CN208685580U - A kind of hydraulic and hydroelectric engineering dam - Google Patents

A kind of hydraulic and hydroelectric engineering dam Download PDF

Info

Publication number
CN208685580U
CN208685580U CN201821435766.2U CN201821435766U CN208685580U CN 208685580 U CN208685580 U CN 208685580U CN 201821435766 U CN201821435766 U CN 201821435766U CN 208685580 U CN208685580 U CN 208685580U
Authority
CN
China
Prior art keywords
plate
fixed
dam
drawstring
support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821435766.2U
Other languages
Chinese (zh)
Inventor
钟尚鹏
刘小艳
Original Assignee
钟尚鹏
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 钟尚鹏 filed Critical 钟尚鹏
Priority to CN201821435766.2U priority Critical patent/CN208685580U/en
Application granted granted Critical
Publication of CN208685580U publication Critical patent/CN208685580U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of hydraulic and hydroelectric engineering dams, including dam body, the upper end of the dam body is fixed with loading plate, one end of the loading plate is fixed with connecting plate, support device there are three being set on the connecting plate, one of support device is located at the lower end of connecting plate, other two support device is located at the upper end of connecting plate, the side of the loading plate is equipped with the first lifting device, the upper end of the dam body is equipped with the second lifting device, the upper end side of the dam body is equipped with collecting tank, the side of the dam body sets that there are two the limiting slots that are parallel to each other, the side of the dam body is equipped with movable plate, one end of the movable plate is fixed with the first drawstring.The utility model has achieved the purpose that large area is collected, and can more efficiently collect the floating refuse in water, increases capacity gauge, can salvage to different water levels, cleans water flow, protects generating set, reduces the risk for being manually lauched salvaging, is easy to use.

Description

A kind of hydraulic and hydroelectric engineering dam
Technical field
The utility model relates to hydraulic and hydroelectric engineering technical field more particularly to a kind of hydraulic and hydroelectric engineering dams.
Background technique
Dam is block rivers ditch water flow with raising of water level or the water retaining structure of adjusting flow.Reservoir can be formed, is lifted High water level, concentrates head at regulated flow, for flood control, water supply, irrigation, hydroelectric generation, improvement shipping etc..Adjust river regime, protection The river regulating structure of bank bed is also referred to as dam.
Water flow inevitably drives some afloat rubbish, with the foundation of dam, float in water flow in flowing The rubbish floated is also with being blocked, in order to protect generating set and water environment to need to spray the rubbish of floating Fishing, traditional hydraulic and hydroelectric engineering dam does not have the ability for salvaging floating refuse, for this purpose, we have proposed a kind of water conservancy water Electrical engineering dam solves the above problems.
Utility model content
Purpose of the utility model is to solve disadvantages existing in the prior art, and a kind of water conservancy and hydropower work proposed Journey dam.
To achieve the goals above, the utility model adopts the technical scheme that
A kind of hydraulic and hydroelectric engineering dam, including dam body, the upper end of the dam body are fixed with loading plate, the loading plate One end is fixed with connecting plate, is set on the connecting plate there are three support device, one of support device is located under connecting plate End, other two support device are located at the upper end of connecting plate, and the side of the loading plate is equipped with the first lifting device, the dam body Upper end be equipped with the second lifting device, the upper end side of the dam body is equipped with collecting tank, and the side of the dam body sets that there are two phases Mutually parallel limiting slot, the side of the dam body are equipped with movable plate, and one end of the movable plate is fixed with the first drawstring, and described the One end of one drawstring a support device and has extended to the side of the support device therethrough, one end of first drawstring It is wrapped in the side of the first lifting device, the side of the movable plate is equipped with four rolling, and two idler wheels of the same side are one group, Two groups of four rollings are located in two limiting slots, and the side of the movable plate is rotatably connected to collecting box, the collecting box Both ends penetrate through setting, the bottom in the collecting box is fixed with filter plate, and the side of the collecting box is equipped with collection device, The side of the collection device is equipped with the second drawstring, and one end of second drawstring through other two support device of position and extends To the side of loading plate, second drawstring is wrapped in the side of the second lifting device.
Preferably, the support device includes that three fixed plates of connecting plate side, one of fixed plate position is arranged in In the lower end of connecting plate, other two fixed plate is located at the upper end of connecting plate, and the side of the fixed plate is equipped with opening, described to open Common rotation connection is one group there are two pulley, two pulleys of the same side in opposing sidewalls in mouthful, first drawstring position Between one group of two pulley of connecting plate lower end, second drawstring is located between two groups of four pulleys of connecting plate upper end.
Preferably, first lifting device includes two mounting plates being parallel to each other for being fixed on loading plate side, and two The opposite side common rotation of a mounting plate is connected with the second rotating roller, and the side of one of mounting plate is fixed with the second protection Case, is fixed with the first driving motor on one end side wall in second guard box, the output shaft of first driving motor according to Secondary one end run through the second guard box and the mounting plate and be fixed on the second rotating roller, the one ends wound of second drawstring is the The side of two rotating rollers, the side of another mounting plate are equidistantly equipped with multiple first limit holes, and the one of second rotating roller Side is equipped with the second limit hole, wherein being equipped with gag lever post in the first limit hole, the gag lever post is through first limit hole and extends To the second limit hole.
Preferably, second lifting device includes two support rods being parallel to each other for being fixed on dam body upper end, and two The opposite side common rotation of support rod is connected with the first rotating roller, and the one ends wound of first drawstring is in the first rotating roller Side, the side of one of support rod are fixed with the first guard box, are fixed on one end side wall in first guard box Second driving motor, the output shaft of second driving motor sequentially pass through the first guard box and the support rod and are fixed on first One end of rotating roller.
Preferably, the collection device includes the rotating block for being rotatably connected on collecting box side, the side of the rotating block Equidistantly be fixed with multiple collection hooks, wherein the side of four collection hooks is fixed with fixed block jointly, first drawstring it is another One end is fixed on the side of fixed block.
Preferably, spacing are equipped with multiple drainage holes on one end side wall in the collecting tank etc..
Compared with prior art, the utility model has the beneficial effects that
1, by the cooperation of movable plate, collecting box, the second rotating roller, the second drawstring and the first driving motor, water is solved Rubbish is difficult to the problem of collecting in stream, has achieved the purpose that quick collection, can salvage to different water levels, cleans water flow, Generating set is protected, the risk for being manually lauched salvaging is reduced;
2, by rotating block, collect the cooperation of hook, the first drawstring, fixed block, the first rotating roller and the second driving motor, the Two driving motors are packed up by the first rotating roller and the first drawstring by hook is collected, and are solved the problems, such as that garbage collection is incomplete, are reached The purpose for having arrived large area collection can more efficiently collect the floating refuse in water, increase capacity gauge, be easy to use;
In conclusion the utility model has achieved the purpose that large area is collected, the drift in water can be more efficiently collected Floating rubbish, increases capacity gauge, can salvage to different water levels, cleans water flow, protects generating set, and reduction is manually lauched The risk of salvaging is easy to use.
Detailed description of the invention
Fig. 1 be the utility model proposes a kind of hydraulic and hydroelectric engineering dam structural schematic diagram;
Fig. 2 be the utility model proposes a kind of hydraulic and hydroelectric engineering dam carrying plate structure schematic diagram;
Fig. 3 be the utility model proposes a kind of hydraulic and hydroelectric engineering dam top view;
Fig. 4 be the utility model proposes a kind of hydraulic and hydroelectric engineering dam A at schematic enlarged-scale view.
In figure: 1 dam body, 2 support rods, 3 first rotating rollers, 4 first guard boxs, 5 collecting tanks, 6 drainage holes, 7 first drawstrings, 8 second drawstrings, 9 limiting slots, 10 idler wheels, 11 movable plates, 12 filter plates, 13 rotating blocks, 14 collecting boxs, 15 fixed blocks, 16 carryings Plate, 17 second guard boxs, 18 second rotating rollers, 19 first limit holes, 20 mounting plates, 21 connecting plates, 22 collect hooks, 23 pulleys, 24 fixed plates.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.
Referring to Fig.1-4, a kind of hydraulic and hydroelectric engineering dam, including dam body 1, the upper end of dam body 1 are fixed with loading plate 16, rise The effect of support is arrived, one end of loading plate 16 is fixed with connecting plate 21, is set on connecting plate 21 there are three support device, support the One drawstring 7 and the second drawstring 8 simultaneously change direction of pull, and one of support device is located at the lower end of connecting plate 21, to support With the pulling force for changing the second drawstring 8, other two support device is located at the upper end of connecting plate 21, to change the first drawstring 7 The side of direction of pull, loading plate 16 is equipped with the first lifting device, and for promoting the second drawstring 8, the upper end of dam body 1 is equipped with second Lifting device, to promote the first drawstring 7, the upper end side of dam body 1 is equipped with collecting tank 5, facilitates recycling and dries the rubbish of floating Rubbish, the side of dam body 1 are set there are two the limiting slot 9 being parallel to each other, and are moved easily the movement of plate 11, and the side of dam body 1, which is equipped with, to be moved Movable plate 11, one end of movable plate 11 are fixed with the first drawstring 7, and the second drawstring 8 drives movable plate 11 mobile, and the one of the first drawstring 7 It holds a support device therethrough and has extended to the side of the support device, the one ends wound of the first drawstring 7 is mentioned first The side for rising device, has achieved the purpose that quick collection, can salvage to different water levels, cleans water flow;
The side of movable plate 11 is equipped with four rolling 10, and two idler wheels 10 of the same side are one group, two groups of four rollings 10 It is located in two limiting slots 9, is moved easily the movement of plate 11, the side of movable plate 11 is rotatably connected to collecting box 14, collects The rubbish of floating, the both ends of collecting box 14 penetrate through setting, and the bottom in collecting box 14 is fixed with filter plate 12, and it is extra to filter Water, the side of collecting box 14 are equipped with collection device, facilitate the rubbish of the collection floating of large area, and the side of collection device is equipped with the One end of two drawstrings 8, the second drawstring 8 runs through other two support device and extends to the side of loading plate 16, and the second drawstring 8 twines It is wound on the side of the second lifting device, spacing are equipped with multiple drainage holes 6 on one end side wall in collecting tank 5 etc., facilitate draining, clearly Clean water flow protects generating set, reduces the risk for being manually lauched salvaging.
In the utility model, support device includes that three fixed plates 24 of 21 side of connecting plate are arranged in, one of them is solid Fixed board 24 is located at the lower end of connecting plate 21, other two fixed plate 24 is located at the upper end of connecting plate 21, and the side of fixed plate 24 is set There is opening, common rotation connection is one group there are two pulley 23, two pulleys 23 of the same side in the opposing sidewalls in opening, the One drawstring 7 is located between one group of two pulley 23 of 21 lower end of connecting plate, is moved easily, and the second drawstring 8 is located on connecting plate 21 Between two groups of four pulleys 23 at end, change the direction of pull of the second drawstring 8, is easy to use.
In the utility model, the first lifting device includes two mounting plates being parallel to each other for being fixed on 16 side of loading plate 20, the opposite side common rotation of two mounting plates 20 is connected with the second rotating roller 18, and the side of one of mounting plate 20 is solid Surely there is the second guard box 17, the first driving motor is fixed on one end side wall in the second guard box 17, the first driving motor Model YE2-180M-4-18.5, the output shaft of the first driving motor sequentially pass through the second guard box 17 and the mounting plate 20 simultaneously It is fixed on one end of the second rotating roller 18, the first driving motor drives the rotation of the second rotating roller 18, the one ends wound of the second drawstring 8 In the side of the second rotating roller 18, the second drawstring 8 is packed up in the rotation of the second rotating roller 18, and the side of another mounting plate 20 is equidistant Equipped with multiple first limit holes 19, the side of the second rotating roller 18 is equipped with the second limit hole, wherein being equipped in the first limit hole 19 Gag lever post, gag lever post is through first limit hole 19 and extends in the second limit hole, and the second rotating roller 18 is fixed, from And movable plate 11 is fixed, facilitate collecting box 14 to be collected, reduces the risk for being manually lauched salvaging.
In the utility model, the second lifting device includes two support rods 2 being parallel to each other for being fixed on 1 upper end of dam body, The opposite side common rotation of two support rods 2 is connected with the first rotating roller 3, and the one ends wound of the first drawstring 7 is in the first rotation The side of roller 3, the side of one of support rod 2 are fixed with the first guard box 4, consolidate on one end side wall in the first guard box 4 Surely there is the second driving motor, the model YE2-180M-4-18.5 of the second driving motor, the output shaft of the second driving motor is successively Through the first guard box 4 and the support rod 2 and the one end for being fixed on the first rotating roller 3, the second driving motor drives the first rotation Roller 3 rotates, and facilitates the collection of collection device.
In the utility model, collection device includes the rotating block 13 for being rotatably connected on 14 side of collecting box, rotating block 13 Side is equidistantly fixed with multiple collection hooks 22, wherein the side of four collection hooks 22 is fixed with fixed block 15 jointly, first is drawn The other end of rope 7 is fixed on the side of fixed block 15, and the first rotating roller 3, which shrinks the first drawstring 7, will collect 22 pull-up of hook, will swim Rubbish receives in collecting box 5, has achieved the purpose that large area is collected, can more efficiently collect the floating refuse in water, has increased Add capacity gauge, is easy to use.
In the utility model, in use, two groups of four rollings 10 of 11 side of movable plate are individually positioned in two limits In slot 9, gag lever post is extracted, the first driving motor drives the second drawstring 8 slowly by movable plate by the second rotating roller 18 of rotation 11 are put into water, until the upper end of collecting box 14 is moved to water surface grade height, stop mobile movable plate 11, and gag lever post is inserted Enter, collects hook 22 and be slightly below the water surface, when the side for thering is more floating garbage to be located at dam body 1, the second driving motor drive the The rotation of one rotating roller 3, the first rotating roller 3, which shrinks the first drawstring 7, will collect 22 pull-up of hook, and floating garbage is received collecting box 14 It is interior, gag lever post is extracted, the first driving motor drives the rotation of the second rotating roller 18, and the second drawstring 8 is packed up in the rotation of the second rotating roller 18, To drive movable plate 11 to rise, movable plate 11 is moved to the upper end side of dam body 1, collecting box 14 is buckled to the rubbish of salvaging Rubbish pours into collecting tank 5, after collecting box 14 is resetted, is moved in water and is salvaged again by movable plate 11.
The preferable specific embodiment of the above, only the utility model, but the protection scope of the utility model is not It is confined to this, anyone skilled in the art is within the technical scope disclosed by the utility model, practical according to this Novel technical solution and its utility model design are subject to equivalent substitution or change, should all cover the protection model in the utility model Within enclosing.

Claims (6)

1. a kind of hydraulic and hydroelectric engineering dam, including dam body (1), it is characterised in that: the upper end of the dam body (1) is fixed with carrying One end of plate (16), the loading plate (16) is fixed with connecting plate (21), is set on the connecting plate (21) there are three support device, One of support device is located at the lower end of connecting plate (21), other two support device is located at the upper end of connecting plate (21), institute The side for stating loading plate (16) is equipped with the first lifting device, and the upper end of the dam body (1) is equipped with the second lifting device, the dam body (1) upper end side is equipped with collecting tank (5), and the side of the dam body (1) is set there are two the limiting slot (9) being parallel to each other, described The side of dam body (1) is equipped with movable plate (11), and one end of the movable plate (11) is fixed with the first drawstring (7), and described first draws The restrict one end of (7) support device and has extended to the side of the support device therethrough, and the one of first drawstring (7) End is wrapped in the side of the first lifting device, and the side of the movable plate (11) is equipped with four rolling (10), and two of the same side Idler wheel (10) is one group, and two groups of four rollings (10) are located in two limiting slots (9), and the side of the movable plate (11) turns Dynamic to be connected with collecting box (14), the both ends of the collecting box (14) penetrate through setting, and the bottom in the collecting box (14) is fixed Have filter plate (12), the side of the collecting box (14) is equipped with collection device, and the side of the collection device is equipped with the second drawstring (8), one end of second drawstring (8) through other two support device and extends to the sides of loading plate (16), and described the Two drawstrings (8) are wrapped in the side of the second lifting device.
2. a kind of hydraulic and hydroelectric engineering dam according to claim 1, which is characterized in that the support device includes setting Three fixed plates (24) in connecting plate (21) side, one of fixed plate (24) are located at the lower end of connecting plate (21), in addition Two fixed plates (24) are located at the upper end of connecting plate (21), and the side of the fixed plate (24), which is equipped with, to be open, in the opening Common rotation connection is one group there are two pulley (23), two pulleys (23) of the same side in opposing sidewalls, first drawstring (7) between one group of two pulley (23) of connecting plate (21) lower end, second drawstring (8) is located at connecting plate (21) upper end Two groups of four pulleys (23) between.
3. a kind of hydraulic and hydroelectric engineering dam according to claim 1, which is characterized in that first lifting device includes Two mounting plates (20) being parallel to each other of loading plate (16) side are fixed on, the opposite side of two mounting plates (20) turns jointly Dynamic to be connected with the second rotating roller (18), the side of one of mounting plate (20) is fixed with the second guard box (17), and described second The first driving motor is fixed on one end side wall in guard box (17), the output shaft of first driving motor sequentially passes through Two guard boxs (17) and the mounting plate (20) and the one end for being fixed on the second rotating roller (18), one end of second drawstring (8) It is wrapped in the side of the second rotating roller (18), the side of another mounting plate (20) is equidistantly equipped with multiple first limit holes (19), the side of second rotating roller (18) is equipped with the second limit hole, wherein being equipped with gag lever post, institute in the first limit hole (19) Gag lever post is stated through first limit hole (19) and is extended in the second limit hole.
4. a kind of hydraulic and hydroelectric engineering dam according to claim 1, which is characterized in that second lifting device includes Two support rods (2) being parallel to each other of dam body (1) upper end are fixed on, the opposite side common rotation of two support rods (2) connects It is connected to the first rotating roller (3), the one ends wound of first drawstring (7) is in the side of the first rotating roller (3), one of support The side of bar (2) is fixed with the first guard box (4), is fixed with the second driving on one end side wall in first guard box (4) Motor, the output shaft of second driving motor sequentially pass through the first guard box (4) and the support rod (2) and are fixed on first turn The one end of dynamic roller (3).
5. a kind of hydraulic and hydroelectric engineering dam according to claim 1, which is characterized in that the collection device includes rotation It is connected to the rotating block (13) of collecting box (14) side, the side of the rotating block (13) is equidistantly fixed with multiple collection hooks (22), wherein the side of four collection hooks (22) is fixed with fixed block (15) jointly, the other end of first drawstring (7) is fixed In the side of fixed block (15).
6. a kind of hydraulic and hydroelectric engineering dam according to claim 1, which is characterized in that one in the collecting tank (5) Equidistantly multiple drainage holes (6) are equipped on the wall of end side.
CN201821435766.2U 2018-09-04 2018-09-04 A kind of hydraulic and hydroelectric engineering dam Expired - Fee Related CN208685580U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821435766.2U CN208685580U (en) 2018-09-04 2018-09-04 A kind of hydraulic and hydroelectric engineering dam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821435766.2U CN208685580U (en) 2018-09-04 2018-09-04 A kind of hydraulic and hydroelectric engineering dam

Publications (1)

Publication Number Publication Date
CN208685580U true CN208685580U (en) 2019-04-02

Family

ID=65888299

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821435766.2U Expired - Fee Related CN208685580U (en) 2018-09-04 2018-09-04 A kind of hydraulic and hydroelectric engineering dam

Country Status (1)

Country Link
CN (1) CN208685580U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111236172A (en) * 2020-01-18 2020-06-05 四川圆瑞建设工程有限责任公司 Overflowing slag collection weir for hydraulic and hydroelectric engineering and construction method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111236172A (en) * 2020-01-18 2020-06-05 四川圆瑞建设工程有限责任公司 Overflowing slag collection weir for hydraulic and hydroelectric engineering and construction method thereof

Similar Documents

Publication Publication Date Title
CN208685580U (en) A kind of hydraulic and hydroelectric engineering dam
CN208586579U (en) A kind of river course clear up floating material interception collection device
CN110984097B (en) Automatic system of salvaging of floater
CN211036895U (en) River dam water-retaining gate
CN201495527U (en) Pollutant blocking device for generating set water inlet in lower pool of reservoir
CN203583448U (en) Water surface sundry cleaning device of hydropower station
JP2010248785A (en) River suspended dust automatic recovery device
CN106869089B (en) River course gate blocks husky device of removing sand
CN108221903A (en) A kind of floating marine formula garbage recovery device of marine tidal-current energy driving
CN211898257U (en) Dam mouth rubbish cleaning device
CN204662391U (en) A kind of river floater automatic intercepting device of hoist engine lifting
CN210315462U (en) River course cleaning device for hydraulic engineering
CN208280104U (en) A kind of dirt-blocking dirt-cleaning device of the automatic following water-level lifting of energy
CN211080179U (en) Sewage treatment plant river course floater fishing device
CN206646476U (en) Over-water elevating formula Blue algae salvage device
CN201826289U (en) Water floater fishing device
CN214089785U (en) Environmental protection irrigation canals and ditches debris retention device
CN212270877U (en) River water meter garbage collection device
CN215052797U (en) Floating type river floating object collecting device for hydraulic and hydroelectric engineering
CN206624283U (en) Dustbin waterborne
CN214219702U (en) Anchor-pull type detachable concrete cofferdam
CN202543998U (en) Full open type hydraulic grab
CN210063312U (en) Water surface floater fishing boat
CN212052620U (en) Drainage dykes and dams for hydraulic engineering
CN214423324U (en) Water conservancy water and electricity dam water inlet floater fishing device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190402

Termination date: 20190904