CN110219451A - Main body construction and finishing synchronization job lifting protective platform and operational method - Google Patents
Main body construction and finishing synchronization job lifting protective platform and operational method Download PDFInfo
- Publication number
- CN110219451A CN110219451A CN201910618352.6A CN201910618352A CN110219451A CN 110219451 A CN110219451 A CN 110219451A CN 201910618352 A CN201910618352 A CN 201910618352A CN 110219451 A CN110219451 A CN 110219451A
- Authority
- CN
- China
- Prior art keywords
- main body
- ontology
- construction
- wall
- body construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000010276 construction Methods 0.000 title claims abstract description 168
- 230000001681 protective effect Effects 0.000 title claims abstract description 66
- 238000000034 method Methods 0.000 title claims abstract description 24
- 238000009434 installation Methods 0.000 claims description 10
- 230000002093 peripheral effect Effects 0.000 claims description 6
- 229910000831 Steel Inorganic materials 0.000 claims description 4
- 239000010959 steel Substances 0.000 claims description 4
- 230000000712 assembly Effects 0.000 claims description 3
- 238000000429 assembly Methods 0.000 claims description 3
- 230000015271 coagulation Effects 0.000 claims description 3
- 238000005345 coagulation Methods 0.000 claims description 3
- 238000010586 diagram Methods 0.000 description 7
- 230000000694 effects Effects 0.000 description 2
- 230000007423 decrease Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000008439 repair process Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/28—Mobile scaffolds; Scaffolds with mobile platforms
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/28—Mobile scaffolds; Scaffolds with mobile platforms
- E04G3/30—Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables
- E04G3/32—Hoisting devices; Safety devices
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/28—Mobile scaffolds; Scaffolds with mobile platforms
- E04G3/30—Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables
- E04G3/32—Hoisting devices; Safety devices
- E04G3/325—Safety devices for stabilising the mobile platform, e.g. to avoid it swinging in the wind
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/04—Means for fastening, supporting, or bracing scaffolds on or against building constructions
- E04G5/046—Means for fastening, supporting, or bracing scaffolds on or against building constructions for fastening scaffoldings on walls
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/28—Mobile scaffolds; Scaffolds with mobile platforms
- E04G2003/286—Mobile scaffolds; Scaffolds with mobile platforms mobile vertically
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
- Movable Scaffolding (AREA)
Abstract
The present invention provides the operational methods of main body construction and finishing synchronization job lifting protective platform, lifting protective platform is installed on concrete main body structural construction wall, including main body construction ontology and fitment operation ontology, operational method includes the following steps: 1. to construct to main structure;2. setting up main body construction ontology;3. continuing to construct to main structure, and main body construction ontology is promoted successively according to demand;4. building fitment operation ontology as the bottom of main body construction ontology 16.5m~20m a height of far from ground;5. continuing to construct to main structure, and fitment operation is carried out to main structure, main body construction ontology and fitment operation ontology are promoted successively according to demand;6. being removed on demand to main body construction ontology and fitment operation ontology when main structure and fitment operation construction finish.Operational method of the invention can be realized the synchronization job of main body construction and finishing.The present invention also provides main body construction and finishing synchronization job lifting protective platforms.
Description
Technical field
The present invention relates to construction engineering technical field, in particular to a kind of main body construction and finishing synchronization job are anti-with lifting
The operational method for protecting platform, further relates to a kind of main body construction and finishing synchronization job goes up and down protective platform.
Background technique
At present during China's building structure construction, the external wall fitment operation of part unit in charge of construction can closely follow main body
Construction operation, and the prior art, Specific construction mode is the enhanced feature using attachment type raise scaffold, first by main body construction
To building top layer, the rear top-down progress exterior wall finishing operation of decline function for passing through attachment type raise scaffold, the operation
On the one hand method can postpone the progress of fitment operation and extend the overall construction period, another aspect attachment type raise scaffold is under
The danger such as high falling are easy to happen during drop, are unfavorable for construction safety control.
Summary of the invention
In view of this, the present invention is directed to propose a kind of operation of main body construction and finishing synchronization job lifting protective platform
Method can be realized the synchronization job of main body construction and finishing, to realize safe construction under the premise of without influence construction speed.
In order to achieve the above objectives, the technical scheme of the present invention is realized as follows:
The operational method of a kind of main body construction and finishing synchronization job lifting protective platform, the lifting protective platform are pacified
Loaded on concrete main body structural construction wall, and the lifting protective platform includes along the concrete main body structural construction wall
The main body construction ontology and fitment operation ontology of body short transverse arrangement, can realize main body construction and dress using the operational method
The synchronization job repaired, the operational method include the following steps:
1. it constructs to main structure, construction to 3m;
2. setting up the main body construction ontology along the concrete main body structural construction wall;
3. continuing to construct to main structure, and the main body construction ontology is promoted successively according to demand;
4. as the bottom of main body construction ontology 16.5m~20m a height of away from the ground, along the concrete main body
Structural construction wall builds the fitment operation ontology;
5. continuing to construct to the main structure, and fitment operation is carried out to main structure, according to demand to described
Main body construction ontology and the fitment operation ontology are promoted successively;
6. when main structure and fitment operation construction finish, on demand to the main body construction ontology and the fitment operation sheet
Body is removed.
As restriction, the height of the main body construction ontology is 10.5m~11m, and the height of the fitment operation ontology is
6m~7m.
A kind of main body construction of the invention and the finishing synchronization job operational method of lifting protective platform, can be realized master
The synchronization job of body construction and finishing, and construction safety is reliable, can also promote integral construction progress.
The present invention, which also aims to, proposes that a kind of main body construction and finishing synchronization job go up and down protective platform, and technical solution is such as
Under:
A kind of main body construction and finishing synchronization job lifting protective platform, the lifting protective platform use work as above
Industry method carries out operation, and spacing is 6m~9m, the lifting protective platform between the main body construction ontology and fitment operation ontology
It further include being laid in the concrete main body structural construction wall two sides, respectively to drive the main body construction ontology and the dress
Two groups of lifting devices of operation ontology lifting are repaired, the main body construction ontology and the fitment operation ontology respectively include rectangular
The frame body of the bodily form, and the frame body is installed on the wall-attaching equipment on the concrete main body structural construction wall, also
Including the protective device being installed between the wall-attaching equipment and the frame body, the fitment operation ontology further includes being installed on institute
The protective platform at the top of frame body is stated, the protective platform includes along the multiple outstanding of the width direction interval of frame body installation
Cross bar is chosen, and the protective plate being installed on the overhanging cross bar, further includes the separate coagulation for being installed on the protective plate
The side guard plate of native main structure construction wall one end, and be respectively arranged in more on the frame body and each overhanging cross bar
A support rod.
As restriction, each frame body includes along the length direction interval of the concrete main body structural construction wall
The multiple groups of distribution indulge frame assembly, and along the concrete main body structural construction wall short transverse be distributed, respectively with
The multiple groups crossing frame component of the vertical frame assembly connection of corresponding position, it includes along the coagulation that frame assembly is indulged described in each group
Spaced two stringers of the width direction of native main structure construction wall, crossing frame component described in each group includes operation layer
Walkway board, and the transverse truss adjacent to operation layer walkway board setting.
It is limited as further, each wall-attaching equipment is along the concrete main body structural construction wall height side
To at least two groups of setting, each group wall-attaching equipment includes setting along concrete main body structural construction wall length direction interval
The two attached wall bodies set, each attached wall body respectively include being installed on via bolt on the concrete main body structural construction wall
Wall-attached supporting seat.
It is limited as further, each protective device includes:
Anti-tilt device, the anti-tilt device include being respectively arranged in close to the concrete main body structural construction wall two sides
The stringer on two installation frame bodies, and be respectively arranged at it is on the wall-attached supporting seat, make main body construction ontology and dress
The anti-dumping leading truck that operation ontology is gone up and down in guide track is repaired, each installation frame body includes along the concrete main body knot
Two C-shaped beams that the length direction of structure construction wall is disposed opposite to each other, along C-shaped depth of beam direction, between two C-shaped beams between
Every being equipped with multiple cylinders, the anti-dumping leading truck includes two support bases that interval is laid in the wall-attached supporting seat, and respectively
The corresponding support frame being laid on two support bases, in being respectively equipped on each support frame in the C of the C-shaped beam of corresponding position
The pulley slided in shape slot;
Anti-fall device, the anti-fall device includes L-shaped anti-fall piece, and is connected to described anti-fall piece and the attached wall branch
Reset spring between seat, anti-fall piece of the top are articulated on the anti-dumping leading truck via articulated shaft, the fall arrest dress
Setting further includes the fall arrest baffle for being located at described anti-fall piece of one end, in described anti-fall piece far from close to the fall arrest baffle one
The arc-shaped slot being adapted to the cylinder is offered on the other end at end;
Supporting device, the supporting device include that one end is articulated between the support base and shores seat, and is connected to institute
The shore shored on seat is stated, further includes the head of shoring being connected on the shore, the head of shoring is equipped with and the column
The card slot of body clamping.
Limited as further, lifting device described in each group include be installed on two groups of the main body construction ontology it is vertical
First between frame assembly bottom is upper between hanger and two groups of vertical frame assemblies tops for being installed on the main body construction ontology down
Hanger, and the second lower hanger being installed between two groups of vertical frame assembly bottoms of the fitment operation ontology;Further include via
First hook hook is connected in the electric block of the upper hanger, is equipped with chain on Yu Suoshu electric block, Yu Suoshu chain is separate
The connecting pin of the electric block is equipped with the second hook, and the first guiding of outer peripheral surface setting is hinged between the lower hanger of Yu Suoshu first
First directive wheel of slot, be arranged on the first guide groove of Yu Suoshu one end and the concrete main body structural construction wall connecting,
The other end and described second links up with the first lifting rope of hook even, is hinged with outer peripheral surface setting second between the lower hanger of Yu Suoshu second
Second directive wheel of guide groove, one end is arranged on the second guide groove of Yu Suoshu and the concrete main body structural construction wall connects
It connects, the second lifting rope of the other end and the second hook hook even.
It is limited as further, mechanics sensor is installed on Yu Suoshu upper hanger, the first hook hook is connected in
On the mechanics sensor.
It is limited as further, the operation layer walkway board of Yu Suoshu fitment operation ontology and the concrete main body structure
Inverted U-shaped steel plate is installed between construction wall.
It is limited as further, in being separately installed with enclosure device on each frame body, the enclosure device is by more
Group goes along with sb. to guard him module and is spliced, and it includes the installation card installed along the short transverse interval of the stringer that module is gone along with sb. to guard him described in each group
Seat, and the protection screen sheet being installed in the installed cassette.
Compared with the existing technology, present invention has the advantage that
(1) a kind of main body construction of the invention and finishing synchronization job lifting protective platform, by main body construction ontology,
The setting of fitment operation ontology and two groups of lifting devices can be realized the synchronization job of main body construction and finishing, to shorten construction
Period, and can ensure safety work, and the setting of protective platform, it is able to ascend the protective capacities of fitment operation ontology;
(2) first lifting ropes and second go up and down being separately provided for rope, can be according to demand to main body construction ontology and dress
It repairs the synchronization of operation ontology or is individually promoted, and promote property easy to use;
(3) setting of mechanics sensor can prompt load capacity, and promote lifting protective platform safety in utilization;
(4) setting of enclosure device can promote the usage safety performance of lifting protective platform.
Detailed description of the invention
The attached drawing for constituting a part of the invention is used to provide further understanding of the present invention, schematic reality of the invention
It applies example and its explanation is used to explain the present invention, do not constitute improper limitations of the present invention.In the accompanying drawings:
Fig. 1 is the stereochemical structure that main body construction described in the embodiment of the present invention and finishing synchronization job go up and down protective platform
Schematic diagram;
Fig. 2 is the main view that main body construction described in the embodiment of the present invention and finishing synchronization job go up and down protective platform;
Fig. 3 is the left view that main body construction described in the embodiment of the present invention and finishing synchronization job go up and down protective platform;
Fig. 4 is partial enlarged view at the A of Fig. 1;
Fig. 5 is structural schematic diagram at operation layer walkway board described in the embodiment of the present invention;
Fig. 6 is partial enlarged view at the B of Fig. 1;
Fig. 7 is the assembling schematic diagram of attached wall body and protective device described in the embodiment of the present invention;
Fig. 8 is the usage state diagram of attached wall body and protective device described in the embodiment of the present invention;
The structural schematic diagram that Fig. 9 is anti-fall piece described in the embodiment of the present invention;
Figure 10 is the structural schematic diagram of the first lower hanger described in the embodiment of the present invention;
Figure 11 is the structural schematic diagram of upper hanger described in the embodiment of the present invention;
Figure 12 is partial enlarged view at the C of Fig. 2.
Description of symbols:
1- main body construction ontology, 111- stringer, 112- operation layer walkway board, 113- transverse truss, 114- enclosure device,
1141- installed cassette, 1142- protection screen sheet, 121- wall-attached supporting seat, 13- protective device, 131-C ellbeam, 132- cylinder, 133-C
Shape slot, 134- support base, 135- support frame, 136- pulley, anti-fall piece of 137-, 138- supporting device, 2- fitment operation ontology,
21- overhangs cross bar, and 22- protective plate, 23- side guard plate, 24- support rod, the inverted U-shaped steel plate of 25-, 3- lifting device, 31- first is lower to be hung
Frame, 32- upper hanger, the lower hangers of 33- second, 34- electric block, 35- first are linked up with, and 36- chain, 37- second is linked up with, 38- the
One lifting rope, 39- second go up and down rope, 40- mechanics sensor, 4- concrete main body structural construction wall.
Specific embodiment
It should be noted that in the absence of conflict, the feature in embodiment and embodiment in the present invention can phase
Mutually combination.
The present invention will be described in detail below with reference to the accompanying drawings and embodiments.
The present embodiment is related to the operational method of a kind of main body construction and finishing synchronization job lifting protective platform, and lifting is prevented
Stage+module is protected on concrete main body structural construction wall 4, and going up and down protective platform includes along concrete main body structural construction
The main body construction ontology 1 and fitment operation ontology 2 of 4 short transverse of wall arrangement are used using main body construction and finishing synchronization job
The operational method of lifting protective platform can realize the synchronization job of main body construction and finishing, specifically as shown in Fig. 1, operator
Method includes the following steps:
1. it constructs to main structure, construction to 3m;
2. setting up the main body construction ontology 1 along concrete main body structural construction wall 4;
3. continuing to construct to main structure, and main body construction ontology 1 is promoted successively according to demand;
4. as the bottom of main body construction ontology 1 16.5m~20m a height of far from ground, along concrete main body structural construction wall
Body 4 builds fitment operation ontology 2;
5. continuing to construct to main structure, and fitment operation is carried out to main structure, according to demand to main body construction
Ontology 1 and fitment operation ontology 2 are promoted successively;
6. being carried out on demand to main body construction ontology 1 and fitment operation ontology 2 when main structure and fitment operation construction finish
It removes.
By main body construction and finishing synchronization job with lifting protective platform operational method, can be realized main body construction and
The synchronization job of finishing, and construction safety is reliable, can also promote integral construction progress.
In the present embodiment, the height of main body construction ontology 1 is 10.5m~11m, the height of fitment operation ontology 2 be 6m~
7m。
The present invention, which also aims to, proposes that a kind of main body construction and finishing synchronization job go up and down protective platform, uses work as above
Industry method carries out operation, and on specific structure, as shown in Fig. 1 to Figure 12, lifting protective platform is installed on concrete main body structure
On construction wall 4, and going up and down protective platform includes the main body construction along 4 short transverse of concrete main body structural construction wall arrangement
Ontology 1 and fitment operation ontology 2, and it is laid in 4 two sides of concrete main body structural construction wall, respectively to drive main body construction
Two groups of lifting devices 3 that ontology 1 and fitment operation ontology 2 are gone up and down, in the present embodiment, main body construction ontology 1 and fitment operation sheet
2 spacing of body are 6m~9m.
In the present embodiment, main body construction ontology 1 and fitment operation ontology 2 respectively include the frame body of cuboid, with
And frame body is installed on the wall-attaching equipment on concrete main body structural construction wall 4, it further include being installed on wall-attaching equipment and frame
Protective device 13 between frame body, to make protection effect more preferably, fitment operation ontology 2 further includes the protection being installed at the top of frame body
Platform specifically, protective platform includes the multiple overhanging cross bars 21 installed along the width direction interval of frame body, and is installed on
Overhang the protective plate 22 on cross bar 21, further includes separate 4 one end of concrete main body structural construction wall for being installed on protective plate 22
Side guard plate 23, and be respectively arranged in frame body and it is each overhanging cross bar 21 on multiple support rods 24, specifically, each support rod
24 are respectively arranged between following stringers 111 and overhanging cross bar 21, in the present embodiment, to promote protection effect, in fitment operation sheet
Inverted U-shaped steel plate 25 is installed between the operation layer walkway board 112 and concrete main body structural construction wall 4 of body 2.
In the present embodiment, each frame body includes being spaced apart along the length direction of concrete main body structural construction wall 4
Multiple groups indulge frame assembly, and along concrete main body structural construction wall 4 short transverse be distributed, respectively with corresponding position
The multiple groups crossing frame component of the vertical frame assembly connection at place, it includes along concrete main body structural construction wall that each group, which indulges frame assembly,
Spaced two stringers 111 of the width direction of body 4, each group crossing frame component includes operation layer walkway board 112, Yi Jixiang
The transverse truss 113 being arranged adjacent to operation layer walkway board 112.
Each wall-attaching equipment is at least two groups along the setting of 4 short transverse of concrete main body structural construction wall, this implementation
In example, the wall-attaching equipment of main body construction ontology 1 is three groups, and the wall-attaching equipment of fitment operation ontology 2 is two groups, each group wall-attaching equipment
It include along the spaced two attached wall bodies of concrete main body structural construction 4 length directions of wall, specifically, each attached wall body point
It does not include the wall-attached supporting seat 121 being installed on via bolt on concrete main body structural construction wall 4.
In the present embodiment, each protective device 13 is arranged corresponding to wall-attached supporting seat 121, and each protective device 13 includes that anti-dumping fills
It sets, anti-fall device and supporting device 138, on specific structure, anti-tilt device includes being respectively arranged in close to concrete main body structure
Two installation frame bodies on the stringer 111 of 4 two sides of construction wall, and be respectively arranged at it is on wall-attached supporting seat 121, apply main body
The anti-dumping leading truck that cost body 1 and fitment operation ontology 2 are gone up and down in guide track, each installation frame body include along concrete master
Two C-shaped beams 131 that the length direction of body structural construction wall 4 is disposed opposite to each other, along the short transverse of C-shaped beam 131, in two C
Multiple cylinders 132 are equipped at intervals between ellbeam 131, anti-dumping leading truck includes two support bases that interval is laid in wall-attached supporting seat 121
134, and the support frame 135 being laid on two support bases 134 is respectively corresponded, it is respectively equipped on each support frame 135 in right
Answer the pulley 136 slided in the C-channel 133 of the C-shaped beam 131 at position.
In the present embodiment, anti-fall device includes L-shaped anti-fall piece 137, and is connected to anti-fall piece 137 and wall-attached supporting seat
Reset spring between 121, anti-fall piece 137 of top are articulated on anti-dumping leading truck via articulated shaft, and falling proof device further includes
Fall arrest baffle positioned at anti-fall piece of 137 one end is opened on anti-fall piece 137 of the other end far from close fall arrest baffle one end
Equipped with the arc-shaped slot being adapted to cylinder 132.In the present embodiment, supporting device 138 includes that one end is articulated between support base 134
Shore seat, and be connected to the shore shored on seat, further include being connected on shore to shore head, shore head be equipped with
The card slot that cylinder 132 is clamped.
In the present embodiment, each group lifting device 3 includes two groups of vertical frame assembly bottoms for being installed on main body construction ontology 1
Between the first lower hanger 31 and the upper hangers 32, Yi Jian between being installed at the top of two groups of vertical frame assemblies of main body construction ontology 1
The second lower hanger 33 between two groups of vertical frame assembly bottoms loaded on fitment operation ontology 2;It further include via the first 35 hooks of hook
The electric block 34 of upper hanger 32 is connected in, in being equipped with chain 36 on electric block 34, in chain 36 far from electric block 34
Connecting pin is equipped with the second hook 37, and the first guiding that the first guide groove is arranged in outer peripheral surface is hinged between the first lower hanger 31
Wheel, in be arranged with one end on the first guide groove and connect with concrete main body structural construction wall 4, the other end and second links up with 37 hooks
The first lifting rope 38 even is hinged with the second directive wheel that the second guide groove is arranged in outer peripheral surface between the second lower hanger 33, in
Be arranged on second guide groove one end connect with concrete main body structural construction wall 4, the other end and second hook 37 hooks even
Second lifting rope 39.By the setting of the first lifting rope 38 and the second lifting rope 39, separately or concurrently the can be connected in by hook
On two hooks 37, to be promoted to main body construction ontology 1 and fitment operation ontology 2 or be promoted simultaneously respectively as needed.
To promote safety, in being equipped with mechanics sensor 40 on upper hanger 32, the first 35 hooks of hook are connected in mechanics sensing
On device 40, to promote protective performance, enclosed in being separately installed on each frame body of main body construction ontology 1 and fitment operation ontology 2
Protection unit 114, enclosure device 114 go along with sb. to guard him module by multiple groups and are spliced, and each group goes along with sb. to guard him module and include the height along stringer 111
The installed cassette 1141 of direction interval installation, and the protection screen sheet 1142 being installed in installed cassette 1141, in the present embodiment,
Installed cassette 1141 include along the spaced pairs of fixture block of multiple groups H-shaped of 4 length direction of concrete main body structural construction wall, with
And it is respectively arranged in the U-shaped part between the pairs of fixture block of H-shaped.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all in essence of the invention
Within mind and principle, any modification, equivalent replacement, improvement and so on be should all be included in the protection scope of the present invention.
Claims (10)
1. the operational method of a kind of main body construction and finishing synchronization job lifting protective platform, which is characterized in that the lifting
Protective platform is installed on concrete main body structural construction wall, and the lifting protective platform includes along the concrete main body
The main body construction ontology and fitment operation ontology of structural construction wall short transverse arrangement, can realize master using the operational method
The synchronization job of body construction and finishing, the operational method include the following steps:
1. it constructs to main structure, construction to 3m;
2. setting up the main body construction ontology along the concrete main body structural construction wall;
3. continuing to construct to main structure, and the main body construction ontology is promoted successively according to demand;
4. as the bottom of main body construction ontology 16.5m~20m a height of far from ground, along the concrete main body structural construction
Wall builds the fitment operation ontology;
5. continuing to construct to the main structure, and fitment operation is carried out to main structure, according to demand to the main body
Construction ontology and the fitment operation ontology are promoted successively;
6. when main structure and fitment operation construction finish, on demand to the main body construction ontology and the fitment operation ontology into
Row is removed.
2. the operational method of main body construction according to claim 1 and finishing synchronization job lifting protective platform, special
Sign is: the height of the main body construction ontology is 10.5m~11m, and the height of the fitment operation ontology is 6m~7m.
3. a kind of main body construction and finishing synchronization job lifting protective platform, it is characterised in that: the lifting protective platform makes
Operation, the main body construction ontology and fitment operation sheet are carried out with the operational method of the claim 1 or the claim 2
Spacing is 6m~9m between body, and the lifting protective platform further includes being laid in the concrete main body structural construction wall two respectively
Side, two groups of lifting devices to drive the main body construction ontology and the fitment operation ontology to go up and down, the main body construction sheet
Body and the fitment operation ontology respectively include the frame body of cuboid, and the frame body is installed on the coagulation
Wall-attaching equipment on native main structure construction wall further includes the protection dress being installed between the wall-attaching equipment and the frame body
It sets, the fitment operation ontology further includes the protective platform being installed at the top of the frame body, and the protective platform includes along institute
Multiple overhanging cross bars of the width direction interval installation of frame body are stated, and the protective plate being installed on the overhanging cross bar, also
The side guard plate far from described concrete main body structural construction wall one end including being installed on the protective plate, and is installed respectively
Multiple support rods on the frame body and each overhanging cross bar.
4. main body construction according to claim 3 and finishing synchronization job lifting protective platform, it is characterised in that: each institute
Stating frame body includes that the multiple groups being spaced apart along the length direction of the concrete main body structural construction wall indulge frame assembly,
And along the concrete main body structural construction wall short transverse be distributed, the vertical frame assembly with corresponding position respectively
The multiple groups crossing frame component of connection, it includes the width along the concrete main body structural construction wall that frame assembly is indulged described in each group
Spaced two stringers in direction are spent, crossing frame component described in each group includes operation layer walkway board, and adjacent to described
The transverse truss of operation layer walkway board setting.
5. main body construction according to claim 4 and finishing synchronization job lifting protective platform, it is characterised in that: each institute
Stating wall-attaching equipment is at least two groups along concrete main body structural construction wall short transverse setting, each group wall-attaching equipment
It include along the spaced two attached wall bodies of the concrete main body structural construction wall length direction, each attached wall body point
It does not include the wall-attached supporting seat being installed on via bolt on the concrete main body structural construction wall.
6. main body construction according to claim 5 and finishing synchronization job lifting protective platform, which is characterized in that each institute
Stating protective device includes:
Anti-tilt device, the anti-tilt device include the institute being respectively arranged in close to the concrete main body structural construction wall two sides
State two installation frame bodies on stringer, and be respectively arranged at it is on the wall-attached supporting seat, make main body construction ontology and finishing make
The anti-dumping leading truck that industry ontology is gone up and down in guide track, each installation frame body include building along the concrete main body structure
Two C-shaped beams that the length direction of walling body is disposed opposite to each other along C-shaped depth of beam direction, are spaced between two C-shaped beams and set
There are multiple cylinders, the anti-dumping leading truck includes two support bases that interval is laid in the wall-attached supporting seat, and is respectively corresponded
The support frame being laid on two support bases, in being respectively equipped on each support frame in the C-channel of the C-shaped beam of corresponding position
The pulley of interior sliding;
Anti-fall device, the anti-fall device include L-shaped anti-fall piece, and are connected to described anti-fall piece between the wall-attached supporting seat
Reset spring, anti-fall piece of the top is articulated on the anti-dumping leading truck via articulated shaft, and the falling proof device is also
Fall arrest baffle including being located at described anti-fall piece of one end, in described anti-fall piece far from close to fall arrest baffle one end
The arc-shaped slot being adapted to the cylinder is offered on the other end;
Supporting device, the supporting device include that one end is articulated between the support base and shores seat, and is connected to the top
The shore on seat is supportted, further includes the head of shoring being connected on the shore, the head of shoring is equipped with and the cylinder card
The card slot connect.
7. main body construction according to claim 4 and finishing synchronization job lifting protective platform, it is characterised in that: each group
The lifting device include the first lower hangers between being installed on two groups of the main body construction ontology vertical frame assembly bottoms and
Upper hanger between being installed at the top of two groups of vertical frame assemblies of the main body construction ontology, and it is installed on the fitment operation sheet
The second lower hanger between the vertical frame assembly bottom of two groups of body;It further include being connected in the electronic of the upper hanger via the first hook hook
Cucurbit is equipped with chain on Yu Suoshu electric block, and Yu Suoshu chain is equipped with second far from the connecting pin of the electric block
It links up with, is hinged with the first directive wheel that the first guide groove is arranged in outer peripheral surface between the lower hanger of Yu Suoshu first, Yu Suoshu first is oriented to
First of one end and the concrete main body structural construction wall connecting, the other end and the second hook hook even is arranged on slot
Rope is gone up and down, is hinged with the second directive wheel that the second guide groove is arranged in outer peripheral surface, Yu Suoshu second between the lower hanger of Yu Suoshu second
It is arranged with one end on guide groove and the concrete main body structural construction wall connecting, the other end and described second link up with what hook connected
Second lifting rope.
8. main body construction according to claim 7 and finishing synchronization job lifting protective platform, it is characterised in that: in institute
It states and mechanics sensor is installed on upper hanger, the first hook hook is connected on the mechanics sensor.
9. main body construction according to claim 4 and finishing synchronization job lifting protective platform, it is characterised in that: in institute
It states and inverted U-shaped steel plate is installed between the operation layer walkway board and the concrete main body structural construction wall of fitment operation ontology.
10. main body construction according to claim 4 and finishing synchronization job lifting protective platform, it is characterised in that: in
Enclosure device is separately installed on each frame body, the enclosure device goes along with sb. to guard him module by multiple groups and is spliced, described in each group
Going along with sb. to guard him module includes the installed cassette installed along the short transverse interval of the stringer, and is installed in the installed cassette
Protection screen sheet.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910618352.6A CN110219451B (en) | 2019-07-10 | 2019-07-10 | Lifting protection platform for main body construction and decoration synchronous operation and operation method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910618352.6A CN110219451B (en) | 2019-07-10 | 2019-07-10 | Lifting protection platform for main body construction and decoration synchronous operation and operation method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110219451A true CN110219451A (en) | 2019-09-10 |
CN110219451B CN110219451B (en) | 2024-02-27 |
Family
ID=67812329
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910618352.6A Active CN110219451B (en) | 2019-07-10 | 2019-07-10 | Lifting protection platform for main body construction and decoration synchronous operation and operation method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110219451B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114541729A (en) * | 2022-03-10 | 2022-05-27 | 中国十九冶集团有限公司 | Operation method for super high-rise building |
CN115788001A (en) * | 2023-02-08 | 2023-03-14 | 山西锦辉工程检测有限公司 | Split lifting type attached scaffold and construction method thereof |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100777937B1 (en) * | 2006-06-19 | 2007-11-22 | 이명래 | Construcion safety working cage with scaffold |
KR100874865B1 (en) * | 2008-06-16 | 2008-12-19 | 이송복 | Apparatus for salvaging slab mold |
CN202090591U (en) * | 2010-07-27 | 2011-12-28 | 江苏和平建设集团有限公司 | Lift type climbing formwork of building operations |
CN206467991U (en) * | 2016-12-30 | 2017-09-05 | 河北亿安工程技术股份有限公司 | The operation platform that a kind of building main body construction protection and exterior wall finishing are integrated |
CN109296192A (en) * | 2018-12-05 | 2019-02-01 | 河北亿安工程技术股份有限公司 | Assembled architecture crane |
CN210369843U (en) * | 2019-07-10 | 2020-04-21 | 河北亿安工程技术股份有限公司 | Lifting protection platform for main body construction and decoration synchronous operation |
-
2019
- 2019-07-10 CN CN201910618352.6A patent/CN110219451B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100777937B1 (en) * | 2006-06-19 | 2007-11-22 | 이명래 | Construcion safety working cage with scaffold |
KR100874865B1 (en) * | 2008-06-16 | 2008-12-19 | 이송복 | Apparatus for salvaging slab mold |
CN202090591U (en) * | 2010-07-27 | 2011-12-28 | 江苏和平建设集团有限公司 | Lift type climbing formwork of building operations |
CN206467991U (en) * | 2016-12-30 | 2017-09-05 | 河北亿安工程技术股份有限公司 | The operation platform that a kind of building main body construction protection and exterior wall finishing are integrated |
CN109296192A (en) * | 2018-12-05 | 2019-02-01 | 河北亿安工程技术股份有限公司 | Assembled architecture crane |
CN210369843U (en) * | 2019-07-10 | 2020-04-21 | 河北亿安工程技术股份有限公司 | Lifting protection platform for main body construction and decoration synchronous operation |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114541729A (en) * | 2022-03-10 | 2022-05-27 | 中国十九冶集团有限公司 | Operation method for super high-rise building |
CN115788001A (en) * | 2023-02-08 | 2023-03-14 | 山西锦辉工程检测有限公司 | Split lifting type attached scaffold and construction method thereof |
Also Published As
Publication number | Publication date |
---|---|
CN110219451B (en) | 2024-02-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106894342B (en) | Pipe installing job platform and construction method | |
CN110219451A (en) | Main body construction and finishing synchronization job lifting protective platform and operational method | |
CN105129602A (en) | Sling capable of integrally lifting long and large-diameter vertical steel bars | |
CN103967263B (en) | Hydraulic automatic jumping discharging platform | |
CN103821084B (en) | Operational method at the bottom of implement at the bottom of beam and beam | |
CN109296192A (en) | Assembled architecture crane | |
CN210369843U (en) | Lifting protection platform for main body construction and decoration synchronous operation | |
CN102518292B (en) | Lifting material platform and use method for same | |
CN204475182U (en) | The mounting tool of a kind of Railway Bridges And Piers pier top hanging basket | |
CN216196742U (en) | A wallboard installation device for position is striden to height | |
CN107487423B (en) | Marine suspension scaffold and construction method thereof | |
CN103743581A (en) | Internal-climbing tower crane test platform apparatus and test method | |
CN209556327U (en) | Assembled architecture crane | |
CN204728225U (en) | A kind of rail rail traffic bridge of embracing evacuates inspection platform | |
CN209940330U (en) | Tower crane externally-hung detachable safety passageway for people to get on | |
CN2741943Y (en) | Special device for mounting lift | |
CN205638500U (en) | Large -scale steel shotcrete of variant formula installation movable trolley | |
CN219260998U (en) | Anchor cable stretching device | |
CN221255244U (en) | Steel-concrete composite beam main longitudinal beam construction platform | |
CN218540450U (en) | Regularization bent cap steel strand wires maintenance platform | |
CN219569525U (en) | Safe operation platform for column-column connection construction | |
CN214168783U (en) | Sliding beam bottom hanging basket | |
CN211313138U (en) | Combined platform ladder for dust-free workshop | |
CN217000787U (en) | Elevartor shaft exempts from to dismantle formula lift platform device | |
CN203834907U (en) | Installation rack for non-scaffold elevator installation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |