- CN110258547A CN110258547A CN201910412327.2A CN201910412327A CN110258547A CN 110258547 A CN110258547 A CN 110258547A CN 201910412327 A CN201910412327 A CN 201910412327A CN 110258547 A CN110258547 A CN 110258547A
- Authority
- CN
- China
- Prior art keywords
- steel
- pipe pile
- flange
- cover
- flange cover
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 46
- 239000010959 steel Substances 0.000 title claims abstract description 46
- 238000003672 processing method Methods 0.000 title claims abstract description 12
- 238000000034 method Methods 0.000 claims abstract description 9
- 239000000463 material Substances 0.000 claims description 18
- 230000003014 reinforcing effect Effects 0.000 claims description 7
- 239000000945 filler Substances 0.000 claims description 6
- 238000010276 construction Methods 0.000 abstract description 14
- 238000005516 engineering process Methods 0.000 abstract description 2
- 230000000694 effects Effects 0.000 description 6
- 239000000499 gel Substances 0.000 description 4
- 230000005540 biological transmission Effects 0.000 description 3
- 241000233855 Orchidaceae Species 0.000 description 2
- 239000002689 soil Substances 0.000 description 2
- 229910000975 Carbon steel Inorganic materials 0.000 description 1
- 229920000965 Duroplast Polymers 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000010962 carbon steel Substances 0.000 description 1
- 238000005260 corrosion Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 238000009413 insulation Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 238000003032 molecular docking Methods 0.000 description 1
- 238000004806 packaging method and process Methods 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 239000011435 rock Substances 0.000 description 1
- 238000007789 sealing Methods 0.000 description 1
- 238000010008 shearing Methods 0.000 description 1
- 230000035939 shock Effects 0.000 description 1
- 238000007569 slipcasting Methods 0.000 description 1
- 229910000679 solder Inorganic materials 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/52—Piles composed of separable parts, e.g. telescopic tubes ; Piles composed of segments
- E02D5/523—Piles composed of separable parts, e.g. telescopic tubes ; Piles composed of segments composed of segments
- E02D5/526—Connection means between pile segments
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Piles And Underground Anchors (AREA)
Abstract
Description
Claims (14)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910412327.2A CN110258547A (zh) | 2019-05-17 | 2019-05-17 | 一种钢管桩接头及其处理方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910412327.2A CN110258547A (zh) | 2019-05-17 | 2019-05-17 | 一种钢管桩接头及其处理方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110258547A true CN110258547A (zh) | 2019-09-20 |
Family
ID=67913291
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910412327.2A Pending CN110258547A (zh) | 2019-05-17 | 2019-05-17 | 一种钢管桩接头及其处理方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110258547A (zh) |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2009024436A (ja) * | 2007-07-23 | 2009-02-05 | Chiyoda Koei Kk | 鋼管杭の機械式継手 |
CN201757231U (zh) * | 2010-07-06 | 2011-03-09 | 上海瑞孚管路系统有限公司 | 超高压管接头结构 |
CN202787248U (zh) * | 2012-09-21 | 2013-03-13 | 天津港航桩业有限公司 | 预应力混凝土管桩抱箍式机械快速接头 |
CN203270556U (zh) * | 2013-05-23 | 2013-11-06 | 福州第七建筑工程有限公司 | 一种管桩对接处的加固结构 |
CN203613533U (zh) * | 2013-12-12 | 2014-05-28 | 本溪银龙预应力材料有限公司 | 一种加强型预应力管桩 |
CN205000329U (zh) * | 2015-08-12 | 2016-01-27 | 刘文海 | 接头器 |
CN205387716U (zh) * | 2016-03-21 | 2016-07-20 | 王佩振 | 一种通信铁塔管桩基础 |
CN205557551U (zh) * | 2016-04-06 | 2016-09-07 | 福州大学 | 配置钢筋的海上风电机组基础灌浆套管连接结构 |
-
2019
- 2019-05-17 CN CN201910412327.2A patent/CN110258547A/zh active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2009024436A (ja) * | 2007-07-23 | 2009-02-05 | Chiyoda Koei Kk | 鋼管杭の機械式継手 |
CN201757231U (zh) * | 2010-07-06 | 2011-03-09 | 上海瑞孚管路系统有限公司 | 超高压管接头结构 |
CN202787248U (zh) * | 2012-09-21 | 2013-03-13 | 天津港航桩业有限公司 | 预应力混凝土管桩抱箍式机械快速接头 |
CN203270556U (zh) * | 2013-05-23 | 2013-11-06 | 福州第七建筑工程有限公司 | 一种管桩对接处的加固结构 |
CN203613533U (zh) * | 2013-12-12 | 2014-05-28 | 本溪银龙预应力材料有限公司 | 一种加强型预应力管桩 |
CN205000329U (zh) * | 2015-08-12 | 2016-01-27 | 刘文海 | 接头器 |
CN205387716U (zh) * | 2016-03-21 | 2016-07-20 | 王佩振 | 一种通信铁塔管桩基础 |
CN205557551U (zh) * | 2016-04-06 | 2016-09-07 | 福州大学 | 配置钢筋的海上风电机组基础灌浆套管连接结构 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209144637U (zh) | 一种圆柱桥墩的拼装接头结构 | |
CN209040117U (zh) | 一种预制可拼接防腐蚀钢套筒挤土钻入桩 | |
CN205476091U (zh) | 一种现浇混凝土结构用钢筋全灌浆连接套筒 | |
CN107386434A (zh) | 一种混凝土柱与混凝土柱的新型装配式连接结构 | |
CN207812277U (zh) | 一种预制桥墩与预制承台的拼接结构 | |
CN110258547A (zh) | 一种钢管桩接头及其处理方法 | |
CN107130513A (zh) | 一种复合钢管混凝土叠合桥墩 | |
CN110670581A (zh) | 一种预制空心抗拔桩插销式连接结构 | |
CN104278690B (zh) | 一种新型高压输电线路铁塔桩基础 | |
CN107327196A (zh) | 一种平滑型拼接电杆 | |
CN206570833U (zh) | 一种提高地基承载力的复合桩 | |
CN213448450U (zh) | 一种便于运输的超长管桩 | |
CN205557551U (zh) | 配置钢筋的海上风电机组基础灌浆套管连接结构 | |
CN208857811U (zh) | 一种钢管桩超大吨位预应力封桩结构 | |
CN207987918U (zh) | 一种预制混凝土桩及桩结构 | |
CN208323750U (zh) | 一种预应力管桩填芯混凝土浇筑漏斗 | |
CN209669854U (zh) | 一种水泥土复合桩 | |
CN107023019B (zh) | 基坑支护结构中的混凝土-装配式型钢混合围檩及其施工方法 | |
CN208280017U (zh) | 一种预制装配式立柱用半灌浆钢筋连接套筒 | |
CN107060362B (zh) | 基于预应力钢板的混凝土梁负弯矩区加固结构 | |
CN203213102U (zh) | 预应力混凝土管桩对接构件 | |
CN106930339B (zh) | 一种用于逆变器箱变平台的桩基加固方法 | |
CN210341932U (zh) | 一种注浆管固定支架 | |
CN208379582U (zh) | 一种现浇大管桩成孔器内活瓣 | |
CN207268047U (zh) | 一种插入厚板中的竖向钢筋固定装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20200519 Address after: 100192 Beijing city Haidian District Qinghe small Camp Road No. 15 Applicant after: CHINA ELECTRIC POWER RESEARCH INSTITUTE Co.,Ltd. Applicant after: STATE GRID CORPORATION OF CHINA Applicant after: STATE GRID ZHEJIANG ELECTRIC POWER CO., LTD. NINGBO POWER SUPPLY Co. Address before: 100192 Beijing city Haidian District Qinghe small Camp Road No. 15 Applicant before: CHINA ELECTRIC POWER RESEARCH INSTITUTE Co.,Ltd. Applicant before: STATE GRID CORPORATION OF CHINA |
|
TA01 | Transfer of patent application right | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |