CN110258868A - Integrated integral wall body for preparing soil and construction waste, pouring in situ, preserving heat and painting - Google Patents
Integrated integral wall body for preparing soil and construction waste, pouring in situ, preserving heat and painting Download PDFInfo
- Publication number
- CN110258868A CN110258868A CN201910657652.5A CN201910657652A CN110258868A CN 110258868 A CN110258868 A CN 110258868A CN 201910657652 A CN201910657652 A CN 201910657652A CN 110258868 A CN110258868 A CN 110258868A
- Authority
- CN
- China
- Prior art keywords
- skeleton
- integral wall
- integrated integral
- heat preservation
- soil
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 239000002689 soil Substances 0.000 title claims abstract description 19
- 239000002699 waste material Substances 0.000 title claims abstract description 18
- 238000011065 in-situ storage Methods 0.000 title claims description 12
- 238000010422 painting Methods 0.000 title claims description 8
- 238000010276 construction Methods 0.000 title abstract description 14
- 238000004321 preservation Methods 0.000 claims abstract description 34
- 239000000463 material Substances 0.000 claims abstract description 32
- 239000000843 powder Substances 0.000 claims abstract description 15
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 10
- 238000002360 preparation method Methods 0.000 claims description 18
- 229910052751 metal Inorganic materials 0.000 claims description 16
- 239000002184 metal Substances 0.000 claims description 16
- 239000003610 charcoal Substances 0.000 claims description 10
- 238000003756 stirring Methods 0.000 claims description 10
- 239000002994 raw material Substances 0.000 claims description 8
- DIZPMCHEQGEION-UHFFFAOYSA-H aluminium sulfate (anhydrous) Chemical compound [Al+3].[Al+3].[O-]S([O-])(=O)=O.[O-]S([O-])(=O)=O.[O-]S([O-])(=O)=O DIZPMCHEQGEION-UHFFFAOYSA-H 0.000 claims description 6
- BRPQOXSCLDDYGP-UHFFFAOYSA-N calcium oxide Chemical compound [O-2].[Ca+2] BRPQOXSCLDDYGP-UHFFFAOYSA-N 0.000 claims description 6
- ODINCKMPIJJUCX-UHFFFAOYSA-N calcium oxide Inorganic materials [Ca]=O ODINCKMPIJJUCX-UHFFFAOYSA-N 0.000 claims description 6
- 239000000292 calcium oxide Substances 0.000 claims description 6
- 239000004568 cement Substances 0.000 claims description 6
- 239000003245 coal Substances 0.000 claims description 6
- 239000006260 foam Substances 0.000 claims description 6
- 239000004088 foaming agent Substances 0.000 claims description 6
- 239000003973 paint Substances 0.000 claims description 6
- 239000004576 sand Substances 0.000 claims description 6
- 239000003381 stabilizer Substances 0.000 claims description 6
- 238000002156 mixing Methods 0.000 claims description 5
- 230000003340 mental effect Effects 0.000 claims description 3
- 150000002739 metals Chemical class 0.000 claims description 3
- 238000000465 moulding Methods 0.000 claims description 3
- 238000000034 method Methods 0.000 abstract description 16
- 238000009413 insulation Methods 0.000 abstract description 5
- 230000000694 effects Effects 0.000 abstract description 4
- 238000009434 installation Methods 0.000 abstract description 4
- 239000003415 peat Substances 0.000 abstract 2
- 239000002893 slag Substances 0.000 abstract 2
- 238000004064 recycling Methods 0.000 abstract 1
- 239000004570 mortar (masonry) Substances 0.000 description 11
- 239000004567 concrete Substances 0.000 description 8
- 239000010802 sludge Substances 0.000 description 8
- 238000001035 drying Methods 0.000 description 7
- 230000003014 reinforcing effect Effects 0.000 description 6
- 239000011449 brick Substances 0.000 description 5
- 239000000203 mixture Substances 0.000 description 5
- 239000010813 municipal solid waste Substances 0.000 description 5
- 230000002787 reinforcement Effects 0.000 description 5
- 230000018044 dehydration Effects 0.000 description 3
- 238000006297 dehydration reaction Methods 0.000 description 3
- 238000010586 diagram Methods 0.000 description 3
- 230000010354 integration Effects 0.000 description 3
- 238000004519 manufacturing process Methods 0.000 description 3
- 229910000831 Steel Inorganic materials 0.000 description 2
- 239000003795 chemical substances by application Substances 0.000 description 2
- 238000004140 cleaning Methods 0.000 description 2
- 230000007812 deficiency Effects 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 230000007613 environmental effect Effects 0.000 description 2
- 239000004744 fabric Substances 0.000 description 2
- 239000003292 glue Substances 0.000 description 2
- 238000003801 milling Methods 0.000 description 2
- 239000010959 steel Substances 0.000 description 2
- 229910001294 Reinforcing steel Inorganic materials 0.000 description 1
- 239000000853 adhesive Substances 0.000 description 1
- 230000001070 adhesive effect Effects 0.000 description 1
- 239000002956 ash Substances 0.000 description 1
- 210000000988 bone and bone Anatomy 0.000 description 1
- 239000010882 bottom ash Substances 0.000 description 1
- 238000005266 casting Methods 0.000 description 1
- 238000005253 cladding Methods 0.000 description 1
- 238000005034 decoration Methods 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 238000005553 drilling Methods 0.000 description 1
- 238000007667 floating Methods 0.000 description 1
- 238000009415 formwork Methods 0.000 description 1
- 238000000227 grinding Methods 0.000 description 1
- 230000008595 infiltration Effects 0.000 description 1
- 238000001764 infiltration Methods 0.000 description 1
- 239000012774 insulation material Substances 0.000 description 1
- 239000011505 plaster Substances 0.000 description 1
- 229920000642 polymer Polymers 0.000 description 1
- 238000003825 pressing Methods 0.000 description 1
- 230000001012 protector Effects 0.000 description 1
- 238000010079 rubber tapping Methods 0.000 description 1
- 238000007711 solidification Methods 0.000 description 1
- 230000008023 solidification Effects 0.000 description 1
Classifications
-
- C—CHEMISTRY; METALLURGY
- C04—CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
- C04B—LIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
- C04B28/00—Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/84—Walls made by casting, pouring, or tamping in situ
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
Abstract
The invention relates to the field of buildings, in particular to a cast-in-place heat-preservation plastering integrated integral wall body prepared from soil and construction wastes. The filling material of the heat-preservation plastering integrated integral wall body is prepared from original materials, and is made into the peat slag soil powder, the peat slag soil powder is prepared by recycling project soil and comprehensive construction waste, the problems of digging, transporting and consuming places of the soil and the comprehensive construction waste are effectively solved, the non-bearing wall body is completed by converting the original fourteen processes into the current three processes, and the heat-preservation plastering integrated integral wall body is low in cost, high in installation speed, good in sound insulation and heat preservation effect, light in weight, energy-saving and environment-friendly, and can enable a bearing beam, a column and the wall body to be integrated. Meanwhile, the quality problems of long construction period, cracks, hollowing, water seepage, seismic resistance and the like in the prior art are solved.
Description
Technical field
The present invention relates to building fields, and in particular to soil and building waste preparation cast in situs heat preservation painting integration are whole
Walling.
Background technique
Currently, existing building non-bearing wall body structure construction market is all made of main material required for purchase and construction
Process flow is divided into as follows:
Main material needed for existing secondary structure:
1, masonry brick, 2, masonry mortar, 3, thermal insulation material, 4, reinforcing bar be divided into [bar planting reinforcing bar, constructional column reinforcing bar, waist rail reinforcing bar, mistake
Beam steel, ring beam reinforcing steel bar] main reinforcement and stirrup, 5, concrete [constructional column, waterstop, waist rail, lintel, collar tie beam], 6, template, 7, interior
Exterior plaster mortar.
Construction technology:
1, building wall: build require [mixing mortar require, bottom should build 3 skin standard brick requirements, the requirement of concrete waterstop,
Row's brick fissure of displacement, which is taken, to be built requirements, mortar joint requirement, tension rib requirement, waist rail requirement, lintel requirement, requirement of bearing down on one, fills wall and build to connecing
Nearly beam bottom stuff up a crack requires ,] base's examination → wall snap the line → brickwork preparation → brick watering → masonry mortar stirs → lays bricks
Wall → examination → next procedure;
2, for reinforcing bar [bar planting, constructional column, waterstop, waist rail, lintel, the main reinforcement of collar tie beam and stirrup] such as bar planting: unwrapping wire → material
Expect that preparation → concrete digs face → mechanical hole building → borehole cleaning → structure glue preparation → injecting glue → solidification → test → next procedure;
3, template [constructional column, waterstop, waist rail, lintel, collar tie beam]: material preparation → Template Location → template assembly → vertical
Degree control → bottom cleaning → formwork reinforcement → concrete, which pours, smashes → demoulding → test → next procedure;
4, concrete [constructional column, waist rail, lintel, bears down on one at waterstop]: need to be arranged position [the different materials handover of constructional column
Place, inner-outer wall junction, wall be long be greater than 4m, masonry without restrained end, opening width be greater than 2m ,] and require that [section needs, template
It is required that concrete require, main reinforcement require, stirrup require, thin portion requirement], base's examination → reinforcement fabrication → reinforcing bar binding → mould
Plate installs → concreting → examination → next procedure;
5, exterior-wall heat insulation;With adhesive special → base course wall processing → brush interfacial agents one → stickup extruded sheet → pre-bonding edges of boards
Grid cloth → drilling and mounting fixing parts → extruded sheet polish levelling → brush interfacial agents together, and → matching polymer mortar → smears bottom
Strata → with investment precoat → conjunction object mortar → buries patch grid cloth → float coat mortar → examination → next procedure;
6, inside and outside plastering technique process;After electromechanical tube box installation → main body check → [base carries out clear base treatment
Reason, steel wire fixes, whitewashes, water] it → looks for rule, do ash cake, floating screed and → make corner protector → smear bottom ash → float coat is grey → to smear
Windowsill, dado → examination;
But it has the following problems: 1, pitching construction technology;2, period duration is long, 3, mortar it is not full, 4, gaul, 5, metope
Percolating water, 6, be easy to fall after wall face hollowing.
Summary of the invention
In view of the deficiencies of the prior art, the present invention intends to provide the soil at least solving a kind of above problem
And integrated integral wall is painted in building waste preparation cast in situs heat preservation.
To achieve the above object, it the present invention provides the following technical scheme that including skeleton, is equipped in skeleton and pours chamber, bone
Frame includes support frame and the metal mesh sheet that is covered on support frame, pours and intracavitary paints integrated integral wall filled with heat preservation
Body material;
It includes: water 15%-20%, mudstone charcoal dregs powder 40%-70%, cement 10%-30% that integrated integral wall material is painted in heat preservation,
Coal 5%-10%, fine sand 5%-10%, foam stabilizer 0.5%-1%, calcium oxide 0.5%-1%, aluminum sulfate 0.5%-1%, foaming agent 3.5%-
5%, the above raw material summation is 100%.
Further, prepare the heat preservation paint integrated integral wall material the following steps are included:
A. the weight proportion according to claim 1 weighs each raw material component;
B. by water, mudstone charcoal dregs powder and coal put into full-automatic mixing plant stir at least 5 minutes, then, investment fine sand and
Cement simultaneously stirs at least 2 minutes, then, then puts into foam stabilizer, calcium oxide, aluminum sulfate, foaming agent and stirs at least 5 minutes.
Further, support frame includes outer skeleton and the inner frame that is connected with outer skeleton, and outer skeleton and spandrel girder, column are logical
It crosses fastener to be connected, and forms expansion gap between the outer skeleton and spandrel girder.
Further, the aperture of metal mesh sheet is 2mm-4mm.
Further, the present invention also provides whole using soil and building waste preparation cast in situs heat preservation painting integration
The preparation method of wall:
A. it makes skeleton: more mental sections being welded into outer skeleton, metal mesh sheet is welded on outer skeleton, by more metals
Profile is welded into inner frame, and inner frame is mutually welded to form skeleton with outer skeleton, then by skeleton by fastener and spandrel girder,
Column is connected;
B. it pours: integrated integral wall material is painted into heat preservation and is poured to forming wall in skeleton;
C. form: after the completion of pouring, standing at least carries out metope after twenty minutes and evens up molding.
The deficiencies in the prior art are compared, technical solution provided by the invention is brought the utility model has the advantages that when in use, will protect
Temperature paints integrated integral wall material and pours intracavitary to pouring, and when pouring, integrated integral wall material meeting is painted in heat preservation
It expands, and is expanded out from the hole of metal mesh sheet, after integrated integral wall material expansion is painted in heat preservation, by
Manual operation, which will expand heat preservation out, paints integrated integral wall material and carries out evening up processing, therefore can be effectively solved and apply
The problems such as work complex process, long construction period, mortar is not full.
Detailed description of the invention
Fig. 1 is overlooking structure diagram of the invention.
Fig. 2 pours status architecture schematic diagram for of the invention.
Fig. 3 is longitudinal schematic cross-sectional view of the invention.
Fig. 4 is lateral schematic cross-sectional view of the invention.
Specific embodiment
Hereinafter, preferred embodiments of the present invention will be described with reference to the accompanying drawings, it should be understood that preferred reality described herein
Apply example only for the purpose of illustrating and explaining the present invention and is not intended to limit the present invention.
It should be noted that these attached drawings are simplified schematic diagram, the basic knot that only the invention is illustrated in a schematic way
Structure, therefore it only shows the composition relevant to the invention.
In the description of the present invention, it is to be understood that, term " center ", " longitudinal direction ", " transverse direction ", "upper", "lower",
The orientation or positional relationship of the instructions such as "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outside" is
It is based on the orientation or positional relationship shown in the drawings, is merely for convenience of description of the present invention and simplification of the description, rather than instruction or dark
Show that signified device or element must have a particular orientation, be constructed and operated in a specific orientation, therefore should not be understood as pair
Limitation of the invention.In addition, term " first ", " second " are used for description purposes only, it is not understood to indicate or imply opposite
Importance or the quantity for implicitly indicating indicated technical characteristic.Define " first " as a result, the feature of " second " can be bright
Show or implicitly include one or more of the features.In the description of the present invention, unless otherwise indicated, " multiple " contain
Justice is two or more.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " installation ", " phase
Even ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or be integrally connected;It can
To be mechanical connection, it is also possible to be electrically connected;It can be directly connected, can also can be indirectly connected through an intermediary
Connection inside two elements.For the ordinary skill in the art, above-mentioned term can be understood at this with concrete condition
Concrete meaning in invention.
The present invention will be further described by-Fig. 4 referring to Fig.1.
The present invention is further illustrated by the following examples.
Raw materials used in the embodiment of the present invention is commercially available common raw material.
Integrated integral wall, including skeleton are painted in soil and building waste preparation cast in situs heat preservation, are equipped in skeleton
Pour chamber, skeleton includes support frame and the metal mesh sheet 2 that is covered on support frame, is poured intracavitary filled with heat preservation painting one
Body integral wall material;
It includes: water 15%-20%, mudstone charcoal dregs powder 40%-70%, cement 10%-30% that integrated integral wall material is painted in heat preservation,
Coal 5%-10%, fine sand 5%-10%, foam stabilizer 0.5%-1%, calcium oxide 0.5%-1%, aluminum sulfate 0.5%-1%, foaming agent 3.5%-
5%, the above raw material summation is 100%.
Further, prepare the heat preservation paint integrated integral wall material the following steps are included:
A. the weight proportion according to claim 1 weighs each raw material component;
B. by water, mudstone charcoal dregs powder and coal put into full-automatic mixing plant stir at least 5 minutes, then, investment fine sand and
Cement simultaneously stirs at least 2 minutes, then, then puts into foam stabilizer, calcium oxide, aluminum sulfate, foaming agent and stirs at least 5 minutes.
Further, support frame includes outer skeleton 11 and the inner frame 12 that is connected with outer skeleton 11, outer skeleton 11 and is held
Weight beam, column 4 are connected by fastener 3, and expansion gap 4 is formed between the outer skeleton 11 and spandrel girder.
Further, the aperture of metal mesh sheet 2 is 2mm-4mm.When in use, integrated integral wall material is painted into heat preservation
Pour intracavitary to pouring, when pouring, heat preservation is painted integrated integral wall material and can be expanded, and from the hole of metal mesh sheet
It is expanded at gap out, after integrated integral wall material expansion is painted in heat preservation, insulating powder out will be expanded by manual operation
It brushes integrated integral wall material to carry out evening up processing, when evening up, part is kept the temperature into the integrated integral wall material of painting and is drawn
To spandrel girder, column outer edge or cladding spandrel girder, column 4, it is set to form integral structure with spandrel girder, column 4, simultaneously because swollen
When swollen, heat preservation, which is painted in integrated integral wall material, will form several holes, therefore can play good insulation effect,
It also can be effectively solved complicated construction technique simultaneously, the problems such as long construction period, mortar is not full.
Screw can be used in fastener 3, and the value range in expansion gap 4 is 0.7cm-1cm, therefore when in use, whole non-
Bearing wall material during expansion, expansion gap 4 is filled up, so that more preferable with the connection effect of spandrel girder, column 4, globality is more
It is good.
Since the aperture of metal mesh sheet 2 is that 2mm-4mm can effectively avoid whole non-load bearing wall when pouring
The problem of body material is flowed out from the mesh of metal mesh sheet 2.
Further, the present invention also provides whole using soil and building waste preparation cast in situs heat preservation painting integration
The preparation method of wall:
A. it makes skeleton: more mental sections being welded into outer skeleton, metal mesh sheet is welded on outer skeleton, by more metals
Profile is welded into inner frame, and inner frame is mutually welded to form skeleton with outer skeleton, then by skeleton by fastener and spandrel girder,
Column 4 is connected;
B. it pours: integrated integral wall material is painted into heat preservation and is poured to forming wall in skeleton;
C. form: after the completion of pouring, standing at least carries out metope after twenty minutes and evens up molding.
Therefore, to switch to present three process by original 14 procedure using the non-bearing wall body of one-piece casting method complete
At, at low cost, installation speed, fast, sound insulation, heat insulation effect are good, light-weight, and spandrel girder, column 4 and non-bearing wall body can be made to form one
Body.Improve original long in time limit, crack, hollowing, infiltration, anti-seismic performance and other issues simultaneously.
It is worth noting that mudstone charcoal dregs powder is made of the earthwork and building waste, production stage are as follows:
A. by the earthwork and or building waste pour into dregs dispersing device, dispersing device cuts soil and building waste mixture
It is cut into the sheet mixture of 0.5mm-1mm thickness;
B. sheet mixture is delivered to sludge dehydration device through the first conveying equipment, and sheet mixture is squeezed through sludge dehydration device
At water content 3%-10% mud cake;
C. mud cake is delivered in drying unit through the second conveying equipment and is dried, and keeping the inlet temperature of drying unit is 600
DEG C -800 DEG C, tapping temperature is 70 DEG C -90 DEG C;
D. the mud cake after drying is delivered in high pressure milling device through third conveying equipment to be milled, by mud cake grinding at fineness
For the finished product powder of 0.03mm-0.06mm.
Producing machinery involved in mudstone charcoal dregs powder is existing machinery, for example, the optional Weifang of dregs dispersing device is bright
The twin shaft of the double-shaft weightless mixing machine of space mechanical equipment Co., Ltd either Zhi Feng environmental protection equipment Co., Ltd, Zhongshan city is beaten
Machine is dissipated, the characteristics of according to each processing enterprise's beater, selection is most suitable for the beater that our dregs are broken up;Sludge dehydration device
The model HDL-202 Stacked sludge dewatering machine that three brightness Environmental Protection Technology Co., Ltd of Jiangsu can be selected is combined with sludge filter press
It uses, directly by filters pressing after sludge dewatering at mud cake;The sludge of drying unit selection Changzhou and positive drying equipment Co., Ltd
The model of drying machine, drying machine is chosen according to produced on-site amount;High pressure milling device selects dimension section intelligent mine machine superpressure V-type mill
Powder machine or the 4R9518 high pressure pulverizer of upper seamount Zhuo heavy industry Machinery Co., Ltd..
Mudstone charcoal dregs powder be by building removal rubbish, construction sludge garbage, construction and decoration rubbish, earthwork rubbish again
It is secondary using production, above-mentioned materials for wall is configured to by mudstone charcoal dregs powder, effectively solves soil and building complex rubbish
It digs, fortune, consumption place problem.
In attached drawing, 5 indicate to have poured the wall of completion.
The foregoing is merely presently preferred embodiments of the present invention, is not intended to limit the invention, and those skilled in the art exists
Common variations and alternatives are carried out within the scope of technical solution of the present invention should all be included within the scope of the present invention.
Claims (5)
1. integrated integral wall is painted in soil and building waste preparation cast in situs heat preservation, it is characterised in that:
It including skeleton, is equipped in skeleton and pours chamber, skeleton includes support frame and the metal mesh sheet that is covered on support frame, institute
Pouring for stating is intracavitary filled with the integrated integral wall material of heat preservation painting;
It includes: water 15%-20%, mudstone charcoal dregs powder 40%-70%, cement that integrated integral wall material is painted in the heat preservation
10%-30%, coal 5%-10%, fine sand 5%-10%, foam stabilizer 0.5%-1%, calcium oxide 0.5%-1%, aluminum sulfate 0.5%-1%, foaming
Agent 3.5%-5%, the above raw material summation are 100%.
2. integrated integral wall is painted in soil according to claim 1 and building waste preparation cast in situs heat preservation,
Be characterized in that: prepare the heat preservation paint integrated integral wall material the following steps are included:
A. the weight proportion according to claim 1 weighs each raw material component;
B. by water, mudstone charcoal dregs powder and coal put into full-automatic mixing plant stir at least 5 minutes, then, investment fine sand and
Cement simultaneously stirs at least 2 minutes, then, then puts into foam stabilizer, calcium oxide, aluminum sulfate, foaming agent and stirs at least 5 minutes.
3. integrated integral wall is painted in soil according to claim 1 and building waste preparation cast in situs heat preservation,
Be characterized in that: the support frame includes outer skeleton and the inner frame that is connected with outer skeleton, the outer skeleton and load-bearing
Beam, column are connected by fastener, and expansion gap is formed between the outer skeleton and spandrel girder.
4. integrated integral wall is painted in soil according to claim 3 and building waste preparation cast in situs heat preservation,
Be characterized in that: the aperture of the metal mesh sheet is 2mm-4mm.
5. a kind of prepare the integrated integral wall of soil and building waste preparation cast in situs heat preservation painting described in claim 1
Preparation method, it is characterised in that:
A. it makes skeleton: more mental sections being welded into outer skeleton, metal mesh sheet is welded on outer skeleton, by more metals
Profile is welded into inner frame, and inner frame is mutually welded to form skeleton with outer skeleton, then by skeleton by fastener and spandrel girder,
Column is connected;
B. it pours: integrated integral wall material is painted into heat preservation and is poured to forming wall in skeleton;
C. form: after the completion of pouring, standing at least carries out metope after twenty minutes and evens up molding.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910657652.5A CN110258868A (en) | 2019-07-20 | 2019-07-20 | Integrated integral wall body for preparing soil and construction waste, pouring in situ, preserving heat and painting |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910657652.5A CN110258868A (en) | 2019-07-20 | 2019-07-20 | Integrated integral wall body for preparing soil and construction waste, pouring in situ, preserving heat and painting |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110258868A true CN110258868A (en) | 2019-09-20 |
Family
ID=67927433
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910657652.5A Pending CN110258868A (en) | 2019-07-20 | 2019-07-20 | Integrated integral wall body for preparing soil and construction waste, pouring in situ, preserving heat and painting |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110258868A (en) |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2235462Y (en) * | 1994-10-08 | 1996-09-18 | 卢昕阳 | Framework for steel bar reinforced concrete walls |
CN101851971A (en) * | 2010-06-03 | 2010-10-06 | 谢兆坤 | Rebar cylinder mould sandwiched wall body with integral structure of wall body and heat preservation |
CN102587542A (en) * | 2011-01-13 | 2012-07-18 | 谢兆坤 | Method for producing wall with building waste |
CN102850081A (en) * | 2012-08-24 | 2013-01-02 | 镇江中瑞节能科技有限公司 | Foam cement insulation board containing industrial solid waste and preparation method thereof |
CN105645901A (en) * | 2015-12-30 | 2016-06-08 | 浙江大学 | Light-weight heat insulation plate prepared from building rubbish regeneration fine powder and preparation method thereof |
CN107352864A (en) * | 2017-06-09 | 2017-11-17 | 深圳市绿志新型建材研究院有限公司 | One kind is modified non-burning brick and preparation method thereof |
CN108975850A (en) * | 2018-08-29 | 2018-12-11 | 济南大学 | A kind of light high-strength heat preservation material and preparation method thereof |
-
2019
- 2019-07-20 CN CN201910657652.5A patent/CN110258868A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2235462Y (en) * | 1994-10-08 | 1996-09-18 | 卢昕阳 | Framework for steel bar reinforced concrete walls |
CN101851971A (en) * | 2010-06-03 | 2010-10-06 | 谢兆坤 | Rebar cylinder mould sandwiched wall body with integral structure of wall body and heat preservation |
CN102587542A (en) * | 2011-01-13 | 2012-07-18 | 谢兆坤 | Method for producing wall with building waste |
CN102850081A (en) * | 2012-08-24 | 2013-01-02 | 镇江中瑞节能科技有限公司 | Foam cement insulation board containing industrial solid waste and preparation method thereof |
CN105645901A (en) * | 2015-12-30 | 2016-06-08 | 浙江大学 | Light-weight heat insulation plate prepared from building rubbish regeneration fine powder and preparation method thereof |
CN107352864A (en) * | 2017-06-09 | 2017-11-17 | 深圳市绿志新型建材研究院有限公司 | One kind is modified non-burning brick and preparation method thereof |
CN108975850A (en) * | 2018-08-29 | 2018-12-11 | 济南大学 | A kind of light high-strength heat preservation material and preparation method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101967851A (en) | Board-mixing structure assembly type house and building method thereof | |
CN108824812A (en) | A kind of cast-in-place fair-faced concrete wall pours and maintenance process | |
CN107327137A (en) | A kind of heat insulation integrated non-dismantling formworks of STP and its construction technology | |
CN103883026A (en) | Environment-friendly and energy-saving cast-in-place heat preservation composite outer wall system and construction method thereof | |
CN105780976B (en) | Compound concrete shear wall structure and its concreting method | |
CN104712079B (en) | The assembled polypropylene fibre sludge ceramsite concrete wall and its construction method connected based on mat surface | |
CN107313531A (en) | A kind of assembled integral shear wall connecting node and its system and its construction technology | |
CN104727440B (en) | Industrialized production efficiently-assembled type building frame column beam and manufacturing method | |
CN113386255A (en) | Construction and production process of building decoration heat preservation and sound insulation structure integrated plate | |
US7665710B2 (en) | Contoured concrete form | |
CN105507452B (en) | A kind of light concrete built-in heat insulation decorating integrative wall and its construction method | |
CN108277895A (en) | A kind of composite heat preserving external wall system and construction method | |
CN104594633A (en) | Construction method and template structure for umbrella-shaped spatial curved-surface bare concrete | |
CN103883022B (en) | The construction method of space enclosing structure inner-outer wall antidetonation and sound insulation cracking resistance integrated structure | |
CN205502373U (en) | Evaporate and press whole wallboard that keeps warm of aerated concrete | |
CN104675013A (en) | Prefabricated steel fiber recycled brick concrete wall based on T-slot connection and construction method thereof | |
CN205329904U (en) | Integrative wall is decorated to built -in heat preservation of light body concrete | |
CN106337566A (en) | High-strength repairing method for hole of cement prefabricated component | |
CN110258868A (en) | Integrated integral wall body for preparing soil and construction waste, pouring in situ, preserving heat and painting | |
CN104790565A (en) | Cast-in-site ardealite load bearing wall composite structure main building construction method | |
CN210507502U (en) | Prefabricated assembled concrete slab bed structure | |
CN108018972A (en) | Full precast floor slab and laminated floor slab combining structure, making and assembly method | |
CN207377115U (en) | A kind of heat insulation integrated non-dismantling formworks of STP | |
CN103255872A (en) | Hollow building block | |
CN106284990A (en) | A kind of central island prefabricated Cavity structural member of force type cavity building roof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20220513 Address after: 223600 No. 369, Qiaonan group, shuangyao village, TANGJian Town, Shuyang County, Suqian City, Jiangsu Province Applicant after: Shen Zhiyong Address before: 223600 Room 101, building 54, Subei Cheshi Commercial Plaza, Shucheng Town, Suqian City, Jiangsu Province Applicant before: Jiangsu Yibihe Construction Structure Optimization Co.,Ltd. |
|
TA01 | Transfer of patent application right |