CN110258335A - A kind of interim water guide drainage arrangement in bridge construction - Google Patents

A kind of interim water guide drainage arrangement in bridge construction Download PDF

Info

Publication number
CN110258335A
CN110258335A CN201910386721.3A CN201910386721A CN110258335A CN 110258335 A CN110258335 A CN 110258335A CN 201910386721 A CN201910386721 A CN 201910386721A CN 110258335 A CN110258335 A CN 110258335A
Authority
CN
China
Prior art keywords
water guide
bridge construction
drainage
drainage arrangement
bridge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910386721.3A
Other languages
Chinese (zh)
Inventor
徐骁
于进
谷晶磊
姚野
谢琴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kunshan Traffic And Navigation Engineering Co Ltd
Original Assignee
Kunshan Traffic And Navigation Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kunshan Traffic And Navigation Engineering Co Ltd filed Critical Kunshan Traffic And Navigation Engineering Co Ltd
Priority to CN201910386721.3A priority Critical patent/CN110258335A/en
Publication of CN110258335A publication Critical patent/CN110258335A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/08Damp-proof or other insulating layers; Drainage arrangements or devices ; Bridge deck surfacings
    • E01D19/086Drainage arrangements or devices
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Abstract

The present invention relates to construction drainage equipment technical fields, interim water guide drainage arrangement in specially a kind of bridge construction, including Quick drainage area, walking passageway is provided with above the Quick drainage area, the underside of the walking passageway is connected with promotion power facility;The anti-stacking mechanism of floating material is fixedly connected with below the promotion power facility;Collection blowdown funnel is installed in being equipped in the anti-stacking mechanism of floating material, which is followed successively by blowdown funnel and collection bucket from top to bottom;The top side in the Quick drainage area offers suspended matter storage compartment;The bottom in the Quick drainage area is fixedly installed with rapid drainage wheel, and fast row's pump is provided on the right side of rapid drainage wheel, accelerate water guide draining, the impact force to bridge is reduced, drain measure arranges suspended impurity and silt is controllable, reduces the generation of safety accident, it improves water conservancy diversion and drains efficiency, it is convenient to use, it is used convenient for Fast Installation, has preferable purposes in bridge draining field.

Description

A kind of interim water guide drainage arrangement in bridge construction
Technical field
Water guide drainage arrangement the present invention relates to construction drainage equipment technical field, in specially a kind of bridge construction.
Background technique
Bridge construction is the building type generally used by urban construction, and unit in charge of construction builds cross a river stream, sea area, valley Or the space buildings object of other obstacles, many convenience are provided to China's communications and transportation.The action of bridge construction is complicated, Need engineer well-designed, content includes quality control, Stress Control, geometry control and security control etc., wherein most heavy What is wanted is to the control of the quality of bridge entirety, it is necessary to do a good job of it quality control management work, eliminate bridge construction in terms of quality Security risk, structure is complicated for existing bridge water guide drainage arrangement, and operation difficulty is big, not to by draining in floating material and its Impurity is handled, and is easy accumulation and is increased water flow to the impact load of bridge, while not carrying out at fast row to the silt of bottom Reason, long-term gambling plug be easy to cause the waterpower of bridge pile foundation to rush damage, and the presence of the above problem be easy to cause the security risk of bridge, together When existing bridge water guide draining cannot the load discharge capacity to water flow carry out control water conservancy diversion and adjusting, do not adapt to the change of water flow load Change biggish construction, therefore is badly in need of developing a kind of bridge water guide drainage arrangement.
Summary of the invention
The purpose of the present invention is to provide the interim water guide drainage arrangements in a kind of bridge construction, to solve above-mentioned background skill In art the problem of at least one proposition.
The present invention provides the interim water guide drainage arrangements in a kind of bridge construction, including Quick drainage area, feature to exist In: walking passageway is provided with above the Quick drainage area;The underside of the walking passageway is connected with promotion power Facility;The anti-stacking mechanism of floating material is fixedly connected with below the promotion power facility;In the anti-stacking mechanism of floating material Collection blowdown funnel is installed, which is followed successively by blowdown funnel and collection bucket from top to bottom in being equipped with;The quick row The top side in pool offers suspended matter storage compartment;The bottom in the Quick drainage area is fixedly installed with rapid drainage wheel, and Fast row's pump is provided on the right side of rapid drainage wheel;The side in the Quick drainage area is provided with water inlet.
Preferably, the promotion power facility includes hydraulic device and connecting shaft.
Preferably, the outlet diameter size on the blowdown funnel is greater than the outlet of collection bucket.
Preferably, diversion trench is provided on the suspended matter storage compartment.
Preferably, controlling cable is fixedly connected on the right side of the rapid drainage wheel, and controlling cable is connected to fast row's pump.
Preferably, cutting blade is fixedly connected in the water inlet.
Preferably, excretion suspended matter filtered water outlet is offered on the outer wall at the Quick drainage Qu Jinfang stacking mechanism, And valve is fixedly connected on excretion suspended matter filtered water outlet.
Preferably, it is fixedly connected with promotion control button on the walking passageway, and promotes control button and is electrically connected at Promote power facility.
Preferably, bridge floor load-bearing detector, and the other end electricity of bridge floor load-bearing detector are provided on the walking passageway Property is connected to promotion control button.
Preferably, the one circle padded coaming of surrounding package of the anti-stacking mechanism of the floating material.Through the above technical solutions, adopting It prevents from silt stone from being collided with padded coaming to shake out, anticollision anti-leakage is good.
Compared with prior art, the beneficial effects of the present invention are: interim water guide drainage arrangement structure in this bridge construction Simply, easy for installation, stable structure, long service life is at low cost, and multilayer salvaging is poured out, and reduction is drained the miscellaneous of suspended impurity Impact of the water flow that matter accumulation generates to bridge, while the excretion wheel rotation in suspended matter storage compartment is passed through by the silt stone of lower section Transporting defeated exclusion prevents from accumulating, and increases the discharge capacity and water guide and excretion of water, reduces water flow to the impact force of pontic, reduces Security risk, safety and environmental protection, drain measure arranges suspended impurity and silt is controllable, reduces the generation of safety accident, improves water conservancy diversion Efficiency is drained, it is convenient to use, it is used convenient for Fast Installation.
Detailed description of the invention
The drawings described herein are used to provide a further understanding of the present invention, constitutes a part of the invention, this hair Bright illustrative embodiments and their description are used to explain the present invention, and are not constituted improper limitations of the present invention.In the accompanying drawings:
Fig. 1 faces the schematic diagram of the section structure for entirety of the invention;
Fig. 2 is the anti-stacking mechanism the schematic diagram of the section structure of floating material of the invention;
Fig. 3 is Quick drainage area bottom installation structure the schematic diagram of the section structure of the invention;
Fig. 4 is the structural schematic diagram of excretion suspended matter filtered water outlet section of the invention.
In figure: 1- Quick drainage area;2- walking passageway;3- promotes power facility;The anti-stacking mechanism of 4- floating material;5- blowdown Bucket;6- collection bucket;7- suspended matter storage compartment;8- rapid drainage wheel;9- arranges pump fastly;10- water inlet;11- hydraulic device;12- connects Spindle;13- diversion trench;14- controlling cable;15- cutting blade;16- drains suspended matter filtered water outlet;17- valve;18- is promoted Control button;19- padded coaming;20- bridge floor load-bearing detector.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
It please refers to shown in Fig. 1, Fig. 2, Fig. 3 and Fig. 4, the embodiment of the invention provides the interim water guides in a kind of bridge construction The top of drainage arrangement, including Quick drainage area 1, the Quick drainage area 1 is provided with walking passageway 2;The walking passageway 2 Underside be connected with promoted power facility 3;The lower section for promoting power facility 3 is fixedly connected with the anti-tractor-drawn rake of floating material Structure 4;Collection blowdown funnel is installed in the anti-stacking mechanism 4 of floating material, which is followed successively by blowdown funnel 5 from top to bottom With collection bucket 6;The top side in the Quick drainage area 1 offers suspended matter storage compartment 7;The bottom in the Quick drainage area 1 It is fixedly installed with rapid drainage wheel 8, and the right side of rapid drainage wheel 8 is provided with fast row's pump 9;The side in the Quick drainage area 1 It is provided with water inlet 10;Suspended impurity will be drained to enter in Quick drainage area 1 from water inlet 10, when draining one section it Afterwards, then it promotes power facility 3 and can then control the floating material moved down, thereon and pass through the blowdown funnel 5 and collection bucket on anti-stacking mechanism 4 6 the suspended impurity floated out is separated with floating material prevent suspension floating material stop accumulation increase pontic by impact force, compared with Few pontic damage, ensures bridge safety and stability, and impurity and floating material are drained after suspended impurity takes out, silt stone below It prevents from accumulating by the exclusion of excretion wheel rotary transport in Quick drainage area 1, increases the discharge capacity and water guide and excretion of water, drop Low impact force of the water flow to pontic reduces security risk, and while rapid drainage wheel 8 operates silt, water passes through row's pump 9 fastly It is ejected into outside Quick drainage area 1 and is quickly discharged from, increase water guide and drainability, promote power facility 3, the anti-stacking mechanism of floating material 4, blowdown funnel 5 and collection bucket 6 are cleared up in time by clear water, convenient for being recycled and improving working efficiency.
Further, the promotion power facility 3 includes hydraulic device 11 and connecting shaft 12, the control connection of hydraulic device 11 The case where decline of axis 12 moves, reduces the suspended impurity of floating, improves the stability of water conservancy diversion excretion and device.
Further, the outlet diameter size on the blowdown funnel 5 is greater than the outlet of collection bucket 6, salvages by multistage Out, the efficiency for being drained suspended impurity is improved.
Further, diversion trench 13 is provided on the suspended matter storage compartment 7.
Further, the right side of the rapid drainage wheel 8 is fixedly connected with controlling cable 14, and controlling cable 14 and fast row 9 connection of pump.
Further, it is fixedly connected with cutting blade 15 in the water inlet 10, when salvaging is poured out again, by suspension The cutting of object increases the excretion of excreta.
Further, excretion suspended matter drainage is offered on the outer wall at the nearly anti-stacking mechanism in the Quick drainage area 1 to go out Mouth 16, and drain and be fixedly connected with valve 17 on suspended matter filtered water outlet 16, the volume and moisture of excretion suspended matter are reduced, is prevented It ferments smelly.
Further, it is fixedly connected on the walking passageway 2 and promotes control button 18, and promote control button 18 electrically It is connected to and promotes power facility 3.
Further, bridge floor load-bearing detector 20 is provided on the walking passageway 2, and bridge floor load-bearing detector 20 is another One end, which is electrically connected at, promotes control button 18, and flexibly control promotes control button 18, is detected and is drained by testing agency Then start after suspended matter and promote control button 18, control promotes the lifting process of power facility 3, reduces the generation of safety accident.
Further, the one circle padded coaming 19 of surrounding package of the anti-stacking mechanism 4 of the floating material, prevents silt stone quilt Collision shakes out, and anticollision anti-leakage is good.
The working principle of the invention: will be drained suspended impurity and enter in Quick drainage area 1 from water inlet 10, walking The bridge floor load-bearing detector 20 being arranged on channel 2, which is electrically connected at, promotes control button 18, and flexibly control promotes control button 18, It detects then to start after being drained suspended matter by testing agency and promotes control button 18, promoting power facility 3 can then control down It moves, control promotes the lifting process of power facility 3, and reduction suspended impurity accumulation increases bridge water flow impact pressure and causes safety accident Occur, promoting power facility 3 includes hydraulic device 11 and connecting shaft 12, and hydraulic device 11 controls the decline movement of connecting shaft 12, beats Fishing reduces the case where suspended impurity to float, improves the stability of water conservancy diversion excretion and device, the anti-tractor-drawn rake of floating material thereon Blowdown funnel 5 and collection bucket 6 on structure 4 separate the suspended impurity floated out with floating material, the outlet diameter size on blowdown funnel 5 Greater than the outlet of collection bucket 6, is poured out by multistage salvaging, step up the efficiency for being drained suspended impurity, and the anti-heap of floating material The one circle padded coaming 19 of surrounding package of product mechanism 4, prevents silt stone from being collided and shakes out, anticollision anti-leakage is good, quickly arranges Excretion suspended matter filtered water outlet 16 is offered on outer wall at the nearly anti-stacking mechanism in pool 1, and drains suspended matter filtered water outlet 16 On be fixedly connected with valve 17, reduce the volume and moisture of excretion suspended matter, prevent from fermenting smelly, impurity and floating material are arranged After letting out suspended impurity taking-up, by diversion trench 13, silt stone below passes through suspended matter storage compartment 7 and excludes, control Cable 14 provides power supply, and water is ejected into outside Quick drainage area 1 by row's pump 9 fastly, by Quick drainage area 1, is mentioned by rapid drainage wheel 8 It rises power facility 3, the anti-stacking mechanism 4 of floating material, blowdown funnel 5 and collection bucket 6 to clear up in time, convenient for being recycled and improving work Efficiency, the interim water guide drainage arrangement structure in this bridge construction is simple, easy for installation, stable structure, long service life, cost Low, multilayer salvaging is poured out, and the impurity for being drained suspended impurity is reduced, and is accelerated water guide draining, is reduced the impact force to bridge, imitates Rate is high, safety and environmental protection, and drain measure arranges suspended impurity and silt is controllable, reduces the generation of safety accident, improves water conservancy diversion excretion effect Rate, it is convenient to use, it is used convenient for Fast Installation, can be used as preferable interim water guide drainage arrangement in bridge construction.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with A variety of variations, modification, replacement can be carried out to these embodiments without departing from the principles and spirit of the present invention by understanding And modification, the scope of the present invention is defined by the appended.
It should also be noted that, the terms "include", "comprise" or its any other variant are intended to nonexcludability It include so that the process, method, commodity or the equipment that include a series of elements not only include those elements, but also to wrap Include other elements that are not explicitly listed, or further include for this process, method, commodity or equipment intrinsic want Element.In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that including described want There is also other identical elements in the process, method of element, commodity or equipment.

Claims (10)

1. the interim water guide drainage arrangement in a kind of bridge construction, including Quick drainage area (1), it is characterised in that: described quick Walking passageway (2) are provided with above drainage area (1);The underside of the walking passageway (2) is connected with promotion power and sets Apply (3);The anti-stacking mechanism of floating material (4) is fixedly connected with below the promotion power facility (3);The anti-accumulation of floating material Collection blowdown funnel is installed in being equipped in mechanism (4), which is followed successively by blowdown funnel (5) and collection bucket from top to bottom (6);The top side of the Quick drainage area (1) offers suspended matter storage compartment (7);The bottom of the Quick drainage area (1) It is fixedly installed with rapid drainage wheel (8), and is provided with fast row's pump (9) on the right side of rapid drainage wheel (8);The Quick drainage area (1) side is provided with water inlet (10).
2. the interim water guide drainage arrangement in bridge construction according to claim 1, it is characterised in that: the promotion power Facility (3) includes hydraulic device (11) and connecting shaft (12).
3. the interim water guide drainage arrangement in bridge construction according to claim 1, it is characterised in that: the blowdown funnel (5) the outlet diameter size on is greater than the outlet of collection bucket (6).
4. the interim water guide drainage arrangement in bridge construction according to claim 1, it is characterised in that: the suspended matter is deposited It puts and is provided with diversion trench (13) on storehouse (7).
5. the interim water guide drainage arrangement in bridge construction according to claim 1, it is characterised in that: the rapid drainage It is fixedly connected with controlling cable (14) on the right side of wheel (8), and controlling cable (14) is connected to fast row's pump (9).
6. the interim water guide drainage arrangement in bridge construction according to claim 1, it is characterised in that: the water inlet (10) cutting blade (15) are fixedly connected in.
7. the interim water guide drainage arrangement in bridge construction according to claim 1, it is characterised in that: the Quick drainage Excretion suspended matter filtered water outlet (16) is offered on outer wall at the nearly anti-stacking mechanism in area (1), and drains suspended matter filtered water outlet (16) valve (17) are fixedly connected on.
8. the interim water guide drainage arrangement in bridge construction according to claim 7, it is characterised in that: the walking passageway (2) it is fixedly connected on and promotes control button (18), and promoted control button (18) and be electrically connected at promotion power facility (3).
9. the interim water guide drainage arrangement in bridge construction according to claim 1, it is characterised in that: the walking passageway (2) bridge floor load-bearing detector (20) is provided on, and the other end of bridge floor load-bearing detector (20) is electrically connected at promotion control Button (18).
10. the interim water guide drainage arrangement in bridge construction according to claim 1, it is characterised in that: the floating material One circle padded coaming (19) of surrounding package of anti-stacking mechanism (4).
CN201910386721.3A 2019-05-09 2019-05-09 A kind of interim water guide drainage arrangement in bridge construction Pending CN110258335A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910386721.3A CN110258335A (en) 2019-05-09 2019-05-09 A kind of interim water guide drainage arrangement in bridge construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910386721.3A CN110258335A (en) 2019-05-09 2019-05-09 A kind of interim water guide drainage arrangement in bridge construction

Publications (1)

Publication Number Publication Date
CN110258335A true CN110258335A (en) 2019-09-20

Family

ID=67914529

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910386721.3A Pending CN110258335A (en) 2019-05-09 2019-05-09 A kind of interim water guide drainage arrangement in bridge construction

Country Status (1)

Country Link
CN (1) CN110258335A (en)

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE202004014260U1 (en) * 2004-09-10 2006-01-19 BIONIK GmbH - Innovative Technik für die Umwelt Station for retention of boulder detritus, particularly in canalisation system, has inlet and out apertures for shaft handling waste water
CN201012905Y (en) * 2007-01-18 2008-01-30 宋运生 Chamber cage type water foreign matter collection fishing device
KR101332781B1 (en) * 2011-08-23 2013-11-25 씨앤씨주식회사 Apparatus for treating rainwater for bridge or manhole
CN204475502U (en) * 2015-03-07 2015-07-15 淄博亿汇通建筑工程技术有限公司 A kind of intercepting pollution for rainwater hanging basket device
CN206189578U (en) * 2016-11-23 2017-05-24 广州全一泵业有限公司 Take prefabricated pump station of cutting pump integration
CN206784347U (en) * 2017-06-12 2017-12-22 华北电力大学(保定) Colleting garbage floated on water device
CN107558600A (en) * 2017-09-30 2018-01-09 武汉圣禹排水系统有限公司 A kind of hoisting type device for dragging dregs
CN107587492A (en) * 2017-09-25 2018-01-16 浙江绿维环境科技有限公司 A kind of floating suspension for water body treating separates and collects equipment
CN207109774U (en) * 2017-06-16 2018-03-16 江阴市言旭水处理有限公司 A kind of portable floater collects separator
CN107935070A (en) * 2017-12-04 2018-04-20 韩丹 A kind of municipal drainage mouth wastewater treatment equipment
CN207959477U (en) * 2017-12-28 2018-10-12 武汉圣禹排水系统有限公司 A kind of shunting well including multi-functional sewage processing equipment
CN108999161A (en) * 2018-07-17 2018-12-14 芜湖芬特勘测服务有限公司 A kind of river rubbish interceptor structure of municipal works

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE202004014260U1 (en) * 2004-09-10 2006-01-19 BIONIK GmbH - Innovative Technik für die Umwelt Station for retention of boulder detritus, particularly in canalisation system, has inlet and out apertures for shaft handling waste water
CN201012905Y (en) * 2007-01-18 2008-01-30 宋运生 Chamber cage type water foreign matter collection fishing device
KR101332781B1 (en) * 2011-08-23 2013-11-25 씨앤씨주식회사 Apparatus for treating rainwater for bridge or manhole
CN204475502U (en) * 2015-03-07 2015-07-15 淄博亿汇通建筑工程技术有限公司 A kind of intercepting pollution for rainwater hanging basket device
CN206189578U (en) * 2016-11-23 2017-05-24 广州全一泵业有限公司 Take prefabricated pump station of cutting pump integration
CN206784347U (en) * 2017-06-12 2017-12-22 华北电力大学(保定) Colleting garbage floated on water device
CN207109774U (en) * 2017-06-16 2018-03-16 江阴市言旭水处理有限公司 A kind of portable floater collects separator
CN107587492A (en) * 2017-09-25 2018-01-16 浙江绿维环境科技有限公司 A kind of floating suspension for water body treating separates and collects equipment
CN107558600A (en) * 2017-09-30 2018-01-09 武汉圣禹排水系统有限公司 A kind of hoisting type device for dragging dregs
CN107935070A (en) * 2017-12-04 2018-04-20 韩丹 A kind of municipal drainage mouth wastewater treatment equipment
CN207959477U (en) * 2017-12-28 2018-10-12 武汉圣禹排水系统有限公司 A kind of shunting well including multi-functional sewage processing equipment
CN108999161A (en) * 2018-07-17 2018-12-14 芜湖芬特勘测服务有限公司 A kind of river rubbish interceptor structure of municipal works

Similar Documents

Publication Publication Date Title
CN103205991A (en) Channel cleanout device and method thereof
CN207110015U (en) A kind of integrated prefabricated pumping plant with automatic crushing function
CN109469029B (en) Fish gathering and transporting system
CN105064938A (en) Integrated device for treating waste drilling fluid by chemical flocculation and mechanical squeezing
CN210655766U (en) Elevator with adjustable car weight based on secondary water resource utilization
CN110258335A (en) A kind of interim water guide drainage arrangement in bridge construction
CN212956903U (en) A diversion system for pump station desilting
CN105970876B (en) A kind of reservoir takes out method for determining sand
JP7044367B2 (en) Siphon water supply device and siphon water supply method
CN208685580U (en) A kind of hydraulic and hydroelectric engineering dam
CN114197618B (en) Municipal administration road drainage system
CN217203918U (en) Upturning type hydraulic integrated pump gate
CN211200302U (en) Reservoir is auxiliary assembly for scrubbing
CN110904985B (en) Full-automatic drainage recycling system for building foundation pit
CN211228839U (en) Inclined integrated pump station with cleaning device
CN207701337U (en) Deep well pump sand control check three-port structure
CN212956902U (en) A desilting system for pump station
CN202247819U (en) Water inlet sediment releasing structure for hydropower station
CN211873239U (en) Hidden automatic lifting of drainage engineering water inlet blocks dirty maintenance system
CN211621438U (en) A silt is led and is removed structure for water conservancy facility
CN210105917U (en) Auxiliary drainage pipe fitting for preventing and treating water in coal mine construction
CN217379201U (en) Small-sized sewage lifting pump station for river bank
CN109853651A (en) A kind of mill tailings library waterpower takes sand method
CN215483041U (en) Intelligent green drainage system of deep basal pit engineering
CN213510732U (en) Thin mud discharge system in mine underground sump

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190920