CN110232508A - A kind of construction site intelligence construction method and device - Google Patents
A kind of construction site intelligence construction method and device Download PDFInfo
- Publication number
- CN110232508A CN110232508A CN201910473075.4A CN201910473075A CN110232508A CN 110232508 A CN110232508 A CN 110232508A CN 201910473075 A CN201910473075 A CN 201910473075A CN 110232508 A CN110232508 A CN 110232508A
- Authority
- CN
- China
- Prior art keywords
- construction
- parameter
- qualification
- team
- information
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06311—Scheduling, planning or task assignment for a person or group
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0639—Performance analysis of employees; Performance analysis of enterprise or organisation operations
- G06Q10/06395—Quality analysis or management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Educational Administration (AREA)
- Marketing (AREA)
- Development Economics (AREA)
- General Business, Economics & Management (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- Quality & Reliability (AREA)
- Operations Research (AREA)
- Game Theory and Decision Science (AREA)
- Health & Medical Sciences (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The present invention relates to intelligent technical field of construction, disclose a kind of construction site intelligence construction method, comprising the following steps: obtain the essential information of construction team, obtain the qualification information of the construction team, construction team's database is established, construction task is established, obtains the information up to standard of the construction task;Has the construction team of qualification as undertaking construction team according to the information sifting up to standard of the construction task;The acceptance information after the completion of construction team's construction is obtained, the qualification information of corresponding construction team is corrected according to the acceptance information, to update construction team's database.There is the present invention construction task to be assigned record, have foundation, objective and accurate technical effect.
Description
Technical field
The present invention relates to intelligent technical field of construction, and in particular to a kind of construction site intelligence construction method and device.
Background technique
Construction-engineering project is usually complicated and arduous engineering, and architectural engineering smoothly completes design schedule, quality, throwing
The various aspects such as money, contract, manpower.Currently, architectural engineering can be divided into multiple constructions and appointed after bidding of construction engineering
Business, and configure multiple construction teams while carrying out, to accelerate speed of application.But the investigation and recommendation for construction team pass through
Manually realize, there are problems that it is not objective, without according to, no record.
Summary of the invention
It is an object of the invention to overcome above-mentioned technical deficiency, a kind of construction site intelligence construction method and device are provided,
Solve the technical issues of construction task distribution is not objective, without foundation, no record in the prior art.
To reach above-mentioned technical purpose, technical solution of the present invention provides a kind of construction site intelligence construction method, including
Following steps:
The essential information for obtaining construction team, obtains the qualification information of the construction team, establishes construction team's database,
Construction task is established, the information up to standard of the construction task is obtained;
Has the construction team of qualification as undertaking construction team according to the information sifting up to standard of the construction task;
The acceptance information after the completion of construction team's construction is obtained, is believed according to the qualification that the acceptance information corrects corresponding construction team
Breath, to update construction team's database.
The present invention also provides a kind of construction site intelligence constructing device, including processor and memory, the memories
On be stored with computer program, the computer program realizes the construction site intelligence construction party when being executed by the processor
Method.
The present invention also provides a kind of computer storage mediums, are stored thereon with computer program, the computer program quilt
When processor executes, the construction site intelligence construction method is realized.
Compared with prior art, the beneficial effect comprise that establishing construction team's database, the qualification of construction team is believed
Breath is recorded and is managed collectively, and when needing to distribute construction task, judges whether it has according to the qualification information of construction team
Qualification is accepted, to realize objectively evaluating for construction team, guarantees smoothly completing for construction task;After the completion of constructing simultaneously,
It is modified by qualification information of the acceptance information to construction team, so that qualification information becomes multidate information, it can be accurate
The construction level for reflecting construction team's current slot, provides objective basis for the distribution of construction task.
Detailed description of the invention
Fig. 1 is the flow chart of one embodiment of construction site intelligence construction method provided by the invention.
Specific embodiment
In order to make the objectives, technical solutions, and advantages of the present invention clearer, with reference to the accompanying drawings and embodiments, right
The present invention is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, and
It is not used in the restriction present invention.
Embodiment 1
As shown in Figure 1, the embodiment of the present invention 1 provides construction site intelligence construction method, comprising the following steps:
S1, the essential information for obtaining construction team, obtain the qualification information of the construction team, establish construction team's database,
S2, construction task is established, obtains the information up to standard of the construction task;
S3, has the construction team of qualification according to the information sifting up to standard of the construction task as undertaking construction team;
Acceptance information after the completion of S4, the construction of acquisition construction team, the money of corresponding construction team is corrected according to the acceptance information
Matter information, to update construction team's database.
Intelligence construction method in construction site provided by the invention, initially sets up construction team's database, collects the base of construction team
This information and qualification information, specifically, essential information includes construction team's title, area, contact method etc..By establishing construction team
The canonical record of database realizing construction team qualification information and unified management can be from construction teams when needing to distribute construction task
It is screened in database.Specifically, according to the parameter up to standard of construction task, whether judging construction team when distribution construction task
Has the qualification for accepting the construction task, so that having something to base on for construction task distribution is realized, caused by avoiding because of manual allocation
Not the phenomenon that objective no foundation.The acceptance information that construction is completed finally is obtained, according to acceptance information to the qualification of corresponding construction team
Information is modified update, and the qualification information in construction team's database is allowed accurately to objectively respond construction team's current slot
Qualification situation, a closed loop feedback system is integrally formed, so that construction team's database becomes more perfect, preferably to apply
The distribution of work task provides objective basis.
Preferably, the qualification information includes a variety of different classes of qualification parameters, the information up to standard include it is a variety of not
Generic parameter up to standard, the acceptance information include a variety of different classes of examination parameters.
Different classes of qualification parameter, different classes of parameter up to standard and different classes of examination parameter are set, never
The performance of the qualification of angle estimator construction team together, the difficulty of construction task and construction task.Such as from personnel, report
The different aspects such as valence, speed of application, construction quality are arranged different classes of qualification parameter, parameter up to standard and check and accept parameter.
Preferably, it is used as according to the construction team that the information sifting up to standard of the construction task has qualification and accepts construction team,
Specifically:
The type of the qualification parameter is equal with the type of the parameter up to standard and corresponds;
It is each described parametric distribution weight coefficient up to standard according to the construction requirement of the construction task, and sets up to standard
Threshold value;
The weighted average of the qualification parameter of each construction team is calculated according to the weight coefficient;
The weighted average for filtering out qualification parameter is more than the construction team of the threshold value up to standard as construction team to be selected;
The undertaking construction team is selected from the construction team to be selected.
Requirement due to each single item construction task to different parameters up to standard is different, is ginseng up to standard according to the requirement of construction
Different weight coefficients is arranged in number, so that the assessment for construction team more can filter out and be more suitable for close to the requirement of construction task
In the construction team of the construction task.For example, there is some construction task durations tighter, this is mentioned with regard to right speed of application and construction number
Higher requirement is gone out, therefore can be to the higher weight coefficient of qualification parameter setting of reaction speed of application and number of constructing;
Having some construction task times, above no hurry, but stringenter for quality requirement, and Zhejiang proposes higher want to construction quality
It asks, therefore can be to the higher weight coefficient of self-control parameter setting of reaction construction quality.Undertaking is selected from construction team to be selected
Construction team can select the highest construction team to be selected of weighted average of qualification parameter as construction choosing is accepted, can also be used artificial
The method of screening.
Preferably, the qualification information of corresponding construction team is corrected according to the acceptance information, specifically:
The type of the qualification parameter is equal with the examination type of parameter and corresponds;
Each described examination parameter is compared with corresponding parameter up to standard respectively, obtains and checks and accepts correction factor;
The corresponding qualification parameter is modified according to the examination correction factor.
Qualification information is corrected by acceptance information, the real-time update of construction team's qualification information may be implemented, it is made to become dynamic
State data can more reflect the dynamic capability of construction team, so that the evaluation to construction team is more objective more acurrate.Check and accept parameter with it is up to standard
The comparison of parameter reflects the completeness of construction task, and the qualification parameter of construction team is updated according to the completeness of construction task, is made
The qualification parameter for obtaining construction team can objectively embody the performance of all previous construction of construction team comprehensively.
Specifically, parameter and parameter comparison up to standard will be checked and accepted, difference both is obtained, by difference and conversion coefficient and corresponding
Weight coefficient be multiplied, obtain check and accept correction factor, by check and accept correction factor be added to obtain revised qualification with qualification parameter
Parameter.
Preferably, the qualification parameter includes personal scheduling qualification parameter, construction quality qualification parameter and speed of application
Qualification parameter;The parameter up to standard includes personal scheduling parameter up to standard, construction quality parameter up to standard and speed of application ginseng up to standard
Number;The examination parameter includes that parameter, construction quality accident parameter and speed of application examination parameter are checked and accepted in personal scheduling.
This preferred embodiment judged in terms of personal scheduling, construction quality and speed of application three construction team qualification,
The difficulty of construction task and the completion effect of construction task.It should be understood that, qualification parameter, parameter up to standard and examination parameter
Other kinds of parameter can also be chosen, this preferred embodiment only provides a kind of preferred embodiment for reference.
Embodiment 2
The embodiment of the present invention 2 provides construction site intelligence constructing device, including processor and memory, described to deposit
It is stored with computer program on reservoir, realizes that any of the above embodiment provides when the computer program is executed by the processor
Construction site intelligence construction method.
Intelligence constructing device in construction site provided by the invention, for realizing construction site intelligence construction method, therefore, on
The technical effect that construction site intelligence construction method has is stated, construction site intelligence constructing device is likewise supplied with, herein no longer
It repeats.
Embodiment 3
The embodiment of the present invention 3 provides computer storage medium, is stored thereon with computer program, the computer journey
When sequence is executed by processor, the construction site intelligence construction method that any of the above embodiment provides is realized.
Computer storage medium provided by the invention, for realizing construction site intelligence construction method, therefore, above-mentioned building
The technical effect that building site intelligence construction method has, computer storage medium are likewise supplied with, and details are not described herein.
The above described specific embodiments of the present invention are not intended to limit the scope of the present invention..Any basis
Any other various changes and modifications that technical concept of the invention is made should be included in right of the present invention guarantor up to standard
It protects in range.
Claims (7)
1. a kind of construction site intelligence construction method, which comprises the following steps:
The essential information for obtaining construction team, obtains the qualification information of the construction team, establishes construction team's database;
Construction task is established, the information up to standard of the construction task is obtained;
Has the construction team of qualification as undertaking construction team according to the information sifting up to standard of the construction task;
The acceptance information after the completion of construction team's construction is obtained, the qualification information of corresponding construction team is corrected according to the acceptance information,
To update construction team's database.
2. intelligence construction method in construction site according to claim 1, which is characterized in that the qualification information includes a variety of
Different classes of qualification parameter, the information up to standard include a variety of different classes of parameters up to standard, and the acceptance information includes more
The different classes of examination parameter of kind.
3. intelligence construction method in construction site according to claim 2, which is characterized in that according to reaching for the construction task
The construction team that mark information sifting has qualification, which is used as, accepts construction team, specifically:
The type of the qualification parameter is equal with the type of the parameter up to standard and corresponds;
It is each described parametric distribution weight coefficient up to standard according to the construction requirement of the construction task, and sets threshold up to standard
Value;
The weighted average of the qualification parameter of each construction team is calculated according to the weight coefficient;
The weighted average for filtering out qualification parameter is more than the construction team of the threshold value up to standard as construction team to be selected;
The undertaking construction team is selected from the construction team to be selected.
4. intelligence construction method in construction site according to claim 3, which is characterized in that corrected according to the acceptance information
The qualification information of corresponding construction team, specifically:
The type of the qualification parameter is equal with the examination type of parameter and corresponds;
Each described examination parameter is compared with corresponding parameter up to standard respectively, obtains and checks and accepts correction factor;
The corresponding qualification parameter is modified according to the examination correction factor.
5. intelligence construction method in construction site according to claim 4, which is characterized in that the qualification parameter includes personnel
Dispatch qualification parameter, construction quality qualification parameter and speed of application qualification parameter;The parameter up to standard includes that personal scheduling reaches
Mark parameter, construction quality parameter up to standard and speed of application parameter up to standard;The examination parameter include personal scheduling check and accept parameter,
Construction quality accident parameter and speed of application check and accept parameter.
6. a kind of construction site intelligence constructing device, which is characterized in that including processor and memory, deposited on the memory
Computer program is contained, the computer program realizes a method as claimed in any one of claims 1 to 5 build when being executed by the processor
Build building site intelligence construction method.
7. a kind of computer storage medium, is stored thereon with computer program, which is characterized in that the computer program is processed
When device executes, intelligence construction method in construction site a method as claimed in any one of claims 1 to 5 is realized.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910473075.4A CN110232508B (en) | 2019-05-31 | 2019-05-31 | Intelligent construction method and device for building site |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910473075.4A CN110232508B (en) | 2019-05-31 | 2019-05-31 | Intelligent construction method and device for building site |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110232508A true CN110232508A (en) | 2019-09-13 |
CN110232508B CN110232508B (en) | 2023-05-26 |
Family
ID=67858960
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910473075.4A Active CN110232508B (en) | 2019-05-31 | 2019-05-31 | Intelligent construction method and device for building site |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110232508B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112990702A (en) * | 2021-03-12 | 2021-06-18 | 深圳工盟科技有限公司 | Construction team matching method, device and equipment based on construction task and storage medium |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102360459A (en) * | 2011-08-19 | 2012-02-22 | 北京华通伟业科技发展有限公司 | Safety monitoring system for underground operating personnel |
CN105678477A (en) * | 2016-03-02 | 2016-06-15 | 国网四川省电力公司 | Evaluation method for bearing capacity in power transmission and transformation construction enterprise |
CN105677929A (en) * | 2016-03-31 | 2016-06-15 | 比美特医护在线(北京)科技有限公司 | Information recommendation method and device |
CN106447280A (en) * | 2016-08-16 | 2017-02-22 | 李相元 | Qualification definition, formation and evaluation management system |
CN106651072A (en) * | 2015-10-30 | 2017-05-10 | 苏宁云商集团股份有限公司 | Dispatching method and device |
CN108846721A (en) * | 2018-06-02 | 2018-11-20 | 吴远泉 | A kind of Interior Decoration Design System and method |
CN109784876A (en) * | 2019-03-04 | 2019-05-21 | 上海会米策信息科技有限公司 | Review system and method on line |
-
2019
- 2019-05-31 CN CN201910473075.4A patent/CN110232508B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102360459A (en) * | 2011-08-19 | 2012-02-22 | 北京华通伟业科技发展有限公司 | Safety monitoring system for underground operating personnel |
CN106651072A (en) * | 2015-10-30 | 2017-05-10 | 苏宁云商集团股份有限公司 | Dispatching method and device |
CN105678477A (en) * | 2016-03-02 | 2016-06-15 | 国网四川省电力公司 | Evaluation method for bearing capacity in power transmission and transformation construction enterprise |
CN105677929A (en) * | 2016-03-31 | 2016-06-15 | 比美特医护在线(北京)科技有限公司 | Information recommendation method and device |
CN106447280A (en) * | 2016-08-16 | 2017-02-22 | 李相元 | Qualification definition, formation and evaluation management system |
CN108846721A (en) * | 2018-06-02 | 2018-11-20 | 吴远泉 | A kind of Interior Decoration Design System and method |
CN109784876A (en) * | 2019-03-04 | 2019-05-21 | 上海会米策信息科技有限公司 | Review system and method on line |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112990702A (en) * | 2021-03-12 | 2021-06-18 | 深圳工盟科技有限公司 | Construction team matching method, device and equipment based on construction task and storage medium |
Also Published As
Publication number | Publication date |
---|---|
CN110232508B (en) | 2023-05-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
AU2001259992B2 (en) | Continuously updated data processing system and method for measuring and reporting on value creation performance | |
Burt et al. | Measuring a large network quickly | |
US8799210B2 (en) | Framework for supporting transition of one or more applications of an organization | |
Ahmed et al. | A business maturity model of software product line engineering | |
Herranz, Jr | The logic model as a tool for developing a network performance measurement system | |
CN110428176A (en) | Project progress checking method and system | |
CN110232508A (en) | A kind of construction site intelligence construction method and device | |
Negretto et al. | Vo Management Solutions VO Management e-Services | |
CN110363409A (en) | A kind of team's configuration method based on output capacity, apparatus and system | |
Meinert et al. | A case study examining the cost measurements in production and delivery of a Massive Open Online Course (MOOC) for teaching the relationship between human health and climate change | |
Hassannezhad et al. | Dynamic modelling of relationships in complex service design systems | |
Shrestha et al. | Building a software tool for transparent and efficient process assessments in IT service management | |
Hermans et al. | Assessing the maturity of public construction client organisations | |
Giesen et al. | Dynamic agent-based scheduling of treatments: evidence from the Dutch youth health care sector | |
Buntaine et al. | The challenges of using citizen reporting to improve public services: A field experiment and framework | |
Guertler et al. | Can stakeholder-analysis support open innovation? | |
Gregurec et al. | Use of Organizational Analysis Methods for Evaluating Business Improvement Initiatives | |
Mok et al. | Value‐oriented Stakeholder Engagement in Sustainable Development: A Conceptual Framework | |
Coenen | BELSPO BRAIN-be 2.0-BECODIGITAL-WP1 Report-Baseline Measurement | |
Arzeni et al. | Interactive Approach for Innovation: The Experience of the Italian EIP AGRI Operational Groups. Sustainability 2023, 15, 14271 | |
Matthews et al. | Raising the Bar–Is evaluating the outcomes of decision and information support tools a bridge too far? | |
Banihammad et al. | NEB De-Manning and Digital transformation | |
Nursin et al. | A Survey Of Collaboration Model For Design And Build Projects In Indonesia. | |
HADGU | DEPARTMENT OF BUSINESS ADMINISTRATION AND INFORMATION SYSTEM | |
Barclay et al. | A framework for developing performance objectives for projects, programs, and portfolios |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |