listed
scheduled outage
moment
practical
time
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910624562.6A
Other languages
Chinese (zh)
Other versions
CN110224494B (en
Inventor
蒋业婷
严芬
王昆
苏磊
郑震
包争园
孙朝辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuxi Power Supply Branch Jiangsu Electric Power Co Ltd
Original Assignee
Wuxi Power Supply Branch Jiangsu Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuxi Power Supply Branch Jiangsu Electric Power Co Ltd filed Critical Wuxi Power Supply Branch Jiangsu Electric Power Co Ltd
Priority to CN201910624562.6A priority Critical patent/CN110224494B/en
Publication of CN110224494A publication Critical patent/CN110224494A/en
Application granted granted Critical
Publication of CN110224494B publication Critical patent/CN110224494B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00001Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by the display of information or by user interaction, e.g. supervisory control and data acquisition systems [SCADA] or graphical user interfaces [GUI]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Engineering & Computer Science (AREA)
  • Human Computer Interaction (AREA)
  • Power Engineering (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The present invention relates to automation field of power distribution, and in particular to a kind of automatic listed method of power distribution automation main station system.The automatic listed method of the power distribution automation main station system includes: to obtain single information that has a power failure;Go out the beginning, last moment and scheduled outage facility information of scheduled outage according to single information analysis that has a power failure;Judge whether to need according to scheduled outage facility information listed;Practical listed temporal information is obtained, according to the time difference between the listed temporal information real-time judge of the reality practical listed moment and the beginning of scheduled outage, last moment;According to the listed display type of time difference real-time judge between practical listed moment and the beginning of scheduled outage, last moment.Show the relationship between beginning at currently practical listed moment and scheduled outage, last moment with enabling to listed dynamic realtime, it can play the role of accurate and the state of scheduled outage equipment is automatically reminded in time, prevent situation that is accidentally listed or being delayed delisted from occurring.

Description

The automatic listed method of power distribution automation main station system
Technical field
The present invention relates to distribution automation fields, and in particular to a kind of automatic listed side of power distribution automation main station system Method.
Background technique
It is listed be in power network dispatching system in order to observably prompt dispatcher's primary equipment current operating conditions and in correspondence One Xiang Gongneng of Sign Board, there are commonly Sign Boards such as maintenance, debugging, prepared auto restarts, different Sign Boards are set on equipment figure Indicate the different state of equipment.By the way that correct Sign Board is arranged, it is ensured that the operation of dispatcher's safety, while shielding Interference main station judging accidentally transmits.
Currently, electrical power distribution automatization system has powerful troubleshooting capability.When line failure tripping, main website can Quickly summarize the information such as failure logging, monitoring running state data and manual block condition, automatically provides Fault Isolation and power supply Recovery scheme, therefore, the accuracy of scheme and the actual conditions of live route are closely bound up.And the mark extension of Sign Board directly affects Judgement of the main website to line status on site, incorrect Sign Board, which is arranged, will likely influence the starting of feeder automation FA (no Starting or error starting), the judgement of fault section and be specifically isolated execution with service restoration scheme.
The mark that current electrical power distribution automatization system is identified board using manually mode is hung, but the frequent face of dispatcher Face the odd-numbered day have a power failure it is single up to tens of the case where, thereby increases and it is possible to be related to the more days interruption maintenances across shift, inevitably occur it is accidentally listed or Be delayed delisted situation, causes dispatcher that cannot accurately and effectively be judged by system on-site actual situations.
Summary of the invention
In order to solve the deficiencies in the prior art, the present invention provides a kind of automatic extension of power distribution automation main station system Board method, the automatic listed method of the power distribution automation main station system show currently practical with enabling to listed dynamic realtime Relationship between listed moment and the beginning of scheduled outage, last moment, can play accurately and in time to scheduled outage equipment The effect that state is automatically reminded to prevents situation that is accidentally listed or being delayed delisted from occurring.
The technical solution provided according to the present invention, a kind of automatic listed method of power distribution automation main station system are described to match The automatic listed method of electric automation main station system includes:
Obtain single information that has a power failure;
Go out the beginning, last moment and scheduled outage facility information of scheduled outage according to single information analysis that has a power failure;
Judge whether to need according to scheduled outage facility information listed;
Practical listed temporal information is obtained, is stopped according to the listed temporal information real-time judge of the reality practical listed moment with plan Time difference between the beginning of electricity, last moment;
According to the listed display type of time difference real-time judge between practical listed moment and the beginning of scheduled outage, last moment.
Further, the scheduled outage facility information includes scheduled outage device name and power failure equipments type;
The step: judge whether that the listed detailed process of needs includes: according to scheduled outage facility information
The type of scheduled outage equipment is judged according to the scheduled outage facility information;
It needs to be listed if scheduled outage device type is line facility;
It does not need to be listed if scheduled outage device type is transformer equipment.
Further, the step: obtaining practical listed temporal information, is sentenced in real time according to the listed temporal information of the reality The step of carrying out also is needed to include: before time difference between disconnected practical listed moment and the beginning of scheduled outage, last moment
Acquisition needs listed initial time information;
Listed initial time is needed to send listed instruction described, the listed instruction is hung for controlling corresponding power failure equipments Board.
Further, the step: real according to the time difference between practical listed moment and the beginning of scheduled outage, last moment When judge that the process of listed display type includes:
If the practical listed moment is before the initial time of scheduled outage, and the practical listed moment is in the initial time of scheduled outage Between time difference be greater than first time threshold, then show the first listed type;
If the practical listed moment is before the initial time of scheduled outage, and the initial time at practical listed moment and scheduled outage Between time difference be less than or equal to first time threshold, then show the second listed type;
If the practical listed moment is between the initial time of scheduled outage and the end time of scheduled outage, show that third is hung Board type;
If the practical listed moment is in after the end time of scheduled outage, the 4th listed type is shown.
Further, further includes:
Obtain the practical completion moment;
Delisted instruction is sent at the practical completion moment, the delisted instruction is for controlling the corresponding power failure equipments being listed Carry out delisted operation.
Further, judge whether the practical completion moment is in after the end time of scheduled outage, stop if then generating Electric list extension record.
From it is described above as can be seen that power distribution automation main station system provided by the invention automatic listed method, and show There is technology to compare and have following advantages:
First, listed function can be punctual, accurately delisted automatically, in case the Sign Board being detained influences power distribution automation main station feedback The starting of line automation and judgement to fault section, the processing of feeder automation troubleshooting even under fully automatic mode Process.
Second, on the Sign Board that mark is hung required for the more information content on power failure list being embodied in, in sign board Hold more abundant clear.
Third, listed functional expansionary is higher automatically, voice broadcast, short message prompt when the later period can increase listed etc. Function prompts the dispatcher to carry out listing operation.
When fourth, the function that is listed automatically can work at the scene, midway has variation to need replacing Sign Board, carry out in time more It changes, so that working site interacts more flexible coordination with power distribution automation main station.
Detailed description of the invention
Fig. 1 is the flow chart of the first embodiment of the invention.
Fig. 2 is the flow chart of second of embodiment of the invention.
Fig. 3 is the flow chart of the third embodiment of the invention.
Fig. 4 is the specific flow chart of step S300 in the present invention.
Fig. 5 is the specific flow chart of step S400 in the present invention.
Specific embodiment
To make the objectives, technical solutions, and advantages of the present invention clearer, below in conjunction with specific embodiment, and reference Attached drawing, the present invention is described in more detail.
The present invention provides a kind of automatic listed method of power distribution automation main station system, as shown in Figure 1, the distribution is automatic Change main station system it is automatic be listed the first embodiment of method specifically includes the following steps:
S100: single information that has a power failure is obtained;
S200: go out the beginning, last moment and scheduled outage facility information of scheduled outage according to single information analysis that has a power failure;
S300: judge whether to need according to scheduled outage facility information listed;
S400: obtaining practical listed temporal information, according to the reality be listed the temporal information real-time judge practical listed moment and Time difference between the beginning of scheduled outage, last moment;
S500: according to the listed display class of time difference real-time judge between practical listed moment and the beginning of scheduled outage, last moment Type.
It is understood that S400 and S500 show currently practical listed moment and meter with enabling to listed dynamic realtime The relationship between the beginning having a power failure, last moment is drawn, can play accurate and the state of scheduled outage equipment is automatically reminded in time Effect, prevent situation that is accidentally listed or being delayed delisted from occurring.
The scheduled outage facility information includes scheduled outage device name and power failure equipments type;
As shown in figure 4, the step: S300: being judged whether to need listed detailed process packet according to scheduled outage facility information It includes:
S310: the type of scheduled outage equipment is judged according to the scheduled outage facility information;
S320: it needs to be listed if scheduled outage device type is line facility;
S330: it does not need to be listed if scheduled outage device type is transformer equipment.
It is understood that different equipment is to have different listed demands there is power failure demand, line facility is having Power failure demand is to need to be listed in power distribution automation main station system, and transformer equipment there is power failure demand is not needed in distribution It automates in main station system and is listed, judge power failure equipments type, according to the listed situation of different power failure equipments Type Controls It can prevent accidentally listed problem from occurring.
As shown in figure 5, the step: S400: according between practical listed moment and the beginning of scheduled outage, last moment when Between the be listed process of display type of poor real-time judge include:
S410: if practical be listed the moment before the initial time of scheduled outage, and practical rising in scheduled outage of listed moment Time difference between moment beginning is greater than first time threshold, then shows the first listed type;
S420: if practical be listed the moment before the initial time of scheduled outage, and at practical listed moment and scheduled outage Time difference between moment beginning is less than or equal to first time threshold, then shows the second listed type;
S430: it if the practical listed moment is between the initial time of scheduled outage and the end time of scheduled outage, shows Third is listed type;
S440: if the practical listed moment is in after the end time of scheduled outage, the 4th listed type is shown.
It is understood that the case where listed display is in chronological sequence divided into above four kinds, listed basis is enabled to Time dynamically shows different type, and wherein each type corresponds to the different state of scheduled outage equipment, and described first is listed The power failure demand that type can be intended to power failure equipments is shown, and indicates current time rising apart from scheduled outage equipment Beginning, the moment, there are also certain times;When the second listed type indicates starting of the current time close to scheduled outage equipment It carves, staff is needed to be ready;The listed type of the third indicates that scheduled outage equipment is currently in interruption maintenance rank Section, third be listed the stage that type show will forbid feeder automation and fault location etc. operation;In the 4th listed type Indicate that the practical power off time of scheduled outage equipment has been over power failure required time section.
As shown in Fig. 2, automatic listed second of embodiment of method of the power distribution automation main station system specifically include with Lower step:
S100: single information that has a power failure is obtained;
S200: go out the beginning, last moment and scheduled outage facility information of scheduled outage according to single information analysis that has a power failure;
S300: judge whether to need to be listed according to scheduled outage facility information, be if desired listed and then follow the steps below, otherwise tie Beam;
S301: acquisition needs listed initial time information;
S302: listed initial time is needed to send listed instruction described, the listed instruction is set for controlling corresponding power failure It is standby listed.
S400: obtaining practical listed temporal information, when practical listed according to the listed temporal information real-time judge of the reality Carve the time difference between the beginning of scheduled outage, last moment;
S500: according to the listed display class of time difference real-time judge between practical listed moment and the beginning of scheduled outage, last moment Type.
The scheduled outage facility information includes scheduled outage device name and power failure equipments type;
The step: S300: judge whether that the listed detailed process of needs includes: according to scheduled outage facility information
S310: the type of scheduled outage equipment is judged according to the scheduled outage facility information;
S320: it needs to be listed if scheduled outage device type is line facility;
S330: it does not need to be listed if scheduled outage device type is transformer equipment.
It is understood that different equipment is to have different listed demands there is power failure demand, line facility is having Power failure demand is to need to be listed in power distribution automation main station system, and transformer equipment there is power failure demand is not needed in distribution It automates in main station system and is listed, judge power failure equipments type, according to the listed situation of different power failure equipments Type Controls It can prevent accidentally listed problem from occurring.
The step: S400: sentenced in real time according to the time difference between practical listed moment and the beginning of scheduled outage, last moment The process of disconnected listed display type includes:
S410: if practical be listed the moment before the initial time of scheduled outage, and practical rising in scheduled outage of listed moment Time difference between moment beginning is greater than first time threshold, then shows the first listed type;
S420: if practical be listed the moment before the initial time of scheduled outage, and at practical listed moment and scheduled outage Time difference between moment beginning is less than or equal to first time threshold, then shows the second listed type;
S430: it if the practical listed moment is between the initial time of scheduled outage and the end time of scheduled outage, shows Third is listed type;
S440: if the practical listed moment is in after the end time of scheduled outage, the 4th listed type is shown.
It is understood that the case where listed display is in chronological sequence divided into above four kinds, listed basis is enabled to Time dynamically shows different type, and wherein each type corresponds to the different state of scheduled outage equipment, and described first is listed The power failure demand that type can be intended to power failure equipments is shown, and indicates current time rising apart from scheduled outage equipment Beginning, the moment, there are also certain times;When the second listed type indicates starting of the current time close to scheduled outage equipment It carves, staff is needed to be ready;The listed type of the third indicates that scheduled outage equipment is currently in interruption maintenance rank Section, third be listed the stage that type show will forbid feeder automation and fault location etc. operation;In the 4th listed type Indicate that the practical power off time of scheduled outage equipment has been over power failure required time section.
As shown in figure 3, automatic listed the third embodiment of method of the power distribution automation main station system specifically include with Lower step:
S100: single information that has a power failure is obtained;
S200: go out the beginning, last moment and scheduled outage facility information of scheduled outage according to single information analysis that has a power failure;
S300: judge whether to need to be listed according to scheduled outage facility information, be if desired listed and then follow the steps below, otherwise tie Beam;
S301: acquisition needs listed initial time information;
S302: listed initial time is needed to send listed instruction described, the listed instruction is set for controlling corresponding power failure It is standby listed.
S400: obtaining practical listed temporal information, when practical listed according to the listed temporal information real-time judge of the reality Carve the time difference between the beginning of scheduled outage, last moment;
S500: according to the listed display class of time difference real-time judge between practical listed moment and the beginning of scheduled outage, last moment Type;
S600: the practical completion moment is obtained;
S700: delisted instruction is sent at the completion moment real time, the delisted instruction is for controlling corresponding be listed Power failure equipments carry out delisted operation.
It is understood that the S600 and S700 enable to promptly and accurately automatic delisted the step of description.
For being carried out while carrying out step S700
S800 judges whether practical completion moment time is in after the end time of scheduled outage, singly prolongs if then generating power failure Phase record.
The scheduled outage facility information includes scheduled outage device name and power failure equipments type;
The step: S300: judge whether that the listed detailed process of needs includes: according to scheduled outage facility information
S310: the type of scheduled outage equipment is judged according to the scheduled outage facility information;
S320: it needs to be listed if scheduled outage device type is line facility;
S330: it does not need to be listed if scheduled outage device type is transformer equipment.
It is understood that different equipment is to have different listed demands there is power failure demand, line facility is having Power failure demand is to need to be listed, and transformer equipment is not need to be listed there is power failure demand, judges power failure equipments type, with root It can prevent accidentally listed problem from occurring according to the listed situation of different power failure equipments Type Controls.
The step: S400: sentenced in real time according to the time difference between practical listed moment and the beginning of scheduled outage, last moment The process of disconnected listed display type includes:
S410: if practical be listed the moment before the initial time of scheduled outage, and practical rising in scheduled outage of listed moment Time difference between moment beginning is greater than first time threshold, then shows the first listed type;
S420: if practical be listed the moment before the initial time of scheduled outage, and at practical listed moment and scheduled outage Time difference between moment beginning is less than or equal to first time threshold, then shows the second listed type;
S430: it if the practical listed moment is between the initial time of scheduled outage and the end time of scheduled outage, shows Third is listed type;
S440: if the practical listed moment is in after the end time of scheduled outage, the 4th listed type is shown.
It is understood that the case where listed display is in chronological sequence divided into above four kinds, listed basis is enabled to Time dynamically shows different type, and wherein each type corresponds to the different state of scheduled outage equipment, and described first is listed The power failure demand that type can be intended to power failure equipments is shown, and indicates current time rising apart from scheduled outage equipment Beginning, the moment, there are also certain times;When the second listed type indicates starting of the current time close to scheduled outage equipment It carves, staff is needed to be ready;The listed type of the third indicates that scheduled outage equipment is currently in interruption maintenance rank Section, third be listed the stage that type show will forbid feeder automation and fault location etc. operation;In the 4th listed type Indicate that the power failure of scheduled outage equipment has been over power failure required time section.
It should be understood by those ordinary skilled in the art that: the above is only a specific embodiment of the present invention, and It is not used in the limitation present invention, all any modification, equivalent substitution, improvement and etc. within purport of the invention, done should all include Within protection scope of the present invention.

Claims (6)

1. a kind of automatic listed method of power distribution automation main station system, which is characterized in that the power distribution automation main station system Automatic listed method include:
Obtain single information that has a power failure;
Go out the beginning, last moment and scheduled outage facility information of scheduled outage according to single information analysis that has a power failure;
Judge whether to need according to scheduled outage facility information listed;
Practical listed temporal information is obtained, is stopped according to the listed temporal information real-time judge of the reality practical listed moment with plan Time difference between the beginning of electricity, last moment;
According to the listed display type of time difference real-time judge between practical listed moment and the beginning of scheduled outage, last moment.
2. the automatic listed method of power distribution automation main station system as described in claim 1, which is characterized in that the plan stops Electric equipment information includes scheduled outage device name and power failure equipments type;
The step: judge whether that the listed detailed process of needs includes: according to scheduled outage facility information
The type of scheduled outage equipment is judged according to the scheduled outage facility information;
It needs to be listed if scheduled outage device type is line facility;
It does not need to be listed if scheduled outage device type is transformer equipment.
3. the automatic listed method of power distribution automation main station system as described in claim 1, which is characterized in that the step: Practical listed temporal information is obtained, is listed temporal information real-time judge practical be listed moment and scheduled outage according to the reality Begin, also need the step of carrying out to include: before the time difference between the last moment
Acquisition needs listed initial time information;
Listed initial time is needed to send listed instruction described, the listed instruction is hung for controlling corresponding power failure equipments Board.
4. the automatic listed method of power distribution automation main station system as described in claim 1, which is characterized in that the step: According to the process packet of the listed display type of time difference real-time judge between practical listed moment and the beginning of scheduled outage, last moment It includes:
If the practical listed moment is before the initial time of scheduled outage, and the practical listed moment is in the initial time of scheduled outage Between time difference be greater than first time threshold, then show the first listed type;
If the practical listed moment is before the initial time of scheduled outage, and the initial time at practical listed moment and scheduled outage Between time difference be less than or equal to first time threshold, then show the second listed type;
If the practical listed moment is between the initial time of scheduled outage and the end time of scheduled outage, show that third is hung Board type;
If the practical listed moment is in after the end time of scheduled outage, the 4th listed type is shown.
5. the automatic listed method of power distribution automation main station system as described in claim 1, which is characterized in that further include:
Obtain the practical completion moment;
Delisted instruction is sent at the practical completion moment, the delisted instruction is for controlling the corresponding power failure equipments being listed Carry out delisted operation.
6. the automatic listed method of power distribution automation main station system as claimed in claim 5, which is characterized in that judgement is actually completed Working hour carves whether be in after the end time of scheduled outage, if then generating the single extension record of power failure.
CN201910624562.6A 2019-07-11 2019-07-11 Automatic listing method of distribution automation master station system Active CN110224494B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910624562.6A CN110224494B (en) 2019-07-11 2019-07-11 Automatic listing method of distribution automation master station system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910624562.6A CN110224494B (en) 2019-07-11 2019-07-11 Automatic listing method of distribution automation master station system

Publications (2)

Publication Number Publication Date
CN110224494A true CN110224494A (en) 2019-09-10
CN110224494B CN110224494B (en) 2022-08-12

Family

ID=67812379

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910624562.6A Active CN110224494B (en) 2019-07-11 2019-07-11 Automatic listing method of distribution automation master station system

Country Status (1)

Country Link
CN (1) CN110224494B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112186763A (en) * 2020-10-13 2021-01-05 安徽海控电子科技有限公司 Intelligent power consumption management system safety control method
CN112818648A (en) * 2020-12-24 2021-05-18 深圳供电局有限公司 Automatic leading-in method and system for power grid energy management system signboards
CN112990791A (en) * 2021-05-11 2021-06-18 广东电网有限责任公司佛山供电局 Scheduling work order flow monitoring method and system based on intelligent voice
CN113610391A (en) * 2021-08-04 2021-11-05 国网江苏省电力有限公司泰州供电分公司 Two-way management and control system of distribution network based on hang tablet power failure and reason after events are traceed back
CN115001133A (en) * 2022-04-21 2022-09-02 北京南凯自动化系统工程有限公司 Intelligent power-on/off switching operation method and system in traction power supply system

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103853436A (en) * 2013-12-19 2014-06-11 国家电网公司 Novel method for intelligently hanging and detaching signboard
CN107704739A (en) * 2017-11-01 2018-02-16 珠海华伟电气科技股份有限公司 Microcomputer anti-error operating system and method, anti-error main frame with listed function, Intelligent key, intelligent lock
CN107968405A (en) * 2017-12-25 2018-04-27 国网湖北省电力有限公司 A kind of unplanned blackouts monitoring method of distribution based on battalion's auxiliary tone perforation
CN109840696A (en) * 2019-01-11 2019-06-04 广东电网有限责任公司 A kind of traffic control overall process management-control method and system based on closed loop management

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103853436A (en) * 2013-12-19 2014-06-11 国家电网公司 Novel method for intelligently hanging and detaching signboard
CN107704739A (en) * 2017-11-01 2018-02-16 珠海华伟电气科技股份有限公司 Microcomputer anti-error operating system and method, anti-error main frame with listed function, Intelligent key, intelligent lock
CN107968405A (en) * 2017-12-25 2018-04-27 国网湖北省电力有限公司 A kind of unplanned blackouts monitoring method of distribution based on battalion's auxiliary tone perforation
CN109840696A (en) * 2019-01-11 2019-06-04 广东电网有限责任公司 A kind of traffic control overall process management-control method and system based on closed loop management

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112186763A (en) * 2020-10-13 2021-01-05 安徽海控电子科技有限公司 Intelligent power consumption management system safety control method
CN112186763B (en) * 2020-10-13 2023-12-22 安徽海控电子科技有限公司 Safety control method for intelligent electricity management system
CN112818648A (en) * 2020-12-24 2021-05-18 深圳供电局有限公司 Automatic leading-in method and system for power grid energy management system signboards
CN112990791A (en) * 2021-05-11 2021-06-18 广东电网有限责任公司佛山供电局 Scheduling work order flow monitoring method and system based on intelligent voice
CN112990791B (en) * 2021-05-11 2021-07-30 广东电网有限责任公司佛山供电局 Scheduling work order flow monitoring method and system based on intelligent voice
CN113610391A (en) * 2021-08-04 2021-11-05 国网江苏省电力有限公司泰州供电分公司 Two-way management and control system of distribution network based on hang tablet power failure and reason after events are traceed back
CN115001133A (en) * 2022-04-21 2022-09-02 北京南凯自动化系统工程有限公司 Intelligent power-on/off switching operation method and system in traction power supply system
CN115001133B (en) * 2022-04-21 2024-04-23 北京南凯自动化系统工程有限公司 Intelligent power-off and power-on switching operation method and system in traction power supply system

Also Published As

Publication number Publication date
CN110224494B (en) 2022-08-12

Similar Documents

Publication Publication Date Title
CN110224494A (en) The automatic listed method of power distribution automation main station system
CN105184442A (en) Power distribution network dispatching management statistical analysis system
CN110086251B (en) Monitoring method and system for improving operation safety of power grid
CN102306929B (en) Method and system for realizing fault self-healing
CN103915827A (en) Power distribution network fault studying and judging method and system
CN104269934B (en) Based on the supervisory control of substation information adjustment method of moving analog scheduling station
CN111478972B (en) Integrated remote monitoring background management system and monitoring method
CN104460589A (en) Mobile debugging system with simulation dispatching master station
CN101609407A (en) Detection method based on the full station model file coupling of publisher/subscriber's pattern
CN110474334A (en) A kind of power distribution network management and running whole process control method
CN101546189A (en) Method for controlling real-time database system
CN111193968A (en) Verification method, debugging verification host, monitoring host and system of remote signaling information
JP2017034745A (en) Supervisory control system
CN104796559A (en) Intelligent dialing test platform for dynamic routes of dispatching telephone exchange net and dialing test method
JP6604075B2 (en) Supervisory control system
CN104951884A (en) Visual display method of accident emergency repair and inversion based on distribution network
JP2017034746A (en) Supervisory control system
CN111354239A (en) Integrated multi-platform PLC comprehensive simulation body platform
CN204598105U (en) A kind of intelligent dispatch switched telephone network dynamic routing testing platform
CN109768619A (en) Monitoring information automatic debugging system and adjustment method
CN111884329B (en) Unified operation and maintenance method and system for secondary equipment of power distribution network
KR102159247B1 (en) Record and Analysis Device for Control Signal and Communication Signal of the Instrumentation Control System for Water Treatment Plant
CN105894216A (en) Power grid dispatching operation duty shifting aiding device
CN109598996B (en) Load cutting training system for distribution transformer area
CN110175736B (en) Automatic card disassembling and hanging method for power system regulation and control center

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant