CN110224494A - The automatic listed method of power distribution automation main station system - Google Patents
The automatic listed method of power distribution automation main station system Download PDFInfo
- Publication number
- CN110224494A CN110224494A CN201910624562.6A CN201910624562A CN110224494A CN 110224494 A CN110224494 A CN 110224494A CN 201910624562 A CN201910624562 A CN 201910624562A CN 110224494 A CN110224494 A CN 110224494A
- Authority
- CN
- China
- Prior art keywords
- listed
- scheduled outage
- moment
- practical
- time
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J13/00—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
- H02J13/00001—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by the display of information or by user interaction, e.g. supervisory control and data acquisition systems [SCADA] or graphical user interfaces [GUI]
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Landscapes
- Engineering & Computer Science (AREA)
- Human Computer Interaction (AREA)
- Power Engineering (AREA)
- Supply And Distribution Of Alternating Current (AREA)
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
Abstract
The present invention relates to automation field of power distribution, and in particular to a kind of automatic listed method of power distribution automation main station system.The automatic listed method of the power distribution automation main station system includes: to obtain single information that has a power failure;Go out the beginning, last moment and scheduled outage facility information of scheduled outage according to single information analysis that has a power failure;Judge whether to need according to scheduled outage facility information listed;Practical listed temporal information is obtained, according to the time difference between the listed temporal information real-time judge of the reality practical listed moment and the beginning of scheduled outage, last moment;According to the listed display type of time difference real-time judge between practical listed moment and the beginning of scheduled outage, last moment.Show the relationship between beginning at currently practical listed moment and scheduled outage, last moment with enabling to listed dynamic realtime, it can play the role of accurate and the state of scheduled outage equipment is automatically reminded in time, prevent situation that is accidentally listed or being delayed delisted from occurring.
Description
Technical field
The present invention relates to distribution automation fields, and in particular to a kind of automatic listed side of power distribution automation main station system
Method.
Background technique
It is listed be in power network dispatching system in order to observably prompt dispatcher's primary equipment current operating conditions and in correspondence
One Xiang Gongneng of Sign Board, there are commonly Sign Boards such as maintenance, debugging, prepared auto restarts, different Sign Boards are set on equipment figure
Indicate the different state of equipment.By the way that correct Sign Board is arranged, it is ensured that the operation of dispatcher's safety, while shielding
Interference main station judging accidentally transmits.
Currently, electrical power distribution automatization system has powerful troubleshooting capability.When line failure tripping, main website can
Quickly summarize the information such as failure logging, monitoring running state data and manual block condition, automatically provides Fault Isolation and power supply
Recovery scheme, therefore, the accuracy of scheme and the actual conditions of live route are closely bound up.And the mark extension of Sign Board directly affects
Judgement of the main website to line status on site, incorrect Sign Board, which is arranged, will likely influence the starting of feeder automation FA (no
Starting or error starting), the judgement of fault section and be specifically isolated execution with service restoration scheme.
The mark that current electrical power distribution automatization system is identified board using manually mode is hung, but the frequent face of dispatcher
Face the odd-numbered day have a power failure it is single up to tens of the case where, thereby increases and it is possible to be related to the more days interruption maintenances across shift, inevitably occur it is accidentally listed or
Be delayed delisted situation, causes dispatcher that cannot accurately and effectively be judged by system on-site actual situations.
Summary of the invention
In order to solve the deficiencies in the prior art, the present invention provides a kind of automatic extension of power distribution automation main station system
Board method, the automatic listed method of the power distribution automation main station system show currently practical with enabling to listed dynamic realtime
Relationship between listed moment and the beginning of scheduled outage, last moment, can play accurately and in time to scheduled outage equipment
The effect that state is automatically reminded to prevents situation that is accidentally listed or being delayed delisted from occurring.
The technical solution provided according to the present invention, a kind of automatic listed method of power distribution automation main station system are described to match
The automatic listed method of electric automation main station system includes:
Obtain single information that has a power failure;
Go out the beginning, last moment and scheduled outage facility information of scheduled outage according to single information analysis that has a power failure;
Judge whether to need according to scheduled outage facility information listed;
Practical listed temporal information is obtained, is stopped according to the listed temporal information real-time judge of the reality practical listed moment with plan
Time difference between the beginning of electricity, last moment;
According to the listed display type of time difference real-time judge between practical listed moment and the beginning of scheduled outage, last moment.
Further, the scheduled outage facility information includes scheduled outage device name and power failure equipments type;
The step: judge whether that the listed detailed process of needs includes: according to scheduled outage facility information
The type of scheduled outage equipment is judged according to the scheduled outage facility information;
It needs to be listed if scheduled outage device type is line facility;
It does not need to be listed if scheduled outage device type is transformer equipment.
Further, the step: obtaining practical listed temporal information, is sentenced in real time according to the listed temporal information of the reality
The step of carrying out also is needed to include: before time difference between disconnected practical listed moment and the beginning of scheduled outage, last moment
Acquisition needs listed initial time information;
Listed initial time is needed to send listed instruction described, the listed instruction is hung for controlling corresponding power failure equipments
Board.
Further, the step: real according to the time difference between practical listed moment and the beginning of scheduled outage, last moment
When judge that the process of listed display type includes:
If the practical listed moment is before the initial time of scheduled outage, and the practical listed moment is in the initial time of scheduled outage
Between time difference be greater than first time threshold, then show the first listed type;
If the practical listed moment is before the initial time of scheduled outage, and the initial time at practical listed moment and scheduled outage
Between time difference be less than or equal to first time threshold, then show the second listed type;
If the practical listed moment is between the initial time of scheduled outage and the end time of scheduled outage, show that third is hung
Board type;
If the practical listed moment is in after the end time of scheduled outage, the 4th listed type is shown.
Further, further includes:
Obtain the practical completion moment;
Delisted instruction is sent at the practical completion moment, the delisted instruction is for controlling the corresponding power failure equipments being listed
Carry out delisted operation.
Further, judge whether the practical completion moment is in after the end time of scheduled outage, stop if then generating
Electric list extension record.
From it is described above as can be seen that power distribution automation main station system provided by the invention automatic listed method, and show
There is technology to compare and have following advantages:
First, listed function can be punctual, accurately delisted automatically, in case the Sign Board being detained influences power distribution automation main station feedback
The starting of line automation and judgement to fault section, the processing of feeder automation troubleshooting even under fully automatic mode
Process.
Second, on the Sign Board that mark is hung required for the more information content on power failure list being embodied in, in sign board
Hold more abundant clear.
Third, listed functional expansionary is higher automatically, voice broadcast, short message prompt when the later period can increase listed etc.
Function prompts the dispatcher to carry out listing operation.
When fourth, the function that is listed automatically can work at the scene, midway has variation to need replacing Sign Board, carry out in time more
It changes, so that working site interacts more flexible coordination with power distribution automation main station.
Detailed description of the invention
Fig. 1 is the flow chart of the first embodiment of the invention.
Fig. 2 is the flow chart of second of embodiment of the invention.
Fig. 3 is the flow chart of the third embodiment of the invention.
Fig. 4 is the specific flow chart of step S300 in the present invention.
Fig. 5 is the specific flow chart of step S400 in the present invention.
Specific embodiment
To make the objectives, technical solutions, and advantages of the present invention clearer, below in conjunction with specific embodiment, and reference
Attached drawing, the present invention is described in more detail.
The present invention provides a kind of automatic listed method of power distribution automation main station system, as shown in Figure 1, the distribution is automatic
Change main station system it is automatic be listed the first embodiment of method specifically includes the following steps:
S100: single information that has a power failure is obtained;
S200: go out the beginning, last moment and scheduled outage facility information of scheduled outage according to single information analysis that has a power failure;
S300: judge whether to need according to scheduled outage facility information listed;
S400: obtaining practical listed temporal information, according to the reality be listed the temporal information real-time judge practical listed moment and
Time difference between the beginning of scheduled outage, last moment;
S500: according to the listed display class of time difference real-time judge between practical listed moment and the beginning of scheduled outage, last moment
Type.
It is understood that S400 and S500 show currently practical listed moment and meter with enabling to listed dynamic realtime
The relationship between the beginning having a power failure, last moment is drawn, can play accurate and the state of scheduled outage equipment is automatically reminded in time
Effect, prevent situation that is accidentally listed or being delayed delisted from occurring.
The scheduled outage facility information includes scheduled outage device name and power failure equipments type;
As shown in figure 4, the step: S300: being judged whether to need listed detailed process packet according to scheduled outage facility information
It includes:
S310: the type of scheduled outage equipment is judged according to the scheduled outage facility information;
S320: it needs to be listed if scheduled outage device type is line facility;
S330: it does not need to be listed if scheduled outage device type is transformer equipment.
It is understood that different equipment is to have different listed demands there is power failure demand, line facility is having
Power failure demand is to need to be listed in power distribution automation main station system, and transformer equipment there is power failure demand is not needed in distribution
It automates in main station system and is listed, judge power failure equipments type, according to the listed situation of different power failure equipments Type Controls
It can prevent accidentally listed problem from occurring.
As shown in figure 5, the step: S400: according between practical listed moment and the beginning of scheduled outage, last moment when
Between the be listed process of display type of poor real-time judge include:
S410: if practical be listed the moment before the initial time of scheduled outage, and practical rising in scheduled outage of listed moment
Time difference between moment beginning is greater than first time threshold, then shows the first listed type;
S420: if practical be listed the moment before the initial time of scheduled outage, and at practical listed moment and scheduled outage
Time difference between moment beginning is less than or equal to first time threshold, then shows the second listed type;
S430: it if the practical listed moment is between the initial time of scheduled outage and the end time of scheduled outage, shows
Third is listed type;
S440: if the practical listed moment is in after the end time of scheduled outage, the 4th listed type is shown.
It is understood that the case where listed display is in chronological sequence divided into above four kinds, listed basis is enabled to
Time dynamically shows different type, and wherein each type corresponds to the different state of scheduled outage equipment, and described first is listed
The power failure demand that type can be intended to power failure equipments is shown, and indicates current time rising apart from scheduled outage equipment
Beginning, the moment, there are also certain times;When the second listed type indicates starting of the current time close to scheduled outage equipment
It carves, staff is needed to be ready;The listed type of the third indicates that scheduled outage equipment is currently in interruption maintenance rank
Section, third be listed the stage that type show will forbid feeder automation and fault location etc. operation;In the 4th listed type
Indicate that the practical power off time of scheduled outage equipment has been over power failure required time section.
As shown in Fig. 2, automatic listed second of embodiment of method of the power distribution automation main station system specifically include with
Lower step:
S100: single information that has a power failure is obtained;
S200: go out the beginning, last moment and scheduled outage facility information of scheduled outage according to single information analysis that has a power failure;
S300: judge whether to need to be listed according to scheduled outage facility information, be if desired listed and then follow the steps below, otherwise tie
Beam;
S301: acquisition needs listed initial time information;
S302: listed initial time is needed to send listed instruction described, the listed instruction is set for controlling corresponding power failure
It is standby listed.
S400: obtaining practical listed temporal information, when practical listed according to the listed temporal information real-time judge of the reality
Carve the time difference between the beginning of scheduled outage, last moment;
S500: according to the listed display class of time difference real-time judge between practical listed moment and the beginning of scheduled outage, last moment
Type.
The scheduled outage facility information includes scheduled outage device name and power failure equipments type;
The step: S300: judge whether that the listed detailed process of needs includes: according to scheduled outage facility information
S310: the type of scheduled outage equipment is judged according to the scheduled outage facility information;
S320: it needs to be listed if scheduled outage device type is line facility;
S330: it does not need to be listed if scheduled outage device type is transformer equipment.
It is understood that different equipment is to have different listed demands there is power failure demand, line facility is having
Power failure demand is to need to be listed in power distribution automation main station system, and transformer equipment there is power failure demand is not needed in distribution
It automates in main station system and is listed, judge power failure equipments type, according to the listed situation of different power failure equipments Type Controls
It can prevent accidentally listed problem from occurring.
The step: S400: sentenced in real time according to the time difference between practical listed moment and the beginning of scheduled outage, last moment
The process of disconnected listed display type includes:
S410: if practical be listed the moment before the initial time of scheduled outage, and practical rising in scheduled outage of listed moment
Time difference between moment beginning is greater than first time threshold, then shows the first listed type;
S420: if practical be listed the moment before the initial time of scheduled outage, and at practical listed moment and scheduled outage
Time difference between moment beginning is less than or equal to first time threshold, then shows the second listed type;
S430: it if the practical listed moment is between the initial time of scheduled outage and the end time of scheduled outage, shows
Third is listed type;
S440: if the practical listed moment is in after the end time of scheduled outage, the 4th listed type is shown.
It is understood that the case where listed display is in chronological sequence divided into above four kinds, listed basis is enabled to
Time dynamically shows different type, and wherein each type corresponds to the different state of scheduled outage equipment, and described first is listed
The power failure demand that type can be intended to power failure equipments is shown, and indicates current time rising apart from scheduled outage equipment
Beginning, the moment, there are also certain times;When the second listed type indicates starting of the current time close to scheduled outage equipment
It carves, staff is needed to be ready;The listed type of the third indicates that scheduled outage equipment is currently in interruption maintenance rank
Section, third be listed the stage that type show will forbid feeder automation and fault location etc. operation;In the 4th listed type
Indicate that the practical power off time of scheduled outage equipment has been over power failure required time section.
As shown in figure 3, automatic listed the third embodiment of method of the power distribution automation main station system specifically include with
Lower step:
S100: single information that has a power failure is obtained;
S200: go out the beginning, last moment and scheduled outage facility information of scheduled outage according to single information analysis that has a power failure;
S300: judge whether to need to be listed according to scheduled outage facility information, be if desired listed and then follow the steps below, otherwise tie
Beam;
S301: acquisition needs listed initial time information;
S302: listed initial time is needed to send listed instruction described, the listed instruction is set for controlling corresponding power failure
It is standby listed.
S400: obtaining practical listed temporal information, when practical listed according to the listed temporal information real-time judge of the reality
Carve the time difference between the beginning of scheduled outage, last moment;
S500: according to the listed display class of time difference real-time judge between practical listed moment and the beginning of scheduled outage, last moment
Type;
S600: the practical completion moment is obtained;
S700: delisted instruction is sent at the completion moment real time, the delisted instruction is for controlling corresponding be listed
Power failure equipments carry out delisted operation.
It is understood that the S600 and S700 enable to promptly and accurately automatic delisted the step of description.
For being carried out while carrying out step S700
S800 judges whether practical completion moment time is in after the end time of scheduled outage, singly prolongs if then generating power failure
Phase record.
The scheduled outage facility information includes scheduled outage device name and power failure equipments type;
The step: S300: judge whether that the listed detailed process of needs includes: according to scheduled outage facility information
S310: the type of scheduled outage equipment is judged according to the scheduled outage facility information;
S320: it needs to be listed if scheduled outage device type is line facility;
S330: it does not need to be listed if scheduled outage device type is transformer equipment.
It is understood that different equipment is to have different listed demands there is power failure demand, line facility is having
Power failure demand is to need to be listed, and transformer equipment is not need to be listed there is power failure demand, judges power failure equipments type, with root
It can prevent accidentally listed problem from occurring according to the listed situation of different power failure equipments Type Controls.
The step: S400: sentenced in real time according to the time difference between practical listed moment and the beginning of scheduled outage, last moment
The process of disconnected listed display type includes:
S410: if practical be listed the moment before the initial time of scheduled outage, and practical rising in scheduled outage of listed moment
Time difference between moment beginning is greater than first time threshold, then shows the first listed type;
S420: if practical be listed the moment before the initial time of scheduled outage, and at practical listed moment and scheduled outage
Time difference between moment beginning is less than or equal to first time threshold, then shows the second listed type;
S430: it if the practical listed moment is between the initial time of scheduled outage and the end time of scheduled outage, shows
Third is listed type;
S440: if the practical listed moment is in after the end time of scheduled outage, the 4th listed type is shown.
It is understood that the case where listed display is in chronological sequence divided into above four kinds, listed basis is enabled to
Time dynamically shows different type, and wherein each type corresponds to the different state of scheduled outage equipment, and described first is listed
The power failure demand that type can be intended to power failure equipments is shown, and indicates current time rising apart from scheduled outage equipment
Beginning, the moment, there are also certain times;When the second listed type indicates starting of the current time close to scheduled outage equipment
It carves, staff is needed to be ready;The listed type of the third indicates that scheduled outage equipment is currently in interruption maintenance rank
Section, third be listed the stage that type show will forbid feeder automation and fault location etc. operation;In the 4th listed type
Indicate that the power failure of scheduled outage equipment has been over power failure required time section.
It should be understood by those ordinary skilled in the art that: the above is only a specific embodiment of the present invention, and
It is not used in the limitation present invention, all any modification, equivalent substitution, improvement and etc. within purport of the invention, done should all include
Within protection scope of the present invention.
Claims (6)
1. a kind of automatic listed method of power distribution automation main station system, which is characterized in that the power distribution automation main station system
Automatic listed method include:
Obtain single information that has a power failure;
Go out the beginning, last moment and scheduled outage facility information of scheduled outage according to single information analysis that has a power failure;
Judge whether to need according to scheduled outage facility information listed;
Practical listed temporal information is obtained, is stopped according to the listed temporal information real-time judge of the reality practical listed moment with plan
Time difference between the beginning of electricity, last moment;
According to the listed display type of time difference real-time judge between practical listed moment and the beginning of scheduled outage, last moment.
2. the automatic listed method of power distribution automation main station system as described in claim 1, which is characterized in that the plan stops
Electric equipment information includes scheduled outage device name and power failure equipments type;
The step: judge whether that the listed detailed process of needs includes: according to scheduled outage facility information
The type of scheduled outage equipment is judged according to the scheduled outage facility information;
It needs to be listed if scheduled outage device type is line facility;
It does not need to be listed if scheduled outage device type is transformer equipment.
3. the automatic listed method of power distribution automation main station system as described in claim 1, which is characterized in that the step:
Practical listed temporal information is obtained, is listed temporal information real-time judge practical be listed moment and scheduled outage according to the reality
Begin, also need the step of carrying out to include: before the time difference between the last moment
Acquisition needs listed initial time information;
Listed initial time is needed to send listed instruction described, the listed instruction is hung for controlling corresponding power failure equipments
Board.
4. the automatic listed method of power distribution automation main station system as described in claim 1, which is characterized in that the step:
According to the process packet of the listed display type of time difference real-time judge between practical listed moment and the beginning of scheduled outage, last moment
It includes:
If the practical listed moment is before the initial time of scheduled outage, and the practical listed moment is in the initial time of scheduled outage
Between time difference be greater than first time threshold, then show the first listed type;
If the practical listed moment is before the initial time of scheduled outage, and the initial time at practical listed moment and scheduled outage
Between time difference be less than or equal to first time threshold, then show the second listed type;
If the practical listed moment is between the initial time of scheduled outage and the end time of scheduled outage, show that third is hung
Board type;
If the practical listed moment is in after the end time of scheduled outage, the 4th listed type is shown.
5. the automatic listed method of power distribution automation main station system as described in claim 1, which is characterized in that further include:
Obtain the practical completion moment;
Delisted instruction is sent at the practical completion moment, the delisted instruction is for controlling the corresponding power failure equipments being listed
Carry out delisted operation.
6. the automatic listed method of power distribution automation main station system as claimed in claim 5, which is characterized in that judgement is actually completed
Working hour carves whether be in after the end time of scheduled outage, if then generating the single extension record of power failure.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910624562.6A CN110224494B (en) | 2019-07-11 | 2019-07-11 | Automatic listing method of distribution automation master station system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910624562.6A CN110224494B (en) | 2019-07-11 | 2019-07-11 | Automatic listing method of distribution automation master station system |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110224494A true CN110224494A (en) | 2019-09-10 |
CN110224494B CN110224494B (en) | 2022-08-12 |
Family
ID=67812379
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910624562.6A Active CN110224494B (en) | 2019-07-11 | 2019-07-11 | Automatic listing method of distribution automation master station system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110224494B (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112186763A (en) * | 2020-10-13 | 2021-01-05 | 安徽海控电子科技有限公司 | Intelligent power consumption management system safety control method |
CN112818648A (en) * | 2020-12-24 | 2021-05-18 | 深圳供电局有限公司 | Automatic leading-in method and system for power grid energy management system signboards |
CN112990791A (en) * | 2021-05-11 | 2021-06-18 | 广东电网有限责任公司佛山供电局 | Scheduling work order flow monitoring method and system based on intelligent voice |
CN113610391A (en) * | 2021-08-04 | 2021-11-05 | 国网江苏省电力有限公司泰州供电分公司 | Two-way management and control system of distribution network based on hang tablet power failure and reason after events are traceed back |
CN115001133A (en) * | 2022-04-21 | 2022-09-02 | 北京南凯自动化系统工程有限公司 | Intelligent power-on/off switching operation method and system in traction power supply system |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103853436A (en) * | 2013-12-19 | 2014-06-11 | 国家电网公司 | Novel method for intelligently hanging and detaching signboard |
CN107704739A (en) * | 2017-11-01 | 2018-02-16 | 珠海华伟电气科技股份有限公司 | Microcomputer anti-error operating system and method, anti-error main frame with listed function, Intelligent key, intelligent lock |
CN107968405A (en) * | 2017-12-25 | 2018-04-27 | 国网湖北省电力有限公司 | A kind of unplanned blackouts monitoring method of distribution based on battalion's auxiliary tone perforation |
CN109840696A (en) * | 2019-01-11 | 2019-06-04 | 广东电网有限责任公司 | A kind of traffic control overall process management-control method and system based on closed loop management |
-
2019
- 2019-07-11 CN CN201910624562.6A patent/CN110224494B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103853436A (en) * | 2013-12-19 | 2014-06-11 | 国家电网公司 | Novel method for intelligently hanging and detaching signboard |
CN107704739A (en) * | 2017-11-01 | 2018-02-16 | 珠海华伟电气科技股份有限公司 | Microcomputer anti-error operating system and method, anti-error main frame with listed function, Intelligent key, intelligent lock |
CN107968405A (en) * | 2017-12-25 | 2018-04-27 | 国网湖北省电力有限公司 | A kind of unplanned blackouts monitoring method of distribution based on battalion's auxiliary tone perforation |
CN109840696A (en) * | 2019-01-11 | 2019-06-04 | 广东电网有限责任公司 | A kind of traffic control overall process management-control method and system based on closed loop management |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112186763A (en) * | 2020-10-13 | 2021-01-05 | 安徽海控电子科技有限公司 | Intelligent power consumption management system safety control method |
CN112186763B (en) * | 2020-10-13 | 2023-12-22 | 安徽海控电子科技有限公司 | Safety control method for intelligent electricity management system |
CN112818648A (en) * | 2020-12-24 | 2021-05-18 | 深圳供电局有限公司 | Automatic leading-in method and system for power grid energy management system signboards |
CN112990791A (en) * | 2021-05-11 | 2021-06-18 | 广东电网有限责任公司佛山供电局 | Scheduling work order flow monitoring method and system based on intelligent voice |
CN112990791B (en) * | 2021-05-11 | 2021-07-30 | 广东电网有限责任公司佛山供电局 | Scheduling work order flow monitoring method and system based on intelligent voice |
CN113610391A (en) * | 2021-08-04 | 2021-11-05 | 国网江苏省电力有限公司泰州供电分公司 | Two-way management and control system of distribution network based on hang tablet power failure and reason after events are traceed back |
CN115001133A (en) * | 2022-04-21 | 2022-09-02 | 北京南凯自动化系统工程有限公司 | Intelligent power-on/off switching operation method and system in traction power supply system |
CN115001133B (en) * | 2022-04-21 | 2024-04-23 | 北京南凯自动化系统工程有限公司 | Intelligent power-off and power-on switching operation method and system in traction power supply system |
Also Published As
Publication number | Publication date |
---|---|
CN110224494B (en) | 2022-08-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110224494A (en) | The automatic listed method of power distribution automation main station system | |
CN105184442A (en) | Power distribution network dispatching management statistical analysis system | |
CN110086251B (en) | Monitoring method and system for improving operation safety of power grid | |
CN102306929B (en) | Method and system for realizing fault self-healing | |
CN103915827A (en) | Power distribution network fault studying and judging method and system | |
CN104269934B (en) | Based on the supervisory control of substation information adjustment method of moving analog scheduling station | |
CN111478972B (en) | Integrated remote monitoring background management system and monitoring method | |
CN104460589A (en) | Mobile debugging system with simulation dispatching master station | |
CN101609407A (en) | Detection method based on the full station model file coupling of publisher/subscriber's pattern | |
CN110474334A (en) | A kind of power distribution network management and running whole process control method | |
CN101546189A (en) | Method for controlling real-time database system | |
CN111193968A (en) | Verification method, debugging verification host, monitoring host and system of remote signaling information | |
JP2017034745A (en) | Supervisory control system | |
CN104796559A (en) | Intelligent dialing test platform for dynamic routes of dispatching telephone exchange net and dialing test method | |
JP6604075B2 (en) | Supervisory control system | |
CN104951884A (en) | Visual display method of accident emergency repair and inversion based on distribution network | |
JP2017034746A (en) | Supervisory control system | |
CN111354239A (en) | Integrated multi-platform PLC comprehensive simulation body platform | |
CN204598105U (en) | A kind of intelligent dispatch switched telephone network dynamic routing testing platform | |
CN109768619A (en) | Monitoring information automatic debugging system and adjustment method | |
CN111884329B (en) | Unified operation and maintenance method and system for secondary equipment of power distribution network | |
KR102159247B1 (en) | Record and Analysis Device for Control Signal and Communication Signal of the Instrumentation Control System for Water Treatment Plant | |
CN105894216A (en) | Power grid dispatching operation duty shifting aiding device | |
CN109598996B (en) | Load cutting training system for distribution transformer area | |
CN110175736B (en) | Automatic card disassembling and hanging method for power system regulation and control center |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |