CN109763650A - A kind of Super High construction method of steel bar truss floor support plate - Google Patents

A kind of Super High construction method of steel bar truss floor support plate Download PDF

Info

Publication number
CN109763650A
CN109763650A CN201910042152.0A CN201910042152A CN109763650A CN 109763650 A CN109763650 A CN 109763650A CN 201910042152 A CN201910042152 A CN 201910042152A CN 109763650 A CN109763650 A CN 109763650A
Authority
CN
China
Prior art keywords
steel
truss
plate
support plate
floor support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910042152.0A
Other languages
Chinese (zh)
Inventor
程全红
李进
董正申
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Construction Group Co Ltd
Beijing Engineering Co Ltd of China Railway Construction Group Co Ltd
Original Assignee
China Railway Construction Group Co Ltd
Beijing Engineering Co Ltd of China Railway Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Construction Group Co Ltd, Beijing Engineering Co Ltd of China Railway Construction Group Co Ltd filed Critical China Railway Construction Group Co Ltd
Priority to CN201910042152.0A priority Critical patent/CN109763650A/en
Publication of CN109763650A publication Critical patent/CN109763650A/en
Pending legal-status Critical Current

Links

Landscapes

  • Rod-Shaped Construction Members (AREA)

Abstract

The invention discloses a kind of Super High construction method of steel bar truss floor support plate, realizing the reduction in construction, frame body is set up, the spelling of roof plate template sets, installs, and considerably reduce the workload of live reinforcing bar binding, speed of application is dramatically speeded up, improve construction efficiency, the safety guarantee for increasing site operation, realizes civilized construction;And truss slab muscle firm welding, spacing is uniform, the binding of additional muscle reinforcing bar is convenient, it is easily controlled assembling reinforcement spacing, setting supporting steel bar is not needed, protective layer thickness uniformity above and below reinforcing bar, construction quality can be good at controlling, economic benefits, it is easy to promote and utilize, with the preferable performance for resisting force majeure, steel bar truss floor support plate structure is identical with ordinary reinforced concrete structure, reinforcing bar is wrapped in concrete, with preferable durability and fire resistance, it is not required to set up supporting frame, can multilayer construct simultaneously, upper and lower level continuous laying truss plate or casting concrete, short time limit.

Description

A kind of Super High construction method of steel bar truss floor support plate
Technical field
The present invention relates to a kind of construction method of steel bar truss floor support plate, specially a kind of Super High steel bar truss floor support plate is applied Work method, belongs to technical field of building construction.
Background technique
Steel bar truss floor support plate is improved on the basis of die mould floor support plate, and steel bar girder is fixed in backstage processing space Type processing, can precast length, dried using metal plate welding, silanization, pure manganese phosphatization, washing, the derusting rust-proofings technique skill such as zinc-plated Art, rust-preventing film winding sealing, site operation needs first to put truss floor support plate to correct position, welding production reinforcing bar, rear to weld Peg is connect, then places live reinforcing bar and is bound, customs inspection after-pouring concrete, in existing high-rise steel bar truss floor support plate It in construction method, needs largely to bind reinforcing bar at the scene, workload is very big, causes speed of application slow, construction efficiency It is low, but also need that supporting steel bar is arranged, cause the binding of additional muscle reinforcing bar difficult, the spacing of assembling reinforcement is not easily controlled.
Summary of the invention
The object of the invention is that providing a kind of Super High steel bar truss floor support plate construction to solve the above-mentioned problems Method, realizing reduces that frame body is set up, the spelling of roof plate template sets, installs, and considerably reduces the work of live reinforcing bar binding Amount, has dramatically speeded up speed of application, has improved construction efficiency, increased the safety guarantee of site operation.
The present invention is achieved through the following technical solutions above-mentioned purpose, a kind of Super High steel bar truss floor support plate construction party Method, comprising the following steps:
S1 reference line when being laid with truss plate) is being released on girder steel by the initial position of layout design and scheme arrangement, is being pressed First block of truss plate is installed according to the reference line of releasing and other plates, the rabbet groove that adjacent two blocks of truss plates pass through edges of boards are successively installed It is attached, truss floor support plate is laid with installation in the horizontal direction, finally handles corner and privileged sites, vertical direction is with main body steel The sequence of construction of structure, to install the steel bar truss floor support plate of corresponding each floor;
S2) by the vertical reinforcement of truss plate end and bottom galvanized steel plain sheet and steel beam flange firm welding, along truss plate Length direction is by bottom steel plate and steel beam flange firm welding;
S3 cheek board) is set to by floor structure edge and hole periphery according to design drawing, cheek board is close to girder steel Flange surfaces draw logical line adjustment, alignment so that the lower part of side steel form and the every 200~300mm of spacing in steel beam flange surface away from From using lacing wire crotch and the bilateral welding of cheek board after adjusting suitably, by side mode fixation;
S4 hole part) is opened on floor to punch, and adds stiffener on hole periphery by Design Requirement Drawing, and in hole Side steel form is arranged in mouth surrounding, after floor support plate concrete strength reaches design requirement intensity, cuts off the truss plate in hole On reinforcing bar and truss board bottom portion steel plate;
S5 it) is provided with stress weld stud on truss plate and steel beam flange, is directly welded on the top surface of steel beam flange Stress weld stud is welded for non-penetrating steel bar girder board bottom portion's galvanized steel plain sheet, is welded on truss board bottom portion galvanized steel plain sheet Stress weld stud is welded to penetrate steel bar girder board bottom portion's galvanized steel plain sheet and steel beam flange;
S6 additional muscle) is added on the top of the lower part for the muscle that winds up and lower edge muscle, the floor support plate gap on girder steel, up and down Additional bar is added, is intersected vertically at girder steel place in floor support plate, the reinforcing bar of the additional stress in scene is anchored into vertical trusses plate;
S7 angle steel supporting element) is set in rectangular pillar corner, setting arc shape is distributed rest in circular posts border, outside Rest is added in frame overhanging region.
Wherein, setting is fixed with stress weld stud in the truss plate and steel beam flange.
Wherein, the notch geometry of the rabbet groove on the step S1 adjacent truss plate can be complementary to fit together.
Wherein, the welding of the bottom step S2 steel plate and steel beam flange uses manual electric arc welding, forms 25mm long 2mm high weldering Seam, spacing are 200~300mm.
Wherein, the direction cut is from plate when step S3 cuts off the reinforcing bar and truss board bottom portion's steel plate on the truss plate in hole It is lower gradually to carry out upwards.
The beneficial effects of the present invention are: reducing in present invention construction, frame body is set up, the spelling of roof plate template sets, installs, and The workload of live reinforcing bar binding is considerably reduced, speed of application has been dramatically speeded up, has improved construction efficiency, the scene of increasing is applied The safety guarantee of work, realizes civilized construction;And truss slab muscle firm welding, spacing is uniform, and the binding of additional muscle reinforcing bar is convenient, It is easily controlled assembling reinforcement spacing, does not need setting supporting steel bar, protective layer thickness uniformity above and below reinforcing bar, construction quality energy Enough control well, economic benefits are easy to promote and utilize, and steel bar truss floor support plate and steel beam flange use welding of peg, Truss plate is linked together with girder steel, bearing load, is cooperated, and has the preferable performance for resisting force majeure, steel bar girder Floor support plate structure is identical with ordinary reinforced concrete structure, and reinforcing bar is wrapped in concrete, has preferable durability and fire resisting Property, is not required to set up supporting frame, can multilayer construct simultaneously, upper and lower level continuous laying truss plate or casting concrete, short time limit.
Detailed description of the invention
Fig. 1 is operation of the present invention flow chart.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
Refering to Figure 1, a kind of Super High construction method of steel bar truss floor support plate, comprising the following steps:
S1 reference line when being laid with truss plate) is being released on girder steel by the initial position of layout design and scheme arrangement, is being pressed First block of truss plate is installed according to the reference line of releasing and other plates, the rabbet groove that adjacent two blocks of truss plates pass through edges of boards are successively installed It is attached, truss floor support plate is laid with installation in the horizontal direction, finally handles corner and privileged sites, vertical direction is with main body steel The sequence of construction of structure, to install the steel bar truss floor support plate of corresponding each floor;
S2) by the vertical reinforcement of truss plate end and bottom galvanized steel plain sheet and steel beam flange firm welding, along truss plate Length direction is by bottom steel plate and steel beam flange firm welding;
S3 cheek board) is set to by floor structure edge and hole periphery according to design drawing, cheek board is close to girder steel Flange surfaces draw logical line adjustment, alignment so that the lower part of side steel form and the every 200~300mm of spacing in steel beam flange surface away from From using lacing wire crotch and the bilateral welding of cheek board after adjusting suitably, by side mode fixation;
S4 hole part) is opened on floor to punch, and adds stiffener on hole periphery by Design Requirement Drawing, and in hole Side steel form is arranged in mouth surrounding, after floor support plate concrete strength reaches design requirement intensity, cuts off the truss plate in hole On reinforcing bar and truss board bottom portion steel plate;
S5 it) is provided with stress weld stud on truss plate and steel beam flange, is directly welded on the top surface of steel beam flange Stress weld stud is welded for non-penetrating steel bar girder board bottom portion's galvanized steel plain sheet, is welded on truss board bottom portion galvanized steel plain sheet Stress weld stud is welded to penetrate steel bar girder board bottom portion's galvanized steel plain sheet and steel beam flange;
S6 additional muscle) is added on the top of the lower part for the muscle that winds up and lower edge muscle, the floor support plate gap on girder steel, up and down Additional bar is added, is intersected vertically at girder steel place in floor support plate, the reinforcing bar of the additional stress in scene is anchored into vertical trusses plate;
S7 angle steel supporting element) is set in rectangular pillar corner, setting arc shape is distributed rest in circular posts border, outside Rest is added in frame overhanging region.
Wherein, setting is fixed with stress weld stud in the truss plate and steel beam flange.
Wherein, the notch geometry of the rabbet groove on the step S1 adjacent truss plate can be complementary to fit together.
Wherein, the welding of the bottom step S2 steel plate and steel beam flange uses manual electric arc welding, forms 25mm long 2mm high weldering Seam, spacing are 200~300mm.
Wherein, the direction cut is from plate when step S3 cuts off the reinforcing bar and truss board bottom portion's steel plate on the truss plate in hole It is lower gradually to carry out upwards.
Embodiment:
The following detailed description of the specific implementation of the present embodiment:
(1) truss floor support plate is installed
Before truss plate is laid with, released on girder steel when being laid with truss plate by the initial position of layout design and scheme arrangement Reference line.The 1st block of truss plate is installed according to the reference line of releasing and other plates are successively installed, adjacent two blocks of truss plates pass through edges of boards Rabbet groove be attached, installation is laid on truss floor support plate horizontal plane in the horizontal direction, finally handles corner and privileged sites, The installation of steel bar truss floor support plate is suitable with the construction of main body steel construction in vertical direction from a direction of structural slab to another Sequence installs the steel bar truss floor support plate of corresponding each floor, and the tongue and groove connection between two blocks of adjacent truss plates should be close, must not There is gap, also, it is noted that the plate-laying direction of truss plate is consistent, not spillage when guaranteeing casting concrete on it, simultaneously It need to guarantee that, in the construction stage, without under support, plate body will have enough intensity and amount of deflection for truss plate lower part.
Structure plate face irregularity and less than at a monolith truss plate (floor edge, steel column, girder steel corner, beam face liner Connecting plate etc.), after planning in advance, monolith steel bar girder plate is cut, is carried out according to floor support plate drawing optimization design Cutting shifts to an earlier date unwrapping wire on floor support plate, and cutting is using the cutting of mechanical or gas cutting, the vertical reinforcement of support end and the level of support Reinforcing bar by cutting damage, restore welding it is in place after, laying installation can be carried out, if paving to across floor width at side or ending not Sufficient 590mm, the length direction by steel bar girder plate along truss plate are cut, and having cut should at least 1~2 Pin on rear spar frame plate Truss bars, the truss bars on truss plate must not be cut off.
After the installation of steel bar girder plate is in place, the vertical reinforcement of truss plate end and bottom galvanized steel plain sheet and steel beam flange are welded It connects securely.For length direction along truss plate by bottom steel plate and steel beam flange site welding, welding uses manual electric arc welding, 25mm Long, 2mm high weld seam, spacing is 200~300mm.
Hole part is opened on floor, the stiffener on hole periphery is added by Design Requirement Drawing, and set in hole surrounding Side steel form is set, after floor support plate concrete strength reaches design requirement intensity, using machine cuts or electric welding cutting cutting The reinforcing bar and truss board bottom portion steel plate on truss plate in hole, when cutting, carry out upwards under plate.
(2) cheek board is installed
It is set to floor structure edge and hole periphery according to design drawing, logical line adjustment is drawn, is straightened, under the steel form of side Every 200~300mm of the spacing distance in portion and steel beam flange surface, spot welding 25mm long, 2mm high weld seam, using lacing wire crotch with The bilateral welding of cheek board, by side mode fixation.
(3) welding of peg
Stress peg is directly welded on the top surface of steel beam flange, is welded for non-penetrating steel bar girder board bottom portion's galvanized steel plain sheet; Peg is directly welded on truss board bottom portion galvanized steel plain sheet, is welded to penetrate steel bar girder board bottom portion's galvanized steel plain sheet and steel beam flange It connects.
(4) additional bar is installed
Truss floor support plate additional bar are as follows: top muscle is 12@195 of Φ, and lower part muscle is 8@195 of Φ;Top additional muscle is located at It winds up the lower part of muscle, lower part additional muscle is located at the top of lower edge muscle.The floor support plate gap on girder steel must add additional steel up and down Muscle, top additional bar spacing 195, diameter anchor into 1.6La with the larger bar diameter in connected top, both ends respectively, and lower part is attached Add bar spacing 98, diameter is with the larger bar diameter in connected lower part, and both ends anchor into 1.2La respectively, in floor support plate at girder steel It intersects vertically, steel bar stress anchors into vertical trusses plate L/4 (L takes beam side floor support plate span the larger value).
(5) it is reinforced at floor support plate and Column border node
Core Walls Structure position pillar be it is rectangular, exterior frame column is circle, and L75 × angle steel supporting element is arranged in rectangular pillar corner Q235, circular posts border are arranged arc shape and are distributed rest, and floor support plate can combine closely with circular steel column, seamless, and in outline border Rest is added in overhanging region.
It is obvious to a person skilled in the art that invention is not limited to the details of the above exemplary embodiments, Er Qie In the case where without departing substantially from spirit or essential attributes of the invention, the present invention can be realized in other specific forms.Therefore, no matter From the point of view of which point, the present embodiments are to be considered as illustrative and not restrictive, and the scope of the present invention is by appended power Benefit requires rather than above description limits, it is intended that all by what is fallen within the meaning and scope of the equivalent elements of the claims Variation is included within the present invention.Any reference signs in the claims should not be construed as limiting the involved claims.
In addition, it should be understood that although this specification is described in terms of embodiments, but not each embodiment is only wrapped Containing an independent technical solution, this description of the specification is merely for the sake of clarity, and those skilled in the art should It considers the specification as a whole, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art The other embodiments being understood that.

Claims (5)

1. a kind of Super High construction method of steel bar truss floor support plate, it is characterised in that: method includes the following steps:
S1) initial position by layout design and scheme arrangement is releasing reference line when being laid with truss plate on girder steel, according to putting Reference line out installs first block of truss plate and successively installs other plates, and adjacent two blocks of truss plates are carried out by the rabbet groove of edges of boards Connection, truss floor support plate are laid with installation in the horizontal direction, finally handle corner and privileged sites, vertical direction is with main body steel construction Sequence of construction, to install the steel bar truss floor support plate of corresponding each floor;
S2) by the vertical reinforcement of truss plate end and bottom galvanized steel plain sheet and steel beam flange firm welding, along the length of truss plate Direction is by bottom steel plate and steel beam flange firm welding;
S3 cheek board) is set to by floor structure edge and hole periphery according to design drawing, cheek board is close to steel beam flange Logical line adjustment, alignment are drawn in surface, so that every 200~300mm of the spacing distance in the lower part of side steel form and steel beam flange surface, is adjusted Using lacing wire crotch and the bilateral welding of cheek board after section is appropriate, by side mode fixation;
S4 hole part) is opened on floor to punch, and adds stiffener on hole periphery by Design Requirement Drawing, and at hole four Week setting side steel form is cut off on the truss plate in hole after floor support plate concrete strength reaches design requirement intensity Reinforcing bar and truss board bottom portion steel plate;
S5 stress weld stud, the stress being directly welded on the top surface of steel beam flange) are provided on truss plate and steel beam flange Weld stud is welded, the stress being welded on truss board bottom portion galvanized steel plain sheet for non-penetrating steel bar girder board bottom portion's galvanized steel plain sheet Weld stud is welded to penetrate steel bar girder board bottom portion's galvanized steel plain sheet and steel beam flange;
S6 additional muscle) is added on the top of the lower part for the muscle that winds up and lower edge muscle, the floor support plate gap on girder steel adds up and down Additional bar intersects vertically place in floor support plate at girder steel, and the reinforcing bar of the additional stress in scene is anchored into vertical trusses plate;
S7 angle steel supporting element) is set in rectangular pillar corner, setting arc shape is distributed rest in circular posts border, outstanding in outline border It chooses region and adds rest.
2. a kind of Super High construction method of steel bar truss floor support plate according to claim 1, it is characterised in that: the truss Setting is fixed with stress weld stud on plate and steel beam flange.
3. a kind of Super High construction method of steel bar truss floor support plate according to claim 1, it is characterised in that: the step The notch geometry of rabbet groove on S1 adjacent truss plate can be complementary to fit together.
4. a kind of Super High construction method of steel bar truss floor support plate according to claim 2, it is characterised in that: the step The welding of the bottom S2 steel plate and steel beam flange use manual electric arc welding, formed 25mm long 2mm high weld seam, spacing be 200~ 300mm。
5. a kind of Super High construction method of steel bar truss floor support plate according to claim 2, it is characterised in that: the step When reinforcing bar and truss board bottom portion's steel plate on the truss plate in step S3 cutting hole the direction cut under plate upwards gradually into Row.
CN201910042152.0A 2019-01-17 2019-01-17 A kind of Super High construction method of steel bar truss floor support plate Pending CN109763650A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910042152.0A CN109763650A (en) 2019-01-17 2019-01-17 A kind of Super High construction method of steel bar truss floor support plate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910042152.0A CN109763650A (en) 2019-01-17 2019-01-17 A kind of Super High construction method of steel bar truss floor support plate

Publications (1)

Publication Number Publication Date
CN109763650A true CN109763650A (en) 2019-05-17

Family

ID=66452437

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910042152.0A Pending CN109763650A (en) 2019-01-17 2019-01-17 A kind of Super High construction method of steel bar truss floor support plate

Country Status (1)

Country Link
CN (1) CN109763650A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110258886A (en) * 2019-07-02 2019-09-20 长沙而道新能源科技有限公司 A kind of construction method of steel bar truss floor support plate
CN111794428A (en) * 2020-07-27 2020-10-20 南京耀丰新材料科技有限公司 Large-span steel bar truss floor bearing plate for high-rise building and production process thereof
CN112922208A (en) * 2021-03-30 2021-06-08 中建市政工程有限公司 Construction method of steel bar truss floor support plate
CN113530243A (en) * 2021-08-10 2021-10-22 山西广业建设工程有限公司 High-earthquake-resistance quick-installation steel structure floor bearing plate concrete multilayer synchronous pouring construction method
CN114233008A (en) * 2021-12-07 2022-03-25 宁波领辰构件有限公司 Construction method of steel bar truss floor support plate
CN115075284A (en) * 2022-06-28 2022-09-20 中国二十二冶集团有限公司 Non-split heads construction method for adding waterproof plate reinforcing steel bars to independent column bases in frame structure foundation

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102134907A (en) * 2010-12-31 2011-07-27 中铁二局股份有限公司 Construction method of steel bar truss floor support plate
CN102425306A (en) * 2011-03-17 2012-04-25 建研科技股份有限公司 Construction method of steel bar truss floor bearing plate and steel bar truss floor bearing plate
CN103291070A (en) * 2012-02-21 2013-09-11 多维联合集团有限公司 Bottom die of steel bar truss deck and steel bar truss deck
US9340975B2 (en) * 2012-05-08 2016-05-17 Kunshan Ecological Building Technology Co., Ltd. Method of casting in-situ ferrocement ribbed slab with spliced rack and suspended formwork
CN208202271U (en) * 2018-03-12 2018-12-07 中建二局第三建筑工程有限公司 A kind of spliced steel bar truss floor support plate structure

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102134907A (en) * 2010-12-31 2011-07-27 中铁二局股份有限公司 Construction method of steel bar truss floor support plate
CN102425306A (en) * 2011-03-17 2012-04-25 建研科技股份有限公司 Construction method of steel bar truss floor bearing plate and steel bar truss floor bearing plate
CN103291070A (en) * 2012-02-21 2013-09-11 多维联合集团有限公司 Bottom die of steel bar truss deck and steel bar truss deck
US9340975B2 (en) * 2012-05-08 2016-05-17 Kunshan Ecological Building Technology Co., Ltd. Method of casting in-situ ferrocement ribbed slab with spliced rack and suspended formwork
CN208202271U (en) * 2018-03-12 2018-12-07 中建二局第三建筑工程有限公司 A kind of spliced steel bar truss floor support plate structure

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
李晓宏: "钢结构钢筋桁架现浇楼承板施工研究", 《中国土木工程学会2018年学术年会论文集》 *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110258886A (en) * 2019-07-02 2019-09-20 长沙而道新能源科技有限公司 A kind of construction method of steel bar truss floor support plate
CN111794428A (en) * 2020-07-27 2020-10-20 南京耀丰新材料科技有限公司 Large-span steel bar truss floor bearing plate for high-rise building and production process thereof
CN112922208A (en) * 2021-03-30 2021-06-08 中建市政工程有限公司 Construction method of steel bar truss floor support plate
CN113530243A (en) * 2021-08-10 2021-10-22 山西广业建设工程有限公司 High-earthquake-resistance quick-installation steel structure floor bearing plate concrete multilayer synchronous pouring construction method
CN113530243B (en) * 2021-08-10 2022-11-11 山西广业建设工程有限公司 High-earthquake-resistance quick-installation steel structure floor bearing plate concrete multilayer synchronous pouring construction method
CN114233008A (en) * 2021-12-07 2022-03-25 宁波领辰构件有限公司 Construction method of steel bar truss floor support plate
CN115075284A (en) * 2022-06-28 2022-09-20 中国二十二冶集团有限公司 Non-split heads construction method for adding waterproof plate reinforcing steel bars to independent column bases in frame structure foundation
CN115075284B (en) * 2022-06-28 2023-07-07 中国二十二冶集团有限公司 No-split heads construction method for adding waterproof plate steel bars to independent column bases in frame structure foundation

Similar Documents

Publication Publication Date Title
CN109763650A (en) A kind of Super High construction method of steel bar truss floor support plate
CN101949191B (en) Method for constructing unsupported super-long irregularly-shaped overhanging floor
CN103643753B (en) A kind of waveform welding reinforced type steel plate combined concrete shear wall
CN104532997B (en) A kind of precast assemble floor system and its construction method
CN107476476A (en) Combined construction method of long-span steel bar truss floor bearing plate and reinforced concrete beam
CN108625489A (en) A kind of steel bar girder edges of boards portion and connection joints of steel structure structure
CN105887660B (en) A kind of perforated plate connector with boot-shaped slot, girder steel and method
CN110512765A (en) A kind of fabricated shear wall and construction method with steel plate peg combined type diagonal brace
CN108625485A (en) A kind of steel bar girder plate end connecting joint structure and construction method
CN111705987A (en) Large-span prefabricated ribbed prestressed hollow bidirectional laminated slab
CN108625488A (en) A kind of detachable reinforcing steel truss plate end support node structure and construction method
CN114482400A (en) Superposed beam connected with prefabricated vertical component
CN208472972U (en) A kind of steel bar girder plate end connecting joint structure
CN208884804U (en) A kind of superimposed sheet and its mounting structure
CN208472971U (en) A kind of steel bar girder edges of boards portion and connection joints of steel structure structure
CN206722216U (en) A kind of prefabricated girder of laminated floor slab
CN105952044B (en) Fully-prefabricated prestressed concrete floor structure and prestressed assembly method
CN112252560A (en) Novel composite floor slab for building and construction method thereof
CN218643645U (en) Full-assembly type reinforced concrete floor connected by steel-concrete combined structure
CN217027725U (en) Prefabricated reinforced concrete foundation structure that can splice
CN207296062U (en) A kind of honeycomb hole combined steel plate shearing force wall
CN212405651U (en) Assembly type prestress continuous laminated floor
CN208830566U (en) Steel bar truss concrete superimposed sheet
CN113026521A (en) Assembled cantilever composite structure bridge and construction method thereof
KR101051356B1 (en) Shear reinforcement device arranged in the slab-column connection

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190517