CN110258868A - Integrated integral wall body for preparing soil and construction waste, pouring in situ, preserving heat and painting - Google Patents

Integrated integral wall body for preparing soil and construction waste, pouring in situ, preserving heat and painting Download PDF

Info

Publication number
CN110258868A
CN110258868A CN201910657652.5A CN201910657652A CN110258868A CN 110258868 A CN110258868 A CN 110258868A CN 201910657652 A CN201910657652 A CN 201910657652A CN 110258868 A CN110258868 A CN 110258868A
Authority
CN
China
Prior art keywords
skeleton
integral wall
integrated integral
heat preservation
soil
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910657652.5A
Other languages
Chinese (zh)
Inventor
沈志勇
王克超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shen Zhiyong
Original Assignee
Jiangsu Yibihe Construction Structure Optimization Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Yibihe Construction Structure Optimization Co ltd filed Critical Jiangsu Yibihe Construction Structure Optimization Co ltd
Priority to CN201910657652.5A priority Critical patent/CN110258868A/en
Publication of CN110258868A publication Critical patent/CN110258868A/en
Pending legal-status Critical Current

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B28/00Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/84Walls made by casting, pouring, or tamping in situ
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work

Abstract

The invention relates to the field of buildings, in particular to a cast-in-place heat-preservation plastering integrated integral wall body prepared from soil and construction wastes. The filling material of the heat-preservation plastering integrated integral wall body is prepared from original materials, and is made into the peat slag soil powder, the peat slag soil powder is prepared by recycling project soil and comprehensive construction waste, the problems of digging, transporting and consuming places of the soil and the comprehensive construction waste are effectively solved, the non-bearing wall body is completed by converting the original fourteen processes into the current three processes, and the heat-preservation plastering integrated integral wall body is low in cost, high in installation speed, good in sound insulation and heat preservation effect, light in weight, energy-saving and environment-friendly, and can enable a bearing beam, a column and the wall body to be integrated. Meanwhile, the quality problems of long construction period, cracks, hollowing, water seepage, seismic resistance and the like in the prior art are solved.

Description

Integrated integral wall is painted in soil and building waste preparation cast in situs heat preservation
Technical field
The present invention relates to building fields, and in particular to soil and building waste preparation cast in situs heat preservation painting integration are whole Walling.
Background technique
Currently, existing building non-bearing wall body structure construction market is all made of main material required for purchase and construction Process flow is divided into as follows:
Main material needed for existing secondary structure:
1, masonry brick, 2, masonry mortar, 3, thermal insulation material, 4, reinforcing bar be divided into [bar planting reinforcing bar, constructional column reinforcing bar, waist rail reinforcing bar, mistake Beam steel, ring beam reinforcing steel bar] main reinforcement and stirrup, 5, concrete [constructional column, waterstop, waist rail, lintel, collar tie beam], 6, template, 7, interior Exterior plaster mortar.
Construction technology:
1, building wall: build require [mixing mortar require, bottom should build 3 skin standard brick requirements, the requirement of concrete waterstop, Row's brick fissure of displacement, which is taken, to be built requirements, mortar joint requirement, tension rib requirement, waist rail requirement, lintel requirement, requirement of bearing down on one, fills wall and build to connecing Nearly beam bottom stuff up a crack requires ,] base's examination → wall snap the line → brickwork preparation → brick watering → masonry mortar stirs → lays bricks Wall → examination → next procedure;
2, for reinforcing bar [bar planting, constructional column, waterstop, waist rail, lintel, the main reinforcement of collar tie beam and stirrup] such as bar planting: unwrapping wire → material Expect that preparation → concrete digs face → mechanical hole building → borehole cleaning → structure glue preparation → injecting glue → solidification → test → next procedure;
3, template [constructional column, waterstop, waist rail, lintel, collar tie beam]: material preparation → Template Location → template assembly → vertical Degree control → bottom cleaning → formwork reinforcement → concrete, which pours, smashes → demoulding → test → next procedure;
4, concrete [constructional column, waist rail, lintel, bears down on one at waterstop]: need to be arranged position [the different materials handover of constructional column Place, inner-outer wall junction, wall be long be greater than 4m, masonry without restrained end, opening width be greater than 2m ,] and require that [section needs, template It is required that concrete require, main reinforcement require, stirrup require, thin portion requirement], base's examination → reinforcement fabrication → reinforcing bar binding → mould Plate installs → concreting → examination → next procedure;
5, exterior-wall heat insulation;With adhesive special → base course wall processing → brush interfacial agents one → stickup extruded sheet → pre-bonding edges of boards Grid cloth → drilling and mounting fixing parts → extruded sheet polish levelling → brush interfacial agents together, and → matching polymer mortar → smears bottom Strata → with investment precoat → conjunction object mortar → buries patch grid cloth → float coat mortar → examination → next procedure;
6, inside and outside plastering technique process;After electromechanical tube box installation → main body check → [base carries out clear base treatment Reason, steel wire fixes, whitewashes, water] it → looks for rule, do ash cake, floating screed and → make corner protector → smear bottom ash → float coat is grey → to smear Windowsill, dado → examination;
But it has the following problems: 1, pitching construction technology;2, period duration is long, 3, mortar it is not full, 4, gaul, 5, metope Percolating water, 6, be easy to fall after wall face hollowing.
Summary of the invention
In view of the deficiencies of the prior art, the present invention intends to provide the soil at least solving a kind of above problem And integrated integral wall is painted in building waste preparation cast in situs heat preservation.
To achieve the above object, it the present invention provides the following technical scheme that including skeleton, is equipped in skeleton and pours chamber, bone Frame includes support frame and the metal mesh sheet that is covered on support frame, pours and intracavitary paints integrated integral wall filled with heat preservation Body material;
It includes: water 15%-20%, mudstone charcoal dregs powder 40%-70%, cement 10%-30% that integrated integral wall material is painted in heat preservation, Coal 5%-10%, fine sand 5%-10%, foam stabilizer 0.5%-1%, calcium oxide 0.5%-1%, aluminum sulfate 0.5%-1%, foaming agent 3.5%- 5%, the above raw material summation is 100%.
Further, prepare the heat preservation paint integrated integral wall material the following steps are included:
A. the weight proportion according to claim 1 weighs each raw material component;
B. by water, mudstone charcoal dregs powder and coal put into full-automatic mixing plant stir at least 5 minutes, then, investment fine sand and Cement simultaneously stirs at least 2 minutes, then, then puts into foam stabilizer, calcium oxide, aluminum sulfate, foaming agent and stirs at least 5 minutes.
Further, support frame includes outer skeleton and the inner frame that is connected with outer skeleton, and outer skeleton and spandrel girder, column are logical It crosses fastener to be connected, and forms expansion gap between the outer skeleton and spandrel girder.
Further, the aperture of metal mesh sheet is 2mm-4mm.
Further, the present invention also provides whole using soil and building waste preparation cast in situs heat preservation painting integration The preparation method of wall:
A. it makes skeleton: more mental sections being welded into outer skeleton, metal mesh sheet is welded on outer skeleton, by more metals Profile is welded into inner frame, and inner frame is mutually welded to form skeleton with outer skeleton, then by skeleton by fastener and spandrel girder, Column is connected;
B. it pours: integrated integral wall material is painted into heat preservation and is poured to forming wall in skeleton;
C. form: after the completion of pouring, standing at least carries out metope after twenty minutes and evens up molding.
The deficiencies in the prior art are compared, technical solution provided by the invention is brought the utility model has the advantages that when in use, will protect Temperature paints integrated integral wall material and pours intracavitary to pouring, and when pouring, integrated integral wall material meeting is painted in heat preservation It expands, and is expanded out from the hole of metal mesh sheet, after integrated integral wall material expansion is painted in heat preservation, by Manual operation, which will expand heat preservation out, paints integrated integral wall material and carries out evening up processing, therefore can be effectively solved and apply The problems such as work complex process, long construction period, mortar is not full.
Detailed description of the invention
Fig. 1 is overlooking structure diagram of the invention.
Fig. 2 pours status architecture schematic diagram for of the invention.
Fig. 3 is longitudinal schematic cross-sectional view of the invention.
Fig. 4 is lateral schematic cross-sectional view of the invention.
Specific embodiment
Hereinafter, preferred embodiments of the present invention will be described with reference to the accompanying drawings, it should be understood that preferred reality described herein Apply example only for the purpose of illustrating and explaining the present invention and is not intended to limit the present invention.
It should be noted that these attached drawings are simplified schematic diagram, the basic knot that only the invention is illustrated in a schematic way Structure, therefore it only shows the composition relevant to the invention.
In the description of the present invention, it is to be understood that, term " center ", " longitudinal direction ", " transverse direction ", "upper", "lower", The orientation or positional relationship of the instructions such as "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outside" is It is based on the orientation or positional relationship shown in the drawings, is merely for convenience of description of the present invention and simplification of the description, rather than instruction or dark Show that signified device or element must have a particular orientation, be constructed and operated in a specific orientation, therefore should not be understood as pair Limitation of the invention.In addition, term " first ", " second " are used for description purposes only, it is not understood to indicate or imply opposite Importance or the quantity for implicitly indicating indicated technical characteristic.Define " first " as a result, the feature of " second " can be bright Show or implicitly include one or more of the features.In the description of the present invention, unless otherwise indicated, " multiple " contain Justice is two or more.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " installation ", " phase Even ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or be integrally connected;It can To be mechanical connection, it is also possible to be electrically connected;It can be directly connected, can also can be indirectly connected through an intermediary Connection inside two elements.For the ordinary skill in the art, above-mentioned term can be understood at this with concrete condition Concrete meaning in invention.
The present invention will be further described by-Fig. 4 referring to Fig.1.
The present invention is further illustrated by the following examples.
Raw materials used in the embodiment of the present invention is commercially available common raw material.
Integrated integral wall, including skeleton are painted in soil and building waste preparation cast in situs heat preservation, are equipped in skeleton Pour chamber, skeleton includes support frame and the metal mesh sheet 2 that is covered on support frame, is poured intracavitary filled with heat preservation painting one Body integral wall material;
It includes: water 15%-20%, mudstone charcoal dregs powder 40%-70%, cement 10%-30% that integrated integral wall material is painted in heat preservation, Coal 5%-10%, fine sand 5%-10%, foam stabilizer 0.5%-1%, calcium oxide 0.5%-1%, aluminum sulfate 0.5%-1%, foaming agent 3.5%- 5%, the above raw material summation is 100%.
Further, prepare the heat preservation paint integrated integral wall material the following steps are included:
A. the weight proportion according to claim 1 weighs each raw material component;
B. by water, mudstone charcoal dregs powder and coal put into full-automatic mixing plant stir at least 5 minutes, then, investment fine sand and Cement simultaneously stirs at least 2 minutes, then, then puts into foam stabilizer, calcium oxide, aluminum sulfate, foaming agent and stirs at least 5 minutes.
Further, support frame includes outer skeleton 11 and the inner frame 12 that is connected with outer skeleton 11, outer skeleton 11 and is held Weight beam, column 4 are connected by fastener 3, and expansion gap 4 is formed between the outer skeleton 11 and spandrel girder.
Further, the aperture of metal mesh sheet 2 is 2mm-4mm.When in use, integrated integral wall material is painted into heat preservation Pour intracavitary to pouring, when pouring, heat preservation is painted integrated integral wall material and can be expanded, and from the hole of metal mesh sheet It is expanded at gap out, after integrated integral wall material expansion is painted in heat preservation, insulating powder out will be expanded by manual operation It brushes integrated integral wall material to carry out evening up processing, when evening up, part is kept the temperature into the integrated integral wall material of painting and is drawn To spandrel girder, column outer edge or cladding spandrel girder, column 4, it is set to form integral structure with spandrel girder, column 4, simultaneously because swollen When swollen, heat preservation, which is painted in integrated integral wall material, will form several holes, therefore can play good insulation effect, It also can be effectively solved complicated construction technique simultaneously, the problems such as long construction period, mortar is not full.
Screw can be used in fastener 3, and the value range in expansion gap 4 is 0.7cm-1cm, therefore when in use, whole non- Bearing wall material during expansion, expansion gap 4 is filled up, so that more preferable with the connection effect of spandrel girder, column 4, globality is more It is good.
Since the aperture of metal mesh sheet 2 is that 2mm-4mm can effectively avoid whole non-load bearing wall when pouring The problem of body material is flowed out from the mesh of metal mesh sheet 2.
Further, the present invention also provides whole using soil and building waste preparation cast in situs heat preservation painting integration The preparation method of wall:
A. it makes skeleton: more mental sections being welded into outer skeleton, metal mesh sheet is welded on outer skeleton, by more metals Profile is welded into inner frame, and inner frame is mutually welded to form skeleton with outer skeleton, then by skeleton by fastener and spandrel girder, Column 4 is connected;
B. it pours: integrated integral wall material is painted into heat preservation and is poured to forming wall in skeleton;
C. form: after the completion of pouring, standing at least carries out metope after twenty minutes and evens up molding.
Therefore, to switch to present three process by original 14 procedure using the non-bearing wall body of one-piece casting method complete At, at low cost, installation speed, fast, sound insulation, heat insulation effect are good, light-weight, and spandrel girder, column 4 and non-bearing wall body can be made to form one Body.Improve original long in time limit, crack, hollowing, infiltration, anti-seismic performance and other issues simultaneously.
It is worth noting that mudstone charcoal dregs powder is made of the earthwork and building waste, production stage are as follows:
A. by the earthwork and or building waste pour into dregs dispersing device, dispersing device cuts soil and building waste mixture It is cut into the sheet mixture of 0.5mm-1mm thickness;
B. sheet mixture is delivered to sludge dehydration device through the first conveying equipment, and sheet mixture is squeezed through sludge dehydration device At water content 3%-10% mud cake;
C. mud cake is delivered in drying unit through the second conveying equipment and is dried, and keeping the inlet temperature of drying unit is 600 DEG C -800 DEG C, tapping temperature is 70 DEG C -90 DEG C;
D. the mud cake after drying is delivered in high pressure milling device through third conveying equipment to be milled, by mud cake grinding at fineness For the finished product powder of 0.03mm-0.06mm.
Producing machinery involved in mudstone charcoal dregs powder is existing machinery, for example, the optional Weifang of dregs dispersing device is bright The twin shaft of the double-shaft weightless mixing machine of space mechanical equipment Co., Ltd either Zhi Feng environmental protection equipment Co., Ltd, Zhongshan city is beaten Machine is dissipated, the characteristics of according to each processing enterprise's beater, selection is most suitable for the beater that our dregs are broken up;Sludge dehydration device The model HDL-202 Stacked sludge dewatering machine that three brightness Environmental Protection Technology Co., Ltd of Jiangsu can be selected is combined with sludge filter press It uses, directly by filters pressing after sludge dewatering at mud cake;The sludge of drying unit selection Changzhou and positive drying equipment Co., Ltd The model of drying machine, drying machine is chosen according to produced on-site amount;High pressure milling device selects dimension section intelligent mine machine superpressure V-type mill Powder machine or the 4R9518 high pressure pulverizer of upper seamount Zhuo heavy industry Machinery Co., Ltd..
Mudstone charcoal dregs powder be by building removal rubbish, construction sludge garbage, construction and decoration rubbish, earthwork rubbish again It is secondary using production, above-mentioned materials for wall is configured to by mudstone charcoal dregs powder, effectively solves soil and building complex rubbish It digs, fortune, consumption place problem.
In attached drawing, 5 indicate to have poured the wall of completion.
The foregoing is merely presently preferred embodiments of the present invention, is not intended to limit the invention, and those skilled in the art exists Common variations and alternatives are carried out within the scope of technical solution of the present invention should all be included within the scope of the present invention.

Claims (5)

1. integrated integral wall is painted in soil and building waste preparation cast in situs heat preservation, it is characterised in that:
It including skeleton, is equipped in skeleton and pours chamber, skeleton includes support frame and the metal mesh sheet that is covered on support frame, institute Pouring for stating is intracavitary filled with the integrated integral wall material of heat preservation painting;
It includes: water 15%-20%, mudstone charcoal dregs powder 40%-70%, cement that integrated integral wall material is painted in the heat preservation 10%-30%, coal 5%-10%, fine sand 5%-10%, foam stabilizer 0.5%-1%, calcium oxide 0.5%-1%, aluminum sulfate 0.5%-1%, foaming Agent 3.5%-5%, the above raw material summation are 100%.
2. integrated integral wall is painted in soil according to claim 1 and building waste preparation cast in situs heat preservation, Be characterized in that: prepare the heat preservation paint integrated integral wall material the following steps are included:
A. the weight proportion according to claim 1 weighs each raw material component;
B. by water, mudstone charcoal dregs powder and coal put into full-automatic mixing plant stir at least 5 minutes, then, investment fine sand and Cement simultaneously stirs at least 2 minutes, then, then puts into foam stabilizer, calcium oxide, aluminum sulfate, foaming agent and stirs at least 5 minutes.
3. integrated integral wall is painted in soil according to claim 1 and building waste preparation cast in situs heat preservation, Be characterized in that: the support frame includes outer skeleton and the inner frame that is connected with outer skeleton, the outer skeleton and load-bearing Beam, column are connected by fastener, and expansion gap is formed between the outer skeleton and spandrel girder.
4. integrated integral wall is painted in soil according to claim 3 and building waste preparation cast in situs heat preservation, Be characterized in that: the aperture of the metal mesh sheet is 2mm-4mm.
5. a kind of prepare the integrated integral wall of soil and building waste preparation cast in situs heat preservation painting described in claim 1 Preparation method, it is characterised in that:
A. it makes skeleton: more mental sections being welded into outer skeleton, metal mesh sheet is welded on outer skeleton, by more metals Profile is welded into inner frame, and inner frame is mutually welded to form skeleton with outer skeleton, then by skeleton by fastener and spandrel girder, Column is connected;
B. it pours: integrated integral wall material is painted into heat preservation and is poured to forming wall in skeleton;
C. form: after the completion of pouring, standing at least carries out metope after twenty minutes and evens up molding.
CN201910657652.5A 2019-07-20 2019-07-20 Integrated integral wall body for preparing soil and construction waste, pouring in situ, preserving heat and painting Pending CN110258868A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910657652.5A CN110258868A (en) 2019-07-20 2019-07-20 Integrated integral wall body for preparing soil and construction waste, pouring in situ, preserving heat and painting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910657652.5A CN110258868A (en) 2019-07-20 2019-07-20 Integrated integral wall body for preparing soil and construction waste, pouring in situ, preserving heat and painting

Publications (1)

Publication Number Publication Date
CN110258868A true CN110258868A (en) 2019-09-20

Family

ID=67927433

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910657652.5A Pending CN110258868A (en) 2019-07-20 2019-07-20 Integrated integral wall body for preparing soil and construction waste, pouring in situ, preserving heat and painting

Country Status (1)

Country Link
CN (1) CN110258868A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2235462Y (en) * 1994-10-08 1996-09-18 卢昕阳 Framework for steel bar reinforced concrete walls
CN101851971A (en) * 2010-06-03 2010-10-06 谢兆坤 Rebar cylinder mould sandwiched wall body with integral structure of wall body and heat preservation
CN102587542A (en) * 2011-01-13 2012-07-18 谢兆坤 Method for producing wall with building waste
CN102850081A (en) * 2012-08-24 2013-01-02 镇江中瑞节能科技有限公司 Foam cement insulation board containing industrial solid waste and preparation method thereof
CN105645901A (en) * 2015-12-30 2016-06-08 浙江大学 Light-weight heat insulation plate prepared from building rubbish regeneration fine powder and preparation method thereof
CN107352864A (en) * 2017-06-09 2017-11-17 深圳市绿志新型建材研究院有限公司 One kind is modified non-burning brick and preparation method thereof
CN108975850A (en) * 2018-08-29 2018-12-11 济南大学 A kind of light high-strength heat preservation material and preparation method thereof

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2235462Y (en) * 1994-10-08 1996-09-18 卢昕阳 Framework for steel bar reinforced concrete walls
CN101851971A (en) * 2010-06-03 2010-10-06 谢兆坤 Rebar cylinder mould sandwiched wall body with integral structure of wall body and heat preservation
CN102587542A (en) * 2011-01-13 2012-07-18 谢兆坤 Method for producing wall with building waste
CN102850081A (en) * 2012-08-24 2013-01-02 镇江中瑞节能科技有限公司 Foam cement insulation board containing industrial solid waste and preparation method thereof
CN105645901A (en) * 2015-12-30 2016-06-08 浙江大学 Light-weight heat insulation plate prepared from building rubbish regeneration fine powder and preparation method thereof
CN107352864A (en) * 2017-06-09 2017-11-17 深圳市绿志新型建材研究院有限公司 One kind is modified non-burning brick and preparation method thereof
CN108975850A (en) * 2018-08-29 2018-12-11 济南大学 A kind of light high-strength heat preservation material and preparation method thereof

Similar Documents

Publication Publication Date Title
CN101967851A (en) Board-mixing structure assembly type house and building method thereof
CN108824812A (en) A kind of cast-in-place fair-faced concrete wall pours and maintenance process
CN107327137A (en) A kind of heat insulation integrated non-dismantling formworks of STP and its construction technology
CN103883026A (en) Environment-friendly and energy-saving cast-in-place heat preservation composite outer wall system and construction method thereof
CN105780976B (en) Compound concrete shear wall structure and its concreting method
CN104712079B (en) The assembled polypropylene fibre sludge ceramsite concrete wall and its construction method connected based on mat surface
CN107313531A (en) A kind of assembled integral shear wall connecting node and its system and its construction technology
CN104727440B (en) Industrialized production efficiently-assembled type building frame column beam and manufacturing method
CN113386255A (en) Construction and production process of building decoration heat preservation and sound insulation structure integrated plate
US7665710B2 (en) Contoured concrete form
CN105507452B (en) A kind of light concrete built-in heat insulation decorating integrative wall and its construction method
CN108277895A (en) A kind of composite heat preserving external wall system and construction method
CN104594633A (en) Construction method and template structure for umbrella-shaped spatial curved-surface bare concrete
CN103883022B (en) The construction method of space enclosing structure inner-outer wall antidetonation and sound insulation cracking resistance integrated structure
CN205502373U (en) Evaporate and press whole wallboard that keeps warm of aerated concrete
CN104675013A (en) Prefabricated steel fiber recycled brick concrete wall based on T-slot connection and construction method thereof
CN205329904U (en) Integrative wall is decorated to built -in heat preservation of light body concrete
CN106337566A (en) High-strength repairing method for hole of cement prefabricated component
CN110258868A (en) Integrated integral wall body for preparing soil and construction waste, pouring in situ, preserving heat and painting
CN104790565A (en) Cast-in-site ardealite load bearing wall composite structure main building construction method
CN210507502U (en) Prefabricated assembled concrete slab bed structure
CN108018972A (en) Full precast floor slab and laminated floor slab combining structure, making and assembly method
CN207377115U (en) A kind of heat insulation integrated non-dismantling formworks of STP
CN103255872A (en) Hollow building block
CN106284990A (en) A kind of central island prefabricated Cavity structural member of force type cavity building roof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20220513

Address after: 223600 No. 369, Qiaonan group, shuangyao village, TANGJian Town, Shuyang County, Suqian City, Jiangsu Province

Applicant after: Shen Zhiyong

Address before: 223600 Room 101, building 54, Subei Cheshi Commercial Plaza, Shucheng Town, Suqian City, Jiangsu Province