CN110219451A - Main body construction and finishing synchronization job lifting protective platform and operational method - Google Patents

Main body construction and finishing synchronization job lifting protective platform and operational method Download PDF

Info

Publication number
CN110219451A
CN110219451A CN201910618352.6A CN201910618352A CN110219451A CN 110219451 A CN110219451 A CN 110219451A CN 201910618352 A CN201910618352 A CN 201910618352A CN 110219451 A CN110219451 A CN 110219451A
Authority
CN
China
Prior art keywords
main body
ontology
construction
wall
body construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910618352.6A
Other languages
Chinese (zh)
Other versions
CN110219451B (en
Inventor
李建民
吴国祥
沈永革
李月强
徐洋
刘洪琦
吴国庆
吴国政
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HEBEI YIAN ENGINEERING TECHNOLOGY Co Ltd
Original Assignee
HEBEI YIAN ENGINEERING TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HEBEI YIAN ENGINEERING TECHNOLOGY Co Ltd filed Critical HEBEI YIAN ENGINEERING TECHNOLOGY Co Ltd
Priority to CN201910618352.6A priority Critical patent/CN110219451B/en
Publication of CN110219451A publication Critical patent/CN110219451A/en
Application granted granted Critical
Publication of CN110219451B publication Critical patent/CN110219451B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G3/30Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables
    • E04G3/32Hoisting devices; Safety devices
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G3/30Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables
    • E04G3/32Hoisting devices; Safety devices
    • E04G3/325Safety devices for stabilising the mobile platform, e.g. to avoid it swinging in the wind
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/04Means for fastening, supporting, or bracing scaffolds on or against building constructions
    • E04G5/046Means for fastening, supporting, or bracing scaffolds on or against building constructions for fastening scaffoldings on walls
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G2003/286Mobile scaffolds; Scaffolds with mobile platforms mobile vertically

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Movable Scaffolding (AREA)

Abstract

The present invention provides the operational methods of main body construction and finishing synchronization job lifting protective platform, lifting protective platform is installed on concrete main body structural construction wall, including main body construction ontology and fitment operation ontology, operational method includes the following steps: 1. to construct to main structure;2. setting up main body construction ontology;3. continuing to construct to main structure, and main body construction ontology is promoted successively according to demand;4. building fitment operation ontology as the bottom of main body construction ontology 16.5m~20m a height of far from ground;5. continuing to construct to main structure, and fitment operation is carried out to main structure, main body construction ontology and fitment operation ontology are promoted successively according to demand;6. being removed on demand to main body construction ontology and fitment operation ontology when main structure and fitment operation construction finish.Operational method of the invention can be realized the synchronization job of main body construction and finishing.The present invention also provides main body construction and finishing synchronization job lifting protective platforms.

Description

Main body construction and finishing synchronization job lifting protective platform and operational method
Technical field
The present invention relates to construction engineering technical field, in particular to a kind of main body construction and finishing synchronization job are anti-with lifting The operational method for protecting platform, further relates to a kind of main body construction and finishing synchronization job goes up and down protective platform.
Background technique
At present during China's building structure construction, the external wall fitment operation of part unit in charge of construction can closely follow main body Construction operation, and the prior art, Specific construction mode is the enhanced feature using attachment type raise scaffold, first by main body construction To building top layer, the rear top-down progress exterior wall finishing operation of decline function for passing through attachment type raise scaffold, the operation On the one hand method can postpone the progress of fitment operation and extend the overall construction period, another aspect attachment type raise scaffold is under The danger such as high falling are easy to happen during drop, are unfavorable for construction safety control.
Summary of the invention
In view of this, the present invention is directed to propose a kind of operation of main body construction and finishing synchronization job lifting protective platform Method can be realized the synchronization job of main body construction and finishing, to realize safe construction under the premise of without influence construction speed.
In order to achieve the above objectives, the technical scheme of the present invention is realized as follows:
The operational method of a kind of main body construction and finishing synchronization job lifting protective platform, the lifting protective platform are pacified Loaded on concrete main body structural construction wall, and the lifting protective platform includes along the concrete main body structural construction wall The main body construction ontology and fitment operation ontology of body short transverse arrangement, can realize main body construction and dress using the operational method The synchronization job repaired, the operational method include the following steps:
1. it constructs to main structure, construction to 3m;
2. setting up the main body construction ontology along the concrete main body structural construction wall;
3. continuing to construct to main structure, and the main body construction ontology is promoted successively according to demand;
4. as the bottom of main body construction ontology 16.5m~20m a height of away from the ground, along the concrete main body Structural construction wall builds the fitment operation ontology;
5. continuing to construct to the main structure, and fitment operation is carried out to main structure, according to demand to described Main body construction ontology and the fitment operation ontology are promoted successively;
6. when main structure and fitment operation construction finish, on demand to the main body construction ontology and the fitment operation sheet Body is removed.
As restriction, the height of the main body construction ontology is 10.5m~11m, and the height of the fitment operation ontology is 6m~7m.
A kind of main body construction of the invention and the finishing synchronization job operational method of lifting protective platform, can be realized master The synchronization job of body construction and finishing, and construction safety is reliable, can also promote integral construction progress.
The present invention, which also aims to, proposes that a kind of main body construction and finishing synchronization job go up and down protective platform, and technical solution is such as Under:
A kind of main body construction and finishing synchronization job lifting protective platform, the lifting protective platform use work as above Industry method carries out operation, and spacing is 6m~9m, the lifting protective platform between the main body construction ontology and fitment operation ontology It further include being laid in the concrete main body structural construction wall two sides, respectively to drive the main body construction ontology and the dress Two groups of lifting devices of operation ontology lifting are repaired, the main body construction ontology and the fitment operation ontology respectively include rectangular The frame body of the bodily form, and the frame body is installed on the wall-attaching equipment on the concrete main body structural construction wall, also Including the protective device being installed between the wall-attaching equipment and the frame body, the fitment operation ontology further includes being installed on institute The protective platform at the top of frame body is stated, the protective platform includes along the multiple outstanding of the width direction interval of frame body installation Cross bar is chosen, and the protective plate being installed on the overhanging cross bar, further includes the separate coagulation for being installed on the protective plate The side guard plate of native main structure construction wall one end, and be respectively arranged in more on the frame body and each overhanging cross bar A support rod.
As restriction, each frame body includes along the length direction interval of the concrete main body structural construction wall The multiple groups of distribution indulge frame assembly, and along the concrete main body structural construction wall short transverse be distributed, respectively with The multiple groups crossing frame component of the vertical frame assembly connection of corresponding position, it includes along the coagulation that frame assembly is indulged described in each group Spaced two stringers of the width direction of native main structure construction wall, crossing frame component described in each group includes operation layer Walkway board, and the transverse truss adjacent to operation layer walkway board setting.
It is limited as further, each wall-attaching equipment is along the concrete main body structural construction wall height side To at least two groups of setting, each group wall-attaching equipment includes setting along concrete main body structural construction wall length direction interval The two attached wall bodies set, each attached wall body respectively include being installed on via bolt on the concrete main body structural construction wall Wall-attached supporting seat.
It is limited as further, each protective device includes:
Anti-tilt device, the anti-tilt device include being respectively arranged in close to the concrete main body structural construction wall two sides The stringer on two installation frame bodies, and be respectively arranged at it is on the wall-attached supporting seat, make main body construction ontology and dress The anti-dumping leading truck that operation ontology is gone up and down in guide track is repaired, each installation frame body includes along the concrete main body knot Two C-shaped beams that the length direction of structure construction wall is disposed opposite to each other, along C-shaped depth of beam direction, between two C-shaped beams between Every being equipped with multiple cylinders, the anti-dumping leading truck includes two support bases that interval is laid in the wall-attached supporting seat, and respectively The corresponding support frame being laid on two support bases, in being respectively equipped on each support frame in the C of the C-shaped beam of corresponding position The pulley slided in shape slot;
Anti-fall device, the anti-fall device includes L-shaped anti-fall piece, and is connected to described anti-fall piece and the attached wall branch Reset spring between seat, anti-fall piece of the top are articulated on the anti-dumping leading truck via articulated shaft, the fall arrest dress Setting further includes the fall arrest baffle for being located at described anti-fall piece of one end, in described anti-fall piece far from close to the fall arrest baffle one The arc-shaped slot being adapted to the cylinder is offered on the other end at end;
Supporting device, the supporting device include that one end is articulated between the support base and shores seat, and is connected to institute The shore shored on seat is stated, further includes the head of shoring being connected on the shore, the head of shoring is equipped with and the column The card slot of body clamping.
Limited as further, lifting device described in each group include be installed on two groups of the main body construction ontology it is vertical First between frame assembly bottom is upper between hanger and two groups of vertical frame assemblies tops for being installed on the main body construction ontology down Hanger, and the second lower hanger being installed between two groups of vertical frame assembly bottoms of the fitment operation ontology;Further include via First hook hook is connected in the electric block of the upper hanger, is equipped with chain on Yu Suoshu electric block, Yu Suoshu chain is separate The connecting pin of the electric block is equipped with the second hook, and the first guiding of outer peripheral surface setting is hinged between the lower hanger of Yu Suoshu first First directive wheel of slot, be arranged on the first guide groove of Yu Suoshu one end and the concrete main body structural construction wall connecting, The other end and described second links up with the first lifting rope of hook even, is hinged with outer peripheral surface setting second between the lower hanger of Yu Suoshu second Second directive wheel of guide groove, one end is arranged on the second guide groove of Yu Suoshu and the concrete main body structural construction wall connects It connects, the second lifting rope of the other end and the second hook hook even.
It is limited as further, mechanics sensor is installed on Yu Suoshu upper hanger, the first hook hook is connected in On the mechanics sensor.
It is limited as further, the operation layer walkway board of Yu Suoshu fitment operation ontology and the concrete main body structure Inverted U-shaped steel plate is installed between construction wall.
It is limited as further, in being separately installed with enclosure device on each frame body, the enclosure device is by more Group goes along with sb. to guard him module and is spliced, and it includes the installation card installed along the short transverse interval of the stringer that module is gone along with sb. to guard him described in each group Seat, and the protection screen sheet being installed in the installed cassette.
Compared with the existing technology, present invention has the advantage that
(1) a kind of main body construction of the invention and finishing synchronization job lifting protective platform, by main body construction ontology, The setting of fitment operation ontology and two groups of lifting devices can be realized the synchronization job of main body construction and finishing, to shorten construction Period, and can ensure safety work, and the setting of protective platform, it is able to ascend the protective capacities of fitment operation ontology;
(2) first lifting ropes and second go up and down being separately provided for rope, can be according to demand to main body construction ontology and dress It repairs the synchronization of operation ontology or is individually promoted, and promote property easy to use;
(3) setting of mechanics sensor can prompt load capacity, and promote lifting protective platform safety in utilization;
(4) setting of enclosure device can promote the usage safety performance of lifting protective platform.
Detailed description of the invention
The attached drawing for constituting a part of the invention is used to provide further understanding of the present invention, schematic reality of the invention It applies example and its explanation is used to explain the present invention, do not constitute improper limitations of the present invention.In the accompanying drawings:
Fig. 1 is the stereochemical structure that main body construction described in the embodiment of the present invention and finishing synchronization job go up and down protective platform Schematic diagram;
Fig. 2 is the main view that main body construction described in the embodiment of the present invention and finishing synchronization job go up and down protective platform;
Fig. 3 is the left view that main body construction described in the embodiment of the present invention and finishing synchronization job go up and down protective platform;
Fig. 4 is partial enlarged view at the A of Fig. 1;
Fig. 5 is structural schematic diagram at operation layer walkway board described in the embodiment of the present invention;
Fig. 6 is partial enlarged view at the B of Fig. 1;
Fig. 7 is the assembling schematic diagram of attached wall body and protective device described in the embodiment of the present invention;
Fig. 8 is the usage state diagram of attached wall body and protective device described in the embodiment of the present invention;
The structural schematic diagram that Fig. 9 is anti-fall piece described in the embodiment of the present invention;
Figure 10 is the structural schematic diagram of the first lower hanger described in the embodiment of the present invention;
Figure 11 is the structural schematic diagram of upper hanger described in the embodiment of the present invention;
Figure 12 is partial enlarged view at the C of Fig. 2.
Description of symbols:
1- main body construction ontology, 111- stringer, 112- operation layer walkway board, 113- transverse truss, 114- enclosure device, 1141- installed cassette, 1142- protection screen sheet, 121- wall-attached supporting seat, 13- protective device, 131-C ellbeam, 132- cylinder, 133-C Shape slot, 134- support base, 135- support frame, 136- pulley, anti-fall piece of 137-, 138- supporting device, 2- fitment operation ontology, 21- overhangs cross bar, and 22- protective plate, 23- side guard plate, 24- support rod, the inverted U-shaped steel plate of 25-, 3- lifting device, 31- first is lower to be hung Frame, 32- upper hanger, the lower hangers of 33- second, 34- electric block, 35- first are linked up with, and 36- chain, 37- second is linked up with, 38- the One lifting rope, 39- second go up and down rope, 40- mechanics sensor, 4- concrete main body structural construction wall.
Specific embodiment
It should be noted that in the absence of conflict, the feature in embodiment and embodiment in the present invention can phase Mutually combination.
The present invention will be described in detail below with reference to the accompanying drawings and embodiments.
The present embodiment is related to the operational method of a kind of main body construction and finishing synchronization job lifting protective platform, and lifting is prevented Stage+module is protected on concrete main body structural construction wall 4, and going up and down protective platform includes along concrete main body structural construction The main body construction ontology 1 and fitment operation ontology 2 of 4 short transverse of wall arrangement are used using main body construction and finishing synchronization job The operational method of lifting protective platform can realize the synchronization job of main body construction and finishing, specifically as shown in Fig. 1, operator Method includes the following steps:
1. it constructs to main structure, construction to 3m;
2. setting up the main body construction ontology 1 along concrete main body structural construction wall 4;
3. continuing to construct to main structure, and main body construction ontology 1 is promoted successively according to demand;
4. as the bottom of main body construction ontology 1 16.5m~20m a height of far from ground, along concrete main body structural construction wall Body 4 builds fitment operation ontology 2;
5. continuing to construct to main structure, and fitment operation is carried out to main structure, according to demand to main body construction Ontology 1 and fitment operation ontology 2 are promoted successively;
6. being carried out on demand to main body construction ontology 1 and fitment operation ontology 2 when main structure and fitment operation construction finish It removes.
By main body construction and finishing synchronization job with lifting protective platform operational method, can be realized main body construction and The synchronization job of finishing, and construction safety is reliable, can also promote integral construction progress.
In the present embodiment, the height of main body construction ontology 1 is 10.5m~11m, the height of fitment operation ontology 2 be 6m~ 7m。
The present invention, which also aims to, proposes that a kind of main body construction and finishing synchronization job go up and down protective platform, uses work as above Industry method carries out operation, and on specific structure, as shown in Fig. 1 to Figure 12, lifting protective platform is installed on concrete main body structure On construction wall 4, and going up and down protective platform includes the main body construction along 4 short transverse of concrete main body structural construction wall arrangement Ontology 1 and fitment operation ontology 2, and it is laid in 4 two sides of concrete main body structural construction wall, respectively to drive main body construction Two groups of lifting devices 3 that ontology 1 and fitment operation ontology 2 are gone up and down, in the present embodiment, main body construction ontology 1 and fitment operation sheet 2 spacing of body are 6m~9m.
In the present embodiment, main body construction ontology 1 and fitment operation ontology 2 respectively include the frame body of cuboid, with And frame body is installed on the wall-attaching equipment on concrete main body structural construction wall 4, it further include being installed on wall-attaching equipment and frame Protective device 13 between frame body, to make protection effect more preferably, fitment operation ontology 2 further includes the protection being installed at the top of frame body Platform specifically, protective platform includes the multiple overhanging cross bars 21 installed along the width direction interval of frame body, and is installed on Overhang the protective plate 22 on cross bar 21, further includes separate 4 one end of concrete main body structural construction wall for being installed on protective plate 22 Side guard plate 23, and be respectively arranged in frame body and it is each overhanging cross bar 21 on multiple support rods 24, specifically, each support rod 24 are respectively arranged between following stringers 111 and overhanging cross bar 21, in the present embodiment, to promote protection effect, in fitment operation sheet Inverted U-shaped steel plate 25 is installed between the operation layer walkway board 112 and concrete main body structural construction wall 4 of body 2.
In the present embodiment, each frame body includes being spaced apart along the length direction of concrete main body structural construction wall 4 Multiple groups indulge frame assembly, and along concrete main body structural construction wall 4 short transverse be distributed, respectively with corresponding position The multiple groups crossing frame component of the vertical frame assembly connection at place, it includes along concrete main body structural construction wall that each group, which indulges frame assembly, Spaced two stringers 111 of the width direction of body 4, each group crossing frame component includes operation layer walkway board 112, Yi Jixiang The transverse truss 113 being arranged adjacent to operation layer walkway board 112.
Each wall-attaching equipment is at least two groups along the setting of 4 short transverse of concrete main body structural construction wall, this implementation In example, the wall-attaching equipment of main body construction ontology 1 is three groups, and the wall-attaching equipment of fitment operation ontology 2 is two groups, each group wall-attaching equipment It include along the spaced two attached wall bodies of concrete main body structural construction 4 length directions of wall, specifically, each attached wall body point It does not include the wall-attached supporting seat 121 being installed on via bolt on concrete main body structural construction wall 4.
In the present embodiment, each protective device 13 is arranged corresponding to wall-attached supporting seat 121, and each protective device 13 includes that anti-dumping fills It sets, anti-fall device and supporting device 138, on specific structure, anti-tilt device includes being respectively arranged in close to concrete main body structure Two installation frame bodies on the stringer 111 of 4 two sides of construction wall, and be respectively arranged at it is on wall-attached supporting seat 121, apply main body The anti-dumping leading truck that cost body 1 and fitment operation ontology 2 are gone up and down in guide track, each installation frame body include along concrete master Two C-shaped beams 131 that the length direction of body structural construction wall 4 is disposed opposite to each other, along the short transverse of C-shaped beam 131, in two C Multiple cylinders 132 are equipped at intervals between ellbeam 131, anti-dumping leading truck includes two support bases that interval is laid in wall-attached supporting seat 121 134, and the support frame 135 being laid on two support bases 134 is respectively corresponded, it is respectively equipped on each support frame 135 in right Answer the pulley 136 slided in the C-channel 133 of the C-shaped beam 131 at position.
In the present embodiment, anti-fall device includes L-shaped anti-fall piece 137, and is connected to anti-fall piece 137 and wall-attached supporting seat Reset spring between 121, anti-fall piece 137 of top are articulated on anti-dumping leading truck via articulated shaft, and falling proof device further includes Fall arrest baffle positioned at anti-fall piece of 137 one end is opened on anti-fall piece 137 of the other end far from close fall arrest baffle one end Equipped with the arc-shaped slot being adapted to cylinder 132.In the present embodiment, supporting device 138 includes that one end is articulated between support base 134 Shore seat, and be connected to the shore shored on seat, further include being connected on shore to shore head, shore head be equipped with The card slot that cylinder 132 is clamped.
In the present embodiment, each group lifting device 3 includes two groups of vertical frame assembly bottoms for being installed on main body construction ontology 1 Between the first lower hanger 31 and the upper hangers 32, Yi Jian between being installed at the top of two groups of vertical frame assemblies of main body construction ontology 1 The second lower hanger 33 between two groups of vertical frame assembly bottoms loaded on fitment operation ontology 2;It further include via the first 35 hooks of hook The electric block 34 of upper hanger 32 is connected in, in being equipped with chain 36 on electric block 34, in chain 36 far from electric block 34 Connecting pin is equipped with the second hook 37, and the first guiding that the first guide groove is arranged in outer peripheral surface is hinged between the first lower hanger 31 Wheel, in be arranged with one end on the first guide groove and connect with concrete main body structural construction wall 4, the other end and second links up with 37 hooks The first lifting rope 38 even is hinged with the second directive wheel that the second guide groove is arranged in outer peripheral surface between the second lower hanger 33, in Be arranged on second guide groove one end connect with concrete main body structural construction wall 4, the other end and second hook 37 hooks even Second lifting rope 39.By the setting of the first lifting rope 38 and the second lifting rope 39, separately or concurrently the can be connected in by hook On two hooks 37, to be promoted to main body construction ontology 1 and fitment operation ontology 2 or be promoted simultaneously respectively as needed.
To promote safety, in being equipped with mechanics sensor 40 on upper hanger 32, the first 35 hooks of hook are connected in mechanics sensing On device 40, to promote protective performance, enclosed in being separately installed on each frame body of main body construction ontology 1 and fitment operation ontology 2 Protection unit 114, enclosure device 114 go along with sb. to guard him module by multiple groups and are spliced, and each group goes along with sb. to guard him module and include the height along stringer 111 The installed cassette 1141 of direction interval installation, and the protection screen sheet 1142 being installed in installed cassette 1141, in the present embodiment, Installed cassette 1141 include along the spaced pairs of fixture block of multiple groups H-shaped of 4 length direction of concrete main body structural construction wall, with And it is respectively arranged in the U-shaped part between the pairs of fixture block of H-shaped.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all in essence of the invention Within mind and principle, any modification, equivalent replacement, improvement and so on be should all be included in the protection scope of the present invention.

Claims (10)

1. the operational method of a kind of main body construction and finishing synchronization job lifting protective platform, which is characterized in that the lifting Protective platform is installed on concrete main body structural construction wall, and the lifting protective platform includes along the concrete main body The main body construction ontology and fitment operation ontology of structural construction wall short transverse arrangement, can realize master using the operational method The synchronization job of body construction and finishing, the operational method include the following steps:
1. it constructs to main structure, construction to 3m;
2. setting up the main body construction ontology along the concrete main body structural construction wall;
3. continuing to construct to main structure, and the main body construction ontology is promoted successively according to demand;
4. as the bottom of main body construction ontology 16.5m~20m a height of far from ground, along the concrete main body structural construction Wall builds the fitment operation ontology;
5. continuing to construct to the main structure, and fitment operation is carried out to main structure, according to demand to the main body Construction ontology and the fitment operation ontology are promoted successively;
6. when main structure and fitment operation construction finish, on demand to the main body construction ontology and the fitment operation ontology into Row is removed.
2. the operational method of main body construction according to claim 1 and finishing synchronization job lifting protective platform, special Sign is: the height of the main body construction ontology is 10.5m~11m, and the height of the fitment operation ontology is 6m~7m.
3. a kind of main body construction and finishing synchronization job lifting protective platform, it is characterised in that: the lifting protective platform makes Operation, the main body construction ontology and fitment operation sheet are carried out with the operational method of the claim 1 or the claim 2 Spacing is 6m~9m between body, and the lifting protective platform further includes being laid in the concrete main body structural construction wall two respectively Side, two groups of lifting devices to drive the main body construction ontology and the fitment operation ontology to go up and down, the main body construction sheet Body and the fitment operation ontology respectively include the frame body of cuboid, and the frame body is installed on the coagulation Wall-attaching equipment on native main structure construction wall further includes the protection dress being installed between the wall-attaching equipment and the frame body It sets, the fitment operation ontology further includes the protective platform being installed at the top of the frame body, and the protective platform includes along institute Multiple overhanging cross bars of the width direction interval installation of frame body are stated, and the protective plate being installed on the overhanging cross bar, also The side guard plate far from described concrete main body structural construction wall one end including being installed on the protective plate, and is installed respectively Multiple support rods on the frame body and each overhanging cross bar.
4. main body construction according to claim 3 and finishing synchronization job lifting protective platform, it is characterised in that: each institute Stating frame body includes that the multiple groups being spaced apart along the length direction of the concrete main body structural construction wall indulge frame assembly, And along the concrete main body structural construction wall short transverse be distributed, the vertical frame assembly with corresponding position respectively The multiple groups crossing frame component of connection, it includes the width along the concrete main body structural construction wall that frame assembly is indulged described in each group Spaced two stringers in direction are spent, crossing frame component described in each group includes operation layer walkway board, and adjacent to described The transverse truss of operation layer walkway board setting.
5. main body construction according to claim 4 and finishing synchronization job lifting protective platform, it is characterised in that: each institute Stating wall-attaching equipment is at least two groups along concrete main body structural construction wall short transverse setting, each group wall-attaching equipment It include along the spaced two attached wall bodies of the concrete main body structural construction wall length direction, each attached wall body point It does not include the wall-attached supporting seat being installed on via bolt on the concrete main body structural construction wall.
6. main body construction according to claim 5 and finishing synchronization job lifting protective platform, which is characterized in that each institute Stating protective device includes:
Anti-tilt device, the anti-tilt device include the institute being respectively arranged in close to the concrete main body structural construction wall two sides State two installation frame bodies on stringer, and be respectively arranged at it is on the wall-attached supporting seat, make main body construction ontology and finishing make The anti-dumping leading truck that industry ontology is gone up and down in guide track, each installation frame body include building along the concrete main body structure Two C-shaped beams that the length direction of walling body is disposed opposite to each other along C-shaped depth of beam direction, are spaced between two C-shaped beams and set There are multiple cylinders, the anti-dumping leading truck includes two support bases that interval is laid in the wall-attached supporting seat, and is respectively corresponded The support frame being laid on two support bases, in being respectively equipped on each support frame in the C-channel of the C-shaped beam of corresponding position The pulley of interior sliding;
Anti-fall device, the anti-fall device include L-shaped anti-fall piece, and are connected to described anti-fall piece between the wall-attached supporting seat Reset spring, anti-fall piece of the top is articulated on the anti-dumping leading truck via articulated shaft, and the falling proof device is also Fall arrest baffle including being located at described anti-fall piece of one end, in described anti-fall piece far from close to fall arrest baffle one end The arc-shaped slot being adapted to the cylinder is offered on the other end;
Supporting device, the supporting device include that one end is articulated between the support base and shores seat, and is connected to the top The shore on seat is supportted, further includes the head of shoring being connected on the shore, the head of shoring is equipped with and the cylinder card The card slot connect.
7. main body construction according to claim 4 and finishing synchronization job lifting protective platform, it is characterised in that: each group The lifting device include the first lower hangers between being installed on two groups of the main body construction ontology vertical frame assembly bottoms and Upper hanger between being installed at the top of two groups of vertical frame assemblies of the main body construction ontology, and it is installed on the fitment operation sheet The second lower hanger between the vertical frame assembly bottom of two groups of body;It further include being connected in the electronic of the upper hanger via the first hook hook Cucurbit is equipped with chain on Yu Suoshu electric block, and Yu Suoshu chain is equipped with second far from the connecting pin of the electric block It links up with, is hinged with the first directive wheel that the first guide groove is arranged in outer peripheral surface between the lower hanger of Yu Suoshu first, Yu Suoshu first is oriented to First of one end and the concrete main body structural construction wall connecting, the other end and the second hook hook even is arranged on slot Rope is gone up and down, is hinged with the second directive wheel that the second guide groove is arranged in outer peripheral surface, Yu Suoshu second between the lower hanger of Yu Suoshu second It is arranged with one end on guide groove and the concrete main body structural construction wall connecting, the other end and described second link up with what hook connected Second lifting rope.
8. main body construction according to claim 7 and finishing synchronization job lifting protective platform, it is characterised in that: in institute It states and mechanics sensor is installed on upper hanger, the first hook hook is connected on the mechanics sensor.
9. main body construction according to claim 4 and finishing synchronization job lifting protective platform, it is characterised in that: in institute It states and inverted U-shaped steel plate is installed between the operation layer walkway board and the concrete main body structural construction wall of fitment operation ontology.
10. main body construction according to claim 4 and finishing synchronization job lifting protective platform, it is characterised in that: in Enclosure device is separately installed on each frame body, the enclosure device goes along with sb. to guard him module by multiple groups and is spliced, described in each group Going along with sb. to guard him module includes the installed cassette installed along the short transverse interval of the stringer, and is installed in the installed cassette Protection screen sheet.
CN201910618352.6A 2019-07-10 2019-07-10 Lifting protection platform for main body construction and decoration synchronous operation and operation method Active CN110219451B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910618352.6A CN110219451B (en) 2019-07-10 2019-07-10 Lifting protection platform for main body construction and decoration synchronous operation and operation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910618352.6A CN110219451B (en) 2019-07-10 2019-07-10 Lifting protection platform for main body construction and decoration synchronous operation and operation method

Publications (2)

Publication Number Publication Date
CN110219451A true CN110219451A (en) 2019-09-10
CN110219451B CN110219451B (en) 2024-02-27

Family

ID=67812329

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910618352.6A Active CN110219451B (en) 2019-07-10 2019-07-10 Lifting protection platform for main body construction and decoration synchronous operation and operation method

Country Status (1)

Country Link
CN (1) CN110219451B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114541729A (en) * 2022-03-10 2022-05-27 中国十九冶集团有限公司 Operation method for super high-rise building
CN115788001A (en) * 2023-02-08 2023-03-14 山西锦辉工程检测有限公司 Split lifting type attached scaffold and construction method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100777937B1 (en) * 2006-06-19 2007-11-22 이명래 Construcion safety working cage with scaffold
KR100874865B1 (en) * 2008-06-16 2008-12-19 이송복 Apparatus for salvaging slab mold
CN202090591U (en) * 2010-07-27 2011-12-28 江苏和平建设集团有限公司 Lift type climbing formwork of building operations
CN206467991U (en) * 2016-12-30 2017-09-05 河北亿安工程技术股份有限公司 The operation platform that a kind of building main body construction protection and exterior wall finishing are integrated
CN109296192A (en) * 2018-12-05 2019-02-01 河北亿安工程技术股份有限公司 Assembled architecture crane
CN210369843U (en) * 2019-07-10 2020-04-21 河北亿安工程技术股份有限公司 Lifting protection platform for main body construction and decoration synchronous operation

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100777937B1 (en) * 2006-06-19 2007-11-22 이명래 Construcion safety working cage with scaffold
KR100874865B1 (en) * 2008-06-16 2008-12-19 이송복 Apparatus for salvaging slab mold
CN202090591U (en) * 2010-07-27 2011-12-28 江苏和平建设集团有限公司 Lift type climbing formwork of building operations
CN206467991U (en) * 2016-12-30 2017-09-05 河北亿安工程技术股份有限公司 The operation platform that a kind of building main body construction protection and exterior wall finishing are integrated
CN109296192A (en) * 2018-12-05 2019-02-01 河北亿安工程技术股份有限公司 Assembled architecture crane
CN210369843U (en) * 2019-07-10 2020-04-21 河北亿安工程技术股份有限公司 Lifting protection platform for main body construction and decoration synchronous operation

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114541729A (en) * 2022-03-10 2022-05-27 中国十九冶集团有限公司 Operation method for super high-rise building
CN115788001A (en) * 2023-02-08 2023-03-14 山西锦辉工程检测有限公司 Split lifting type attached scaffold and construction method thereof

Also Published As

Publication number Publication date
CN110219451B (en) 2024-02-27

Similar Documents

Publication Publication Date Title
CN106894342B (en) Pipe installing job platform and construction method
CN110219451A (en) Main body construction and finishing synchronization job lifting protective platform and operational method
CN105129602A (en) Sling capable of integrally lifting long and large-diameter vertical steel bars
CN103967263B (en) Hydraulic automatic jumping discharging platform
CN103821084B (en) Operational method at the bottom of implement at the bottom of beam and beam
CN109296192A (en) Assembled architecture crane
CN210369843U (en) Lifting protection platform for main body construction and decoration synchronous operation
CN102518292B (en) Lifting material platform and use method for same
CN204475182U (en) The mounting tool of a kind of Railway Bridges And Piers pier top hanging basket
CN216196742U (en) A wallboard installation device for position is striden to height
CN107487423B (en) Marine suspension scaffold and construction method thereof
CN103743581A (en) Internal-climbing tower crane test platform apparatus and test method
CN209556327U (en) Assembled architecture crane
CN204728225U (en) A kind of rail rail traffic bridge of embracing evacuates inspection platform
CN209940330U (en) Tower crane externally-hung detachable safety passageway for people to get on
CN2741943Y (en) Special device for mounting lift
CN205638500U (en) Large -scale steel shotcrete of variant formula installation movable trolley
CN219260998U (en) Anchor cable stretching device
CN221255244U (en) Steel-concrete composite beam main longitudinal beam construction platform
CN218540450U (en) Regularization bent cap steel strand wires maintenance platform
CN219569525U (en) Safe operation platform for column-column connection construction
CN214168783U (en) Sliding beam bottom hanging basket
CN211313138U (en) Combined platform ladder for dust-free workshop
CN217000787U (en) Elevartor shaft exempts from to dismantle formula lift platform device
CN203834907U (en) Installation rack for non-scaffold elevator installation

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant