CN110215779A - Green construction environmental monitoring system - Google Patents
Green construction environmental monitoring system Download PDFInfo
- Publication number
- CN110215779A CN110215779A CN201910465700.0A CN201910465700A CN110215779A CN 110215779 A CN110215779 A CN 110215779A CN 201910465700 A CN201910465700 A CN 201910465700A CN 110215779 A CN110215779 A CN 110215779A
- Authority
- CN
- China
- Prior art keywords
- detection signal
- control platform
- centralized control
- environmental monitoring
- signal
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B01—PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
- B01D—SEPARATION
- B01D47/00—Separating dispersed particles from gases, air or vapours by liquid as separating agent
- B01D47/06—Spray cleaning
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01D—MEASURING NOT SPECIALLY ADAPTED FOR A SPECIFIC VARIABLE; ARRANGEMENTS FOR MEASURING TWO OR MORE VARIABLES NOT COVERED IN A SINGLE OTHER SUBCLASS; TARIFF METERING APPARATUS; MEASURING OR TESTING NOT OTHERWISE PROVIDED FOR
- G01D21/00—Measuring or testing not otherwise provided for
- G01D21/02—Measuring two or more variables by means not covered by a single other subclass
Landscapes
- Chemical & Material Sciences (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Catching Or Destruction (AREA)
Abstract
The invention discloses a kind of green construction environmental monitoring systems, its key points of the technical solution are that: several fog gun machines and safety cap is arranged in a kind of green construction environmental monitoring system, each region, and green construction environmental monitoring system includes, particulate matter sensors, for exporting concentration detection signal;Sensor noise detects signal for output noise;Zone controller, for by concentration detection signal and noise measuring signal acquisition and being sent to centralized control platform;Centralized control platform is built-in with particle concentration predetermined value and noise predetermined value, for receiving simultaneously analytical concentration detection signal and noise measuring signal, and sends control instruction, to control the opening and closing of fog gun machine;Centralized control platform was built-in with for the first predetermined time, and when more than the first predetermined time, concentration detection signal is also higher than particle concentration predetermined value, then centralized control platform issues standby signal.Green construction environmental monitoring system of the invention to carry out the daily life that environmental monitoring ensures periphery health automatically.
Description
Technical field
The present invention relates to the technical fields of building monitoring, more particularly, to a kind of green construction environmental monitoring system.
Background technique
With the fast development of all types of processes of industrialization, environmental problem is got worse, and the public is to living in a health
Natural environment have tight demand;Thus environmental monitoring becomes more and more important.Brought by current building engineering construction
Environmental pollution can not despise, there are many building engineering construction includes: for example, the engineering construction of urban public infrastructure,
Industrial building engineering construction, city commercial and residential construction engineering construction etc..
Since extensive management, construction worker lack the reasons such as environmental consciousness in building construction process at present, cause
During construction operation at this stage, affect to urban environment;Produced pollution source master in work progress
To include in city commercial and residential construction construction process, in certain a road section work progress of urban traffic road with
And generated dust pollution, noise pollution and pernicious gas pollution etc. in City Buried Pipeline work progress, and harmful gas
Risk caused by body: cause caused by the Combustible Gas Leak in pernicious gas in the damage and maintenance of urban pipeline
Explosion danger on fire, these pollutions can all cause serious influence and harm to environment;Therefore, green construction is to realize that the modern times build
The important link of industry energy-saving and emission-reduction is built, and becomes the inevitable requirement in building course.
As a result, it is often necessary to be monitored to construction site environment etc., to ensure the daily life of nearby residents health.
Summary of the invention
In view of the deficiencies of the prior art, the present invention intends to provide a kind of green construction environmental monitoring system,
With automatic continuous carry out environmental monitoring, the daily life of nearby residents health is ensured.
Foregoing invention purpose of the invention has the technical scheme that
A kind of green construction environmental monitoring system, construction site are divided into multiple regions, and several fog gun machines are arranged in each region
With with the matched safety cap of construction personnel, the green construction environmental monitoring system includes,
Particulate matter sensors are installed on safety cap, for detecting the particle concentration of site operation environment, and export concentration inspection
Survey signal;
Sensor noise is installed on the noise monitor point in each region, and for detecting construction noise, and output noise detects signal;
Zone controller is connected to particulate matter sensors and sensor noise, for believing concentration detection signal and noise measuring
It number acquires and is sent to centralized control platform;
Centralized control platform, connect with zone controller, particle concentration predetermined value and noise predetermined value is built-in with, for receiving
And analytical concentration detects signal and noise measuring signal, and sends control instruction, to control the opening and closing of fog gun machine;
Centralized control platform was built-in with for the first predetermined time, when more than the first predetermined time, concentration detection signal also higher than
Grain object concentration predetermined value, then centralized control platform issues standby signal.
By using above-mentioned technical proposal, in a construction site, with the progress of construction operation, dust pollution and
Noise pollution is undoubtedly most significant, and country is also all to have its limit value, and each construction site is just needed for the two
The two is reduced in limit value hereinafter, guarantee same and to construction personnel's health, avoids long-term work in particle
In object concentration over-standard, the serious environment of noise pollution;Entire construction site is marked off into multiple regions as needed first, each
The fog gun machine and configuration corresponding safety cap that several are used to depositing dust are set in region;Particulate matter sensors and noise are sensed
Device is mounted on safety cap, detects construction environment locating for construction personnel on the spot, more accurate and meet actual demand, by concentration
It detects signal and noise measuring signal and centralized control platform is sent to by zone controller region, then centralized control platform receives
And analytical concentration detects signal, when particle concentration is exceeded, sends control instruction, zone controller controls the starting of fog gun machine,
Depositing dust processing is carried out to the region in time, and after more than the first predetermined time, it is dense that concentration detection signal is also higher than particulate matter
Predetermined value is spent, then centralized control platform issues standby signal and at the first time reaches construction environment to carry out other depositing dust schemes
Good standard;When noise is exceeded, centralized control platform issues early warning, to carry out sound insulation or noise reduction process to the region, with
It avoids having an impact periphery living environment, to be always ensured that the green and healthy of construction environment.
The present invention is further arranged to: the zone controller is also connected with the wind transducer being set in each region,
For detecting current wind direction, and wind direction detection signal is exported, the centralized control platform detects signal according to wind direction and shows
Current wind direction.
By using above-mentioned technical proposal, in the case where there is wind, fog gun machine will should be sprayed with the wind, can be only achieved most
Big effect;Gone out in construction site by wind transducer real-time monitoring/region in wind direction so that when carrying out depositing dust,
Fog gun machine can be sprayed in the case where with the wind, to reach the maximization of dust-laying effect.
The present invention is further arranged to: the zone controller is connected with the GPS module being installed on safety cap, for sending out
The positioning signal of each construction personnel is sent, the centralized control platform includes GIS map module, for receiving positioning signal, and
Show construction personnel's location information.
By using above-mentioned technical proposal, because each region is each equipped with respective safety cap, and pacify in safety cap
GPS module is filled, to carry out the positioning of local environment to construction personnel, so that the particulate matter sensors on the safety cap detect
When the concentration detection signal of local environment is greater than particle concentration predetermined value, which can be accurately positioned by GPS module
The location of member, and depositing dust processing is carried out to the regional location.
The present invention is further arranged to: the centralized control platform is connected with communication module, and the communication module signal connects
It is connected to first movement terminal, when more than the first predetermined time, concentration detection signal is also higher than particle concentration predetermined value, then collects
Middle control platform sends prompt information to first movement terminal by communication module, and prompt information includes construction personnel position letter
Breath, current wind direction information.
By using above-mentioned technical proposal, when particle concentration is exceeded, control instruction is sent, zone controller controls mist
The starting of big gun machine, carries out depositing dust processing to the region in time, but when more than the first predetermined time after, concentration detection signal is also higher than
When grain object concentration predetermined value, then centralized control platform is sent out by communication module to first movement terminal entrained by Regional Champion
Prompt information is sent, prompt information includes construction personnel's location information, current wind direction information, carries out other with notification area responsible person
Construction environment is reached good standard at the first time by depositing dust scheme, more information-based, intelligent without issuing a separate notice again.
The present invention is further arranged to: the communication module is also connected with the second mobile terminal, and in centralized control platform
It was equipped with for the second predetermined time, when more than the second predetermined time, concentration detection signal is also higher than particle concentration predetermined value, then collects
Middle control platform sends timeout treatment information to the second mobile terminal by communication module.
By using above-mentioned technical proposal, when particle concentration is exceeded, control instruction is sent, zone controller controls mist
The starting of big gun machine carries out depositing dust processing to the region in time, but when more than the second predetermined time, (it is pre- that the second predetermined time was greater than first
Fix time) after, when concentration detection signal is also higher than particle concentration predetermined value, then centralized control platform is by communication module to total
Second mobile terminal entrained by responsible person send timeout treatment signal, timely feedback the situation to person in overall, avoid because
The carelessness of some of the staff or the seriousness of situation and cause duration particle concentration exceeded, to guarantee the good of construction environment.
The present invention is further arranged to: the zone controller is connected with the temperature sensor for being installed on each region, is used for
The real time temperature in each region is detected, and issues temperature detection signal, the centralized control platform receives and analyzes temperature detection letter
Number, and control instruction is sent, to control the opening and closing of fog gun machine.
By using above-mentioned technical proposal, summer high-temperature weather annoyings always construction personnel, continues in the high temperature environment
Operation, it is easy to lead to heatstroke, therefore when temperature detection signal detection Current Temperatures are excessively high, by control fog gun machine it is spraying into
Row cooling, fog gun machine can also be cooled down while playing the role of depositing dust by water mist, to guarantee construction personnel's life
Health.
The present invention is further arranged to: the zone controller is connected with display, and the zone controller is according to concentration
It detects signal, noise measuring signal, wind direction detection signal and temperature detection signal control display and shows current region particulate matter
Concentration, noise level, wind direction and temperature information.
By using above-mentioned technical proposal, installation is used to show current region particle concentration, noise in each region
The display of size, wind direction and temperature information enables and recognizes current construction environment in region construction personnel, with
Make counter-measure, than such as whether than with a mask, to ensure itself health.
The present invention is further arranged to: the fog gun machine includes pedestal, U-bracket and is rotationally connected on U-bracket
For the spraying gun barrel of atomizing de-dusting, turntable is rotatably connected on the pedestal, the turntable is connected by setting shaft
There is direct driving motor, the U-bracket is fixed on turntable upper surface.
By using above-mentioned technical proposal, turntable is driven to be rotated by the transmission of direct driving motor, to drive U
Spraying gun barrel on shape bracket carries out 360 degree rotation, can carry out atomizing de-dusting to all directions.
The present invention is further arranged to: rotary encoder is provided in the shaft of the turntable, for detecting shaft
Angular displacement, and angle displacement detects signal, the centralized control platform is controlled according to the positioning signal of GPS module to region
Device sends control instruction, drives turntable rotation predetermined angular displacement to control direct driving motor.
By using above-mentioned technical proposal, the positioning signal and wind direction that are issued according to GPS module when centralized control platform
Sensor issue wind direction detect signal, so that it is determined that in the region fog gun machine spray direction, thus direct driving motor driving rotation
Turntable turns to the spray direction, and determines angular displacement by rotary encoder, to guarantee the correctness of spray direction.
In conclusion advantageous effects of the invention are as follows:
1. when particle concentration is exceeded, send control instruction, zone controller controls the starting of fog gun machine, in time to the region into
The processing of row depositing dust, and after more than the first predetermined time, concentration detection signal is also higher than particle concentration predetermined value, to carry out
Other depositing dust schemes, reach good standard for construction environment at the first time;
2. Current Temperatures are excessively high, cooled down by spraying by controlling fog gun machine, fog gun machine is gone back while playing the role of depositing dust
It can be cooled down by water mist, to guarantee construction personnel's life and health;
3. fog gun machine drives turntable to be rotated by the transmission of direct driving motor, to drive the spraying big gun on U-bracket
Cylinder carries out 360 degree rotation, can carry out atomizing de-dusting to all directions;
4. the spray direction of fog gun machine in the region is determined by GPS module, so that direct driving motor driving turntable turns to this
Spray direction, and angular displacement is determined by rotary encoder, to guarantee the correctness of spray direction.
Detailed description of the invention
Fig. 1 is system block diagram of the invention;
Fig. 2 is the overall structure diagram of fog gun machine.
In figure, 1, fog gun machine;101, pedestal;102, U-bracket;103, spraying gun barrel;104, turntable;105, straight to drive electricity
Machine;106, rotary encoder;2, particulate matter sensors;3, sensor noise;4, zone controller;5, centralized control platform;6,
GPS module;7, GIS map module;8, wind transducer;9, communication module;10, first movement terminal;11, second is mobile whole
End;12, display;13, temperature sensor.
Specific embodiment
Below in conjunction with attached drawing, invention is further described in detail.
It referring to Fig.1, is a kind of green construction environmental monitoring system disclosed by the invention, construction site is divided into multiple areas
Domain, each region be arranged several fog gun machines 1 and with the matched safety cap of construction personnel, green construction environmental monitoring system packet
It includes, particulate matter sensors 2 are installed on safety cap, for detecting the particle concentration of site operation environment, and export concentration inspection
Survey signal;Sensor noise 3 is installed on the noise monitor point in each region, for detecting construction noise, and output noise detection letter
Number;Zone controller 4 is connected to particulate matter sensors 2 and sensor noise 3, is used for concentration detection signal and noise measuring
Signal acquisition is simultaneously sent to centralized control platform 5;Centralized control platform 5 connect with zone controller 4, it is dense to be built-in with particulate matter
Predetermined value and noise predetermined value are spent, for receiving simultaneously analytical concentration detection signal and noise measuring signal, and sends control instruction,
To control the opening and closing of fog gun machine;Centralized control platform 5 was built-in with for the first predetermined time, when more than the first predetermined time, concentration inspection
It surveys signal and is also higher than particle concentration predetermined value, then centralized control platform 5 issues standby signal.
In a construction site, with the progress of construction operation, dust pollution and noise pollution are undoubtedly most significantly
, and country be also all for the two have its limit value, and each construction site just need by the two reduce limit value with
Under, same is also the guarantee to construction personnel's health, avoids long-term work particle concentration is exceeded, noise pollution is tight
In the environment of weight;First entire construction site is marked off into multiple regions as needed, several are arranged in each region and is used to
The fog gun machine 1 and the corresponding safety cap of configuration of depositing dust;Particulate matter sensors 2 and sensor noise 3 are mounted on safety cap,
Construction environment locating for construction personnel is detected on the spot, it is more accurate and meet actual demand, concentration detection signal and noise are examined
It surveys signal and centralized control platform 5 is sent to by 4 region of zone controller, then centralized control platform 5 receives and analytical concentration is examined
Signal is surveyed, when particle concentration is exceeded, sends control instruction, zone controller 4 controls fog gun machine 1 and starts, in time to the area
Domain carries out depositing dust processing, and after more than the first predetermined time, concentration detection signal is also higher than particle concentration predetermined value, then
Centralized control platform 5 issues standby signal and construction environment is reached good mark at the first time to carry out other depositing dust schemes
It is quasi-;When noise is exceeded, centralized control platform 5 issues early warning, to carry out sound insulation or noise reduction process to the region, to avoid to week
Side living environment has an impact, to be always ensured that the green and healthy of construction environment.
For the maximization for reaching dust-laying effect, referring to Fig.1, zone controller 4 is connected with the wind direction being set in each region
Sensor 8 for detecting current wind direction, and exports wind direction detection signal, and centralized control platform 5 detects signal according to wind direction and shows
Current wind direction is shown.In the case where there is wind, fog gun machine 1 will should be sprayed with the wind, can be only achieved maximum efficiency;Pass through wind direction
8 real-time monitoring of sensor goes out in construction site/region in wind direction so that fog gun machine 1 can be existed when carrying out depositing dust
It is sprayed in the case where with the wind, to reach the maximization of dust-laying effect.
In addition, referring to Fig.1, zone controller 4 is also connected with the GPS module 6 being installed on safety cap, each for sending
The positioning signal of construction personnel, centralized control platform 5 include GIS map module 7, for receiving positioning signal, and show construction
Personnel location information.Because each region is each equipped with respective safety cap, and GPS module 6 is installed, in safety cap with to applying
Worker person carries out the positioning of local environment, so that when the particulate matter sensors 2 on the safety cap detect the concentration of local environment
When detecting signal greater than particle concentration predetermined value, the location of the construction personnel can be accurately positioned by GPS module 6,
And depositing dust processing is carried out to the regional location.
To realize intelligentized control method, referring to Fig.1, centralized control platform 5 is connected with communication module 9, and 9 signal of communication module connects
It is connected to first movement terminal 10, when more than the first predetermined time, concentration detection signal is also higher than particle concentration predetermined value, then
Centralized control platform 5 sends prompt information to first movement terminal 10 by communication module 9, and prompt information includes construction personnel position
Confidence breath, current wind direction information.When particle concentration is exceeded, control instruction is sent, zone controller 4 controls fog gun machine 1 and opens
It is dynamic, depositing dust processing is carried out to the region in time, but after more than the first predetermined time, it is dense that concentration detection signal is also higher than particulate matter
When spending predetermined value, then centralized control platform 5 is sent by communication module 9 to first movement terminal 10 entrained by Regional Champion
Prompt information, prompt information include construction personnel's location information, current wind direction information, carry out other drops with notification area responsible person
Construction environment is reached good standard at the first time by dirt scheme, more information-based, intelligent without issuing a separate notice again.
Meanwhile referring to Fig.1, communication module 9 is also connected with the second mobile terminal 11, and centralized control platform 5 is built-in with
Two predetermined times, when more than the second predetermined time, concentration detection signal is also higher than particle concentration predetermined value, then centralized control
Platform 5 sends timeout treatment information to the second mobile terminal 11 by communication module 9.When particle concentration is exceeded, control is sent
System instruction, zone controller 4 control fog gun machine 1 and start, and carry out depositing dust processing to the region in time, but when more than the second pre- timing
Between after (the second predetermined time be greater than the first predetermined time), when concentration detection signal is also higher than particle concentration predetermined value, then collect
Middle control platform 5 sends timeout treatment signal to the second mobile terminal 11 entrained by person in overall by communication module 9, to total
Responsible person timely feedbacks the situation, avoids causing duration particulate matter dense due to the seriousness because of the carelessness of some of the staff or situation
Spend it is exceeded, to guarantee the good of construction environment.
To avoid that Heat stroke phenomenon occurs, referring to Fig.1, zone controller 4 is connected with the temperature biography for being installed on each region
Sensor 13 for detecting the real time temperature in each region, and issues temperature detection signal, and centralized control platform 5 receives and analyzes temperature
Degree detection signal, and control instruction is sent, to control the opening and closing of fog gun machine.Summer high-temperature weather annoyings always construction personnel, holds
Continuous operation in the high temperature environment, it is easy to lead to heatstroke, therefore when temperature detection signal detection Current Temperatures are excessively high, pass through control
Fog gun machine 1 processed cools down by spraying, and fog gun machine 1 can also be cooled down while playing the role of depositing dust by water mist, thus
Guarantee construction personnel's life and health.
To check site environment situation convenient for construction personnel and administrative staff, referring to Fig.1, zone controller 4 is connected with aobvious
Show device 12, zone controller 4 is according to concentration detection signal, noise measuring signal, wind direction detection signal and temperature detection signal control
Display 12 processed shows current region particle concentration, noise level, wind direction and temperature information.It installs and uses in each region
The display 12 of current region particle concentration, noise level, wind direction and temperature information is shown, so that constructing in the region
Personnel can recognize current construction environment, to make counter-measure, than such as whether than with a mask, to ensure the strong of itself
Health.
In the present embodiment, referring to Fig. 2, fog gun machine 1 is including pedestal 101, U-bracket 102 and is rotationally connected with U-shaped branch
It is used for the spraying gun barrel 103 of atomizing de-dusting on frame 102, turntable 104 is rotatably connected on pedestal 101, turntable 104 is by setting
It sets shaft and is connected with direct driving motor 105, U-bracket 102 is fixed on 104 upper surface of turntable.Pass through the transmission of direct driving motor 105
Turntable 104 is driven to be rotated, so that the spraying gun barrel 103 on U-bracket 102 be driven to carry out 360 degree rotation, with can
Atomizing de-dusting is carried out to all directions.
Meanwhile referring to Fig.1, Fig. 2, rotary encoder 106 is provided in the shaft of turntable 104, for detecting shaft
Angular displacement, and angle displacement detects signal, and centralized control platform 5 is controlled according to the positioning signal of GPS module 6 to region
Device 4 sends control instruction, drives turntable 104 to rotate predetermined angular displacement to control direct driving motor 105.When centralized control platform 5
The wind direction that the positioning signal and wind transducer 8 issued according to GPS module 6 issues detects signal, so that it is determined that in the region
The spray direction of fog gun machine 1 so that direct driving motor 105 drives turntable 104 to turn to the spray direction, and passes through rotary coding
Device 106 determines angular displacement, to guarantee the correctness of spray direction.
The embodiment of present embodiment is presently preferred embodiments of the present invention, not limits protection model of the invention according to this
It encloses, therefore: the equivalence changes that all structures under this invention, shape, principle are done should all be covered by within protection scope of the present invention.
Claims (9)
1. a kind of green construction environmental monitoring system, it is characterised in that: construction site is divided into multiple regions, each region setting
Several fog gun machines (1) and with the matched safety cap of construction personnel, the green construction environmental monitoring system includes,
Particulate matter sensors (2), are installed on safety cap, for detecting the particle concentration of site operation environment, and export dense
Degree detection signal;
Sensor noise (3) is installed on the noise monitor point in each region, for detecting construction noise, and output noise detection letter
Number;
Zone controller (4) is connected to particulate matter sensors (2) and sensor noise (3), for by concentration detection signal with make an uproar
Sound detection signal acquisition is simultaneously sent to centralized control platform (5);
Centralized control platform (5) is connect with zone controller (4), is built-in with particle concentration predetermined value and noise predetermined value, is used
Signal and noise measuring signal are detected in receiving simultaneously analytical concentration, and sends control instruction, to control the opening and closing of fog gun machine;
Centralized control platform (5) was built-in with for the first predetermined time, and when more than the first predetermined time, concentration detection signal is also higher than
Particle concentration predetermined value, then centralized control platform (5) issues standby signal.
2. green construction environmental monitoring system according to claim 1, it is characterised in that: the zone controller (4) is also
It is connected with the wind transducer (8) being set in each region, for detecting current wind direction, and exports wind direction detection signal, institute
It states centralized control platform (5) and current wind direction is shown according to wind direction detection signal.
3. green construction environmental monitoring system according to claim 2, it is characterised in that: the zone controller (4) is even
It is connected to the GPS module (6) being installed on safety cap, for sending the positioning signal of each construction personnel, the centralized control is flat
Platform (5) includes GIS map module (7), for receiving positioning signal, and shows construction personnel's location information.
4. green construction environmental monitoring system according to claim 3, it is characterised in that: the centralized control platform (5)
It is connected with communication module (9), communication module (9) signal is connected with first movement terminal (10), when more than the first pre- timing
Between when, concentration detection signal is also higher than particle concentration predetermined value, then centralized control platform (5) is by communication module (9) to the
One mobile terminal (10) sends prompt information, and prompt information includes construction personnel's location information, current wind direction information.
5. green construction environmental monitoring system according to claim 4, it is characterised in that: the communication module (9) also connects
It is connected to the second mobile terminal (11), and centralized control platform (5) was built-in with for the second predetermined time, when more than the second predetermined time
When, concentration detection signal is also higher than particle concentration predetermined value, then centralized control platform (5) passes through communication module (9) to second
Mobile terminal (11) sends timeout treatment information.
6. green construction environmental monitoring system according to claim 2, it is characterised in that: the zone controller (4) is even
It is connected to the temperature sensor (13) for being installed on each region, for detecting the real time temperature in each region, and issues temperature detection signal,
The centralized control platform (5) receives and analyzes temperature detection signal, and sends control instruction, to control the opening and closing of fog gun machine.
7. green construction environmental monitoring system according to claim 6, it is characterised in that: the zone controller (4) is even
Be connected to display (12), the zone controller (4) according to concentration detection signal, noise measuring signal, wind direction detection signal and
Temperature detection signal controls display (12) and shows current region particle concentration, noise level, wind direction and temperature information.
8. green construction environmental monitoring system according to claim 3, it is characterised in that: the fog gun machine (1) includes bottom
Seat (101), U-bracket (102) and be rotationally connected on U-bracket (102) be used for atomizing de-dusting spraying gun barrel (103),
It is rotatably connected to turntable (104) on the pedestal (101), the turntable (104) is connected with straight drive electricity by the way that shaft is arranged
Machine (105), the U-bracket (102) are fixed on turntable (104) upper surface.
9. green construction environmental monitoring system according to claim 8, it is characterised in that: the turntable (104) turns
Rotary encoder (106) are provided on axis, for detecting the angular displacement of shaft, and angle displacement detects signal, the concentration
Control platform (5) sends control instruction to zone controller (4) according to the positioning signal of GPS module (6), to control straight drive electricity
Machine (105) drives turntable (104) to rotate predetermined angular displacement.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910465700.0A CN110215779A (en) | 2019-05-30 | 2019-05-30 | Green construction environmental monitoring system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910465700.0A CN110215779A (en) | 2019-05-30 | 2019-05-30 | Green construction environmental monitoring system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110215779A true CN110215779A (en) | 2019-09-10 |
Family
ID=67818724
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910465700.0A Pending CN110215779A (en) | 2019-05-30 | 2019-05-30 | Green construction environmental monitoring system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110215779A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111521738A (en) * | 2020-05-06 | 2020-08-11 | 北方工业大学 | Construction environment monitoring and early warning method based on BIM and sensor technology |
CN112070941A (en) * | 2020-07-17 | 2020-12-11 | 上海有间建筑科技有限公司 | Wisdom building site is environment supervisory systems for construction |
CN113932847A (en) * | 2021-09-22 | 2022-01-14 | 单连杰 | Building engineering construction environment monitoring system |
CN115437433A (en) * | 2022-09-26 | 2022-12-06 | 中国五冶集团有限公司 | Remote control system for field fog gun machine controlled by environmental factors |
CN116777160A (en) * | 2023-06-21 | 2023-09-19 | 苏州傲之途智慧科技有限公司 | Environment intelligent supervision system and method for urban construction site |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103246256A (en) * | 2013-04-10 | 2013-08-14 | 合肥工业大学 | Field production safety monitoring system for building construction and application method thereof |
CN205549910U (en) * | 2016-02-23 | 2016-09-07 | 福建省雾精灵环境科技有限公司 | Barrier dust shaker is kept away to intelligence |
CN106383463A (en) * | 2016-09-06 | 2017-02-08 | 华中科技大学 | Construction environmental monitoring system and method based on safety helmet |
CN107544326A (en) * | 2017-08-30 | 2018-01-05 | 深圳市易联智道科技有限公司 | Ensure the multifunction monitoring system of construction site security |
CN206881968U (en) * | 2017-05-25 | 2018-01-16 | 湖北恒信国通信息产业有限公司 | A kind of building site environmental monitoring and spray integrated apparatus |
CN109137809A (en) * | 2018-09-03 | 2019-01-04 | 武汉梦之蓝科技有限公司 | A kind of electronic fog gun vehicle |
-
2019
- 2019-05-30 CN CN201910465700.0A patent/CN110215779A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103246256A (en) * | 2013-04-10 | 2013-08-14 | 合肥工业大学 | Field production safety monitoring system for building construction and application method thereof |
CN205549910U (en) * | 2016-02-23 | 2016-09-07 | 福建省雾精灵环境科技有限公司 | Barrier dust shaker is kept away to intelligence |
CN106383463A (en) * | 2016-09-06 | 2017-02-08 | 华中科技大学 | Construction environmental monitoring system and method based on safety helmet |
CN206881968U (en) * | 2017-05-25 | 2018-01-16 | 湖北恒信国通信息产业有限公司 | A kind of building site environmental monitoring and spray integrated apparatus |
CN107544326A (en) * | 2017-08-30 | 2018-01-05 | 深圳市易联智道科技有限公司 | Ensure the multifunction monitoring system of construction site security |
CN109137809A (en) * | 2018-09-03 | 2019-01-04 | 武汉梦之蓝科技有限公司 | A kind of electronic fog gun vehicle |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111521738A (en) * | 2020-05-06 | 2020-08-11 | 北方工业大学 | Construction environment monitoring and early warning method based on BIM and sensor technology |
CN112070941A (en) * | 2020-07-17 | 2020-12-11 | 上海有间建筑科技有限公司 | Wisdom building site is environment supervisory systems for construction |
CN113932847A (en) * | 2021-09-22 | 2022-01-14 | 单连杰 | Building engineering construction environment monitoring system |
CN115437433A (en) * | 2022-09-26 | 2022-12-06 | 中国五冶集团有限公司 | Remote control system for field fog gun machine controlled by environmental factors |
CN116777160A (en) * | 2023-06-21 | 2023-09-19 | 苏州傲之途智慧科技有限公司 | Environment intelligent supervision system and method for urban construction site |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110215779A (en) | Green construction environmental monitoring system | |
CN208606809U (en) | A kind of green construction environment protection and monitoring system | |
CN210233046U (en) | Rail mounted utility tunnel patrols and examines robot and system | |
CN208044404U (en) | A kind of natural gas crusing robot | |
CN109754562A (en) | A kind of municipal administration synthesis pipe gallery alarm system | |
CN106922162B (en) | Method, wind field, controller and the method for controlling cabin yaw system of verificating sensor | |
CN202393703U (en) | Device for gas leakage monitoring by means of three-dimensional cradle head scanning and laser telemetering | |
CN108506172B (en) | Online detection system for health state of wind power generation blade | |
CN107671831B (en) | A kind of power station subregion intelligent inspection system and method | |
CN103010885B (en) | Long-range positioning and monitoring system for engineering elevator | |
CN206795819U (en) | Rail mounted electric inspection process robot | |
CN208444335U (en) | A kind of cruising inspection system | |
CN105351754A (en) | Urban underground comprehensive pipe gallery intelligent monitoring system | |
CN107765145A (en) | A kind of shelf depreciation automatic detection device, system and method | |
CN112327729A (en) | Underground cable monitoring system | |
CN111721969A (en) | Tower drum health state monitoring method based on fixed detection and movable detection | |
KR102196719B1 (en) | System for measuring and forecasting of fine dust | |
CN107239072A (en) | A kind of outdoor automatic tour inspection system | |
CN111521738A (en) | Construction environment monitoring and early warning method based on BIM and sensor technology | |
CN109781174A (en) | A kind of municipal administration synthesis pipe gallery detection system | |
CN205582222U (en) | Long -range failure alarm system supplies water | |
CN109231012A (en) | Power station portal formula lifting group of planes collision protection intelligence control system | |
CN113672009A (en) | Intelligent dehumidification robot system and method for power distribution station room | |
CN206363539U (en) | Traffic signal light fault early warning system | |
CN206562235U (en) | A kind of lift car speed of service and station acquisition device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190910 |