CN110258766A - A kind of safe plugging structure and its installation and method for dismounting - Google Patents
A kind of safe plugging structure and its installation and method for dismounting Download PDFInfo
- Publication number
- CN110258766A CN110258766A CN201910392176.9A CN201910392176A CN110258766A CN 110258766 A CN110258766 A CN 110258766A CN 201910392176 A CN201910392176 A CN 201910392176A CN 110258766 A CN110258766 A CN 110258766A
- Authority
- CN
- China
- Prior art keywords
- pipeline
- sand packet
- sand
- packet
- plugging
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F7/00—Other installations or implements for operating sewer systems, e.g. for preventing or indicating stoppage; Emptying cesspools
- E03F7/02—Shut-off devices
Landscapes
- Health & Medical Sciences (AREA)
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Hydrology & Water Resources (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- Pipe Accessories (AREA)
Abstract
The present invention discloses installation and the method for dismounting of a kind of safe plugging structure, comprising the following steps: 1) raw material preparation: depending on the site environment measuring the pipeline blocked, and calculates the closure raw material of needs;2) the first sand packet is piled up: by inspection shaft by inside raw material artificial transmission to pipeline, while along water (flow) direction in pipeline building up inside sand packet;3) plugging block is built: along water (flow) direction after the first sand packet, construction plugging block;4) the second sand packet is piled up: the sand packet accumulated after plugging block along water (flow) direction;5) it blocks and removes: by the protection of the second sand packet; remove the top half of plugging block; then the second sand packet is removed in order again; next by the protection of the first sand packet, the lower half portion of plugging block is removed, finally removes the first sand packet in order; the entire work removed and blocked can be completed; set internal diameter of the pipeline wherein as H1, the piling height of sand packet is H2, and the height of block wall is H3;2 × H2 of the H1=H3, H1 >.
Description
Technical field
The present invention relates to drainage system fields, more particularly to a kind of safe plugging structure and its installation and method for dismounting.
Background technique
Drainage system refers to various waste water, extra surface water and groundwater in collection and discharge human lives' sewage and production
The engineering of (lowering of watertable).Key facility has drainage channels or pipeline and its annex at different levels, depending on different drainings
Object and drainage requirement can also add water pump or other water lifting machineries, sewage treatment building etc..Be mainly used for farmland, mine,
Cities and towns (including factory) and construction site etc..
But in existing drainage system construction due to for example new and old pipe of many reasons plugs into, closed-water test etc. will be to pipeline
It is blocked, there are mainly two types of modes for closure: one is closure of laying bricks, another kind is rubber water-proof air bag, although brick envelope
Stifled is thick brick wall, can play the role of water in blocking pipe, and rubber water-proof air bag blocks water and is used in the built-in rubber of pipeline
Air bag, inflation allows rubber pneumatic bag and duct wall to have enough pressure to achieve the purpose that block water in rubber pneumatic bag, but makes
With or demolishing process in due to hydraulic pressure it is big, can wall be collapsed, while having sharp object that can also break rubber pneumatic bag in water, from
And cause to block and fail, the accidents such as cause casualties occur.
Summary of the invention
A kind of safe plugging structure is provided it is an object of the present invention to avoiding shortcoming in the prior art
Installation and method for dismounting, this method is easy to operate, effective to guarantee to block in installation, operation, the safety for removing three links
Can, effectively increase the generation that envelope water plugging effect reduces accident.
An object of the present invention is achieved through the following technical solutions:
A kind of installation of safe plugging structure and method for dismounting, comprising the following steps:
(1) raw material preparation: dimensional measurement is carried out to the pipeline blocked according to work on the spot environment, then calculating needs
The amount for the closure raw material wanted;
(2) it piles up the first sand packet: by inspection shaft by inside raw material artificial transmission to pipeline, while meeting water along water (flow) direction
Side, in a certain amount of sand packet of pipeline building up inside;
(3) plugging block is built: in the pipeline for completing step (2), along water (flow) direction in first back side Sha Bao, construction one
Block up plugging block compatible with internal diameter of the pipeline size;
(4) the second sand packet is piled up: in the pipeline for completing step (3), along water (flow) direction in the plugging block back side, that is, land side,
A certain amount of sand packet of pipeline building up inside completes entire closure work;
(5) it blocks and removes: in the pipeline for completing step (4), first by the protection of the second sand packet, manual demolition plugging block
Then top half removes the second sand packet in order again, next by the protection of the first sand packet, under manual demolition plugging block
Half part finally removes the first sand packet in order, and the entire work removed and blocked can be completed;
Set internal diameter of the pipeline wherein as H1, the piling height of the first sand packet and the second sand packet is H2, and the height of block wall is H3;
2 × H2 of the H1=H3, H1 >.
Further, in step (3), the plugging block with a thickness of 20cm to 30cm.
Further, in step (2) and step (4), the size dimension of the first sand packet and the second sand packet is 20
× 60cm to 45 × 90cm.
Further, in step (3), the plugging block is block wall of laying bricks.
The utility model has the advantages that the side heap that meets water along water (flow) direction is equipped with the first sand packet, and first due to during installation
The heap of sand packet height is not more than the half of internal diameter of the pipeline, can not only play temporary water dash, facilitate plugging construction, guarantees
Construction quality, while also reducing the water in pipeline and the construction safety blocked is guaranteed to the impact force of closure, while in the first sand packet
Back side construction one block up plugging block compatible with internal diameter of the pipeline size, guarantee plugging effect, be that the side that meets water exists along water (flow) direction
The other side of plugging block, that is, land side heap is equipped with the second sand packet, and the high height of heap of the second sand packet is not more than the two of internal diameter of the pipeline
/ mono-, it can not only prevent from blocking and collapse suddenly when removing, can also prevent having sharp object using rubber pneumatic bag Shi Shuizhong
Rubber pneumatic bag is broken, the safety for guaranteeing construction personnel is avoided.
When simultaneously in the process of dismounting, the envelope on sprue top need to be first sealed off under the protection of land side the second sand packet heap
It is stifled, it then tears land side the second sand packet heap open again, the closure of plugging block lower part is next removed under the protection for the side sand packet heap that meets water,
Finally the first sand packet heap of the side that meets water is removed, while being cooperated between the first sand packet heap, plugging block and the second sand packet heap three
It installs and dismounting sequentially and highly cooperates so that closure is obtained in the security performance of three installation, operation, dismounting links
The reinforcement of very high degree effectively increases envelope water plugging effect, reduces the generation of accident.
The second object of the present invention is to avoid shortcoming in the prior art and provide a kind of safe plugging structure, energy
Enough so that the plugging effect inside pipeline is best, sealing performance is high.
The second object of the present invention is achieved through the following technical solutions:
A kind of safe plugging structure, includes pipeline, is disposed with the first Sha Bao, envelope along water (flow) direction inside the pipeline
Sprue and the second sand packet, the plugging block is between the first sand packet and the second sand packet, the plugging block and the pipeline
Inner wall is fixedly connected.
Further, the pipeline upper end is provided with the inspection shaft being connected to the pipeline.
Further, the first sand packet and the second sand packet heap triangular in shape are set to the inner wall of the pipe.
Further, the inspection shaft upper end is provided with the protection cap being flexibly connected with the inspection shaft.
Further, multiple ladder racks are uniformly fixed on the inner wall of the inspection shaft.
Further, the protection cap is stainless steel protection lid.
The utility model has the advantages that being disposed with the first sand packet, plugging block and the second sand along water (flow) direction due in pipeline
Packet can carry out first time closure to water flow by the first sand packet, then flow into second of closure to water by block wall, finally
The closure of third time carried out by the second sand packet water flow, therefore plugging block cooperates the first sand packet and the second sand packet, between three
Mutual cooperation enable to the plugging effect inside pipeline best, sealing performance is more preferable.
Detailed description of the invention
Invention is described further using attached drawing, but the embodiments in the accompanying drawings do not constitute any limitation to the present invention,
For those of ordinary skill in the art, without creative efforts, it can also be obtained according to the following drawings
Its attached drawing.
Fig. 1 is a kind of installation of safe plugging structure of the invention and the production process schematic diagram of method for dismounting.
Fig. 2 is a kind of overall structure diagram of safe plugging structure of the invention.
Include in figure:
Pipeline 1, inspection shaft 2, plugging block 3, the first sand packet 4, the second sand packet 5, protection cap 6, ladder rack 7.
Specific embodiment
The invention will be further described with the following Examples.
As shown in Figs. 1-2, a kind of installation of safe plugging structure and method for dismounting, comprising the following steps:
(1) raw material preparation: dimensional measurement is carried out to the pipeline 1 blocked according to work on the spot environment, is then calculated
The closure raw material needed;
(2) it piles up the first sand packet 4: by inspection shaft 2 by inside raw material artificial transmission to pipeline, while being met along water (flow) direction
Water side, in a certain amount of sand packet of pipeline building up inside;
(3) plugging block 3 is built: in the pipeline for completing step (2), along water (flow) direction in 4 back side of the first sand packet, construction
One blocks up plugging block 3 compatible with internal diameter of the pipeline size;
(4) the second sand packet 5 is piled up: in the pipeline for completing step (3), along water (flow) direction in the plugging block back side, that is, land side,
In a certain amount of sand packet of pipeline building up inside, entire closure work can be completed;
(5) it blocks and removes: in the pipeline for completing step (4), first by the protection of the second sand packet 5, manual demolition plugging block 3
Top half, the second sand packet 5 is then removed in order again, next by the protection of the first sand packet 4, manual demolition plugging block
The first sand packet 4 is finally removed in 3 lower half portion in order, and the entire work removed and blocked can be completed;
Set internal diameter of the pipeline wherein as H1, the piling height of the first sand packet and the second sand packet is H2, and the height of block wall is H3;
2 × H2 of the H1=H3, H1 >.
In a preferred embodiment, in step (3), the plugging block 3 with a thickness of 25cm, 3 envelope of plugging block of the size
Stifled effect is best.
In a preferred embodiment, in step (2) and step (4), the size dimension of the first sand packet and the second sand packet
It is 35 × 75cm, the sand packet waterproof performance and practical performance of the size are best.
In a preferred embodiment, in step (3), the plugging block 3 is block wall of laying bricks, and can effectively improve closure
The sealing effect of block 3, sealing effect are good.
A kind of safe plugging structure, includes pipeline, is disposed with the first sand along water (flow) direction inside the pipeline
Packet 4, plugging block 3 and the second sand packet 5, the plugging block is between the first sand packet 4 and the second sand packet 5, the plugging block 3
It is fixedly connected with 1 inner wall of pipeline.
In a preferred embodiment, 1 upper end of pipeline is provided with the inspection shaft 2 being connected to the pipeline 1, can be to pipeline
1 inside carries out real-time monitoring, while the later period being made directly can to enter pipe by inspection shaft 2 to the maintenance inside pipeline 1
1 in road, and implement the condition that can also provide when closure to pipeline 1.
In a preferred embodiment, the first sand packet 4 and the second sand packet 5 heap triangular in shape are set to 1 inner wall of pipeline,
It is triangular in shape by setting the first sand packet 4 and the second sand packet 5 all heaps since triangle has highest stability, no
Only the stability of sand packet heap can be effectively improved, while also improve the plugging effect to pipeline.
In a preferred embodiment, 2 upper end of inspection shaft is provided between the inspection shaft 2 through bearing (in figure not
Mark) protection cap 6 that is flexibly connected, it can prevent other exogenous impurities from entering pipeline 1 by inspection shaft 2 by protection cap 6
It is interior, improve the protective value to pipeline 1.
In a preferred embodiment, uniform welding has multiple ladder racks 7 on the inner wall of the inspection shaft 2, in another preferred reality
It applies in example, shown ladder rack 7 is coated with anti-slip layer (not indicating in figure), so that people carry out entering inside pipeline 1
When installation and dismounting block, it can be can smoothly enter into inside pipeline by the ladder rack 7 on 2 side wall of inspection shaft, and can lead to
Anti-slip layer is crossed, security performance of the people in climbing process is improved.
In a preferred embodiment, the protection cap 6 is stainless steel protection lid 6, can increase the service life of protection cap 6.
The utility model has the advantages that the side heap that meets water along water (flow) direction is equipped with the first sand packet, and first due to during installation
The heap of sand packet height is not more than the half of internal diameter of the pipeline, can not only play temporary water dash, facilitate plugging construction, guarantees
Construction quality, while also reducing the water in pipeline and the construction safety blocked is guaranteed to the impact force of closure, while in the first sand packet
Back side construction one block up plugging block compatible with internal diameter of the pipeline size, guarantee plugging effect, be that the side that meets water exists along water (flow) direction
The other side of plugging block, that is, land side heap is equipped with the second sand packet, and the high height of heap of the second sand packet is not more than the two of internal diameter of the pipeline
/ mono-, it can not only prevent from blocking and collapse suddenly when removing, can also prevent having sharp object using rubber pneumatic bag Shi Shuizhong
Rubber pneumatic bag is broken, the safety for guaranteeing construction personnel is avoided.
When simultaneously in the process of dismounting, the envelope on sprue top need to be first sealed off under the protection of land side the second sand packet heap
It is stifled, it then tears land side the second sand packet heap open again, the closure of plugging block lower part is next removed under the protection for the side sand packet heap that meets water,
Finally the first sand packet heap of the side that meets water is removed, while being cooperated between the first sand packet heap, plugging block and the second sand packet heap three
It installs and dismounting sequentially and highly cooperates so that closure is obtained in the security performance of three installation, operation, dismounting links
The reinforcement of very high degree effectively increases envelope water plugging effect, reduces the generation of accident;Due in pipeline, along water (flow) direction according to
It is secondary to be provided with the first sand packet, plugging block and the second sand packet, first time closure can be carried out to water flow by the first sand packet, then led to
It crosses block wall and second of closure is flowed into water, the closure of third time, therefore plugging block are carried out water flow finally by the second sand packet
Cooperate the first sand packet and the second sand packet, the mutual cooperation between three enables to the plugging effect inside pipeline best, sealing
Performance is more preferable.
Finally it should be noted that the above embodiments are merely illustrative of the technical solutions of the present invention, rather than the present invention is protected
The limitation of range is protected, although explaining in detail referring to preferred embodiment to the present invention, those skilled in the art are answered
Work as understanding, it can be with modification or equivalent replacement of the technical solution of the present invention are made, without departing from the reality of technical solution of the present invention
Matter and range.
Claims (10)
1. installation and the method for dismounting of a kind of safe plugging structure, it is characterised in that: the following steps are included:
Raw material preparation: dimensional measurement is carried out to the pipeline blocked according to work on the spot environment, then calculates needs
Closure raw material amount;
It piles up the first sand packet: by inspection shaft by inside raw material artificial transmission to pipeline, while meeting water side along water (flow) direction,
In a certain amount of sand packet of pipeline building up inside;
Build plugging block: in the pipeline for completing step (2), along water (flow) direction at first back side Sha Bao, construction one is stifled
Plugging block compatible with internal diameter of the pipeline size;
Pile up the second sand packet: in the pipeline for completing step (3), along water (flow) direction in the plugging block back side, that is, land side, in pipe
Building up inside a certain amount of sand packet in road completes entire closure work;
Block and remove: in the pipeline for completing step (4), first by the protection of the second sand packet, manual demolition plugging block it is upper
Then half part removes the second sand packet in order again, next by the protection of the first sand packet, the lower half of manual demolition plugging block
The first sand packet is finally removed in part in order, and the entire work removed and blocked can be completed;
Set internal diameter of the pipeline wherein as H1, the piling height of the first sand packet and the second sand packet is H2, and the height of block wall is H3;
2 × H2 of the H1=H3, H1 >.
2. a kind of safe method for blocking for drainage system as described in claim 1, it is characterised in that: in step (3),
The plugging block with a thickness of 20cm to 30cm.
3. a kind of safe method for blocking for drainage system as described in claim 1, it is characterised in that: in step (2) and
In step (4), the size dimension of the first sand packet and the second sand packet is 20 × 60cm to 45 × 90cm.
4. a kind of safe method for blocking for drainage system as described in claim 1, it is characterised in that: in step (3),
The plugging block is block wall of laying bricks.
5. a kind of safe plugging structure, it is characterised in that: a kind of safety closure as described in any one of Claims 1-4
The installation method of structure is made comprising has a pipeline, is disposed with the first Sha Bao, envelope along water (flow) direction inside the pipeline
Sprue and the second sand packet, the plugging block is between the first sand packet and the second sand packet, the plugging block and the pipeline
Inner wall is fixedly connected.
6. a kind of safe plugging structure as claimed in claim 2, it is characterised in that: the pipeline upper end is provided with and the pipe
The inspection shaft of road connection.
7. a kind of safe plugging structure as claimed in claim 3, it is characterised in that: the first sand packet and the second sand Bao Juncheng
Triangle heap is set to the inner wall of the pipe.
8. a kind of safe plugging structure as claimed in claim 3, it is characterised in that: the inspection shaft upper end be provided with it is described
The protection cap that inspection shaft is flexibly connected.
9. a kind of safe plugging structure as claimed in claim 3, it is characterised in that: uniformly fixed on the inner wall of the inspection shaft
There are multiple ladder racks.
10. a kind of safe plugging structure as claimed in claim 3, it is characterised in that: the protection cap is stainless steel protection lid.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910392176.9A CN110258766A (en) | 2019-05-13 | 2019-05-13 | A kind of safe plugging structure and its installation and method for dismounting |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910392176.9A CN110258766A (en) | 2019-05-13 | 2019-05-13 | A kind of safe plugging structure and its installation and method for dismounting |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110258766A true CN110258766A (en) | 2019-09-20 |
Family
ID=67913035
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910392176.9A Pending CN110258766A (en) | 2019-05-13 | 2019-05-13 | A kind of safe plugging structure and its installation and method for dismounting |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110258766A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111031721A (en) * | 2019-12-09 | 2020-04-17 | 广东水利电力职业技术学院(广东省水利电力技工学校) | Quick network deployment electric power instrument controlling means |
CN111795252A (en) * | 2020-07-06 | 2020-10-20 | 深圳市市政工程总公司 | Water injection type water plugging air bag and use method thereof |
CN112458931A (en) * | 2020-10-29 | 2021-03-09 | 上海市政工程设计研究总院(集团)有限公司 | Non-cutoff connection method for double-hole water diversion box culvert |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2533933A1 (en) * | 1975-07-30 | 1977-02-17 | Ludwig Dipl Ing Schmitz | Pipe temporary seal - comprises metal or synthetic central pipe carrying two support rings and inflatable hose |
CN103362204A (en) * | 2012-04-09 | 2013-10-23 | 苏州园林营造工程有限公司 | Method for blocking rain sewage pipeline |
CN105401634A (en) * | 2015-10-23 | 2016-03-16 | 中国十七冶集团有限公司 | Pipeline plugging construction method based on data simulation |
CN105569162A (en) * | 2016-01-13 | 2016-05-11 | 北京建工土木工程有限公司 | Method for blocking bilge wells |
CN207469425U (en) * | 2017-11-17 | 2018-06-08 | 广州自来水专业建安有限公司 | A kind of underwater plugging device of drainpipe |
CN208235703U (en) * | 2018-05-28 | 2018-12-14 | 北京城市排水集团有限责任公司 | One kind exempting from coil type Large Diameter Pipeline plugging device of going into the well |
-
2019
- 2019-05-13 CN CN201910392176.9A patent/CN110258766A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2533933A1 (en) * | 1975-07-30 | 1977-02-17 | Ludwig Dipl Ing Schmitz | Pipe temporary seal - comprises metal or synthetic central pipe carrying two support rings and inflatable hose |
CN103362204A (en) * | 2012-04-09 | 2013-10-23 | 苏州园林营造工程有限公司 | Method for blocking rain sewage pipeline |
CN105401634A (en) * | 2015-10-23 | 2016-03-16 | 中国十七冶集团有限公司 | Pipeline plugging construction method based on data simulation |
CN105569162A (en) * | 2016-01-13 | 2016-05-11 | 北京建工土木工程有限公司 | Method for blocking bilge wells |
CN207469425U (en) * | 2017-11-17 | 2018-06-08 | 广州自来水专业建安有限公司 | A kind of underwater plugging device of drainpipe |
CN208235703U (en) * | 2018-05-28 | 2018-12-14 | 北京城市排水集团有限责任公司 | One kind exempting from coil type Large Diameter Pipeline plugging device of going into the well |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111031721A (en) * | 2019-12-09 | 2020-04-17 | 广东水利电力职业技术学院(广东省水利电力技工学校) | Quick network deployment electric power instrument controlling means |
CN111031721B (en) * | 2019-12-09 | 2024-04-09 | 广东水利电力职业技术学院(广东省水利电力技工学校) | Quick network deployment electric power instrument controlling means |
CN111795252A (en) * | 2020-07-06 | 2020-10-20 | 深圳市市政工程总公司 | Water injection type water plugging air bag and use method thereof |
CN111795252B (en) * | 2020-07-06 | 2021-09-24 | 深圳市市政工程总公司 | Water injection type water plugging air bag and use method thereof |
CN112458931A (en) * | 2020-10-29 | 2021-03-09 | 上海市政工程设计研究总院(集团)有限公司 | Non-cutoff connection method for double-hole water diversion box culvert |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110258766A (en) | A kind of safe plugging structure and its installation and method for dismounting | |
CN108952804B (en) | Tailing filling retaining wall for blocking mining roadway of goaf to be filled and construction method | |
CN105570534B (en) | Shallow overburden push pipe controls the equipment and construction method of ground structure deformation | |
CN109403987B (en) | Shield end horizontal freezing and short steel box combined receiving device and construction method | |
CN111519734B (en) | Silt dredging method for river channel hidden culvert | |
CN203145029U (en) | Plugging structure for deep foundation pit dewatering well | |
CN103266602A (en) | Diameter-expanding pile for manual hole digging and construction method thereof | |
CN111765318A (en) | Pipeline flow guide structure for pipeline repair | |
CN212900365U (en) | Pipeline flow guide structure for pipeline repair | |
CN112282029A (en) | Connection construction method for urban high-water-level large-diameter reinforced concrete sewage pipeline | |
CN208685607U (en) | A kind of PHC tubular pole aperture plugging structure | |
CN108396961A (en) | Construction joint formwork erection method between a kind of dual wall | |
CN213038444U (en) | Temporary device for screening sludge in river channel culvert | |
CN212200511U (en) | Deep foundation pit plugging device | |
CN112832273B (en) | River channel hidden culvert temporary water retaining structure capable of being quickly disassembled, building method and quick disassembling and rebuilding method | |
CN202323934U (en) | Hole forming device for cast-in-situ triangular composite foundation pile | |
CN110685696A (en) | Working well pouring template integrated support frame and working well construction method | |
CN113279429B (en) | Underground diversion operation plugging structure and plugging method | |
CN201764199U (en) | Novel rubber plug for cutting off water of water discharging pipeline | |
CN205857792U (en) | Shear wall concrete replacement bottom provisions for grouting | |
CN216765856U (en) | Full-sleeve full-rotation water-stop secant pile for high confined water stratum | |
CN210858723U (en) | Template integration support frame is pour to working well | |
CN110306553B (en) | Underwater steel pile dismantling device and method | |
CN210798301U (en) | Template end opening gap plugging structure | |
CN212840087U (en) | Heavy-calibre buries a blow off pipe closure structure deeply |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190920 |