data of electric power construction field, and real time data is sent to edge device;Edge device is used for according to the corresponding intelligent algorithm of each acquisition equipment, is carried out boundary operation to the real time data of each acquisition equipment acquisition respectively, is obtained operation result;Background devices are used for the operation result sent according to edge device, electric power construction field is monitored, since multiple acquisition equipment acquire different real time datas, and edge device according to can be different the corresponding different intelligent algorithm of acquisition equipment, to it is each acquisition equipment acquisition real time data carry out boundary operation, and then background devices can realize electric power construction field in time, all standing, overall process safety supervision.
Description
Technical field
This application involves fields of communication technology, more particularly to a kind of Electric Intelligent Monitoring System and method.
Background technique
With the high speed development of power technology, power industry and the relations of production of people's lives and enterprise are closer and closer
It cuts, the covering surface of power grid is also increasingly wider, and at the same time, power industry is as the high issuing industry of accident, the peace of electric power construction field
Become the problem of people increasingly pay close attention to entirely.
Tradition is usually to carry out shooting record to operating personnel, construction site etc. using live video monitoring system, then
By putting into manpower real time inspection image data, unsafe acts and violation phenomenon etc. are therefrom found.However, due to power business
With power construction mobility is strong, construction site broad covered area, ESD protection area is limited, there are many construction personnel, operation of power networks
The features such as frequent operation, can not accomplish the safety supervision of live all standing, overall process using live video monitoring system.
It can be seen that how timely to realize that the monitoring of electric power construction field is a technical problem to be solved urgently comprehensively.
Summary of the invention
Based on this, it is necessary in view of the above technical problems, provide a kind of electric intelligent for realizing timely safety supervision comprehensively
Monitoring system and method.
A kind of Electric Intelligent Monitoring System, the system comprises: multiple acquisition equipment, edge device and background devices;Respectively
The acquisition equipment and the edge device communicate to connect;The edge device and the background devices communicate to connect;
Each acquisition equipment is used to acquire the real time data of electric power construction field, and the real time data is sent to institute
State edge device;
The edge device is used for according to the corresponding intelligent algorithm of each acquisition equipment, respectively to each acquisition equipment
The real time data of acquisition carries out boundary operation, obtains operation result;
The background devices are used for the operation result sent according to the edge device, to the electric power construction field
It is monitored.
The background devices are also used to send the first control instruction to the edge device in one of the embodiments,
First control instruction is used to indicate the edge device and is set according to each acquisition of the first control instruction coordinated management
It is standby.
First control instruction carries the device identification of target acquisition equipment and right in one of the embodiments,
The Intelligent target algorithm mark answered;The edge device is specifically used for, and controls the target acquisition according to the device identification and sets
Back-up does not acquire real time data;And corresponding Intelligent target algorithm is identified according to the Intelligent target algorithm, to each target
The real time data for acquiring equipment acquisition carries out boundary operation.
The acquisition equipment and the background devices communicate to connect in one of the embodiments,;The background devices are also
For issuing the second control instruction to each acquisition equipment;Second control instruction is adopted for controlling each acquisition equipment
Collect the real time data of electric power construction field.
The background devices are also used to according to the corresponding intelligent calculation of each acquisition equipment in one of the embodiments,
Method carries out backstage operation to the real time data of each acquisition equipment acquisition respectively.
The intelligent algorithm includes safety cap recognizer, safety belt recognizer, safety in one of the embodiments,
At least one of region recognition algorithm, face recognition algorithms.
The edge device is also used to the real-time number to each acquisition equipment acquisition in one of the embodiments,
According to being stored.
A kind of electric intelligent monitoring method, which comprises
Acquire the real time data of equipment acquisition electric power construction field;
Edge device carries out boundary operation to the real time data according to the corresponding intelligent algorithm of the acquisition equipment, obtains
Operation result;
Background devices are monitored the electric power construction field according to the operation result.
The real time data of the acquisition equipment acquisition electric power construction field in one of the embodiments, comprising: after described
Platform equipment sends control instruction;The acquisition equipment acquires the real time data of electric power construction field according to the control instruction.
The Electric Intelligent Monitoring System and method provided in above-described embodiment, above system include: multiple acquisition equipment, side
Edge equipment and background devices;Each acquisition equipment and edge device communicate to connect;Edge device and background devices communicate to connect, acquisition
Equipment is used to acquire the real time data of electric power construction field, and real time data is sent to edge device;Edge device is used for root
According to the corresponding intelligent algorithm of each acquisition equipment, boundary operation is carried out to the real time data of each acquisition equipment acquisition respectively, obtains fortune
Calculate result;Background devices are used for the operation result sent according to edge device, are monitored to electric power construction field, due to multiple
Acquisition equipment acquires different real time datas, and edge device is calculated according to the corresponding different intelligent of acquisition equipment that can be different
Method, to it is each acquisition equipment acquisition real time data carry out boundary operation, and then background devices can realize electric power construction field in time,
All standing, overall process safety supervision.
Detailed description of the invention
Fig. 1 is Electric Intelligent Monitoring System schematic diagram in one embodiment;
Fig. 2 is power monitoring method schematic diagram in one embodiment;
Fig. 3 is the flow diagram of the implementation of S201 in Fig. 2 embodiment;
Fig. 4 is the internal structure chart of computer equipment in one embodiment.
Description of symbols:
1: acquisition equipment;
2: edge device;
3: background devices.
Specific embodiment
It is with reference to the accompanying drawings and embodiments, right in order to which the objects, technical solutions and advantages of the application are more clearly understood
The application is further elaborated.It should be appreciated that specific embodiment described herein is only to explain the application, and do not have to
In restriction the application.
Technical solution of the present invention is described in detail with specifically embodiment below.These specific implementations below
Example can be combined with each other, and the same or similar concept or process may be repeated no more in certain embodiments.
In one embodiment, as shown in Figure 1, Fig. 1 provides a kind of Electric Intelligent Monitoring System schematic diagram, the system is more
A acquisition equipment 1, edge device 2 and background devices 3;Each acquisition equipment 1 and edge device 2 communicate to connect;Edge device 2 is with after
Platform equipment 3 communicates to connect;Each acquisition equipment 1 is used to acquire the real time data of electric power construction field, and real time data is sent to
Edge device 2;Edge device 2 is used for according to the corresponding intelligent algorithm of each acquisition equipment 1, is acquired respectively to each acquisition equipment 1
Real time data carries out boundary operation, obtains operation result;Background devices 3 are used for the operation result sent according to edge device 2, right
Electric power construction field is monitored.
Specifically, acquisition equipment 1 can be camera, video camera, scanner, sensor etc., for acquiring power construction
The real time data at scene, acquisition equipment 1 can be mounted on different positions for equipment 1 is acquired according to different electric power scenes, can also
To install different types of acquisition equipment according to different electric power scenes;Edge device 2 is primarily referred to as being mounted on edge network
Interchanger, router, multi-layer switches, IAD and various MAN/WAN equipment etc., be responsible for access device and core/backbone network
The data packet of network equipment room transmits, and edge device 2 can be one or more;Background devices 3 may include independent backstage clothes
The server cluster of business device either multiple background servers composition is realized, can be used for the letter of each power construction point of real-time display
Breath, manages electric power construction field.
Wherein, the real time data of the electric power construction field includes the real time data of different electric power application scenarios, for example,
Real time data, the real time data of electric power construction field personnel and the real time data of status of electric power of electric power construction field environment
Deng;Intelligent algorithm in the embodiment of the present application refers to the intelligent algorithm applied to electric power construction field, such as existing to power construction
Safety belt recognizer, the face recognition algorithms of power construction personnel etc., it should be noted that above-mentioned electric intelligent monitoring
System is the system monitored in real time based on intelligent algorithm to electric power construction field, by the scheduling to intelligent algorithm, with reality
Existing electric power construction field timely monitors in all directions.Optionally, acquisition equipment 1 and edge device 2 communicate to connect, and can be wired
Connection, is also possible to be wirelessly connected, can be not specifically limited by LAN connection, the embodiment of the present application, and edge device 2 is with after
Platform equipment 3 is also possible to wireless communication connection.
The working principle of Electric Intelligent Monitoring System provided by the embodiments of the present application is, during power monitoring, acquisition
Equipment 1 acquires the real time data of electric power construction field, and real time data is passed to corresponding edge device 2, and edge device 2
According to the acquisition corresponding intelligent algorithm of equipment 1, the real time data acquired respectively to each acquisition equipment 1 carries out boundary operation, obtains fortune
Calculate as a result, and operation result is sent to background devices 3, background devices 3 after receiving operation result, to each operation result into
Row comprehensive analysis, and then the real time monitoring to electric power construction field is realized according to Comprehensive analysis results.
Electric Intelligent Monitoring System provided by the above embodiment, comprising: multiple acquisition equipment, edge device and backstage are set
It is standby;Each acquisition equipment and edge device communicate to connect;Edge device and background devices communicate to connect, and acquisition equipment is for acquiring electricity
The real time data of power construction site, and real time data is sent to edge device;Edge device is used for according to each acquisition equipment pair
The intelligent algorithm answered carries out boundary operation to the real time data of each acquisition equipment acquisition respectively, obtains operation result;Background devices
Operation result for being sent according to edge device, is monitored electric power construction field, not due to the acquisition of multiple acquisition equipment
With real time data, and edge device according to can be different the corresponding different intelligent algorithm of acquisition equipment, to each acquisition equipment
The real time data of acquisition carries out boundary operation, so background devices can realize electric power construction field in time, all standing, overall process
Safety supervision.
Background devices are also used to send edge device the first control instruction, the first control in one of the embodiments,
Instruction is used to indicate edge device and respectively acquires equipment according to the first control instruction coordinated management.
Optionally, the first control instruction may include electric power application scenarios mark or/and the corresponding acquisition of electric power application scenarios
Device identification and/or the corresponding intelligent algorithm mark of electric power application scenarios.Specifically, electric power application scenarios, acquisition equipment, intelligence
Corresponding relationship can be respectively set between algorithm.
Optionally, above-mentioned corresponding relationship can be one-to-many or one-to-one, and the embodiment of the present application does not do specific limit
It is fixed;Electric power application scenarios, acquisition equipment, respectively arranged corresponding relationship can store in background devices between intelligent algorithm,
It can be stored respectively in background devices and edge device, the embodiment of the present application is also not specifically limited.
Specifically, it in the embodiment of the present application, can be selected not according to the different objects or different application scene of power construction
Same recognizer.Illustratively, electric power construction field environment is corresponding is identified as the corresponding mark of 100, electric power construction field personnel
It 300 are identified as, relate to danger safety zone correspondence for 200, status of electric power is corresponding and is identified as 400 etc.;Electric power construction field environment
Corresponding acquisition device identification is A, B;The corresponding acquisition device identification of electric power construction field personnel is A, C, D etc.;Power construction
The corresponding intelligent algorithm of site environment is a, g;The corresponding intelligent algorithm of electric power construction field personnel is b, c etc..
Optionally, intelligent algorithm includes safety cap recognizer, safety belt recognizer, safety zone recognizer, people
At least one of face recognizer.For example, intelligent algorithm corresponding for electric power construction field personnel can be known for safety cap
Other algorithm, safety belt recognizer;It can be safety zone recognizer etc. for relating to the corresponding intelligent algorithm in danger safety zone.
Specifically, safety cap recognizer, safety belt recognizer, safety zone recognizer, face recognition algorithms etc.
Intelligent algorithm is the intelligent algorithm for electric power construction field special setting, illustratively, by showing the power construction of acquisition
Input parameter of the real time data of field as intelligent algorithm is realized by model or network training etc. to electric power construction field
Intelligent monitoring, wherein safety cap recognizer can be used for whether safe wearing cap monitors in real time to power construction personnel;
For monitoring whether safety belt is fastened, whether safety zone recognizer is used for electric power personnel in safety safety belt recognizer
Regional activity is analyzed, and face recognition algorithms are for the identity of power construction personnel such as verifying.Illustratively, electric power
After the face information of the camera acquisition power construction personnel of construction site, by electric power recognizer to power construction personnel's
Face information is identified, and face information corresponding with the construction site of power construction system is stored in library compares,
With verify electric power personnel whether be the construction site staff.
Illustratively, the first control instruction may include the corresponding mark 2 of electric power application scenarios, and background devices send the first control
To edge device, edge device, can be according to 2 pairs of mark of the first control instruction after receiving the first control instruction for system instruction
The electric power scene (electric power construction field personnel) answered, corresponding acquisition equipment A under coordinated management electric power construction field personnel's scene,
C、D。
In above-described embodiment, the first control instruction, above-mentioned first control instruction are sent to edge device by background devices
Instruction edge device respectively acquires equipment, and then the collaboration in background devices to acquisition equipment according to the first control instruction coordinated management
Management is planned as a whole to dispose, and comprehensive timely monitoring of different electric power application scenarios is advantageously implemented.
The first control instruction carries the device identification and corresponding target of target acquisition equipment in one of the embodiments,
Intelligent algorithm mark;Edge device is specifically used for, and controls target acquisition equipment according to device identification and acquires real time data respectively;And
Corresponding Intelligent target algorithm is identified according to Intelligent target algorithm, edge is carried out to the real time data of each target acquisition equipment acquisition
Operation.
Wherein, target acquisition equipment refers to the acquisition equipment for realizing that electric power construction field monitoring needs, for example, for electric power
Construction object is power equipment, needs to belong to target acquisition equipment by acquiring equipment such as sensor or camera, need real-time
It works, camera set by non-electricity equipment etc. is then not belonging to target acquisition equipment.
Illustratively, the device identification that the first control instruction carries target acquisition equipment is 1,3,4, corresponding Intelligent target
Algorithm is identified as b, c, d, then after receiving the first control instruction, the control acquisition acquisition of equipment 1,3,4 counts edge device in real time
According to the real time data of acquisition is sent to edge device by acquisition equipment 1,3,4, and edge device is calculated according to the corresponding intelligence of b, c, d
Method carries out edge calculations to real time data.
In above-described embodiment, edge device controls target acquisition equipment according to device identification and acquires real time data respectively, and
Corresponding Intelligent target algorithm is identified according to Intelligent target algorithm, edge is carried out to the real time data of each target acquisition equipment acquisition
Operation can be timely responded to since edge calculations handle data on edge device, while can be will be valuable after processing
Operation result is sent to background devices, and then can greatly save bandwidth resources.
Optionally, acquisition equipment and background devices communicate to connect;Background devices are also used to issue second to each acquisition equipment
Control instruction;Second control instruction is used to control the real time data of each acquisition equipment acquisition electric power construction field.
Wherein, acquisition equipment can be wirelessly communicated with background devices connect, and background devices can be directly to acquisition equipment hair
Control instruction is sent, and then controls the real time data of each acquisition equipment acquisition electric power construction field.It should be noted that in order to improve
Control efficiency is to issue control instruction to edge device using background devices, and then control by edge device under normal conditions
The real time data of each acquisition equipment acquisition electric power construction field.
Similar with the edge calculations of edge device, background devices are also used to according to each acquisition in one of the embodiments,
The corresponding intelligent algorithm of equipment carries out backstage operation to the real time data of each acquisition equipment acquisition respectively.
Wherein, backstage operation here refers to the calculating operation carried out in background devices.Specifically, acquisition equipment can be straight
It connects and the real time data of acquisition is sent to background devices, due to being set respectively between electric power application scenarios, acquisition equipment, intelligent algorithm
The corresponding relationship set is stored in background devices, so background devices can directly according to the corresponding intelligent algorithm of each acquisition equipment,
Backstage operation is carried out to the real time data of each acquisition equipment acquisition respectively, and then background devices are realized according to backstage operation result
To the real time monitoring of electric power construction field.
Optionally, background devices are also used to send abnormal alarm signal in operation result exception.Illustratively, if for
The electric power application environment of danger safety zone is related to when being monitored, in the real-time number according to safety zone algorithm to acquisition equipment acquisition
After carrying out operation, gained operation result is that there are power construction personnel for danger zone, can be protected with alert at this time
Demonstrate,prove electric power safety.
Edge device is also used to store the real time data of each acquisition equipment acquisition in one of the embodiments,.
Wherein, edge device can also include memory module, for being stored to the real time data of each acquisition equipment acquisition, for example,
It can be picture recording module, record a video to the data of camera acquisition, for subsequent real time inspection.
In one embodiment, as shown in Fig. 2, providing a kind of power monitoring method, this application involves be electric power intelligence
The specific implementation process of energy monitoring system, comprising the following steps:
S201, the real time data of acquisition equipment acquisition electric power construction field.
Wherein, the real time data of the electric power construction field includes the real time data of different electric power application scenarios, for example,
Real time data, the real time data of electric power construction field personnel and the real time data of status of electric power of electric power construction field environment
Deng.
Specifically, acquisition equipment can be camera, video camera, scanner, sensor etc., existing for acquiring power construction
The real time data of field, acquisition equipment can be mounted on different positions for equipment is acquired according to different electric power scenes, can also root
Different types of acquisition equipment is installed according to different electric power scenes.Specifically, acquisition equipment acquisition electric power construction field is real-time
Data, and real time data is sent to edge device.
S202, edge device carry out edge fortune to the real time data according to the corresponding intelligent algorithm of the acquisition equipment
It calculates, obtains operation result.
Wherein, edge device be primarily referred to as being mounted on interchanger on edge network, router, multi-layer switches, IAD with
And various MAN/WAN equipment etc., it is responsible for access device and the transmission of core/backbone network equipment room data packet, edge device can
Be it is one or more, the embodiment of the present application is not specifically limited.
Wherein, intelligent algorithm includes safety cap recognizer, safety belt recognizer, safety zone recognizer, face
At least one of recognizer.For example, intelligent algorithm corresponding for electric power construction field personnel can identify for safety cap
Algorithm, safety belt recognizer;It can be safety zone recognizer etc. for relating to the corresponding intelligent algorithm in danger safety zone.Tool
Body, edge device receives the real time data that acquisition equipment is sent, and according to the corresponding intelligent algorithm of acquisition equipment to real-time number
According to progress boundary operation, and then obtain operation result.
It optionally, can also be by background devices according to the corresponding intelligent algorithm of each acquisition equipment, respectively to each acquisition equipment
The real time data of acquisition carries out backstage operation, obtains operation result.
S203, background devices are monitored the electric power construction field according to the operation result.
Specifically, background devices receive the operation result that edge device is sent, and each operation result is carried out comprehensive analysis,
And then it realizes and the electric power construction field is monitored
Optionally, background devices can send abnormal alarm signal in operation result exception.Illustratively, if for relating to
When the electric power application environment of danger safety zone is monitored, in the real time data according to safety zone algorithm to acquisition equipment acquisition
After carrying out operation, gained operation result is that there are power construction personnel for danger zone, at this time can be with alert, it is ensured that
Electric power safety.
In above-described embodiment, the real time data of electric power construction field is acquired by acquisition equipment, edge device is according to acquisition
The corresponding intelligent algorithm of equipment carries out boundary operation to the real time data, obtains operation result, and then background devices are according to institute
Operation result is stated, the electric power construction field is monitored, since multiple acquisition equipment acquire different real time datas, and side
Edge equipment carries out the real time data of each acquisition equipment acquisition according to the corresponding different intelligent algorithm of acquisition equipment that can be different
Boundary operation, so background devices can realize electric power construction field in time, all standing, overall process safety supervision.
This application involves the specific implementation flows of the real time data of acquisition electric power construction field, specifically, as shown in figure 3,
S201 " real time data of acquisition equipment acquisition electric power construction field ", comprising:
S301, the background devices send control instruction.
Optionally, background devices can send the first control instruction to edge device, and the first control instruction is used to indicate side
Edge equipment respectively acquires equipment according to the first control instruction coordinated management, and then edge device is according to the first control instruction coordinated management
Each acquisition equipment;Alternatively, background devices directly can also issue the second control instruction to each acquisition equipment.
S302, the acquisition equipment acquire the real time data of electric power construction field according to the control instruction.
Illustratively, control instruction may include the corresponding mark 2 of electric power application scenarios, and background devices send the first control and refer to
It enables to edge device, edge device, can be according to the corresponding electric power of mark 2 of the first control instruction after receiving control instruction
Scene (electric power construction field personnel), corresponding acquisition equipment A, C, D under coordinated management electric power construction field personnel's scene, in turn
Acquire the real time data of equipment A, C, D acquisition electric power construction field.
In above-described embodiment, background devices send control instruction, and acquisition equipment acquires electric power and apply according to the control instruction
Difference may be implemented since background devices plan as a whole to dispose to acquisition equipment according to control instruction in the real time data at work scene
Comprehensive timely monitoring of electric power application scenarios.
Specific about power monitoring method limits the restriction that may refer to above for Electric Intelligent Monitoring System,
This is no longer repeated one by one.
It should be understood that although each step in the flow chart of Fig. 2-3 is successively shown according to the instruction of arrow,
These steps are not that the inevitable sequence according to arrow instruction successively executes.Unless expressly stating otherwise herein, these steps
Execution there is no stringent sequences to limit, these steps can execute in other order.Moreover, at least one in Fig. 2-3
Part steps may include that perhaps these sub-steps of multiple stages or stage are not necessarily in synchronization to multiple sub-steps
Completion is executed, but can be executed at different times, the execution sequence in these sub-steps or stage is also not necessarily successively
It carries out.
Power monitoring method provided by the present application, can be applied in computer equipment as shown in Figure 4.The computer is set
Standby to can be terminal, internal structure chart can be as shown in Figure 4.The computer equipment includes the processing connected by system bus
Device, memory, network interface, display screen and input unit.Wherein, the processor of the computer equipment is calculated and is controlled for providing
Ability processed.The memory of the computer equipment includes non-volatile memory medium, built-in storage.The non-volatile memory medium is deposited
Contain operating system and computer program.The built-in storage is operating system and computer program in non-volatile memory medium
Operation provide environment.The network interface of the computer equipment is used to communicate with external terminal by network connection.The calculating
A kind of control method of laser radar system is realized when machine program is executed by processor.The display screen of the computer equipment can be with
It is liquid crystal display or electric ink display screen, the input unit of the computer equipment can be the touch covered on display screen
Layer, is also possible to the key being arranged on computer equipment shell, trace ball or Trackpad, can also be external keyboard, touch-control
Plate or mouse etc..
It will be understood by those skilled in the art that structure shown in Fig. 4, only part relevant to application scheme is tied
The block diagram of structure does not constitute the restriction for the computer equipment being applied thereon to application scheme, specific computer equipment
It may include perhaps combining certain components or with different component layouts than more or fewer components as shown in the figure.
In one embodiment, a kind of computer equipment, including memory and processor are provided, is stored in memory
Computer program, the processor perform the steps of when executing computer program
Acquire the real time data of equipment acquisition electric power construction field;
Edge device carries out boundary operation to the real time data according to the corresponding intelligent algorithm of the acquisition equipment, obtains
Operation result;
Background devices are monitored the electric power construction field according to the operation result.
In one embodiment, the background devices are also performed the steps of when processor executes computer program to send
Control instruction;The acquisition equipment acquires the real time data of electric power construction field according to the control instruction.
A kind of computer equipment provided by the above embodiment, implementing principle and technical effect and above method embodiment class
Seemingly, details are not described herein.
In one embodiment, a kind of computer readable storage medium is provided, computer program is stored thereon with, is calculated
Machine program also performs the steps of when being executed by processor
Acquire the real time data of equipment acquisition electric power construction field;
Edge device carries out boundary operation to the real time data according to the corresponding intelligent algorithm of the acquisition equipment, obtains
Operation result;
Background devices are monitored the electric power construction field according to the operation result.
In one embodiment, the background devices hair is also performed the steps of when computer program is executed by processor
Send control instruction;The acquisition equipment acquires the real time data of electric power construction field according to the control instruction.
A kind of computer readable storage medium provided by the above embodiment, implementing principle and technical effect and the above method
Embodiment is similar, and details are not described herein.
Those of ordinary skill in the art will appreciate that realizing all or part of the process in above-described embodiment method, being can be with
Relevant hardware is instructed to complete by computer program, the computer program can be stored in a non-volatile computer
In read/write memory medium, the computer program is when being executed, it may include such as the process of the embodiment of above-mentioned each method.Wherein,
To any reference of memory, storage, database or other media used in each embodiment provided herein,
Including non-volatile and/or volatile memory.Nonvolatile memory may include read-only memory (ROM), programming ROM
(PROM), electrically programmable ROM (EPROM), electrically erasable ROM (EEPROM) or flash memory.Volatile memory may include
Random access memory (RAM) or external cache.By way of illustration and not limitation, RAM is available in many forms,
Such as static state RAM (SRAM), dynamic ram (DRAM), synchronous dram (SDRAM), double data rate SDRAM (DDRSDRAM), increase
Strong type SDRAM (ESDRAM), synchronization link (Synchlink) DRAM (SLDRAM), memory bus (Rambus) direct RAM
(RDRAM), direct memory bus dynamic ram (DRDRAM) and memory bus dynamic ram (RDRAM) etc..
Each technical characteristic of above embodiments can be combined arbitrarily, for simplicity of description, not to above-described embodiment
In each technical characteristic it is all possible combination be all described, as long as however, the combination of these technical characteristics be not present lance
Shield all should be considered as described in this specification.
The several embodiments of the application above described embodiment only expresses, the description thereof is more specific and detailed, but simultaneously
It cannot therefore be construed as limiting the scope of the patent.It should be pointed out that coming for those of ordinary skill in the art
It says, without departing from the concept of this application, various modifications and improvements can be made, these belong to the protection of the application
Range.Therefore, the scope of protection shall be subject to the appended claims for the application patent.
Claims (10)
1. a kind of Electric Intelligent Monitoring System, which is characterized in that the system comprises: multiple acquisition equipment, edge device and after
Platform equipment;Each acquisition equipment and the edge device communicate to connect;The edge device and the background devices communication link
It connects;
Each acquisition equipment is used to acquire the real time data of electric power construction field, and the real time data is sent to the side
Edge equipment;
The edge device is used for according to the corresponding intelligent algorithm of each acquisition equipment, respectively to each acquisition equipment acquisition
Real time data carry out boundary operation, obtain operation result;
The background devices are used for the operation result sent according to the edge device, carry out to the electric power construction field
Monitoring.
2. system according to claim 1, which is characterized in that the background devices are also used to send the edge device
First control instruction, first control instruction are used to indicate the edge device according to the first control instruction coordinated management
Each acquisition equipment.
3. system according to claim 2, which is characterized in that first control instruction carries the target and acquires equipment
Device identification and corresponding Intelligent target algorithm mark;
The edge device is specifically used for, and controls the target acquisition equipment according to the device identification and acquires real-time number respectively
According to;And corresponding Intelligent target algorithm is identified according to the Intelligent target algorithm, to the reality of each target acquisition equipment acquisition
When data carry out boundary operation.
4. system according to claim 1-3, which is characterized in that the acquisition equipment and the background devices are logical
Letter connection;The background devices are also used to issue the second control instruction to each acquisition equipment;Second control instruction is used
In the real time data for controlling each acquisition equipment acquisition electric power construction field.
5. system according to claim 4, which is characterized in that the background devices are also used to according to each acquisition equipment
Corresponding intelligent algorithm carries out backstage operation to the real time data of each acquisition equipment acquisition respectively.
6. system according to claim 1-3, which is characterized in that the intelligent algorithm includes that safety cap identification is calculated
At least one of method, safety belt recognizer, safety zone recognizer, face recognition algorithms.
7. system according to claim 1-3, which is characterized in that the edge device is also used to each institute
The real time data for stating acquisition equipment acquisition is stored.
8. system according to claim 1-3, which is characterized in that the background devices are also used in the operation
Abnormal alarm signal is sent when results abnormity.
9. a kind of electric intelligent monitoring method, which is characterized in that the described method includes:
Acquire the real time data of equipment acquisition electric power construction field;
Edge device carries out boundary operation to the real time data according to the corresponding intelligent algorithm of the acquisition equipment, obtains operation
As a result;
Background devices are monitored the electric power construction field according to the operation result.
10. according to the method described in claim 9, it is characterized in that, the acquisition equipment acquires the real-time of electric power construction field
Data, comprising:
The background devices send control instruction;
The acquisition equipment acquires the real time data of electric power construction field according to the control instruction.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910537700.7A CN110262337B (en) | 2019-06-20 | 2019-06-20 | Intelligent power monitoring system and method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910537700.7A CN110262337B (en) | 2019-06-20 | 2019-06-20 | Intelligent power monitoring system and method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110262337A true CN110262337A (en) | 2019-09-20 |
CN110262337B CN110262337B (en) | 2021-09-28 |
Family
ID=67919973
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910537700.7A Active CN110262337B (en) | 2019-06-20 | 2019-06-20 | Intelligent power monitoring system and method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110262337B (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110677300A (en) * | 2019-10-09 | 2020-01-10 | 国家电网有限公司 | Electric power safety management video intelligent shunting device and method based on mobile edge calculation |
CN112671111A (en) * | 2021-03-18 | 2021-04-16 | 广东新中望信息科技有限公司 | Electric power monitoring and early warning acquisition system and method based on edge calculation |
CN112804494A (en) * | 2021-01-13 | 2021-05-14 | 广州穗能通能源科技有限责任公司 | Power construction site monitoring method and system and storage medium |
CN112800883A (en) * | 2021-01-15 | 2021-05-14 | 广州穗能通能源科技有限责任公司 | Edge box-based power behavior monitoring method and device and edge box |
CN112818758A (en) * | 2021-01-14 | 2021-05-18 | 广州穗能通能源科技有限责任公司 | Monitoring method, system and device for electric power construction site and storage medium |
CN112837531A (en) * | 2020-12-25 | 2021-05-25 | 朗坤智慧科技股份有限公司 | Group-level violation behavior video identification method and device based on 5G network |
CN113011833A (en) * | 2021-01-15 | 2021-06-22 | 广州穗能通能源科技有限责任公司 | Safety management method and device for construction site, computer equipment and storage medium |
CN113205632A (en) * | 2021-04-27 | 2021-08-03 | 内蒙古科电数据服务有限公司 | Internet of things equipment safety access method suitable for electric power operation site |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN205787808U (en) * | 2016-05-18 | 2016-12-07 | 国网山东省电力公司无棣县供电公司 | A kind of electric power construction field intelligent monitoring and controlling device |
CN106454264A (en) * | 2016-11-10 | 2017-02-22 | 国网四川省电力公司自贡供电公司 | Control system for capital construction site of power substation |
CN107992949A (en) * | 2017-11-09 | 2018-05-04 | 北京许继电气有限公司 | Industrial data analysis method and system |
CN108965377A (en) * | 2017-05-19 | 2018-12-07 | 柯尼卡美能达株式会社 | Edge calculations system, communication control method and computer-readable recording medium |
CN109292656A (en) * | 2018-11-27 | 2019-02-01 | 深圳行知聚能科技发展有限公司 | Tower crane real-time system for monitoring and pre-warning and method based on energy monitor and internet of things technology |
US20190072460A1 (en) * | 2017-09-06 | 2019-03-07 | Tomm Aldridge | Method and device to monitor and automatically report electric motor and transformer conditions |
WO2019070951A1 (en) * | 2017-10-04 | 2019-04-11 | New Context Services, Inc. | Autonomous edge device for monitoring and threat detection |
CN109889791A (en) * | 2019-04-11 | 2019-06-14 | 吉林同益光电科技有限公司 | A kind of electric power construction field managing and control system and method |
-
2019
- 2019-06-20 CN CN201910537700.7A patent/CN110262337B/en active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN205787808U (en) * | 2016-05-18 | 2016-12-07 | 国网山东省电力公司无棣县供电公司 | A kind of electric power construction field intelligent monitoring and controlling device |
CN106454264A (en) * | 2016-11-10 | 2017-02-22 | 国网四川省电力公司自贡供电公司 | Control system for capital construction site of power substation |
CN108965377A (en) * | 2017-05-19 | 2018-12-07 | 柯尼卡美能达株式会社 | Edge calculations system, communication control method and computer-readable recording medium |
US20190072460A1 (en) * | 2017-09-06 | 2019-03-07 | Tomm Aldridge | Method and device to monitor and automatically report electric motor and transformer conditions |
WO2019070951A1 (en) * | 2017-10-04 | 2019-04-11 | New Context Services, Inc. | Autonomous edge device for monitoring and threat detection |
CN107992949A (en) * | 2017-11-09 | 2018-05-04 | 北京许继电气有限公司 | Industrial data analysis method and system |
CN109292656A (en) * | 2018-11-27 | 2019-02-01 | 深圳行知聚能科技发展有限公司 | Tower crane real-time system for monitoring and pre-warning and method based on energy monitor and internet of things technology |
CN109889791A (en) * | 2019-04-11 | 2019-06-14 | 吉林同益光电科技有限公司 | A kind of electric power construction field managing and control system and method |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110677300A (en) * | 2019-10-09 | 2020-01-10 | 国家电网有限公司 | Electric power safety management video intelligent shunting device and method based on mobile edge calculation |
CN110677300B (en) * | 2019-10-09 | 2022-05-31 | 国家电网有限公司 | Electric power safety management video intelligent shunting device and method based on mobile edge calculation |
CN112837531A (en) * | 2020-12-25 | 2021-05-25 | 朗坤智慧科技股份有限公司 | Group-level violation behavior video identification method and device based on 5G network |
CN112804494A (en) * | 2021-01-13 | 2021-05-14 | 广州穗能通能源科技有限责任公司 | Power construction site monitoring method and system and storage medium |
CN112818758A (en) * | 2021-01-14 | 2021-05-18 | 广州穗能通能源科技有限责任公司 | Monitoring method, system and device for electric power construction site and storage medium |
CN112800883A (en) * | 2021-01-15 | 2021-05-14 | 广州穗能通能源科技有限责任公司 | Edge box-based power behavior monitoring method and device and edge box |
CN113011833A (en) * | 2021-01-15 | 2021-06-22 | 广州穗能通能源科技有限责任公司 | Safety management method and device for construction site, computer equipment and storage medium |
CN112671111A (en) * | 2021-03-18 | 2021-04-16 | 广东新中望信息科技有限公司 | Electric power monitoring and early warning acquisition system and method based on edge calculation |
CN112671111B (en) * | 2021-03-18 | 2021-07-20 | 广东新中望信息科技有限公司 | Electric power monitoring and early warning acquisition system and method based on edge calculation |
CN113205632A (en) * | 2021-04-27 | 2021-08-03 | 内蒙古科电数据服务有限公司 | Internet of things equipment safety access method suitable for electric power operation site |
Also Published As
Publication number | Publication date |
---|---|
CN110262337B (en) | 2021-09-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110262337A (en) | Electric Intelligent Monitoring System and method | |
CN112272288B (en) | Nuclear power operation monitoring method and device, computer equipment and storage medium | |
CN107241224B (en) | Network risk monitoring method and system for transformer substation | |
CN112114533A (en) | Internet of things data processing method and device, computer equipment and storage medium | |
CN104850093A (en) | Method for monitoring security in an automation network, and automation network | |
CN211906170U (en) | Based on electric wire netting field operation data management and control device | |
CN110991979B (en) | Attendance management method, device and equipment for intelligent building site and computer storage medium | |
CN112364722A (en) | Nuclear power operator monitoring processing method and device and computer equipment | |
CN109981686A (en) | A kind of network security situational awareness method and system based on circulation confrontation | |
CN104092730A (en) | Cloud computing system | |
CN115273205A (en) | Intelligent enterprise machine room comprehensive management and control system | |
CN111507571B (en) | Emergency group scheduling method, device, computer equipment and storage medium | |
CN108881278A (en) | Methods of risk assessment and system | |
CN116229688A (en) | Engineering construction safety risk early warning method and system | |
CN115964645A (en) | Information processing method and system based on big data | |
CN115967166A (en) | Power transmission line monitoring method and device, computer equipment and storage medium | |
CN115618353B (en) | Industrial production safety identification system and method | |
KR102231648B1 (en) | Method, apparatus and computer-readable medium for managing inspection history information of fire fighting facility | |
CN103702080A (en) | Intelligent security and protection system | |
CN111510685A (en) | Information output method and device based on three-dimensional model | |
JP7368582B1 (en) | Certification management system and method for power plant patrol equipment | |
CN108809731B (en) | Control method based on subway dimming projection system service data link | |
CN111062932A (en) | Monitoring method of network service program | |
CN115310078A (en) | Industrial production line auditing system and application method | |
CN113159517B (en) | Three-dimensional visual power grid operation data analysis system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |