CN110258590A - A kind of civil engineering slope protection and production method - Google Patents
A kind of civil engineering slope protection and production method Download PDFInfo
- Publication number
- CN110258590A CN110258590A CN201910503904.9A CN201910503904A CN110258590A CN 110258590 A CN110258590 A CN 110258590A CN 201910503904 A CN201910503904 A CN 201910503904A CN 110258590 A CN110258590 A CN 110258590A
- Authority
- CN
- China
- Prior art keywords
- slope
- protection
- block
- civil engineering
- abaculus
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B3/00—Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
- E02B3/04—Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
- E02B3/12—Revetment of banks, dams, watercourses, or the like, e.g. the sea-floor
- E02B3/14—Preformed blocks or slabs for forming essentially continuous surfaces; Arrangements thereof
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/20—Securing of slopes or inclines
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mining & Mineral Resources (AREA)
- Environmental & Geological Engineering (AREA)
- Ocean & Marine Engineering (AREA)
- Mechanical Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
Abstract
A kind of civil engineering slope protection and production method, it is related to brick or concrete duct field.It includes slope-protection block, abaculus, gutter channel, cover board, circular arc convex block, arc groove, dovetail groove, dovetails, the slope-protection block is square or rectangle structure, the middle position of slope-protection block is provided with through-hole, the front of slope-protection block at left and right sides of through-hole is provided with flowing water groove, the circular arc convex block is fixedly connected on the left side of slope-protection block, the arc groove is mounted remotely from the other end of the slope-protection block of circular arc convex block, the dovetails are mounted on the bottom of slope-protection block, the dovetail groove is mounted remotely from the top of the slope-protection block of dovetails, the abaculus is mounted on the bottom of the slope-protection block of several superpositions, the gutter channel is located at the bottom part down of abaculus, the cover plate lid is in the surface of gutter channel, its structure is simple, it is easy for installation, it can effectively prevent civil engineering slope to come down, simultaneously, it can also be oblique in civil engineering Green plants is planted on slope, it is ensured that good ecological environment.
Description
Technical field
The present invention relates to brick or concrete duct fields, and in particular to a kind of civil engineering slope protection and production method.
Background technique
Currently, in highway, railway, water conservancy and the slope project in mine, through preventing frequently with protection building block slope surface
Shield and greening, due to the combined and spliced performance and side slope of conventional slope-protection block or frame stability and weather conditions the problems such as, lead
It causes protective reinforcing and the afforestation effect of some side slopes undesirable, the side slopes such as slope wash is serious, slope surface is collapsed or even come down occurs
Disease.
For civil engineering side slope, slopes will not only meet slope stability requirement, also require slope leveling to stablize, and the row of being able to satisfy
Water protection and greening require, and in recent years, the protection of side slope mostly uses stone-laying and the bank protecting methods such as concrete precast block of mating formation, still
Stone-laying and mat formation concrete precast block when, be direct laying, and there is no reserved gutter channels for the bottom on slope, so in length
After the use of phase, phenomena such as being easy to appear landslide.
Summary of the invention
In view of the defects and deficiencies of the prior art, the present invention intends to provide a kind of civil engineering slope protection and production sides
Method, its structure is simple, easy for installation, can effectively prevent civil engineering slope and comes down, simultaneously, moreover it is possible to plant on civil engineering slope
Plant green plants, it is ensured that good ecological environment.
To achieve the above object, the present invention is using following technical scheme: it include slope-protection block 1, abaculus 2, gutter channel 3,
Cover board 4, circular arc convex block 5, arc groove 6, dovetail groove 7, dovetails 8, the slope-protection block 1 is square or rectangle structure,
The middle position of slope-protection block 1 is provided with through-hole 11, and the front of the slope-protection block 1 of 11 left and right sides of through-hole is provided with waterway
Slot 12, the circular arc convex block 5 are fixedly connected on the left side of slope-protection block 1, and the arc groove 6 is mounted remotely from circular arc convex block
The other end of 5 slope-protection block 1, the dovetails 8 are mounted on the bottom of slope-protection block 1, and the dovetail groove 7 is mounted remotely from swallow
The top of the slope-protection block 1 of tail block 8, the abaculus 2 are mounted on the bottom of the slope-protection block 1 of several superpositions, the gutter channel 3
In the bottom part down of abaculus 2, the cover board 4 covers the surface in gutter channel 3.
The abaculus 2 is right-angled trapezium component, and the surface of abaculus 2 is evenly arranged with several V-shaped grooves 21.
The bottom of the arc groove 6 is provided with block 61.
The inclined-plane on the oblique angle portion of the abaculus 2 and civil engineering slope is in vertical state.
The slope-protection block 1 is prefabricated integral structure.
Civil engineering slope protection production method: the first step evens the civil engineering slope of slope protection to be installed out, and the angle on slope with
The angle of bevel of abaculus 2 is mutually all 45 °;Second step is levelling in the bottom on civil engineering slope, and the installation site of reserved abaculus 2;The
Three steps dig out gutter channel 3 below the levelling position in civil engineering slope;Prefabricated abaculus 2 is mounted on civil engineering slope bottom by the 4th step
Levelling position;Several slope-protection blocks 1 are coupled by the 5th step from bottom to up by dovetail groove 7 and the cooperation of dovetails 8, and from most
Left side starts;Slope-protection block 1 is continued to install from bottom to up along several slope-protection blocks 1 for being one row of left side by the 6th step, and by second row
Several slope-protection blocks 1 on circular arc convex block 5 be inserted into several 1 arc grooves 6 of slope-protection block of first row.
The working principle of the invention: slope-protection block 1 is square or rectangle structure, and the middle position of slope-protection block 1 is provided with
Through-hole 11 can plant flowers and plants in the inside of through-hole 11, and while increasing ecological environment, the foundation of green plants can also be grabbed
The front on the firmly civil engineering slope of slope protection bottom, the slope-protection block 1 of 11 left and right sides of through-hole is provided with flowing water groove 12, flowing water groove 12
For being convenient for the trickling of rainwater in rainwater weather, circular arc convex block 5 is fixedly connected on the left side of slope-protection block 1, and arc groove 6 is mounted on
The other end of slope-protection block 1 far from circular arc convex block 5, when slope-protection block 1 is mounted on civil engineering slope protection, slope protection is laterally across circular arc convex block
5 and arc groove 6 connect, block 61 can prevent adjacent slope-protection block 1 from dropping, and dovetails 8 are mounted on the bottom of slope-protection block 1
Portion, dovetail groove 7 is mounted remotely from the top of the slope-protection block 1 of dovetails 8, and when slope-protection block 1 is mounted on civil engineering slope protection, slope protection is longitudinal
It is cooperatively connected by dovetail groove 7 and dovetails 8, abaculus 2 is mounted on the bottom of the slope-protection block 1 of several superpositions, and abaculus 2 is slope protection
Support abaculus, the inclined-plane on the oblique angle portion of abaculus 2 and civil engineering slope is in vertical state, it can be ensured that slope-protection block 1 is mounted on abaculus 2
When, the lower part right-angle side of slope-protection block 1 and the bevel edge of abaculus 2 coincide.
After adopting the above technical scheme, the invention has the following beneficial effects: its structure is simple, it is easy for installation, can effectively it prevent
Only civil engineering slope is come down, simultaneously, moreover it is possible to plant green plants on civil engineering slope, it is ensured that good ecological environment.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below
There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this
Some embodiments of invention without any creative labor, may be used also for those of ordinary skill in the art
To obtain other drawings based on these drawings.
Fig. 1 is the installation structure diagram of the invention;
Fig. 2 is the structural schematic diagram of slope-protection block 1 in the present invention;
Fig. 3 is the structural schematic diagram of circular arc convex block 5 and arc groove 6 in the present invention;
Fig. 4 is the structural schematic diagram of dovetail groove 7 and dovetails 8 in the present invention;
Fig. 5 is the structural schematic diagram of abaculus 2 in the present invention;
Fig. 6 is the attachment structure schematic diagram of slope-protection block 1 in the present invention.
Description of symbols: slope-protection block 1, abaculus 2, gutter channel 3, cover board 4, circular arc convex block 5, arc groove 6, dovetail groove 7,
Dovetails 8, through-hole 11, flowing water groove 12, V-shaped groove 21, block 61.
Specific embodiment
Referring to shown in Fig. 1-Fig. 6, present embodiment the technical solution adopted is that: it includes slope-protection block 1, abaculus 2, stream
Sink 3, cover board 4, circular arc convex block 5, arc groove 6, dovetail groove 7, dovetails 8, the slope-protection block 1 is square or rectangle
Structure, the middle position of slope-protection block 1 are provided with through-hole 11, and the front of the slope-protection block 1 of 11 left and right sides of through-hole is provided with
Flowing water groove 12, the circular arc convex block 5 are fixedly connected on the left side of slope-protection block 1, and the arc groove 6 is mounted remotely from circle
The other end of the slope-protection block 1 of arc convex block 5, the dovetails 8 are mounted on the bottom of slope-protection block 1, and the dovetail groove 7 is mounted on
The top of slope-protection block 1 far from dovetails 8, the abaculus 2 are mounted on the bottom of the slope-protection block 1 of several superpositions, the stream
Sink 3 is located at the bottom part down of abaculus 2, and the cover board 4 covers the surface in gutter channel 3.
The abaculus 2 is right-angled trapezium component, and the surface of abaculus 2 is evenly arranged with several V-shaped grooves 21, V-arrangement
Slot 21 is used to for the rainwater on flowing water groove 12 being drained to the inside of gutter channel 3.
The bottom of the arc groove 6 is provided with block 61, and for several slope-protection blocks 1 when being sequentially overlapped arrangement, slope protection is vertical
It is cooperatively connected to by dovetail groove 7 and dovetails 8, slope protection is connected laterally across circular arc convex block 5 and arc groove 6, and block 61 can
To prevent adjacent slope-protection block 1 from dropping.
In vertical state, abaculus 2 is the support abaculus of slope protection, embedding on the inclined-plane on the oblique angle portion of the abaculus 2 and civil engineering slope
The inclined-plane on the oblique angle portion of block 2 and civil engineering slope is in vertical state, it can be ensured that when slope-protection block 1 is mounted on abaculus 2, slope-protection block 1
The bevel edge of lower part right-angle side and abaculus 2 coincide.
The slope-protection block 1 is prefabricated integral structure, is conveniently installed on civil engineering slope.
Civil engineering slope protection production method: the first step evens the civil engineering slope of slope protection to be installed out, and the angle on slope with
The angle of bevel of abaculus 2 is mutually all 45 °;Second step is levelling in the bottom on civil engineering slope, and the installation site of reserved abaculus 2;The
Three steps dig out gutter channel 3 below the levelling position in civil engineering slope;Prefabricated abaculus 2 is mounted on civil engineering slope bottom by the 4th step
Levelling position;Several slope-protection blocks 1 are coupled by the 5th step from bottom to up by dovetail groove 7 and the cooperation of dovetails 8, and from most
Left side starts;Slope-protection block 1 is continued to install from bottom to up along several slope-protection blocks 1 for being one row of left side by the 6th step, and by second row
Several slope-protection blocks 1 on circular arc convex block 5 be inserted into several 1 arc grooves 6 of slope-protection block of first row.
The working principle of the invention: slope-protection block 1 is square or rectangle structure, and the middle position of slope-protection block 1 is provided with
Through-hole 11 can plant flowers and plants in the inside of through-hole 11, and while increasing ecological environment, the foundation of green plants can also be grabbed
The front on the firmly civil engineering slope of slope protection bottom, the slope-protection block 1 of 11 left and right sides of through-hole is provided with flowing water groove 12, flowing water groove 12
For being convenient for the trickling of rainwater in rainwater weather, circular arc convex block 5 is fixedly connected on the left side of slope-protection block 1, and arc groove 6 is mounted on
The other end of slope-protection block 1 far from circular arc convex block 5, when slope-protection block 1 is mounted on civil engineering slope protection, slope protection is laterally across circular arc convex block
5 and arc groove 6 connect, block 61 can prevent adjacent slope-protection block 1 from dropping, and dovetails 8 are mounted on the bottom of slope-protection block 1
Portion, dovetail groove 7 is mounted remotely from the top of the slope-protection block 1 of dovetails 8, and when slope-protection block 1 is mounted on civil engineering slope protection, slope protection is longitudinal
It is cooperatively connected by dovetail groove 7 and dovetails 8, abaculus 2 is mounted on the bottom of the slope-protection block 1 of several superpositions, and abaculus 2 is slope protection
Support abaculus, the inclined-plane on the oblique angle portion of abaculus 2 and civil engineering slope is in vertical state, it can be ensured that slope-protection block 1 is mounted on abaculus 2
When, the lower part right-angle side of slope-protection block 1 and the bevel edge of abaculus 2 coincide.
After adopting the above technical scheme, the invention has the following beneficial effects: its structure is simple, it is easy for installation, can effectively it prevent
Only civil engineering slope is come down, simultaneously, moreover it is possible to plant green plants on civil engineering slope, it is ensured that good ecological environment.
The above is only used to illustrate the technical scheme of the present invention and not to limit it, and those of ordinary skill in the art are to this hair
The other modifications or equivalent replacement that bright technical solution is made, as long as it does not depart from the spirit and scope of the technical scheme of the present invention,
It is intended to be within the scope of the claims of the invention.
Claims (6)
1. a kind of civil engineering slope protection, it is characterised in that: it includes slope-protection block (1), abaculus (2), gutter channel (3), cover board (4), circle
Arc convex block (5), arc groove (6), dovetail groove (7), dovetails (8), the slope-protection block (1) is square or rectangle knot
Structure, the middle position of slope-protection block (1) are provided with through-hole (11), the front of the slope-protection block (1) at left and right sides of the through-hole (11)
It is provided with flowing water groove (12), the circular arc convex block (5) is fixedly connected on the left side of slope-protection block (1), the arc groove
(6) it is mounted remotely from the other end of the slope-protection block (1) of circular arc convex block (5), the dovetails (8) are mounted on slope-protection block (1)
Bottom, the dovetail groove (7) are mounted remotely from the top of the slope-protection block (1) of dovetails (8), and the abaculus (2) is mounted on
The bottom of the slope-protection block (1) of several superpositions, the gutter channel (3) are located at the bottom part down of abaculus (2), the cover board (4)
Cover the surface in gutter channel (3).
2. a kind of civil engineering slope protection according to claim 1, it is characterised in that: the abaculus (2) is right-angled trapezium structure
Part, and several V-shaped grooves (21) are evenly arranged with right above abaculus (2).
3. a kind of civil engineering slope protection according to claim 1, it is characterised in that: the bottom of the arc groove (6) is set
It is equipped with block (61).
4. a kind of civil engineering slope protection according to claim 1, it is characterised in that: the oblique angle portion of the abaculus (2) and soil
Build the inclined-plane on slope in vertical state.
5. a kind of civil engineering slope protection according to claim 1, it is characterised in that: the slope-protection block (1) is prefabricated one
Change structure.
6. a kind of civil engineering slope protection according to claim 1 and production method, it is characterised in that its production method includes
Following steps: the first step evens the civil engineering slope of slope protection to be installed out, and the angle of bevel phase of the angle on slope and abaculus (2)
It is all 45 °;Second step is levelling in the bottom on civil engineering slope, and the installation site of reserved abaculus (2);Third step is looked on civil engineering slope
Dig out gutter channel (3) in the lower section that prosposition is set;Prefabricated abaculus (2) is mounted on the levelling position in civil engineering slope bottom by the 4th step;
5th step cooperates several slope-protection blocks (1) by dovetail groove (7) and dovetails (8) to be coupled from bottom to up, and from the leftmost side
Start;Slope-protection block (1) is continued to install from bottom to up along several slope-protection blocks (1) for being one row of left side by the 6th step, and by second row
Several slope-protection blocks (1) on circular arc convex block (5) be inserted into several slope-protection blocks of first row (1) arc groove (6).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910503904.9A CN110258590A (en) | 2019-06-12 | 2019-06-12 | A kind of civil engineering slope protection and production method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910503904.9A CN110258590A (en) | 2019-06-12 | 2019-06-12 | A kind of civil engineering slope protection and production method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110258590A true CN110258590A (en) | 2019-09-20 |
Family
ID=67917727
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910503904.9A Pending CN110258590A (en) | 2019-06-12 | 2019-06-12 | A kind of civil engineering slope protection and production method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110258590A (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH11256585A (en) * | 1998-03-16 | 1999-09-21 | Woody Sannai:Kk | Method for constructing civil engineering structure |
CN203049592U (en) * | 2013-02-02 | 2013-07-10 | 吉林省恒晟环保建材开发有限公司 | Diamond slope protection brick |
CN206428710U (en) * | 2017-01-24 | 2017-08-22 | 殷绍斌 | A kind of road ecology revetment brick and road ecology bank protection |
CN206916696U (en) * | 2016-10-28 | 2018-01-23 | 上海市政工程设计研究总院(集团)有限公司 | A kind of revetment block and bank protection |
CN207484492U (en) * | 2017-09-30 | 2018-06-12 | 河北省水利水电勘测设计研究院 | A kind of anti-erosion slope protection structure of high soil slope |
-
2019
- 2019-06-12 CN CN201910503904.9A patent/CN110258590A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH11256585A (en) * | 1998-03-16 | 1999-09-21 | Woody Sannai:Kk | Method for constructing civil engineering structure |
CN203049592U (en) * | 2013-02-02 | 2013-07-10 | 吉林省恒晟环保建材开发有限公司 | Diamond slope protection brick |
CN206916696U (en) * | 2016-10-28 | 2018-01-23 | 上海市政工程设计研究总院(集团)有限公司 | A kind of revetment block and bank protection |
CN206428710U (en) * | 2017-01-24 | 2017-08-22 | 殷绍斌 | A kind of road ecology revetment brick and road ecology bank protection |
CN207484492U (en) * | 2017-09-30 | 2018-06-12 | 河北省水利水电勘测设计研究院 | A kind of anti-erosion slope protection structure of high soil slope |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108301280B (en) | Permeable pavement structure | |
CN104652214A (en) | Paving method of water-permeable pavement | |
CN103122622B (en) | Pre-fabricated drainage type slope protection structure and construction method thereof | |
CN207700330U (en) | A kind of concave herbaceous field grass-planting ecological ditch | |
CN211256551U (en) | Ecological gardens road drainage structures in sponge city | |
CN211080261U (en) | Highway side slope protective structure | |
CN211006528U (en) | Hydraulic engineering design slope protection structure | |
CN104594155A (en) | Permeable pavement laying method | |
CN110258590A (en) | A kind of civil engineering slope protection and production method | |
CN214301528U (en) | Sponge transformation system for urban river retaining wall | |
CN210597199U (en) | Ecological bank protection in gardens | |
CN213709368U (en) | Removable combination formula ecological retaining wall | |
CN210151667U (en) | A seepage prevention structure for city river course | |
CN111778925B (en) | River channel ecological slope protection structure and construction method thereof | |
CN209482082U (en) | A kind of assembled gap porous pavement of novel belt rain water collecting system | |
CN209277178U (en) | A kind of novel solid native highway slope protection | |
CN208300421U (en) | A kind of environmental and ecological wall construction of hydraulic engineering | |
CN219315762U (en) | Road slope protection structure of land wind farm | |
CN206521804U (en) | Excavation section drainage system | |
CN219195822U (en) | Ecological side slope structure of river course is prevented silting by water conservancy diversion formula | |
CN213772778U (en) | Tunnel antiseep combined type road surface | |
CN219430679U (en) | Seepage-proofing lining surrounding channel structure | |
CN204940048U (en) | A kind of Afforestation Landscape road | |
CN217104932U (en) | Interlocking type ecological slope protection brick | |
CN216640132U (en) | Ecological side ditch of urban road design |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190920 |
|
RJ01 | Rejection of invention patent application after publication |