CN110231209A - A kind of grouting concrete paste specimen producing device - Google Patents

A kind of grouting concrete paste specimen producing device Download PDF

Info

Publication number
CN110231209A
CN110231209A CN201910548606.1A CN201910548606A CN110231209A CN 110231209 A CN110231209 A CN 110231209A CN 201910548606 A CN201910548606 A CN 201910548606A CN 110231209 A CN110231209 A CN 110231209A
Authority
CN
China
Prior art keywords
baffle
base plate
partition
producing device
grouting concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910548606.1A
Other languages
Chinese (zh)
Inventor
曹献良
汪志祥
来国杰
李鹏程
陈德
苏谦
郭惠芹
陈铖
肖芳炎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Second Engineering Co Ltd of 17th Bureau of China's Railroad Group
Southwest Jiaotong University
Second Engineering Co Ltd of China Railway 17th Bureau Group Co Ltd
Original Assignee
Second Engineering Co Ltd of 17th Bureau of China's Railroad Group
Southwest Jiaotong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Engineering Co Ltd of 17th Bureau of China's Railroad Group, Southwest Jiaotong University filed Critical Second Engineering Co Ltd of 17th Bureau of China's Railroad Group
Priority to CN201910548606.1A priority Critical patent/CN110231209A/en
Publication of CN110231209A publication Critical patent/CN110231209A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N1/00Sampling; Preparing specimens for investigation
    • G01N1/28Preparing specimens for investigation including physical details of (bio-)chemical methods covered elsewhere, e.g. G01N33/50, C12Q
    • G01N1/36Embedding or analogous mounting of samples
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N1/00Sampling; Preparing specimens for investigation
    • G01N1/28Preparing specimens for investigation including physical details of (bio-)chemical methods covered elsewhere, e.g. G01N33/50, C12Q
    • G01N1/36Embedding or analogous mounting of samples
    • G01N2001/366Moulds; Demoulding
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N1/00Sampling; Preparing specimens for investigation
    • G01N1/28Preparing specimens for investigation including physical details of (bio-)chemical methods covered elsewhere, e.g. G01N33/50, C12Q
    • G01N1/36Embedding or analogous mounting of samples
    • G01N2001/368Mounting multiple samples in one block, e.g. TMA [Tissue Microarrays]

Landscapes

  • Physics & Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Analytical Chemistry (AREA)
  • Biochemistry (AREA)
  • General Health & Medical Sciences (AREA)
  • General Physics & Mathematics (AREA)
  • Immunology (AREA)
  • Pathology (AREA)
  • Sampling And Sample Adjustment (AREA)

Abstract

The invention patent relates to the production of cement specimen, and in particular to a kind of grouting concrete paste specimen producing device, comprising: base plate;Fixed side panel, fixed side panel surround frame structure and are set on base plate;Inner plate structure, inner plate structure is detachable to be set on base plate, which is located at fixed side panel and surrounds the chamber in frame structure and fixed side panel being made to surround frame structure inside division multiple bottoms and side seal;Wherein inner plate structure includes baffle, and the one side of baffle is arranged with partition arranged in parallel, and baffle is mutually perpendicular to partition;Baffle is stretched out to outside base plate, and partition is detachable to be connected on base plate.T-shaped structure is set by above-mentioned baffle and partition, above-mentioned apparatus connection is finished when pouring test specimen, is demoulded after reaching age, the end face of baffle is beaten along baffle length direction, separate inner plate structure with test specimen, easily extraction is demoulded, easy to operate, be convenient in demoulding, fast.

Description

A kind of grouting concrete paste specimen producing device
Technical field
The invention patent relates to the production of cement specimen, and in particular to a kind of grouting concrete paste specimen producing device.
Background technique
In recent years, with the continuous expansion of China's Transportation Infrastructure Construction scale, highway and railway construction are swift and violent Development, to avoid large area excavation disturbance massif, welding causes the bad geological phenomenons such as landslide, avalanche, landform, Looks and geologic setting complex region will build more Tunnel Engineering to ensure safety, comfort and the agility of driving, Tunnel quantity is continuously increased, and the ratio for accounting for route total kilometrage is higher and higher.However, China's tunnel geology condition and structure form ten Divide complexity, the disciplines being related to during tunneling are numerous.The Tunnel Engineering construction period is long, and difficulty of construction is big, is transporting The situation that disease is exposed during battalion is commonplace, such as lining cracking, lining cutting come to nothing, structural percolating water, this not only shortens The service life in tunnel, and to communications and transportation bury security risk.
Currently, coming to nothing disease for lining cutting, unit in charge of construction still mostly uses greatly drilling, built-in slip casting pipe, backfill injection cement The traditional approach for starching (cement mortar) carries out Disease Treatment, but the cement slurry shrinkage factor at late stage injected increases, and leads to screed It is detached from lining concrete, facilitation is not had to liner structure stabilization, increases the gravity load of structure instead.Based on biography Unite injecting paste material there are the problem of, it is necessary to backfill injecting paste material optimize innovation, existing cement Dry Shrinkage Performance measuring instrument Error is larger, needs to be improved and innovated to reduce measurement error, this is just needed using concrete paste specimen, but current It is more inconvenient that cement specimen mold demoulds after specimen molding, and when demoulding is generally tapped with wooden hammer in die trial surrounding, is tried with allowing Part and mold have certain separation, the very bad control of degree and inefficiency.
Summary of the invention
The main purpose of the present invention is to provide a kind of grouting concrete paste specimen producing devices being convenient in demoulding.
To achieve the goals above, the application is the technical solution adopted is that a kind of grouting concrete paste specimen production dress It sets, comprising:
Base plate;
Fixed side panel, above-mentioned fixed side panel surround frame structure and are set on base plate;
Inner plate structure, above-mentioned inner plate structure is detachable to be set on base plate, which is located at above-mentioned fixation Side plate surrounds in frame structure and above-mentioned fixed side panel is made to surround the multiple bottoms of frame structure inside division and side seal Chamber;Wherein
Above-mentioned inner plate structure includes baffle, and the one side of above-mentioned baffle is arranged with partition arranged in parallel, baffle with Partition is mutually perpendicular to;Above-mentioned baffle is stretched out to outside base plate, and partition is detachable to be connected on base plate.
T-shaped structure is set by above-mentioned baffle and partition, above-mentioned apparatus connection is finished when pouring test specimen, is reached Demoulded after age, the end face of baffle beaten along baffle length direction, separates inner plate structure with test specimen, easily extract out into Row demoulding, shaves inner plate structure, inner plate structure can be set to fixed side panel again and enclosed by affixed side scrubbing brush oil after demoulding At frame structure in, test specimen production can be carried out again.It is easy to operate, be convenient in demoulding, fast.
Further, this grouting concrete paste specimen producing device further includes fixing piece, above-mentioned fixing piece is bar shaped Structure, one end of the fixing piece are rotatably attached on a side end face of base plate, and the fixing piece is made to be parallel to the end It can be rotated in the plane in face around the junction, the other end of the fixing piece is detachable solid with inner plate structure by connection component Fixed connection.
Fixing piece is gone to below base plate, easily inner plate structure can be taken out, prevent fixing piece to demoulding Interference.
Further, above-mentioned connection component includes bolt, it is provided on the other end of above-mentioned fixing piece and is adapted to bolt Through-hole or threaded hole are provided with the blind hole being adapted to bolt on above-mentioned baffle.It, can be more using simple connector as bolt Easy connect fixing piece with baffle.Using blind hole, to prevent slurry stream from going out, while the smooth, flat of slurry liquid contacts face is ensured It is whole.
Further, above-mentioned connection component includes threaded rod, one end of above-mentioned threaded rod is fixedly installed knob or rotation Handle or handle;The through-hole or threaded hole being adapted to threaded rod are provided on the other end of above-mentioned fixing piece, be provided on above-mentioned baffle with The blind hole of threaded rod adaptation compresses baffle convenient for threaded rod, does not generate the changing of the relative positions.Above-mentioned knob or rotating handle or handle are set, with Facilitate manual operation.
Further, being provided with the screw thread being adapted to threaded rod in above-mentioned blind hole.
Further, above-mentioned fixed side panel includes a horizontal side plate and two parallel longitudinal side plates, above-mentioned horizontal side plate Both ends are separately connected the rear end of two longitudinal side plates and horizontal side plate is vertical with longitudinal side plate, form the rectangular cavity in a front, upper opening Body.
Further, aforementioned barriers are arranged in parallel with longitudinal side plate.
Further, being provided with the through slot worn for partition on above-mentioned horizontal side plate.
By the setting of through slot, it is not only to ensure that inner plate structure or partition can be accurately positioned in this way, while and connection component Inner plate structure front and back end is fixed in collective effect.
Further, being provided with the groove for partition lower side along insertion on above-mentioned base plate.The groove is set, is determined Position is arranged in partition.
Further, the both ends of above-mentioned baffle are located at outside base plate edge, to facilitate the end to baffle to tap, Prevent percussion tool from directly contacting base plate.
Further, the length of the length > partition of above-mentioned baffle.
The present invention is described further with reference to the accompanying drawings and detailed description.The additional aspect of the present invention and excellent Point will be set forth in part in the description, and partially will become apparent from the description below.Or practice through the invention It solves.
Detailed description of the invention
The attached drawing for constituting a part of the invention is used to assist the understanding of the present invention, content provided in attached drawing and its Related explanation can be used for explaining the present invention in the present invention, but not constitute an undue limitation on the present invention.In the accompanying drawings:
Fig. 1 is the dismantling schematic diagram for illustrating this grouting concrete paste specimen producing device;
Fig. 2 is for illustrating the schematic diagram after this grouting concrete paste specimen producing device assembles;
In the figure, it is marked as 1- base plate, 2- fixed side panel, the horizontal side plate of 201-, the longitudinal side 202- plate, 3- inner plate structure, 301- Baffle, 302- partition, 4- fixing piece, 5- groove, 6- threaded rod, 7- rotating handle, 8- through slot, 9- through-hole, 10- blind hole.
Specific embodiment
Clear, complete explanation is carried out to the present invention with reference to the accompanying drawing.Those of ordinary skill in the art are being based on these The present invention will be realized in the case where explanation.It before the present invention will be described, is needing to particularly point out in conjunction with attached drawing 1 or 2 It is:
The technical solution provided in each section including following the description and technical characteristic in the present invention are not rushing In the case where prominent, these technical solutions and technical characteristic be can be combined with each other.
In addition, the embodiment of the present invention being related in following the description is generally only the embodiment of present invention a part, and The embodiment being not all of.Therefore, based on the embodiments of the present invention, those of ordinary skill in the art are not making creativeness Every other embodiment obtained, should fall within the scope of the present invention under the premise of labour.
About term in the present invention and unit.Term in description and claims of this specification and related part " comprising " and its any deformation, it is intended that cover and non-exclusive include.
Related content of the invention is illustrated above.Those of ordinary skill in the art are in the feelings illustrated based on these The present invention will be realized under condition.Based on above content of the invention, those of ordinary skill in the art are not making creativeness Every other embodiment obtained, should fall within the scope of the present invention under the premise of labour.
Fig. 1 or 2, a kind of embodiment one: grouting concrete paste specimen producing device, comprising:
Base plate 1;
Fixed side panel 2, above-mentioned fixed side panel 2 surround frame structure and are set on base plate 1;
Inner plate structure 3, above-mentioned inner plate structure 3 is detachable to be set on base plate 1, which is located at above-mentioned Fixed side panel 2 surrounds in frame structure and above-mentioned fixed side panel 2 is made to surround the multiple bottoms of frame structure inside division and side The chamber of sealing;Wherein
Above-mentioned inner plate structure 3 includes baffle 301, and the one side of above-mentioned baffle 301 is arranged with partition arranged in parallel 302, baffle 301 is mutually perpendicular to partition 302;Above-mentioned baffle 301 is stretched out to outside base plate 1, the detachable connection of partition 302 On base plate 1.
Here inner plate structure 3 can also be multiple perpendicular to base plate 1, staggered, interconnected plate body It is composed.By inner plate structure 3 and 1 detachable connection of base plate, it is equivalent to and this grouting concrete paste specimen is made into dress It sets major part and is only divided into removable two large divisions, disassembly efficiency is higher.
The detachable connection of inner plate structure 3 and base plate 1 can be setting groove 5, inner plate structure 3 on base plate 1 Lower side is pressed into groove 5, can also be that a part of inner plate structure 3 is connected by such as bolt, buckle, pin shaft and hole cooperation Fitting is fixed on base plate 1.
In demoulding, the end face of baffle 301 is beaten, end face is displaced on the direction beaten, at this time partition 302 and examination Part is mainly separated in the side of test specimen, then proceedes to beat 301 other end of baffle, and the opposite direction for doing above-mentioned direction taps, every Plate 302 is mainly separated in the other side of test specimen with test specimen, and then extraction is demoulded, convenient, simple, fast.Compared to other By way of carrying out tapping to the side wall of die trial and demould, demoulded using the present apparatus, demoulding efficiency greatly improves.
In specific setting, base plate 1 may be sized to length 179mm, width 168mm, thickness 10mm.Above-mentioned The size of partition 302 can be length 162mm, height 42mm, thick 2mm.
Embodiment two: on the basis of example 1, this grouting concrete paste specimen producing device further includes fixing piece 4, above-mentioned fixing piece 4 is strip structure, and one end of the fixing piece 4 is rotatably attached on a side end face of base plate 1, makes The fixing piece 4 can be rotated in the plane for being parallel to the end face around the junction, and the other end of the fixing piece 4 passes through connection component Detachable is fixedly connected with inner plate structure 3, particularly fixing piece 4 and 301 detachable connection of baffle.Here fixation Can be with the detachable connection of inner plate structure 3 for part 4 is bolted, and is also possible to pin key connection, when being connected using pin key, By the bolt of one aperture in radial directions of setting on fixing piece 4, two orthogonal holes are set on baffle 301, bolt is inserted After entering a hole, then with another pin by another hole and across the hole of aforementioned bolt, to realize fixation.Above-mentioned fixation When part 4 is specifically arranged, diameter 2mm can be had by end, the fixing bolt of the swingle of length 7cm is connected to base plate 1 On lateral end panel.Here fixing piece 4 may be sized to length 50mm, the long strip type structure of width 12mm, thickness 3mm.
It is above-mentioned to set fixing piece 4 to can be rotated, be in order to which fixing piece 4 can be gone to 1 lower section of base plate or side, Easily inner plate structure 3 can be taken out, prevent 4 pairs of fixing piece demoulding interference, so that demoulding work can it is smooth into Row.
The above-mentioned fixed side panel 2 longitudinal side plate 202 parallel with two including a horizontal side plate 201, the two of above-mentioned horizontal side plate 201 End is separately connected the rear end of two longitudinal side plates 202 and horizontal side plate 201 is with longitudinal side plate 202 vertical, in front of formation one, upper opening Square cavity.
Above-mentioned inner plate structure 3 include baffle 301, the one side of above-mentioned baffle 301 be arranged with be used for longitudinal side plate 202 it is flat The partition 302 of row setting.
The through slot 8 worn for partition 302 is provided on above-mentioned horizontal side plate 201.The setting of through slot 8 is not only to ensure in this way Inner plate structure 3 or partition 302 can be accurately positioned, while 3 front and back end of inner plate structure being fixed with connector collective effect.? When specific setting, longitudinal side plate 202 can be set to length 164mm, height 40mm, thickness 2mm, and horizontal side plate 201 can be set to Length 128mm, height 40mm, thickness 4mm.
Embodiment three: it on the basis of example 2, is provided on above-mentioned base plate 1 for 302 lower side of partition along insertion Groove 5.The groove 5 is set, determines that position, depth and 302 bottom of partition to baffle of groove 5 here is arranged in partition 302 The distance of 301 bottoms is corresponding, ensures when partition 302 is inserted into groove 5, is not in that slurries overflow below baffle 301 The case where.In specific setting, which can be length 160mm, width 2.2mm, depth 2mm.
Example IV: on the basis of embodiment two or three any one, the both ends of above-mentioned baffle 301 are located at base plate 1 Outside edge, the purpose being arranged in this way is not only in that the convenient installation to inner plate structure 3, and for carrying out demoulding work When, biggish torque can produce to the percussion of the end of baffle 301, the disengaging for reinforcing partition 302 and test specimen acts on, and improves demoulding Efficiency.When specific setting, above-mentioned baffle 301 may be sized to length 228mm, height 40mm, thickness 5mm.
Embodiment five: on the basis of two to four any one of embodiment, above-mentioned connection component includes bolt, above-mentioned fixation It is provided with the through-hole 9 being adapted to bolt on the other end of part 4, the blind hole 10 being adapted to bolt is provided on above-mentioned baffle 301.Using spiral shell Fixing piece 4 relatively simple can be connect by simple connector as bolt with baffle 301.One end of the threaded rod 6 of bolt is solid Surely knob or rotating handle 7 or handle are provided with;The through-hole 9 being adapted to threaded rod 6 is provided on the other end of above-mentioned fixing piece 4, it is above-mentioned The blind hole 10 being adapted to threaded rod 6 is provided on baffle 301.Above-mentioned knob or rotating handle 7 or handle are set, to facilitate manual behaviour Make.When specific setting, the screw rod of the bolt may be configured as diameter 6mm, length 2cm, the 7 diameter 4cm of rotating handle of end, and thickness can be 5mm may be set to be rod-shaped handle, diameter 5mm, length 4cm.

Claims (10)

1. a kind of grouting concrete paste specimen producing device characterized by comprising
Base plate;
Fixed side panel, the fixed side panel surround frame structure and are set on base plate;
Inner plate structure, the inner plate structure is detachable to be set on base plate, which is located at the fixed side panel Surround the chamber in frame structure and the fixed side panel being made to surround frame structure inside division multiple bottoms and side seal; Wherein
The inner plate structure includes baffle, and the one side of the baffle is arranged with partition arranged in parallel, baffle and partition It is mutually perpendicular to;The baffle is stretched out to outside base plate, and partition is detachable to be connected on base plate.
2. grouting concrete paste specimen producing device as described in claim 1, which is characterized in that it further include fixing piece, institute Stating fixing piece is strip structure, and one end of the fixing piece is rotatably attached on a side end face of base plate, fixes this Part can be rotated in the plane for being parallel to the end face around the junction, and the other end of the fixing piece is detachable by connection component Be fixedly connected with inner plate structure.
3. grouting concrete paste specimen producing device as claimed in claim 2, which is characterized in that the connection component includes Bolt is provided with the through-hole or threaded hole being adapted to bolt on the other end of the fixing piece, is provided on the baffle suitable with bolt The blind hole matched.
4. grouting concrete paste specimen producing device as claimed in claim 2, which is characterized in that the connection component includes Threaded rod, one end of the threaded rod are fixedly installed knob or rotating handle or handle;Be provided on the other end of the fixing piece with The through-hole or threaded hole of threaded rod adaptation, are provided with blind hole corresponding with threaded rod on the baffle.
5. the grouting concrete paste specimen producing device as described in claim 3 or 4 any one, which is characterized in that described The screw thread being adapted to threaded rod is provided in blind hole.
6. grouting concrete paste specimen producing device as described in claim 1, which is characterized in that the fixed side panel includes One horizontal side plate and two parallel longitudinal side plates, the both ends of the horizontal side plate are separately connected the rear end of two longitudinal side plates and horizontal side plate It is vertical with longitudinal side plate, form the square cavity in a front, upper opening.
7. grouting concrete paste specimen producing device as claimed in claim 6, which is characterized in that be provided on the horizontal side plate The through slot worn for partition.
8. grouting concrete paste specimen producing device as described in claim 1, which is characterized in that be provided on the base plate For partition lower side along the groove of insertion.
9. grouting concrete paste specimen producing device as described in claim 1, which is characterized in that the both ends position of the baffle In outside base plate edge.
10. grouting concrete paste specimen producing device as described in claim 1, which is characterized in that the length of the baffle The length of > partition.
CN201910548606.1A 2019-06-24 2019-06-24 A kind of grouting concrete paste specimen producing device Pending CN110231209A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910548606.1A CN110231209A (en) 2019-06-24 2019-06-24 A kind of grouting concrete paste specimen producing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910548606.1A CN110231209A (en) 2019-06-24 2019-06-24 A kind of grouting concrete paste specimen producing device

Publications (1)

Publication Number Publication Date
CN110231209A true CN110231209A (en) 2019-09-13

Family

ID=67857101

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910548606.1A Pending CN110231209A (en) 2019-06-24 2019-06-24 A kind of grouting concrete paste specimen producing device

Country Status (1)

Country Link
CN (1) CN110231209A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110792114A (en) * 2019-12-18 2020-02-14 江西省建筑科学研究院 Grouting and slurry taking test mold after foundation pile self-balancing static load test
CN113310780A (en) * 2021-05-25 2021-08-27 北京中煤矿山工程有限公司 Preparation method of cement grouting soil block for laboratory

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204414301U (en) * 2015-01-24 2015-06-24 晋江市闽亿再生资源有限公司 Hollow brick moulding machine moulding box
CN205325955U (en) * 2016-01-21 2016-06-22 河南省郑州水利学校 Cement mortar test piece mould shedder
CN207224216U (en) * 2017-07-11 2018-04-13 四川大学 A kind of adjustable readily removable universal mold of depth-width ratio
CN109366698A (en) * 2018-11-02 2019-02-22 萍乡学院 Large-size concrete test block pours and demoulds integrated mould and its application method
CN210690193U (en) * 2019-06-24 2020-06-05 中铁十七局集团第二工程有限公司 Cement paste test piece manufacturing device for grouting

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204414301U (en) * 2015-01-24 2015-06-24 晋江市闽亿再生资源有限公司 Hollow brick moulding machine moulding box
CN205325955U (en) * 2016-01-21 2016-06-22 河南省郑州水利学校 Cement mortar test piece mould shedder
CN207224216U (en) * 2017-07-11 2018-04-13 四川大学 A kind of adjustable readily removable universal mold of depth-width ratio
CN109366698A (en) * 2018-11-02 2019-02-22 萍乡学院 Large-size concrete test block pours and demoulds integrated mould and its application method
CN210690193U (en) * 2019-06-24 2020-06-05 中铁十七局集团第二工程有限公司 Cement paste test piece manufacturing device for grouting

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110792114A (en) * 2019-12-18 2020-02-14 江西省建筑科学研究院 Grouting and slurry taking test mold after foundation pile self-balancing static load test
CN113310780A (en) * 2021-05-25 2021-08-27 北京中煤矿山工程有限公司 Preparation method of cement grouting soil block for laboratory

Similar Documents

Publication Publication Date Title
CN110231209A (en) A kind of grouting concrete paste specimen producing device
CN108316949B (en) Tunnel roof arch hollow-free lining method
CN107401207A (en) The construction method of drainage pipeline
CN106089252B (en) Grouting reinforcement method for inhomogeneous loose bodies
CN102352757A (en) Method for controlling upward floating of pipe piece during shield machine air pushing through mining tunnel
CN209369066U (en) Concrete structure split bolt hole anti-leakage structure
CN110159186A (en) Slurry drilled pile drilling construction method
CN109083200A (en) A kind of Submersed type inspection well and its construction method
CN100556639C (en) A kind of mould of cement permeable pipes and moulding process
CN202991051U (en) Reinforcing structure capable of realizing shield reception without using water-stopping cord fabric
CN204594836U (en) A kind of porous cement concrete construction workability evaluating apparatus
CN103898918A (en) Combined supporting structure and construction method
CN210690193U (en) Cement paste test piece manufacturing device for grouting
CN203487516U (en) Timely control and check device for concrete pouring fullness of tunnel top arch
CN103498453A (en) Appropriate control check device and method for pouring fullness of concrete of top arch of tunnel
CN106978819B (en) It is a kind of without fertile slot construct basement barricade
CN103470266A (en) Anti-seepage well wall
CN101245598A (en) Combined construction technique for driven cast-in-place pile and driven pile tip and driven pipe
CN201407051Y (en) Karst formation pile hole wall protection structure
CN208432410U (en) A kind of rock tunnel(ling) machine imitative experimental appliance
CN206123892U (en) Mould of preparation diaphragm wall
CN105297875B (en) Construction method of integrated catchwater
CN210917374U (en) Grouting device for foundation pit construction
CN207620841U (en) A kind of underground transition settling tank filling system can make full use of filling slurry
CN204140096U (en) The device of small radius variable curvature section curvature and thickness between accurate control tunnel side wall and inverted arch

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination