CN110255413A - Rope climbing block locating mounting method - Google Patents

Rope climbing block locating mounting method Download PDF

Info

Publication number
CN110255413A
CN110255413A CN201910335158.7A CN201910335158A CN110255413A CN 110255413 A CN110255413 A CN 110255413A CN 201910335158 A CN201910335158 A CN 201910335158A CN 110255413 A CN110255413 A CN 110255413A
Authority
CN
China
Prior art keywords
rope
reel
wirerope
layer
climbing block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910335158.7A
Other languages
Chinese (zh)
Other versions
CN110255413B (en
Inventor
冯露
蔡智军
孟康杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Marine Machinery Plant Co Ltd
Original Assignee
Wuhan Marine Machinery Plant Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Marine Machinery Plant Co Ltd filed Critical Wuhan Marine Machinery Plant Co Ltd
Priority to CN201910335158.7A priority Critical patent/CN110255413B/en
Publication of CN110255413A publication Critical patent/CN110255413A/en
Application granted granted Critical
Publication of CN110255413B publication Critical patent/CN110255413B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66DCAPSTANS; WINCHES; TACKLES, e.g. PULLEY BLOCKS; HOISTS
    • B66D1/00Rope, cable, or chain winding mechanisms; Capstans
    • B66D1/28Other constructional details
    • B66D1/30Rope, cable, or chain drums or barrels
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66DCAPSTANS; WINCHES; TACKLES, e.g. PULLEY BLOCKS; HOISTS
    • B66D1/00Rope, cable, or chain winding mechanisms; Capstans
    • B66D1/28Other constructional details
    • B66D1/36Guiding, or otherwise ensuring winding in an orderly manner, of ropes, cables, or chains

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Laying Of Electric Cables Or Lines Outside (AREA)
  • Ropes Or Cables (AREA)

Abstract

The invention discloses a kind of rope climbing block locating mounting methods, belong to reel field.Method includes: based on entering for first layer wirerope restricts a little on the effective length of rope groove, the screw pitch of rope groove and the reel on reel, determine the starting point of climbing of second layer wirerope on the reel, the cylinder both ends for entering rope point and being located at the reel with the starting point of climbing of the second layer wirerope of the first layer wirerope;The minimum constructive height of starting point of climbing, the radius of the reel cross section, the radius of the wirerope and rope climbing block based on the second layer wirerope, determine that original bench mark point of the rope climbing block on the reel, the original bench mark point are located on the wiring direction of the starting point of climbing of the second layer wirerope;Original bench mark point based on the rope climbing block on the reel, installs the rope climbing block.Present invention reduces rope climbing block on reel positioning difficulty, improve the positioning accuracy of rope climbing block.

Description

Rope climbing block locating mounting method
Technical field
The invention belongs to reel field, in particular to a kind of rope climbing block locating mounting method.
Background technique
Reel is important part in crane facility, for folding and unfolding and storage wirerope.Had by drum diameter and rope groove Length limitation is imitated, when rope capacity is too long, wirerope will select two or more layers to wind when storing on reel, so as to Reduce the size and weight of reel.Second layer winding is transitioned into from first layer on reel for wirerope, generally by climbing Rope block guiding orderly winds and discharges to realize wirerope being transitioned into the second layer from first layer.
Positioning accuracy of the rope climbing block on reel is extremely important, if position inaccurate of the rope climbing block on reel, just not It can guarantee that wirerope orderly winds and discharges in interlayer, be easy to happen disorder cable phenomenon, cause wirerope twist ties and damage steel Cord influences the service life of wirerope.
Summary of the invention
The embodiment of the invention provides a kind of rope climbing block locating mounting methods, and it is accurate on reel that rope climbing block may be implemented Positioning and installation.The technical solution is as follows:
The present invention provides a kind of rope climbing block locating mounting methods, which comprises
Based on reel on the effective length of rope groove, the screw pitch of rope groove and the reel first layer wirerope enter rope Point, determines the starting point of climbing of second layer wirerope on the reel, and the first layer wirerope enters rope point and the second layer The starting point of climbing of wirerope is located at the cylinder both ends of the reel;
The radius of starting point of climbing, the reel cross section based on the second layer wirerope, the wirerope radius, And the minimum constructive height of rope climbing block, determine original bench mark point of the rope climbing block on the reel, the original bench mark point In on the wiring direction of the starting point of climbing of the second layer wirerope;
Original bench mark point based on the rope climbing block on the reel, installs the rope climbing block.
Optionally, described based on first layer steel on the effective length of rope groove, the screw pitch of rope groove and the reel on reel Entering for cord is restricted a little, determines the starting point of climbing of second layer wirerope on the reel, comprising:
According to the screw pitch of the effective length of the rope groove and the rope groove, effective winding of the first layer wirerope is calculated Enclose number;
Number is enclosed in effective winding based on the first layer wirerope, and calculate the first layer wirerope enters rope point in target The radius that is passed through on circle, half passed through with subpoint of the starting point on the target circle that climb of the second layer wirerope Central angle between diameter, the target circle are the cross section reel and by the first layer wirerope for entering rope point;
Based on the central angle, the starting point of climbing of second layer wirerope on the reel is determined.
Optionally, the cylinder both ends of the reel are respectively equipped with the first outer web and the second outer web, the first outer abdomen The rope point that enters of plate and the first layer wirerope is located at same cylinder end, the second outer web and the second layer wirerope Starting point of climbing is located at same cylinder end,
It is described to be based on the central angle, determine the starting point of climbing of second layer wirerope on the reel, comprising:
Based on the central angle, subpoint of the starting point on the target circle that climb of the second layer wirerope is determined;
Based on the subpoint, the starting point of climbing of second layer wirerope on the reel, the second layer on the reel are determined The starting point of climbing of wirerope is the intersection point on the inside of the reel outer circle bus that the subpoint is passed through and the described second outer web.
Optionally, the starting point of climbing based on the second layer wirerope, the radius of the reel cross section, the steel The radius of cord and the minimum constructive height of rope climbing block determine original bench mark point of the rope climbing block on the reel, comprising:
The minimum constructive height of radius based on the reel cross section, the radius based on the wirerope and rope climbing block, meter Calculate the distance passed through from the starting point of climbing of the second layer wirerope to the original bench mark point on the wiring direction;
Climb starting point and the distance based on the second layer wirerope, determine the rope climbing block in the reel On original bench mark point.
Optionally, the radius based on the reel cross section, the radius of the wirerope and the minimum of rope climbing block Highly, calculate on the wiring direction from the second layer wirerope climb starting point to the original bench mark point pass through away from From, comprising:
Take the distance as the arc length on the cross section of the reel where the starting point of climbing of the second layer wirerope, is based on The radius of the wirerope and the minimum constructive height of rope climbing block calculate the distance in the corresponding circle in the cross section of the reel Heart angle;
Radius based on the reel cross section and described apart from corresponding central angle, calculates the distance.
Optionally, the original bench mark point based on the rope climbing block on the reel, installs the rope climbing block, packet It includes:
Using the reel outer circle bus where the original bench mark point as original bench mark line, by the lower of the rope climbing block End end face is aligned with the original bench mark line, and by the rope climbing block with and adjacent the second outer web of original bench mark point Side wall fitting;
The rope climbing block is fixed on the cylinder of the reel and the side wall of the second outer web.
Optionally, the side wall of the cylinder and the second outer web that the rope climbing block is fixed on to the reel On, comprising:
Measure gap of the rope climbing block respectively with bobbin trunk and the joint place of the second outer web;
Gap and the rope climbing block and the described second outer web when the rope climbing block and the joint place of bobbin trunk When the gap of joint place is all satisfied target gap range, the rope climbing block is fixed on to the cylinder and described of the reel On the side wall of two outer webs.
Optionally, the target gap range is 0-0.1mm.
Optionally, the side wall of the cylinder and the second outer web that the rope climbing block is fixed on to the reel On, comprising:
Determine at least one measurement point, the measurement point position rises to for contacting from first layer in the rope climbing block On the face of two layers of wirerope;
First length bar is placed into the measurement point, first length bar rises to the second layer for simulating from first layer Wirerope;
Second length bar is placed into the rope groove adjacent with the rope climbing block, second length bar is climbed for simulating with described The wirerope restricted in the adjacent rope groove of block;
When first length bar respectively with the side wall of the described second outer web, the rope climbing block for contacting from first layer When the periphery in the face and second length bar that rise to the wirerope of the second layer is tangent, the rope climbing block is fixed on On the side wall of the cylinder of the reel and the second outer web.
Optionally, at least one measurement point of the determination, comprising:
Determine five measurement points, five measurement point positions are in the low spot section of the rope climbing block, the height of the low spot section It is less than., two neighboring measurement point is equidistant in five measurement points.
Technical solution provided in an embodiment of the present invention has the benefit that through effective length based on rope groove on reel Entering for first layer wirerope restricts a little on degree, the screw pitch of rope groove and reel, determines having climbed for second layer wirerope on reel Point, the cylinder both ends for entering rope point and being located at reel with the starting point of climbing of second layer wirerope of first layer wirerope;Due to The starting point of climbing of two layers of wirerope has certain distance with original bench mark point of the rope climbing block on reel, therefore, then is based on the second layer The starting point of climbing of wirerope, the radius of reel cross section, the radius of wirerope and rope climbing block minimum constructive height, determine rope climbing Original bench mark point of the block on reel, original bench mark point are located on the wiring direction of the starting point of climbing of second layer wirerope;Finally Original bench mark point based on rope climbing block on reel installs rope climbing block;In this way, first passing through theoretical meter accurately determines that rope climbing block exists Rope climbing block is installed in initial position (i.e. original bench mark point) again on the outer web of reel, reduces rope climbing block and positions on web outside reel Difficulty improves the positioning accuracy of rope climbing block, avoids because the positioning of rope climbing block is inaccurate, and generation disorder cable when wirerope-winding is caused to show As causing wirerope twist ties and damage wirerope, influencing the service life of wirerope.
Detailed description of the invention
To describe the technical solutions in the embodiments of the present invention more clearly, make required in being described below to embodiment Attached drawing is briefly described, it should be apparent that, drawings in the following description are only some embodiments of the invention, for For those of ordinary skill in the art, without creative efforts, it can also be obtained according to these attached drawings other Attached drawing.
Fig. 1 is the structural schematic diagram of reel provided in an embodiment of the present invention;
Fig. 2 is a kind of flow chart of rope climbing block locating mounting method provided in an embodiment of the present invention;
Fig. 3 is the schematic diagram of target circle provided in an embodiment of the present invention;
Fig. 4 is the signal of the cross section of the reel where the starting point of climbing of second layer wirerope provided in an embodiment of the present invention Figure;
Fig. 5 is scheme of installation of the rope climbing block provided in an embodiment of the present invention on reel;
Fig. 6 is the schematic diagram of the computational geometry model provided in an embodiment of the present invention for calculating distance;
Fig. 7 is positioning schematic diagram of the rope climbing block provided in an embodiment of the present invention on reel;
Fig. 8 is dosage stick simulating detection " three point contact " schematic diagram provided in an embodiment of the present invention;
In attached drawing:
1a- cylinder, the outer web of 1b- first, the outer web of 1c- second, 1d- rope groove, 1e- rope climbing block, the first length bar of 2-, 3- Two length bars.
Specific embodiment
To make the object, technical solutions and advantages of the present invention clearer, below in conjunction with attached drawing to embodiment party of the present invention Formula is described in further detail.
The technical solution that embodiment provides to facilitate the understanding of the present invention, introduces reel first and the present invention is real Apply the noun that example is related to.Fig. 1 is the structural schematic diagram of reel provided in an embodiment of the present invention.Referring to Fig. 1, reel includes cylinder 1a and the first outer outer web 1c of web 1b and second for being located at the both ends cylinder 1a.Cylinder 1a can be cylinder.First The outer outer web 1c of web 1b and second is along the circumferentially extending of cylinder 1a.Rope groove 1d is located at the first outer outer web of web 1b and second On cylinder 1a outer wall between 1c.
The effective length of rope groove refers to that wirerope enters climbing to second layer wirerope rope is put since first layer wirerope Axial direction (X-direction is shown in Fig. 1) distance of starting point.In Fig. 1, L indicates the effective length of rope groove.
The screw pitch of rope groove refers to the distance between the center of adjacent rope groove.In Fig. 1, P indicates the screw pitch of rope groove.
Entering for first layer wirerope is restricted a little, refers to first point contacted when rope groove on wirerope-winding to reel with rope groove. The rope point place rope groove that enters of first layer wirerope is the circle rope groove of one end (being assumed to be the end A) recently apart from cylinder.In this reality It applies in example, it is assumed that the rope point place rope groove that enters of first layer wirerope is the nearest circle rope groove of the outer web 1b of distance first.
The starting point of climbing of second layer wirerope refers to that wirerope enters rope groove effective district from the rope point that enters of first layer wirerope, Reach the terminal of first layer wirerope, that is, the starting point of second layer wirerope after winding effective length.First layer wirerope Enter the cylinder both ends that rope point is located at reel with the starting point of climbing of second layer wirerope.Enter rope point institute when first layer wirerope When rope groove is the nearest circle rope groove in one end apart from cylinder, rope groove where the starting point of climbing of second layer wirerope is apart from cylinder The nearest circle rope groove of the other end (being assumed to be the end B) of body.In this example, it is assumed that the starting point institute of climbing of second layer wirerope It is the nearest circle rope groove of the outer web 1c of distance second in rope groove.It should be noted that second layer wirerope climbs starting point not It is the starting point of rope climbing block.Theoretically, the starting point of climbing of second layer wirerope is the rearmost point contacted with rope groove, and wirerope is from this point Start rope climbing, but actually because the height of rope climbing block can not be started from from 0mm, the theoretical rearmost point that wirerope is contacted with rope groove There are a little differences with practical rearmost point.
The height of rope climbing block refers to length of the rope climbing block in reel transverse direction.Reel is laterally axially vertical with reel.Referring to figure 1, rope climbing block 1e are located in the nearest circle rope groove of the second outer web 1c, and are fixed on the side wall of the second outer web 1c. Wherein, rope climbing block 1e is generally wedge shape, and the length of rope climbing block 1e is longer, generally higher than the half of reel section girth.Rope climbing Length direction of the height of block 1e in rope climbing block 1e gradually increases.Limited because processing, the minimum constructive height of rope climbing block 1e is greater than 0, this It is meant that there are certain distances apart from rope climbing block 1e for the starting point of climbing of second layer wirerope.Wirerope is from second layer wirerope Starting point of climbing starts to get to rope climbing block 1e along wiring direction winding certain distance.
The embodiment of the invention provides a kind of rope climbing block locating mounting methods, and referring to fig. 2, this method process includes following step Suddenly.
Step 101, based on first layer wirerope on the effective length L of rope groove, the pitch P of rope groove and reel on reel Enter rope point D11, determine the starting point D21 that climbs of second layer wirerope on reel.
Step 102, the starting point D21 that climbs based on second layer wirerope, the radius R of reel cross section, wirerope radius R, and the minimum constructive height h of rope climbing block, original bench mark point D22 of the rope climbing block on reel is determined.
Wherein, original bench mark point D22On the wiring direction for climbing starting point D21 of second layer wirerope.
Step 103, the original bench mark point D22 based on rope climbing block on reel install rope climbing block.
By based on reel on the effective length of rope groove, the screw pitch of rope groove and reel first layer wirerope enter rope Point, determines the starting point of climbing of second layer wirerope on reel, and first layer wirerope enters climbing for rope point and second layer wirerope Starting point is located at the cylinder both ends of reel;Due to the primordium of starting point and rope climbing block on reel that climbs of second layer wirerope Have certain distance on schedule, therefore, then based on the starting point of climbing of second layer wirerope, the radius of reel cross section, wirerope half The minimum constructive height of diameter and rope climbing block determines that original bench mark point of the rope climbing block on reel, original bench mark point are located at second layer steel On the wiring direction of the starting point of climbing of cord;The finally original bench mark point based on rope climbing block on reel installs rope climbing block;This Sample first passes through theoretical meter and accurately determines that initial position (i.e. original bench mark point) installs rope climbing to rope climbing block again on web outside reel Block reduces rope climbing block positioning difficulty on web outside reel, improves the positioning accuracy of rope climbing block, avoids because rope climbing block is fixed Position is inaccurate, leads to that disorder cable phenomenon occurs when wirerope-winding, causes wirerope twist ties and damage wirerope, influence wirerope Service life.
Aforementioned each step is described in detail below.Where it is assumed that the rope point that enters of first layer wirerope is D11, volume on reel The starting point of climbing of second layer wirerope is D21 on cylinder, and the radius of reel cross section is R, and the radius of wirerope is r, rope climbing block Minimum constructive height is h, and original bench mark point of the rope climbing block on reel is D22.
Illustratively, step 101 may include steps of.
The first step, according to the effective length L of rope groove and the pitch P of rope groove, the effective winding for calculating first layer wirerope is enclosed Number N.
Where it is assumed that effective winding circle number of first layer wirerope is N, then N=L/P.
Number N is enclosed in second step, effective winding based on first layer wirerope, and the rope point D11 that enters for calculating first layer wirerope exists The radius that is passed through on target circle, half passed through with subpoint of the starting point D21 on target circle that climb of second layer wirerope Central angle alpha between diameter.
Wherein, target circle is cross section reel and by first layer wirerope for entering rope point D11.Fig. 3 is the present invention The schematic diagram for the target circle that embodiment provides, in conjunction with Fig. 3, the calculation formula of central angle alpha are as follows: α=(N-n) × 360 °.N is first Numerical value of the effective winding circle number N of layer wirerope in integer-bit, then, (N-n) indicates effective winding of first layer wirerope Enclose numerical value of the number N in decimal place.
Third step is based on central angle alpha, determines the starting point D21 that climbs of second layer wirerope on reel.
Fig. 1 is participated in, the both ends cylinder 1a of reel are respectively equipped with the first outer outer web 1c of web 1b and second, the first outer web It is located at same cylinder end (end A) with the rope point D11 that enters of first layer wirerope, the second outer web has climbed with second layer wirerope Point D21 is located at same cylinder end (end B).Based on this, illustratively, third step be may include steps of.
Step a, it is based on central angle alpha, determines subpoint D12 of the starting point D21 on target circle that climb of second layer wirerope.
Specifically, referring to Fig. 3, rope point D11 is entered as starting point, along wiring direction on target circle using first layer wirerope The position that rotation alpha angle reaches is subpoint D12 of the starting point D21 on target circle that climb of second layer wirerope.
Step b, it is based on subpoint D12, determines the starting point D21 that climbs of second layer wirerope on reel, wherein the on reel The starting point D21 that climbs of two layers of wirerope is, on the inside of the outer web of reel outer circle bus L11 and second that subpoint D12 is passed through Intersection point.
Wherein, refer to the second outer web surface to the side of the first outer web on the inside of the second outer web.Specifically, with subpoint D12 is that starting point delineates outer circle bus L11 on bobbin trunk periphery, and outer circle bus L11 is that first layer wirerope is transitioned into Second layer wirerope enters the start line where rope point D21.Intersection point on the inside of the outer web of outer circle bus L11 and second is the second layer Wirerope climbs starting point D21 (referring to fig. 4).
Illustratively, step 102 may include steps of.
Step 1021, the radius R based on reel cross section, the radius r based on wirerope and rope climbing block minimum constructive height H calculates the distance S passed through from the starting point D21 that climbs of second layer wirerope to original bench mark point D22 on wiring direction.
Wherein, original bench mark point D22 be rope climbing block small end (height minimum one end) end respectively with rope groove, Yi Ji Contact position between two outer webs.Illustratively, step 1021 may include steps of.
Firstly, using distance S as the arc length on the cross section of the reel where the starting point D21 that climbs of second layer wirerope, base In the radius r of the wirerope and minimum constructive height h of rope climbing block, distance S is calculated in the corresponding central angle β in the cross section of reel.
Fig. 4 is the schematic diagram of the cross section of the reel where the starting point D21 that climbs of second layer wirerope.In the present embodiment In, original bench mark point D22 is located on the cross section of the reel where the starting point D21 that climbs of second layer wirerope.Fig. 5 is rope climbing block Scheme of installation on reel.Referring to Fig. 5, S=β R can be obtained according to the calculation formula of arc length S.
Fig. 6 be it is provided in an embodiment of the present invention calculate distance S computational geometry model schematic diagram, be described below away from Computing Principle from S.It is known that wirerope, which moves one week central angle along wiring direction, to be 2 π, while axially being moved along reel Dynamic distance is 2r.In conjunction with Fig. 4, the starting point D21 that climbs of second layer wirerope is to original bench mark point D22 along reel axial direction moving distance For r β/π.The theoretical level of rope climbing block is 0 at the starting point D21 that climbs of second layer wirerope, close to the outer web in the end reel B second The distance of center to the outer web in the end B second of second circle wirerope is 3r.When the starting point D21 that climbs of second layer wirerope is along wiring When the mobile arc length S in direction reaches original bench mark point D22, the center close to the second circle wirerope of the outer web in the end reel B second is arrived The distance of original bench mark point D22 is (3r-r* β/π).For in Fig. 6 right angled triangle EFG, EF=2r, FG=(3r-r* β/ π-r), GE=h, had according to Pythagorean theorem: (2r)2=h2+(3r-r*β/π-r)2, the central angle as shown in formula (1) can be obtained β。
Secondly, the radius R based on the reel cross section and corresponding central angle β of distance S calculates distance S.
Referring to Fig. 5, S=β R can be obtained according to the calculation formula of arc length S.In formula the value of R, r, h in reel figure Mark, is known.
Step 1022, the starting point D21 and distance S that climbs based on second layer wirerope, determine rope climbing block on reel Original bench mark point D22.
Specifically, using the starting point D21 that climbs of second layer wirerope as starting point, along wiring direction, moved on rope groove away from It is original bench mark point D22 of the rope climbing block on reel from the position reached S.
Illustratively, step 103 may include steps of.
Step 1031, using the reel outer circle bus L22 where original bench mark point D22 as original bench mark line, by rope climbing block Lower end end face is aligned with original bench mark line, and by rope climbing block with and adjacent the second outer web of original bench mark point D22 side wall Fitting.
Specifically, using original bench mark point D22 as starting point, outer circle bus L22, outer circle bus are delineated on reel periphery L22 is original bench mark line of the rope climbing block small end (the smallest one end of rope climbing block height) on spool body excircle.With rope climbing block Original bench mark line L22 of the small end on spool body excircle is start line, referring to Fig. 7, by mono- side plane of rope climbing block 1e and second The side wall of outer web 1c is bonded, and is along the circumferential direction adjusted the position of rope climbing block 1e, is made rope climbing block 1e small end and L22 pairs of reference line Together.
On the side wall of step 1032, the cylinder that rope climbing block is fixed on to the reel and the second outer web.
Wherein it is possible to be mounted directly rope climbing block after step 1031, can also position to the rope climbing block oriented into Row detection, when testing result meets condition, then installs rope climbing block.Difference based on detection mode, the embodiment of the present invention provide The fixed form of three kinds of rope climbing blocks.
First way is the detection rope climbing block joint place gap with bobbin trunk, the second outer web inner wall respectively.First Kind mode may include: the measurement rope climbing block gap with bobbin trunk and the joint place of the second outer web respectively.When rope climbing block Target gap model is all satisfied with the gap of the joint place of the gap of the joint place of bobbin trunk and rope climbing block and the second outer web When enclosing, rope climbing block is fixed on the cylinder of the reel and the side wall of the second outer web.Illustratively, target gap model It encloses for 0-0.1mm.It can be using the size in clearance gauge measurement gap.
Referring to Fig. 8, when rope climbing block 1e one side is bonded with the second outer web 1c inner wall, while rope climbing block 1e small end and benchmark After line L22 alignment, with clearance gauge measurement rope climbing block 1e and bobbin trunk 1a, the second outer web 1c inner wall joint place gap, it is desirable that Gap is less than 0.1mm.
When the gap of the joint place in the gap and rope climbing block and the second outer web of rope climbing block and the joint place of bobbin trunk In when gap is unsatisfactory for target gap range at least one, local reconditioning is carried out to rope climbing block.It is detected again after reconditioning, Until testing result meets condition.
The second way is whether detection rope climbing block meets " three point contact " requirement.The second way may include: determination At least one measurement point, measurement point position is in rope climbing block for contacting the face for the wirerope for rising to the second layer from first layer; First length bar is placed into measurement point, the first length bar is for simulating the wirerope for rising to the second layer from first layer;By second Length bar is placed into the rope groove adjacent with rope climbing block, and the second length bar is used to simulate the wirerope in the rope groove adjacent with rope climbing block; When the first length bar for contacting rises to the wirerope of the second layer from first layer with the side wall of the second outer web, rope climbing block respectively Face and the second length bar periphery it is tangent when, rope climbing block is fixed on to the cylinder and the second outer web of the reel Side wall on.
Illustratively, it can detecte whether rope climbing block " low spot section " region meets " three point contact " requirement.The equal position of measurement point In low spot section, low spot section refers to that width in rope climbing block (W shown in Fig. 8) is greater than the part of the diameter 1/2 of the first length bar, the first length bar Diameter it is identical as the diameter of wirerope.(when diameter 1/2 of the width of rope climbing block less than the first length bar, the first length bar can not It is tangent with rope climbing block, be illustrated as follows).Preferably, five measurement points can be determined, five measurement point positions are in the low spot of rope climbing block Section, two neighboring measurement point is equidistant in five measurement points.
Referring again to Fig. 8, the second length bar 3 is placed in in one rope groove of rope climbing block 1e adjacent reel, the first length bar 2, which is placed in, climbs Restrict the radial upper surface of block 1e, detect in rope climbing block 1e " low spot section " region, the first length bar 2 whether with outside spool body 1a second Web 1c inner sidewall x, rope climbing block 1e radial direction upper surface y, the second length bar 3 periphery z simultaneously contact (tangent), that is, meet " three Point contact " requirement.
In conjunction with Fig. 5, dosage stick simulating detects rope climbing block " low spot section " region and meets " three point contact " requirement, optionally, Multiple (at least five) Along ents are taken to be detected on rope climbing block 1e " low spot section ".
Further, it requires, then will when multiple test points in rope climbing block " low spot section " region are able to satisfy " three point contact " Rope climbing block welding is fixed on the cylinder and the second outer web of the reel.
When multiple test points in rope climbing block " low spot section " region cannot meet " three point contact " requirement simultaneously, then to rope climbing block Local reconditioning is carried out, until satisfaction " three point contact " requirement.
The third mode be first way and the second way combination, first measure rope climbing block respectively with bobbin trunk, The joint place gap of second outer web inner wall, then detect whether rope climbing block " low spot section " region meets " three point contact " requirement.The Three kinds of modes include: the gap of the joint place when rope climbing block and bobbin trunk and the joint place of rope climbing block and the second outer web Gap when being all satisfied target gap range, whether " three point contact " is met using the first length bar and the second length bar detection measurement point It is required that.
Further, it is required when multiple test points in rope climbing block " low spot section " region cannot meet " three point contact " simultaneously, Local reconditioning then is carried out to rope climbing block, detecting step is then repeated, until multiple test points in rope climbing block " low spot section " region It is able to satisfy " three point contact " requirement, finally rope climbing block welding is fixed in bobbin trunk and the second outer web.
The embodiment of the present invention has accurately determined that rope climbing block originates in spool body outer circle by mathematical modeling and theoretical calculation Position reduces rope climbing block positioning difficulty in spool body outer circle, improves rope climbing by clearance gauge measurement and length bar analog detection The positioning accuracy of block is avoided because the positioning of rope climbing block is inaccurate, leads to that disorder cable phenomenon occurs when wirerope-winding, wirerope is caused to turn round Turn the wirerope that knots and damage, influences the service life of wirerope.
The foregoing is merely presently preferred embodiments of the present invention, is not intended to limit the invention, it is all in spirit of the invention and Within principle, any modification, equivalent replacement, improvement and so on be should all be included in the protection scope of the present invention.

Claims (10)

1. a kind of rope climbing block locating mounting method, which is characterized in that the described method includes:
Based on entering for first layer wirerope restricts a little on the effective length of rope groove, the screw pitch of rope groove and the reel on reel, really The starting point of climbing of second layer wirerope on the fixed reel, the first layer wirerope enter rope point and the second layer wirerope Starting point of climbing be located at the cylinder both ends of the reel;
Starting point of climbing, the radius of the reel cross section, the radius of the wirerope based on the second layer wirerope and The minimum constructive height of rope climbing block determines that original bench mark point of the rope climbing block on the reel, the original bench mark point are located at institute On the wiring direction for stating the starting point of climbing of second layer wirerope;
Original bench mark point based on the rope climbing block on the reel, installs the rope climbing block.
2. rope climbing block locating mounting method according to claim 1, which is characterized in that described to be had based on rope groove on reel Entering for first layer wirerope restricts a little on effect length, the screw pitch of rope groove and the reel, determines second layer steel wire on the reel The starting point of climbing of rope, comprising:
According to the screw pitch of the effective length of the rope groove and the rope groove, effective winding circle of the first layer wirerope is calculated Number;
Number is enclosed in effective winding based on the first layer wirerope, and calculate the first layer wirerope enters rope point on target circle The radius that is passed through, with the second layer wirerope climb radius that subpoint of the starting point on the target circle is passed through it Between central angle, the target circle be the reel and by the first layer wirerope enter rope point cross section;
Based on the central angle, the starting point of climbing of second layer wirerope on the reel is determined.
3. rope climbing block locating mounting method according to claim 2, which is characterized in that distinguish at the cylinder both ends of the reel Equipped with the first outer web and the second outer web, the rope point that enters of the first outer web and the first layer wirerope is located at same cylinder The starting point of climbing of body end, the second outer web and the second layer wirerope is located at same cylinder end,
It is described to be based on the central angle, determine the starting point of climbing of second layer wirerope on the reel, comprising:
Based on the central angle, subpoint of the starting point on the target circle that climb of the second layer wirerope is determined;
Based on the subpoint, the starting point of climbing of second layer wirerope on the reel, second layer steel wire on the reel are determined The starting point of climbing of rope is the intersection point on the inside of the reel outer circle bus that the subpoint is passed through and the described second outer web.
4. rope climbing block locating mounting method according to claim 1, which is characterized in that described to be based on the second layer steel wire The minimum constructive height of starting point of climbing, the radius of the reel cross section, the radius of the wirerope and the rope climbing block restricted determines Original bench mark point of the rope climbing block on the reel, comprising:
The minimum constructive height of radius based on the reel cross section, the radius based on the wirerope and rope climbing block calculates The distance passed through from the starting point of climbing of the second layer wirerope to the original bench mark point on the wiring direction;
Climb starting point and the distance based on the second layer wirerope, determine the rope climbing block on the reel Original bench mark point.
5. rope climbing block locating mounting method according to claim 4, which is characterized in that described to be based on the reel cross section Radius, the radius of the wirerope and the minimum constructive height of rope climbing block, calculate on the wiring direction from the second layer The distance that the starting point of climbing of wirerope is passed through to the original bench mark point, comprising:
It take the distance as the arc length on the cross section of the reel where the starting point of climbing of the second layer wirerope, based on described The radius of wirerope and the minimum constructive height of rope climbing block calculate the distance in the corresponding central angle in the cross section of the reel;
Radius based on the reel cross section and described apart from corresponding central angle, calculates the distance.
6. rope climbing block locating mounting method according to claim 1, which is characterized in that described to be based on the rope climbing block in institute The original bench mark point on reel is stated, the rope climbing block is installed, comprising:
Using the reel outer circle bus where the original bench mark point as original bench mark line, by the lower end end of the rope climbing block Face is aligned with the original bench mark line, and by the rope climbing block with and adjacent the second outer web of original bench mark point side wall Fitting;
The rope climbing block is fixed on the cylinder of the reel and the side wall of the second outer web.
7. rope climbing block locating mounting method according to claim 6, which is characterized in that described to be fixed on the rope climbing block On the side wall of the cylinder of the reel and the second outer web, comprising:
Measure gap of the rope climbing block respectively with bobbin trunk and the joint place of the second outer web;
When being bonded for the rope climbing block and the gap of the joint place of bobbin trunk and the rope climbing block and the described second outer web When the gap at place is all satisfied target gap range, the rope climbing block is fixed on outside the cylinder and described second of the reel On the side wall of web.
8. rope climbing block locating mounting method according to claim 6, which is characterized in that the target gap range is 0- 0.1mm。
9. rope climbing block locating mounting method according to claim 6, which is characterized in that described to be fixed on the rope climbing block On the side wall of the cylinder of the reel and the second outer web, comprising:
Determine that at least one measurement point, the measurement point position rise to the second layer for contacting from first layer in the rope climbing block Wirerope face on;
First length bar is placed into the measurement point, first length bar is for simulating the steel for rising to the second layer from first layer Cord;
Second length bar is placed into the rope groove adjacent with the rope climbing block, second length bar is for simulating and the rope climbing block Wirerope in adjacent rope groove;
When first length bar climbs with the side wall of the described second outer web, the rope climbing block for contacting from first layer respectively When to the face of the wirerope of the second layer and the tangent periphery of second length bar, the rope climbing block is fixed on described On the side wall of the cylinder of reel and the second outer web.
10. rope climbing block locating mounting method according to claim 9, which is characterized in that at least one measurement of the determination Point, comprising:
Determine five measurement points, for five measurement point positions in the low spot section of the rope climbing block, the low spot section is the rope climbing Width is greater than the part of the diameter of first length bar in block, the distance phase of two neighboring measurement point in five measurement points Deng.
CN201910335158.7A 2019-04-24 2019-04-24 Positioning and mounting method for rope climbing block Active CN110255413B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910335158.7A CN110255413B (en) 2019-04-24 2019-04-24 Positioning and mounting method for rope climbing block

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910335158.7A CN110255413B (en) 2019-04-24 2019-04-24 Positioning and mounting method for rope climbing block

Publications (2)

Publication Number Publication Date
CN110255413A true CN110255413A (en) 2019-09-20
CN110255413B CN110255413B (en) 2021-04-13

Family

ID=67913837

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910335158.7A Active CN110255413B (en) 2019-04-24 2019-04-24 Positioning and mounting method for rope climbing block

Country Status (1)

Country Link
CN (1) CN110255413B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111941327A (en) * 2020-06-22 2020-11-17 武汉船用机械有限责任公司 Positioning method of rope climbing block
CN113020919A (en) * 2021-03-31 2021-06-25 中国水利水电夹江水工机械有限公司 Method for manufacturing rope retaining ring of winding drum

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102745614A (en) * 2012-07-18 2012-10-24 武汉船用机械有限责任公司 Multi-layer helix rope winding groove coiling barrel
WO2012155724A1 (en) * 2011-05-18 2012-11-22 上海三一科技有限公司 Drum with multi-layer winding rope grooves, machining method thereof, and crane comprising drum
CN104340900A (en) * 2014-10-21 2015-02-11 徐州建机工程机械有限公司 Method for arranging ropes of coiling block of double-folding hoisting mechanism through whole-course intervene at crane end
CN105921896A (en) * 2016-04-29 2016-09-07 武汉船用机械有限责任公司 Installing and positioning method of drum rope climbing block
CN206336961U (en) * 2016-11-14 2017-07-18 郑州飞机装备有限责任公司 A kind of reel structure
US10189687B2 (en) * 2014-12-05 2019-01-29 Kobe Steel, Ltd. Electric winch device and mobile crane

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2012155724A1 (en) * 2011-05-18 2012-11-22 上海三一科技有限公司 Drum with multi-layer winding rope grooves, machining method thereof, and crane comprising drum
CN102745614A (en) * 2012-07-18 2012-10-24 武汉船用机械有限责任公司 Multi-layer helix rope winding groove coiling barrel
CN104340900A (en) * 2014-10-21 2015-02-11 徐州建机工程机械有限公司 Method for arranging ropes of coiling block of double-folding hoisting mechanism through whole-course intervene at crane end
US10189687B2 (en) * 2014-12-05 2019-01-29 Kobe Steel, Ltd. Electric winch device and mobile crane
CN105921896A (en) * 2016-04-29 2016-09-07 武汉船用机械有限责任公司 Installing and positioning method of drum rope climbing block
CN206336961U (en) * 2016-11-14 2017-07-18 郑州飞机装备有限责任公司 A kind of reel structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111941327A (en) * 2020-06-22 2020-11-17 武汉船用机械有限责任公司 Positioning method of rope climbing block
CN113020919A (en) * 2021-03-31 2021-06-25 中国水利水电夹江水工机械有限公司 Method for manufacturing rope retaining ring of winding drum

Also Published As

Publication number Publication date
CN110255413B (en) 2021-04-13

Similar Documents

Publication Publication Date Title
JP4894620B2 (en) Wire rope flaw detector
CN110255413A (en) Rope climbing block locating mounting method
JP2007297777A (en) Cable for suspension structure and measurement system
CN105866237A (en) Alternating-current magnetic field detection probe applied to inner detection of pipelines
CN111982088B (en) Method for measuring perpendicularity of precast concrete tower barrel
JP4316599B2 (en) Polygonal overhead wire
CN208327112U (en) A kind of hanging apparatus for steel reinforcement cage integral hoisting
CN103673959A (en) Method, device and system for detecting number of wound/unwound steel wire ropes of winding drum and engineering machine
CN111174757A (en) Tunnel bottom plate settlement monitoring device and method
CN105921896B (en) A kind of installation and locating method of reel rope climbing block
JP6180183B2 (en) Method for producing stranded wire and stranded wire device
CN110342415B (en) Positioning tool and positioning method for rope climbing block of winding drum
CN111762706A (en) Double-winch single-hook type lifting equipment and winch synchronous calibration method and system thereof
JP6950961B2 (en) Potential measurement jig for underwater structures, potential measurement method using this, and verification method of generated current
CN110764038B (en) Method and device for evaluating uncertainty of measurement caused by current pole
CN109579665A (en) Metal tape armour gap measuring method
CN109895808A (en) Track off-seam detection method and velocity-measuring system
CN114092444A (en) Average linear overexcavation detection method for tunnel section
CN105095649B (en) The data analysing method and system of building inclination angle
TWI644851B (en) Steel coil center coordinate detecting device and method thereof
CN107339970A (en) A kind of altitude operation vehicle arm support deformation detection method based on total powerstation
US4498812A (en) Process for laying a submarine cable
CN210366411U (en) Detachable aerial insulated cable delivery reel
CN107588727B (en) Pipe orifice assembly parameter measuring device
CN110243298A (en) A kind of square law device detecting elevator rope groove diameter

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant