CN110258886A - A kind of construction method of steel bar truss floor support plate - Google Patents

A kind of construction method of steel bar truss floor support plate Download PDF

Info

Publication number
CN110258886A
CN110258886A CN201910590317.8A CN201910590317A CN110258886A CN 110258886 A CN110258886 A CN 110258886A CN 201910590317 A CN201910590317 A CN 201910590317A CN 110258886 A CN110258886 A CN 110258886A
Authority
CN
China
Prior art keywords
support plate
floor support
girder
steel
steel bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201910590317.8A
Other languages
Chinese (zh)
Inventor
不公告发明人
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changsha Erdao New Energy Technology Co Ltd
Original Assignee
Changsha Erdao New Energy Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changsha Erdao New Energy Technology Co Ltd filed Critical Changsha Erdao New Energy Technology Co Ltd
Priority to CN201910590317.8A priority Critical patent/CN110258886A/en
Publication of CN110258886A publication Critical patent/CN110258886A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B5/00Floors; Floor construction with regard to insulation; Connections specially adapted therefor
    • E04B5/16Load-carrying floor structures wholly or partly cast or similarly formed in situ
    • E04B5/32Floor structures wholly cast in situ with or without form units or reinforcements
    • E04B5/36Floor structures wholly cast in situ with or without form units or reinforcements with form units as part of the floor
    • E04B5/38Floor structures wholly cast in situ with or without form units or reinforcements with form units as part of the floor with slab-shaped form units acting simultaneously as reinforcement; Form slabs with reinforcements extending laterally outside the element

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a kind of construction method of steel bar truss floor support plate, including steel bar truss floor support plate installation and steel bar truss floor support plate site operation, steel bar truss floor support plate installation includes preparation before installation, floor connection, processing at flat shape variation, the installation requirement and side mode installation requirement of steel bar girder, steel bar truss floor support plate site operation includes the bullet picture of girder and secondary beam center line, floor support plate classification designator, floor support plate handling requirement, cutting requirement, side plate connection request and concrete curing, the present invention relates to a kind of construction method of steel bar truss floor support plate, the fast advantage of speed of application with profiled sheet combination or non-combined floor, have cast-in-place overall stiffness big again, the good advantage of anti-seismic performance, floor self weight will not make board bottom concrete generate pulling force, in addition to floor is self-possessed load and Live Loads on Floors in Buildings effect under, board bottom Concrete just generates pulling force, and floor cracking postpones, and the rigidity of floor is bigger than common in-situ reinforced concrete slab.

Description

A kind of construction method of steel bar truss floor support plate
Technical field
The invention belongs to the realm of building construction, specially a kind of construction method of steel bar truss floor support plate.
Background technique
Steel bar truss floor support plate is to belong to one kind without support die mould combination floor support plate;Steel bar girder is in backstage processing space Patterning process, traditional construction method of steel bar truss floor support plate do not use the construction work of profiled sheet combination or non-combined floor Skill, construction efficiency is low, and cast-in-place overall stiffness is small, poor seismic behavior, needs to design a kind of steel bar truss floor support plate construction party to this Method.
Summary of the invention:
The object of the invention is that providing a kind of construction method of steel bar truss floor support plate to solve the above-mentioned problems, solve It has determined the problem of existing steel bar truss floor support plate construction technology construction efficiency is low, and cast-in-place overall stiffness is small, poor seismic behavior.
To solve the above-mentioned problems, the present invention provides a kind of technical solutions:
A kind of construction method of steel bar truss floor support plate, including steel bar truss floor support plate installation and steel bar truss floor support plate scene Construction.
Preferably, the steel bar truss floor support plate is installed including preparing before installation, floor connects, at flat shape variation Processing, steel bar girder installation requirement and side mode installation requirement;
Prepare before installation: before being laid with steel bar truss floor support plate, first by the ink of initial position shown in installation drawing Bucket pop-up reference line, reference line use the snap the line method of combination of long drives and drop shots;
Floor connection: floor connection uses manner, and the drag hook connection between plate and plate should be close, and guarantee pours coagulation Not spillage when native, installs first block of plate, its support vertical bar is fixed with girder steel spot welding.Other plates are successively installed again, had been laid with One straddle of every laying will carry out proofreading by icon dimensioning in journey, if there is deviation to adjust immediately;
Processing at flat shape variation: the flat shapes such as steel column corner, Core Walls Structure corner, beam face liner connecting plate become At change, plate both ends can be cut, unwrapping wire should be carried out before cutting to the size to be cut and check review, the plate end after cutting Portion is still needed to according to original requirement weld horizontal support reinforcing bar and vertical support reinforcing bar;
The installation requirement of steel bar girder: steel bar girder should be parallel to girder steel end, and overlap joint of the bed die on girder steel be not small In 30mm, along its length by galvanized steel plain sheet and girder steel spot welding, welding uses manual electric arc welding, spot pitch 300mm, reinforcing bar Truss should ensure that zinc-plated bed die can snap on girder steel, the laying of every layer of reinforcement bar truss mould plate is suitable perpendicular to girder steel end It is laid with from initial position to a direction, the reinforcement bar truss mould plate of corresponding each layer is laid with main structure installation sequence;
Side mode installation requirement: cheek board answers bracing wire to be straightened when installing, and utilizes reinforcing bar one end and peg spot welding after adjusting suitably, Side mode is fixed with cheek board spot welding in one end, and the upper Ji edge spot welding spacing of side mode bottom and girder steel is 300mm.
Preferably, the steel bar truss floor support plate site operation includes bullet picture, the floor support plate of girder and secondary beam center line Classification designator, floor support plate handling requirement, cutting requirement, side plate connection request and concrete curing;
The bullet of girder and secondary beam center line is drawn: first in the center line of bed board area pop-up girder steel, the center line of girder is to be laid with The control line of the fixed position of floor support plate by the lap width of the center line traffic control floor support plate overlap joint girder steel of girder, and determines that building is held The bond pad locations of plate and the welding of girder steel penetration, the center line of secondary beam will determine the welding position of penetration weld peg, and steel bar girder is flat For row in girder steel end, overlap joint of the bed die on girder steel is not less than 30mm, along its length by galvanized steel plain sheet and girder steel spot welding, weldering It connects using manual electric arc welding, spacing is not easy to be greater than 300mm;
Floor support plate classification designator: being cleaned out floor support plate layering and zoning by material list in windrow place, and indicates number, is distinguished Understand floor, area, number, indicated with marking pen, and be transported to construction appointed part like clockwork;
Floor support plate handling requirement: using dedicated soft hoist cable when handling, Steel Structural Design multilayer generally uses 3 layer of one segmented column Mounting process;
Cutting requirement: can be used the cutting of mechanical or oxygen, and when cutting selects the position of truss contact as far as possible, but must satisfy Overlapped requires for design, and the reinforcement bar truss mould plate end after cutting is still needed to according to original requirement weld horizontal support reinforcing bar and perpendicular To support reinforcing bar, if portion is cut off in node, web member reinforcing bar also needs to be welded on vertical reinforcement, can carry out, cut after in place Surplus capacity should control within the scope of 5mm when unwrapping wire;
Side plate connection request: floor support plate continuously uses force saddle tongs to press with floor support plate side sheet room, first spot welding floor support plate side, Fix two ends again, finally fixed using peg, cheek board answers bracing wire to be straightened when installing, adjust it is appropriate after using reinforcing bar one end with Peg spot welding, one end and cheek board spot welding, side mode are fixed, the top flange spot welding spacing 300mm of cheek board bottom and girder steel;
Concrete curing: filling concrete, which is finished, closes beam body using curing cover, and inputs around automatic steam control beam body Humidity and temperature.
The beneficial effects of the present invention are: the present invention relates to a kind of construction method of steel bar truss floor support plate, in service stage, steel Muscle truss is exactly the arrangement of reinforcement of concrete building board, and to bear working load, therefore, it has profiled sheet combination or non-combined building The fast advantage of the speed of application of plate, and have cast-in-place overall stiffness big, the good advantage of anti-seismic performance;
Firstly, this construction method of steel bar truss floor support plate is used into quasi- cloth steel technique, steel bar girder installs accuracy height, building Plate strength and stiffness, that is, steel bar girder strength and stiffness, template self weight, weight concrete and construction loads are entirely by steel bar girder It bears, what concrete knot carried out under reinforcement bar truss mould plate deformation actually, so floor self weight will not be such that board bottom concrete generates Pulling force, in addition to floor is self-possessed load and Live Loads on Floors in Buildings effect under, board bottom concrete just generates pulling force, and floor, which cracks, to be prolonged Late;
Secondly, this construction method of steel bar truss floor support plate is compared to traditional construction technology, emphatically for concrete layer into The maintenance of row scientific and standard, so that the rigidity of floor is bigger than common in-situ reinforced concrete slab.
Specific embodiment:
Present embodiment uses following technical scheme:
Embodiment
A kind of construction method of steel bar truss floor support plate, including steel bar truss floor support plate installation and steel bar truss floor support plate scene Construction.
Wherein, the steel bar truss floor support plate installation includes the place at the preceding preparation of installation, floor connection, flat shape variation Reason, the installation requirement of steel bar girder and side mode installation requirement;
Prepare before installation: before being laid with steel bar truss floor support plate, first by the ink of initial position shown in installation drawing Bucket pop-up reference line, reference line use the snap the line method of combination of long drives and drop shots, install according to the long line of first segment two for sighting reference line Its support vertical bar is fixed with girder steel spot welding, then successively installs other plates by first block of plate, and every laying straddle is wanted in process of deployment Proofread by icon dimensioning, if there is flat difference to adjust in time;
Floor connection: floor connection uses manner, and the drag hook connection between plate and plate should be close, and guarantee pours coagulation Not spillage when native, installs first block of plate, its support vertical bar is fixed with girder steel spot welding.Other plates are successively installed again, had been laid with One straddle of every laying will carry out proofreading by icon dimensioning in journey, if there is deviation to adjust immediately, while notice that plate-laying direction is wanted Unanimously, panel point spacing is that 200mm-300mm pays attention to the lateral node of different templates depending on actual installation standard It is aligned;
Processing at flat shape variation: the flat shapes such as steel column corner, Core Walls Structure corner, beam face liner connecting plate become At change, plate both ends can be cut, unwrapping wire should be carried out before cutting to the size to be cut and check review, the plate end after cutting Portion is still needed to according to original requirement weld horizontal support reinforcing bar and vertical support reinforcing bar, if portion is cut off in node, web member reinforcing bar Also it needs to be welded on vertical reinforcement, can be installed after in place;
The installation requirement of steel bar girder: steel bar girder should be parallel to girder steel end, and overlap joint of the bed die on girder steel be not small In 30mm, along its length by galvanized steel plain sheet and girder steel spot welding, welding uses manual electric arc welding, spot pitch 300mm, reinforcing bar Truss should ensure that zinc-plated bed die can snap on girder steel, the laying of every layer of reinforcement bar truss mould plate is suitable perpendicular to girder steel end It is laid with from initial position to a direction, the reinforcement bar truss mould plate of corresponding each layer is laid with main structure installation sequence, to After being laid with certain area, floor support dowel, reinforcing rib and negative reinforcement etc. should be set by design requirement;
Side mode installation requirement: cheek board answers bracing wire to be straightened when installing, and utilizes reinforcing bar one end and peg spot welding after adjusting suitably, Side mode is fixed with cheek board spot welding in one end, and the upper Ji edge spot welding spacing of side mode bottom and girder steel is 300mm.
Wherein, the steel bar truss floor support plate site operation includes girder and the bullet of secondary beam center line is drawn, floor support plate is classified Label, floor support plate handling requirement, cutting requirement, side plate connection request and concrete curing;
The bullet of girder and secondary beam center line is drawn: first in the center line of bed board area pop-up girder steel, the center line of girder is to be laid with The control line of the fixed position of floor support plate by the lap width of the center line traffic control floor support plate overlap joint girder steel of girder, and determines that building is held The bond pad locations of plate and the welding of girder steel penetration, the center line of secondary beam will determine the welding position of penetration weld peg, and steel bar girder is flat For row in girder steel end, overlap joint of the bed die on girder steel is not less than 30mm, along its length by galvanized steel plain sheet and girder steel spot welding, weldering It connects using manual electric arc welding, spacing is not easy to be greater than 300mm, is difficult to observe the specific position of time flange of beam after being laid with because of floor support plate It sets, therefore by the center line of secondary beam and the rebound of secondary beam flange width on the center line of girder, it should will be in secondary beam when fixed peg Heart line and secondary beam flange width are in rebound to the floor support plate on secondary beam face;
Floor support plate classification designator: being cleaned out floor support plate layering and zoning by material list in windrow place, and indicates number, is distinguished Understand floor, area, number, indicated with marking pen, and be transported to construction appointed part like clockwork;
Floor support plate handling requirement: using dedicated soft hoist cable when handling, to guarantee that floor support plate plate is integrally indeformable, part is not Crimping, Steel Structural Design multilayer generally use 3 layer of one segmented column mounting process, install floor support plate when with steel structure column beam synchronize apply Work should at least differ 3 layers, therefore can only wear between the beam column on upper layer when floor support plate handling, and playing heavy industry should be layered in beam column Between control;
Cutting requirement: can be used the cutting of mechanical or oxygen, and when cutting selects the position of truss contact as far as possible, but must satisfy Overlapped requires for design, and the reinforcement bar truss mould plate end after cutting is still needed to according to original requirement weld horizontal support reinforcing bar and perpendicular To support reinforcing bar, if portion is cut off in node, web member reinforcing bar also needs to be welded on vertical reinforcement, can carry out, cut after in place Surplus capacity should control within the scope of 5mm when unwrapping wire, and when casting concrete should take measures, mortar leakage prevention;
Side plate connection request: floor support plate continuously uses force saddle tongs to press with floor support plate side sheet room, makes to connect between monolithic floor support plate At whole plate.First spot welding floor support plate side, then fixed two ends, are finally fixed using peg, and cheek board answers bracing wire to be straightened when installing, Reinforcing bar one end and peg spot welding, one end and cheek board spot welding are utilized after adjusting suitably, side mode is fixed, cheek board bottom and girder steel Top flange spot welding spacing 300mm;
Concrete curing: filling concrete, which is finished, closes beam body using curing cover, and inputs around automatic steam control beam body Humidity and temperature input steam heating when temperature is lower, water storage moisturizing in bridge floor and case after concrete initial set, heating rate is not More than 10 DEG C/h;Constant temperature is no more than 45 DEG C, and concrete core temperature is no more than 60 DEG C, and individual maximums must not exceed 65 DEG C, drop Cooling rate is no more than 10 DEG C/h when warm;When the difference for being cooled to beam body temperature and environment temperature is no more than 15 DEG C, maintenance is removed The interior room cooling of cover, box beam is slower, can suitably take venting practice, and the temperature for covering interior each position is consistent, and the temperature difference is not more than 10℃。
The foregoing is only a preferred embodiment of the present invention, but scope of protection of the present invention is not limited thereto, Anyone skilled in the art in the technical scope disclosed by the present invention, according to the technique and scheme of the present invention and its Inventive concept is subject to equivalent substitution or change, should be covered by the protection scope of the present invention.

Claims (3)

1. a kind of construction method of steel bar truss floor support plate, which is characterized in that including steel bar truss floor support plate installation and steel bar girder Floor support plate site operation.
2. a kind of construction method of steel bar truss floor support plate according to claim 1, it is characterised in that: the steel bar girder building Installation requirement and side mode of the board installation including processing, steel bar girder at the preceding preparation of installation, floor connection, flat shape variation Installation requirement;
2.1, prepare before installation: before being laid with steel bar truss floor support plate, first by the ink of initial position shown in installation drawing Bucket pop-up reference line, reference line use the snap the line method of combination of long drives and drop shots;
2.2, floor connects: floor connection uses manner, and the drag hook connection between plate and plate should be close, and guarantee pours coagulation Not spillage when native, installs first block of plate, its support vertical bar is fixed, then successively install other plates with girder steel spot welding, be laid with One straddle of every laying will carry out proofreading by icon dimensioning in journey, if there is deviation to adjust immediately;
2.3, the processing at flat shape variation: the flat shapes such as steel column corner, Core Walls Structure corner, beam face liner connecting plate become At change, plate both ends can be cut, unwrapping wire should be carried out before cutting to the size to be cut and check review, the plate end after cutting Portion is still needed to according to original requirement weld horizontal support reinforcing bar and vertical support reinforcing bar;
2.4, the installation requirement of steel bar girder: steel bar girder should be parallel to girder steel end, and overlap joint of the bed die on girder steel be not small In 30mm, along its length by galvanized steel plain sheet and girder steel spot welding, welding uses manual electric arc welding, spot pitch 300mm, reinforcing bar Truss should ensure that zinc-plated bed die can snap on girder steel, the laying of every layer of reinforcement bar truss mould plate is suitable perpendicular to girder steel end It is laid with from initial position to a direction, the reinforcement bar truss mould plate of corresponding each layer is laid with main structure installation sequence;
2.5, side mode installation requirement: cheek board answers bracing wire to be straightened when installing, and utilizes reinforcing bar one end and peg spot welding after adjusting suitably, Side mode is fixed with cheek board spot welding in one end, and the upper Ji edge spot welding spacing of side mode bottom and girder steel is 300mm.
3. a kind of construction method of steel bar truss floor support plate according to claim 1, it is characterised in that: the steel bar girder building Board site operation includes the bullet picture of girder and secondary beam center line, floor support plate classification designator, floor support plate handling requirement, cuts and want It asks, side plate connection request and concrete curing;
3.1, the bullet of girder and secondary beam center line is drawn: first in the center line of bed board area pop-up girder steel, the center line of girder is to be laid with The control line of the fixed position of floor support plate by the lap width of the center line traffic control floor support plate overlap joint girder steel of girder, and determines that building is held The bond pad locations of plate and the welding of girder steel penetration, the center line of secondary beam will determine the welding position of penetration weld peg, and steel bar girder is flat For row in girder steel end, overlap joint of the bed die on girder steel is not less than 30mm, along its length by galvanized steel plain sheet and girder steel spot welding, weldering It connects using manual electric arc welding, spacing is not easy to be greater than 300mm;
3.2, floor support plate classification designator: being cleaned out floor support plate layering and zoning by material list in windrow place, and indicates number, is distinguished Understand floor, area, number, indicated with marking pen, and be transported to construction appointed part like clockwork;
3.3, floor support plate handling requirement: using dedicated soft hoist cable when handling, Steel Structural Design multilayer generally uses 3 layer of one segmented column Mounting process;
3.4, cutting requirement: can be used the cutting of mechanical or oxygen, and when cutting selects the position of truss contact as far as possible, but must satisfy Overlapped requires for design, and the reinforcement bar truss mould plate end after cutting is still needed to according to original requirement weld horizontal support reinforcing bar and perpendicular To support reinforcing bar, if portion is cut off in node, web member reinforcing bar also needs to be welded on vertical reinforcement, can carry out, cut after in place Surplus capacity should control within the scope of 5mm when unwrapping wire;
3.5, side plate connection request: floor support plate and floor support plate side sheet room continuously use force saddle tongs to press, first spot welding floor support plate side, Fix two ends again, finally fixed using peg, cheek board answers bracing wire to be straightened when installing, adjust it is appropriate after using reinforcing bar one end with Peg spot welding, one end and cheek board spot welding, side mode are fixed, the top flange spot welding spacing 300mm of cheek board bottom and girder steel;
3.6, concrete curing: filling concrete, which is finished, closes beam body using curing cover, and inputs around automatic steam control beam body Humidity and temperature.
CN201910590317.8A 2019-07-02 2019-07-02 A kind of construction method of steel bar truss floor support plate Withdrawn CN110258886A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910590317.8A CN110258886A (en) 2019-07-02 2019-07-02 A kind of construction method of steel bar truss floor support plate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910590317.8A CN110258886A (en) 2019-07-02 2019-07-02 A kind of construction method of steel bar truss floor support plate

Publications (1)

Publication Number Publication Date
CN110258886A true CN110258886A (en) 2019-09-20

Family

ID=67923915

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910590317.8A Withdrawn CN110258886A (en) 2019-07-02 2019-07-02 A kind of construction method of steel bar truss floor support plate

Country Status (1)

Country Link
CN (1) CN110258886A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110821159A (en) * 2019-11-27 2020-02-21 广西建工集团第五建筑工程有限责任公司 Steel-structure large-span adjustable floor support plate supporting structure and construction method thereof
CN110886419A (en) * 2019-10-17 2020-03-17 上海宝冶冶金工程有限公司 Steel bar truss floor support plate support and construction method
CN111910814A (en) * 2020-08-18 2020-11-10 中建八局第二建设有限公司 Construction method of steel bar truss floor bearing plate
CN111926975A (en) * 2020-07-02 2020-11-13 中铁二局第三工程有限公司 Construction method for large-cantilever steel-concrete structure combined type steel bar truss floor bearing plate
CN112900885A (en) * 2021-03-16 2021-06-04 中铁二十局集团第六工程有限公司 Installation method and storage method of steel bar truss floor support plate and steel bar truss floor support plate
CN114233008A (en) * 2021-12-07 2022-03-25 宁波领辰构件有限公司 Construction method of steel bar truss floor support plate
CN116752678A (en) * 2023-06-20 2023-09-15 广东省建筑工程集团有限公司 Pouring molding construction process for recycled aggregate blocks of inclined plates of steel bar truss floor support plates

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102134907A (en) * 2010-12-31 2011-07-27 中铁二局股份有限公司 Construction method of steel bar truss floor support plate
CN109763650A (en) * 2019-01-17 2019-05-17 中铁建设集团有限公司 A kind of Super High construction method of steel bar truss floor support plate

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102134907A (en) * 2010-12-31 2011-07-27 中铁二局股份有限公司 Construction method of steel bar truss floor support plate
CN109763650A (en) * 2019-01-17 2019-05-17 中铁建设集团有限公司 A kind of Super High construction method of steel bar truss floor support plate

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
MFYTJ1988: "《钢筋桁架楼承板的施工方法》", 30 June 2018, HTTPS://WENKU.BAIDU.COM/VIEW/494110C2BB4CF7EC4AFED07C.HTML *
佳图文化: "《建筑设计手册 学校建筑》", 30 November 2013, 华南理工大学出版社 *
成都安德盛: "《如何安装钢筋桁架楼承板》", 11 December 2018, HTTPS://WENKU.BAIDU.COM/VIEW/3E233447AE45B307E87101F69E3143323968F5E0.HTML?FROM=SEARCH.HTML *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110886419A (en) * 2019-10-17 2020-03-17 上海宝冶冶金工程有限公司 Steel bar truss floor support plate support and construction method
CN110821159A (en) * 2019-11-27 2020-02-21 广西建工集团第五建筑工程有限责任公司 Steel-structure large-span adjustable floor support plate supporting structure and construction method thereof
CN111926975A (en) * 2020-07-02 2020-11-13 中铁二局第三工程有限公司 Construction method for large-cantilever steel-concrete structure combined type steel bar truss floor bearing plate
CN111910814A (en) * 2020-08-18 2020-11-10 中建八局第二建设有限公司 Construction method of steel bar truss floor bearing plate
CN112900885A (en) * 2021-03-16 2021-06-04 中铁二十局集团第六工程有限公司 Installation method and storage method of steel bar truss floor support plate and steel bar truss floor support plate
CN114233008A (en) * 2021-12-07 2022-03-25 宁波领辰构件有限公司 Construction method of steel bar truss floor support plate
CN116752678A (en) * 2023-06-20 2023-09-15 广东省建筑工程集团有限公司 Pouring molding construction process for recycled aggregate blocks of inclined plates of steel bar truss floor support plates
CN116752678B (en) * 2023-06-20 2023-12-05 广东省建筑工程集团有限公司 Pouring molding construction process for recycled aggregate blocks of inclined plates of steel bar truss floor support plates

Similar Documents

Publication Publication Date Title
CN110258886A (en) A kind of construction method of steel bar truss floor support plate
CN107401217B (en) A kind of beamless hollow floor-chamber concrete-filled steel tube shear wall combined structure system and method
CN108222347B (en) Assembled large module welding laminated beam slab with plane truss temporary support
CN206707124U (en) Prefabricated assembling type reinforced concrete component with joint of steel structure
CN108643428B (en) But height-adjusting's assembled precast concrete coincide floor
CN105089204A (en) Cold-formed thin-walled ribbed U-shaped steel-encased concrete laminated slab composite beam
CN112922208A (en) Construction method of steel bar truss floor support plate
CN110616840A (en) Concrete laminated slab bottom plate based on steel truss and cement plate and preparation method
CN213868496U (en) Bidirectional laminated plate prestress close-splicing structure
CN106760108A (en) A kind of prefabricated overlapping board connecting equipment
CN210507981U (en) Straight-inserting type honeycomb beam laminated plate
CN114704013A (en) Low thickness profiled steel sheet concrete combination superstructure structural system
CN208219949U (en) Bidirectional laminated slab and prestressed concrete prefabricated component
CN103194982B (en) Construction method for short cantilever support at bridge side span cast-in-situ segment
CN108643429B (en) But height-adjusting's assembled coincide floor
CN108316533A (en) Bidirectional laminated slab and prestressed concrete prefabricated component and making and construction method
CN206722216U (en) A kind of prefabricated girder of laminated floor slab
CN105604197A (en) Steel pipe column barrel structure of beam column
CN112962845A (en) Novel assembled steel plate concrete hollow floor and horizontal production
CN218345930U (en) Bridge structure
CN217517829U (en) Connecting structure for building prefabricated floor and roof board
CN110616839A (en) Preparation method of concrete laminated slab bottom plate based on light steel keels and cement boards
CN106592820A (en) Horizontal integral forming structure and method of shear steel-plates and one side reinforcement fabric
CN101245642A (en) Strip shaped partitioned underplate concrete bidirectional laminated slab
CN209339419U (en) A kind of glomeration building superimposed sheet unidirectional precast hollow slab in gradual change section

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20190920