CN110212256A - A kind of reparation returning to battery and method for group matching - Google Patents

A kind of reparation returning to battery and method for group matching Download PDF

Info

Publication number
CN110212256A
CN110212256A CN201910328203.6A CN201910328203A CN110212256A CN 110212256 A CN110212256 A CN 110212256A CN 201910328203 A CN201910328203 A CN 201910328203A CN 110212256 A CN110212256 A CN 110212256A
Authority
CN
China
Prior art keywords
battery
voltage
stepping
reparation
time
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910328203.6A
Other languages
Chinese (zh)
Other versions
CN110212256B (en
Inventor
刘玉
李亚
邓成智
李桂发
张峰博
王杜友
郭志刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianneng Battery Group Co Ltd
Original Assignee
Tianneng Battery Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianneng Battery Group Co Ltd filed Critical Tianneng Battery Group Co Ltd
Priority to CN201910328203.6A priority Critical patent/CN110212256B/en
Publication of CN110212256A publication Critical patent/CN110212256A/en
Application granted granted Critical
Publication of CN110212256B publication Critical patent/CN110212256B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01MPROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
    • H01M10/00Secondary cells; Manufacture thereof
    • H01M10/06Lead-acid accumulators
    • H01M10/12Construction or manufacture
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01MPROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
    • H01M10/00Secondary cells; Manufacture thereof
    • H01M10/42Methods or arrangements for servicing or maintenance of secondary cells or secondary half-cells
    • H01M10/4207Methods or arrangements for servicing or maintenance of secondary cells or secondary half-cells for several batteries or cells simultaneously or sequentially
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01MPROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
    • H01M10/00Secondary cells; Manufacture thereof
    • H01M10/42Methods or arrangements for servicing or maintenance of secondary cells or secondary half-cells
    • H01M10/44Methods for charging or discharging
    • H01M10/441Methods for charging or discharging for several batteries or cells simultaneously or sequentially
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02E60/10Energy storage using batteries
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P70/00Climate change mitigation technologies in the production process for final industrial or consumer products
    • Y02P70/50Manufacturing or production processes characterised by the final manufactured product

Landscapes

  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • General Chemical & Material Sciences (AREA)
  • Secondary Cells (AREA)

Abstract

The invention discloses a kind of reparation for returning to battery and method for group matching.The present invention returns to reparation and the method for group matching of battery, pass through open-circuit voltage stepping first, series connection is repaired, and the time then maintained using voltage low in repair process as the foundation for repairing stepping, finally combines battery charging voltage and capacity check situation after repairing to carry out rejecting screening.Entire restorative procedure, shorten current existing screening and recovery technique, voltage low, which is held time, is related to the repairing effect of cell negative terminal consistency, using the point as stepping foundation, the battery of same condition can be filed, it avoids that mistake is caused to reject and file during subsequent progress series-connection charge-discharge and capacity check process because of undercharge, and then promotes the effect repaired, reduce the secondary ratio returned to.

Description

A kind of reparation returning to battery and method for group matching
Technical field
The present invention relates to battery technology fields, more particularly to a kind of reparation for returning to battery and method for group matching.
Background technique
Lead-acid accumulator for electric bicycle, generally being connected by 4 or 5 12V batteries forms battery pack and uses in groups, Such as common model 4812 in the market, i.e., it is composed in series by 4 6-DZF-12 models, every voltage rating is 12V, and capacity is 12Ah;Common model 4820 is composed in series by 4 6-DZF-20 models, every voltage rating is 12V, capacity 20Ah.
Every group of battery be all in strict accordance with combo technique carry out combo, after combo, between battery otherness compared with It is small, but in use, unavoidably will appear influences whole group discharge time because a certain battery is backward, causes to travel Mileage shortens and retracts enterprise, also very high with remaining battery capacity in group.
The operating method of existing market is all to return to go back to enterprise in groups, carries out screening and repair process by enterprise, that is, It says, the capacity of whole group battery is affected due to a battery, finally individually battery is returned to each and be screened and repaired Multiple processing is used as battery after sale.Workload is very huge, and enterprise is needed to put into a large amount of manpower, equipment and workshop, invisible In increase the production cost of battery after sale.
Furthermore the battery after screening and reparation is equally also required to by combo, and currently used combo technique is all Combo is carried out based on capacity and open-circuit voltage, the combo technique with new battery is essentially identical, and new battery is not because by market It uses, the battery of combo is all to belong to same batch production, so can satisfy requirement using capacity and open-circuit voltage index.This Class battery after sale because return to from the market, battery from different production batch batteries mixing, after repairing, capacity It can satisfy the requirement of battery after sale, but still there is very big difference with new battery, therefore only according to capacity and open circuit Voltage, which carries out combo, to be met the requirements.
The CN102324584A present invention provides a kind of method of battery group capacity reparation, first discharges with 6~10 hours Rate carries out proof discharge to battery group, then battery group connected with the box-like Switching Power Supply of group of base stations, with filling mode To battery charging 24 hours and floating charge mode to battery charging 20 hours;Then again with 10 hours discharge rates to storage Battery pack carries out proof discharge, after being discharged, if discharge time reaches 10 hours or discharge capacity reaches nominal capacity, says Bright battery group capacity reparation success
CN108270039A belongs to battery the invention discloses a kind of method that lead-acid battery of electric vehicle is repaired in small electric discharge Recovery technique field.It the described method comprises the following steps: (1) connecting and composing single lead-acid accumulator only to be repaired with discharge module One circuit, is discharged to 0V;(2) after discharging, the lead-acid accumulator of several open-circuit voltage < 10V is selected to access charge and discharge Equipment constitutes a charging and discharging circuit, carries out battery reparation.
Summary of the invention
The present invention is based on battery actual conditions after sale at present, carry out combo in conjunction with the production technology of mass reparation, reduce The production cost of battery after sale improves battery with two side terminals after sale.
A kind of reparation returning to battery and method for group matching, comprising the following steps:
(1) the recoverable battery after appearance is screened, detects preprosthetic open-circuit voltage, according to battery pack open circuit Voltage carries out first time stepping;
(2) if being repaired constant-current discharge is carried out after the dry battery for belonging to same shelves in the battery after first time stepping series connection It is multiple, with 0.05C~0.2C amperes of progress constant-current discharges of electric current, until the voltage of batteries all in circuit drops to 0V, after It is continuous to maintain 2~5h of electric discharge;
(3) voltage reaches 0V as starting point when being repaired using step (2) constant-current discharge, calculates every battery voltage in 0V or less Hold time, with this hold time carry out second of stepping;
(4) if being limited after the dry battery series connection of same shelves being belonged in the battery after second of stepping by single constant pressure Current charge;
(5) constant-current discharge is carried out after step (4) modified constant-voltage charge, final voltage is 10.0~10.5V/;
(6) third time stepping is carried out according to step (5) constant-current discharge final voltage;
(7) supplement electricity is carried out to battery, the open-circuit voltage after measurement is repaired after standing carries out the 4th according to open-circuit voltage Secondary stepping, if it is one group that the dry battery for being divided into same shelves, which is matched,.
Preferably, the battery quantity for being connected into a circuit in each step when charge and discharge is 10~18.It is general existing In technology, 18 batteries are up in one series loop of charging/discharging apparatus.
Preferably, before step (1) detection open-circuit voltage, micro-short circuit detection is first carried out, the battery for having micro-short circuit is rejected, In, the micro-short circuit detection method are as follows: by the conductive discharge of the external 200m Ω~300m Ω of battery, controlling discharge current is Judgement of the voltage decline no more than 2V is no micro-short circuit in 40A~50A, 1s~5s.By high current instantaneous discharge, can incite somebody to action Inside has the battery rejected in advance of micro-short circuit.
Preferably, it is divided into 5~10 grades by battery open-circuit voltage size when step (1) first time stepping.
It is furthermore preferred that it is divided into 8 grades by battery open-circuit voltage size when step (1) first time stepping, it is specific as follows:
First grade of open-circuit voltage≤10.0V
Second gear 10.0V < open-circuit voltage≤11.0V
Third gear 11.0V < open-circuit voltage≤12.0V
Fourth speed 12.0V < open-circuit voltage≤12.5V
Fifth speed 12.5V < open-circuit voltage≤13.0V
Sixth speed 13.0V < open-circuit voltage≤13.2V
Seventh speed 13.2V < open-circuit voltage≤13.4V
Eighth speed 13.4V < open-circuit voltage.
In step (2), in repair process, every battery voltage is acquired, in order to guarantee all storages in circuit Cell voltage can drop to 0V, can be in repair process, and 1~2 full electric state normal battery of connecting is put to normal battery When voltage drops to 0V in electric process, the voltage of these batteries to be repaired returned to generally has descended to 0V or less.
It preferably, is one grade according to holding time every 2h points when (3) second of stepping of step.It is furthermore preferred that can basis It holds time and is divided into 4 grades, specific as follows:
First grade of 2.0h
Second gear 2.0h < holds time≤4.0h
Third gear 4.0h < holds time≤6.0h
Fourth speed 6.0h < holds time.
When step (4) modified constant-voltage charge, only by 14.8V/, 0.15C~0.25C amperes of current limliting are charged, i.e. circuit In if having connected 10 batteries, be arranged voltage be 148V, connected 18, setting voltage be 266.4V.
Preferably, the battery after step (4) modified constant-voltage charge by voltage greater than 16V is rejected.After battery is connected It charges together, some batteries are not fully filled electricity in circuit at this time, and performance is exactly that voltage is easy to rise, and voltage increases too many electric power storage Pond will weed out, because voltage is high, charging process idle work increases, and charge efficiency is with regard to low.
Preferably, step (5) constant-current discharge electric current is 0.5C amperes, and final voltage is 10.0V/;Step (6) third time Before stepping, the voltage of every battery when checking discharge time 100min, the battery less than 11.5V is determined as repairing failure, It rejects.Final voltage is 10.0V/, is referred to if having connected 10 batteries in circuit, and setting voltage is 100V, series connection 18, setting voltage is 180V, and average every 10.0V/ is only.
Preferably, when step (6) third time stepping, third gear is divided into according to final voltage, specific as follows:
First grade of final voltage < 10.0V
Second gear 10.0V≤final voltage < 10.5V
Third gear 10.5V≤final voltage.
Preferably, when step (7) carries out the 4th stepping according to open-circuit voltage, it is divided into 4 grades, specific as follows:
First grade of open-circuit voltage < 13.20V
Second gear 13.20V≤open-circuit voltage < 13.30V
Third gear 13.30V≤open-circuit voltage < 13.40V
Fourth speed open-circuit voltage >=13.40V.
The present invention returns to reparation and the method for group matching of battery, and first by open-circuit voltage stepping, series connection is repaired, so The time maintained afterwards using voltage low in repair process as the foundation for repairing stepping, finally combines battery after repairing to charge Voltage and capacity check situation carry out rejecting screening.Entire restorative procedure shortens current existing screening and recovery technique, voltage Low level, which is held time, is related to the repairing effect of cell negative terminal consistency, can be by same shape using the point as stepping foundation The battery of state is filed, and avoids leading to mistake because of undercharge during subsequent progress series-connection charge-discharge and capacity check process It accidentally rejects and files, and then promote the effect repaired, reduce the secondary ratio returned to.
Specific embodiment
Embodiment 1
(1) first time stepping: open-circuit voltage measurement
6-DZF-20 battery, by appearance screening, (appearance screening is main to reject damaged appearance, oxygen blast cyanidation or terminal leakage The battery of corrosion) and checking of great current (i.e. micro-short circuit detects, micro-short circuit detection method are as follows: by the external conductive discharge of battery, The resistance value of outer connecting resistance is 200m Ω~300m Ω, and control discharge current is 40A~50A, and voltage decline does not surpass in 1s~5s The judgement for crossing 2V is no micro-short circuit.) after, preprosthetic open-circuit voltage (OCV) is carried out without abnormal appearance and micro-short circuit battery Measurement, totally 100 batteries, voltage and stepping are as shown in table 1.
Table 1
Gear OCV voltage range Minimum value (V) Maximum value (V) Gear number of elements
1 grade OCV≤10.0V / / 0
2 grades 10.0V < OCV≤11.0V 10.216 10.833 4
3 grades 11.0V < OCV≤12.0V 11.089 11.961 9
4 grades 12.0V < OCV≤12.5V 12.115 12.473 14
5 grades 12.5V < OCV≤13.0V 12.558 12.924 38
6 grades 13.0V < OCV≤13.2V 13.047 13.184 28
7 grades 13.2V < OCV≤13.4V 13.209 13.377 7
8 grades 13.4V < OCV / / 0
(2) constant-current discharge reparation
For the batch according to first time stepping, open-circuit voltage distribution situation is as shown in table 1, wherein the 5th grade 38, with the gear It is illustrated as case is repaired, randomly selects 20 and repaired, 10, each circuit, totally 2 circuits.Renovation technique is 2A (0.1C amperes) constant-current discharge is completed to repair to guarantee that every cell voltage can reach 0V, therefore every in repair process A circuit in series one full electric state normal battery (6-DZF-20,10A discharge time are 125min) is discharged, to each electricity Cell voltage is acquired, and is reached the 0V time as starting point using voltage and is recorded the time that this battery is maintained in 0V and 0V or less, It after reaching 0V using last cell voltage and maintaining 2h as terminal is repaired, stops electric discharge after reaching terminal, reparation terminates, The results are shown in Table 2.
Table 2
(3) second of stepping: 0V holds time
According to battery during 2A constant-current discharge, second of stepping, stepping are carried out in the time that 0V and 0V or less is maintained The results are shown in Table 3.
Table 3
Gear OV holds time t Minimum value (h) Maximum value (h) Gear number of elements
1 grade 2.0h / / 4
2 grades 2.0h < t≤4.0h 2.1 3.8 16
3 grades 4.0h < t≤6.0h / / 0
4 grades 6.0h < t / / 0
(4) capacity check and third time stepping
According to second of stepping, 16 batteries of the 2nd gear are chosen, series connection carries out capacity check in the same circuit, Charge technology be constant pressure 236.8V (14.8 × 16V), current limliting 3.5A, in limited time between 8h;Discharge processes are 10A constant current, blanking voltage For 160V, every cell voltage in charge and discharge process is recorded.In charging process, during constant-voltage phase, voltage is more than the electricity of 16V Pond is rejected, and in 10A discharge process, checks that cell voltage when discharge time is 100min, voltage are carried out lower than 11.5V battery It rejects, it is that 160V (10.0 × 16V) checks each cell voltage situation after reaching final voltage that voltage, which is arranged, in discharge off, Third time stepping is carried out according to final discharging voltage, is divided into 3 gears:
First grade of final voltage < 10.0V
Second gear 10.0V≤final voltage < 10.5V
Third gear 10.5V≤final voltage.
Respective identification is recorded, mark of conformity is that " √ " is rejected labeled as "×", and the results are shown in Table 4.
Table 4
(5) combo
According to battery during 10A constant-current discharge, final discharging voltage carries out third time stepping, as shown in table 4, wherein Gear 1 shares 7, and gear 2 has 6, and gear 3 has 3, and gear 3 needs and other batch batteries are with gear progress combo, to shelves Position 1 and 2 battery of gear connects respectively carries out supplement electricity, and charge technology is constant pressure 14.8V/, current limliting 3.5A, in limited time between 8h;It fills Open-circuit voltage is measured after standing 4h after electricity, combo is carried out according to open-circuit voltage, whole group open-circuit voltage is carried out according to 4 gears Combo:
First grade of open-circuit voltage < 13.20V
Second gear 13.20V≤open-circuit voltage < 13.30V
Third gear 13.30V≤open-circuit voltage < 13.40V
Fourth speed open-circuit voltage >=13.40V.
4th stepping, the results are shown in Table 5 for one combo of gear.
Table 5
Battery number 1-4 1-7 1-9 2-3 2-4 2-5 2-10
Stand voltage 13.274 13.241 13.285 13.344 13.312 13.290 13.287
Combo shelves number 2 2 2 3 3 2 2
According to open-circuit voltage after standing, wherein battery number 1-4,1-7,1-9,2-5,2-10, are the 2nd gear of combo, can To carry out combo, remaining 3 batteries need to carry out combo with gear with other batch batteries, in order to reduce battery pack to the greatest extent Difference, by battery number for 1-4,1-9,2-5,2-10 be made into one group as after sale turnover maintenance battery use.
(6) performance test
Table 6
Volume test Discharge time 1-4 1-9 2-5 2-10 Pressure difference
1st time 124 10.345 10.547 10.621 10.601 0.276
2nd time 125 10.349 10.524 10.634 10.608 0.285
3rd time 125 10.381 10.538 10.649 10.614 0.268
Battery after combo carries out capacity check, predominantly detects room temperature capacity, and whole group carries out volume test, according to 10A perseverance Electricity is banished, final voltage is 10.5V/, i.e. 42V, and table 6 is section of discharge time and every battery during 3 volume tests Only voltage by the method for such reparation and combo, can be improved turnover and safeguard the usability of battery as can be seen from Table 6 Can, it reduces the secondary of battery after repairing and returns to.
Embodiment 2
(1) first time stepping: open-circuit voltage measurement
6-DZF-20 battery, by appearance screening, (appearance screening is main to reject damaged appearance, oxygen blast cyanidation or terminal leakage The battery of corrosion) and checking of great current (i.e. micro-short circuit detects, micro-short circuit detection method are as follows: by the external conductive discharge of battery, The resistance value of outer connecting resistance is 200m Ω~300m Ω, and control discharge current is 40A~50A, and voltage decline does not surpass in 1s~5s The judgement for crossing 2V is no micro-short circuit.) after, preprosthetic open-circuit voltage (OCV) is carried out without abnormal appearance and micro-short circuit battery Measurement, totally 200 batteries, voltage and stepping are as shown in table 7.
Table 7
(2) constant-current discharge reparation
For the batch according to first time stepping, open-circuit voltage distribution situation is as shown in table 7, wherein the 6th grade 62, with the gear It is illustrated as case is repaired, randomly selects 36 and repaired, 18, each circuit, totally 2 circuits.Renovation technique is 1A (0.05C amperes) constant-current discharge is completed to repair to guarantee that every cell voltage can reach 0V, therefore every in repair process A circuit in series one full electric state normal battery (6-DZF-20,10A discharge time are 125min) is discharged, to each electricity Cell voltage is acquired, and is reached the 0V time as starting point using voltage and is recorded the time that this battery is maintained in 0V and 0V or less, It after reaching 0V using last cell voltage and maintaining 5h as terminal is repaired, stops electric discharge after reaching terminal, reparation terminates, The results are shown in Table 8.
Table 8
(3) second of stepping: 0V holds time
According to battery during 2A constant-current discharge, second of stepping, stepping are carried out in the time that 0V and 0V or less is maintained The results are shown in Table 9.
Table 9
Gear OV holds time t Minimum value (h) Maximum value (h) Gear number of elements
1 grade 2.0h / / 0
2 grades 2.0h < t≤4.0h / / 0
3 grades 4.0h < t≤6.0h 5.1 5.8 15
4 grades 6.0h < t 6.1 8.1 21
(4) capacity check and third time stepping
According to second of stepping, 21 batteries of the 4th gear are chosen, the series connection in 2 circuits is randomly assigned and carries out capacity Detection, 10, a circuit, charge technology be constant pressure 148V (14.8 × 10V), current limliting 3.5A, in limited time between 8h;Discharge processes are 10A constant current, blanking voltage 100V, 11, another circuit, charge technology are constant pressure 162.8V (14.8 × 11V), current limliting 3.5A, in limited time between 8h;Discharge processes are 10A constant current, and blanking voltage 110V records every cell voltage in charge and discharge process. In charging process, during constant-voltage phase, voltage is more than that the battery of 16V is rejected, in 10A discharge process, when checking electric discharge Between cell voltage when being 100min, voltage rejected lower than 11.5V battery, after reaching final voltage, checks each battery Voltage condition carries out third time stepping according to final discharging voltage, is divided into 3 gears:
First grade of final voltage < 10.0V
Second gear 10.0V≤final voltage < 10.5V
Third gear 10.5V≤final voltage.
Respective identification is recorded, mark of conformity is that " √ " is rejected labeled as "×", and the results are shown in Table 10.
Table 10
(5) combo
According to battery during 10A constant-current discharge, final discharging voltage carries out third time stepping, as shown in table 10, In 2 rejectings, gear 1 shares 8, and gear 2 has 10, and gear 3 has 1, gear 3 need and other batch batteries with gear into Row combo connects respectively to gear 1 and 2 battery of gear and carries out supplement electricity, and charge technology is constant pressure 14.8V/, current limliting 3.5A, 8h between in limited time;After charging stand 4h after measure open-circuit voltage, according to open-circuit voltage carry out combo, whole group open-circuit voltage according to 4 gears carry out combo:
First grade of open-circuit voltage < 13.20V
Second gear 13.20V≤open-circuit voltage < 13.30V
Third gear 13.30V≤open-circuit voltage < 13.40V
Fourth speed open-circuit voltage >=13.40V.
4th stepping, two combo result of gear are as shown in table 11.
Table 11
Battery number 3-2 3-8 3-11 3-12 3-15 3-16 4-1 4-3 4-8 4-17
Stand voltage 13.341 13.307 13.251 13.316 13.447 13.451 13.243 13.298 13.284 13.338
Combo shelves number 3 3 2 3 4 4 2 2 2 3
According to open-circuit voltage after standing, wherein battery number 3-2,3-8,3-12,4-17, are the 3rd gear of combo, Ke Yipei It is used at one group as turnover maintenance battery after sale.
(6) performance test
Table 12
Volume test Discharge time 3-2 3-8 3-12 4-17 Pressure difference
1st time 125 10.541 10.567 10.421 10.501 0.146
2nd time 125 10.553 10.544 10.434 10.508 0.119
3rd time 126 10.601 10.561 10.449 10.484 0.152
Battery after combo carries out capacity check, predominantly detects room temperature capacity, and whole group carries out volume test, according to 10A perseverance Electricity is banished, final voltage is 10.5V/, i.e. 42V, and table 12 is section of discharge time and every battery during 3 volume tests Only voltage by the method for such reparation and combo, can be improved turnover and safeguard the usability of battery as can be seen from Table 6 Can, it reduces the secondary of battery after repairing and returns to.
Comparative example 1
(1) first time stepping: open-circuit voltage measurement
6-DZF-20 battery, it is different without appearance after appearance screening and checking of great current (the same Examples 1 and 2 of method) Often and micro-short circuit battery carries out open-circuit voltage measurement, and totally 100 batteries, voltage and stepping are as shown in table 13.
Table 13
Gear OCV voltage range Minimum value (V) Maximum value (V) Gear number of elements
1 grade OCV≤10.0V / / 0
2 grades 10.0V < OCV≤11.0V 10.216 10.833 4
3 grades 11.0V < OCV≤12.0V 11.089 11.961 9
4 grades 12.0V < OCV≤12.5V 12.115 12.473 14
5 grades 12.5V < OCV≤13.0V 12.558 12.924 38
6 grades 13.0V < OCV≤13.2V 13.047 13.184 28
7 grades 13.2V < OCV≤13.4V 13.209 13.377 7
8 grades 13.4V < OCV / / 0
(2) reparation and capacity check
For the batch according to first time stepping, open-circuit voltage distribution situation is as shown in table 13, wherein the 6th grade 28, with the shelves Position is illustrated as case is repaired, and is randomly selected 20 and is repaired, 10, each circuit, and totally 2 circuits (circuit 3 and are returned Road 4).Renovation technique is 2A constant-current discharge, and discharge cut-off voltage is 20V (2V/ is only × 10), is adopted to each cell voltage Collection, voltage stop electric discharge after reaching terminal, and reparation terminates, and carries out capacity check to battery after reparation.Charge technology is perseverance Press 148V (14.8V × 10), current limliting 3.5A, in limited time between 8h;Discharge processes be 10A constant current, blanking voltage be 100V (10.0V × 10) every cell voltage in charge and discharge process, is recorded.In charging process, during constant-voltage phase, voltage is more than the battery of 16V It is rejected, in 10A discharge process, checks that cell voltage when discharge time is 100min, voltage are picked lower than 11.5V battery It removes, after reaching final voltage, checks each cell voltage situation, third time stepping is carried out according to final discharging voltage, is divided into For 3 gears, respective identification is recorded, mark of conformity is labeled as "×", as a result as shown in table 14 " √ " is rejected:
Table 14
(3) combo
According to battery during 10A constant-current discharge, final discharging voltage carries out third time stepping, as shown in table 14,2 Circuit, 20 batteries are rejected wherein there is 6 batteries for being pertaining only to repairing failure in total, remaining 14 batteries, and gear 1 is total There are 7, gear 2 there are 7, and gear 3 is 0.Supplement electricity, battery charger are carried out to 14 batteries series connection of gear 1 and gear 2 respectively Skill be constant pressure 14.8V/ only, current limliting 3.5A, in limited time between 8h;Open-circuit voltage is measured after standing 4h after charging, according to open circuit electricity Pressure carries out combo, and whole group open-circuit voltage carries out combo according to 4 gears, as a result as shown in Table 15.
Table 15
Battery number 5-1 5-2 5-4 5-7 5-1 5-8 5-9
Stand voltage 13.352 13.402 13.374 13.214 13.373 13.391 13.417
Combo shelves number 3 4 3 2 3 3 4
Battery number 5-5 5-8 5-9 5-10 6-3 6-4 6-5
Stand voltage 13.477 13.387 13.356 13.301 13.431 13.294 13.336
Combo shelves number 4 3 3 3 4 2 3
According to open-circuit voltage after standing, it can be seen that using the method for such reparation, further battery open-circuit voltage is obvious Higher than the Sample Cell in embodiment 1, in order to reduce the difference of battery pack to the greatest extent, battery is numbered as 5-1,5-4,6-1,5-8 One group is made into use as turnover maintenance battery after sale.
(4) performance test
Table 16
Volume test Discharge time 5-1 5-4 6-1 5-8 Pressure difference
1st time 121 10.174 10.672 10.343 10.812 0.638
2nd time 122 10.113 10.654 10.327 10.854 0.741
3rd time 122 10.124 10.664 10.321 10.884 0.760
Battery after combo carries out capacity check, predominantly detects room temperature capacity, and whole group carries out volume test, according to 10A perseverance Electricity is banished, final voltage is 10.5V/, i.e. 42V, and table 16 is section of discharge time and every battery during 3 volume tests Only voltage, from table, it can be seen that, by the method for such reparation and combo, discharge time is relatively low, and pressure difference is greater than embodiment 1 Middle Sample Cell.

Claims (10)

1. a kind of reparation for returning to battery and method for group matching, which comprises the following steps:
(1) the recoverable battery after appearance is screened, detects preprosthetic open-circuit voltage, according to battery open-circuit voltage Carry out first time stepping;
(2) if by constant-current discharge reparation is carried out after the dry battery series connection for belonging to same shelves in the battery after first time stepping, With 0.05C~0.1C amperes of progress constant-current discharges of electric current, until the voltage of batteries all in circuit drops to 0V, continue to tie up Hold 2~5h of electric discharge;
(3) voltage reaches 0V as starting point when being repaired using step (2) constant-current discharge, calculates every battery voltage in 0V dimension below The time is held, is held time with this and carries out second of stepping;
(4) if by modified constant-voltage charge is carried out after the dry battery for belonging to same shelves in the battery after second of stepping series connection, Battery is fully charged;
(5) constant-current discharge is carried out after step (4) modified constant-voltage charge, final voltage is 10.0~10.5V/;
(6) third time stepping is carried out according to step (5) constant-current discharge final voltage;
(7) supplement electricity is carried out to battery, the open-circuit voltage after measurement is repaired after standing carries out four time point according to open-circuit voltage Shelves, if it is one group that the dry battery for being divided into same shelves, which is matched,.
2. reparation as described in claim 1 and method for group matching, which is characterized in that be connected into one in each step when charge and discharge and return The battery quantity on road is 10~18.
3. reparation as described in claim 1 and method for group matching, which is characterized in that before step (1) detects open-circuit voltage, first carry out Micro-short circuit detection, rejects the battery for having micro-short circuit, wherein the micro-short circuit detection method are as follows: by the external 200m Ω of battery The conductive discharge of~300m Ω, control discharge current are 40A~50A, and judgement of the voltage decline no more than 2V is not in 1s~5s There is micro-short circuit.
4. reparation as described in claim 1 and method for group matching, which is characterized in that press battery when step (1) first time stepping Open-circuit voltage size is divided into 5~10 grades.
5. reparation as claimed in claim 4 and method for group matching, which is characterized in that press battery when step (1) first time stepping Open-circuit voltage size is divided into 8 grades, specific as follows:
6. reparation as described in claim 1 and method for group matching, which is characterized in that when (3) second of stepping of step, according to maintenance Time every 2.0h point is one grade.
7. reparation as described in claim 1 and method for group matching, which is characterized in that by voltage after step (4) modified constant-voltage charge Battery greater than 16V is rejected.
8. reparation as described in claim 1 and method for group matching, which is characterized in that step (5) constant-current discharge electric current is 0.5C peace Training, final voltage are 10.0V/;Before step (6) third time stepping, the electricity of every battery when checking discharge time 100min Pressure, the battery less than 11.5V are determined as repairing failure, reject.
9. reparation as described in claim 1 and method for group matching, which is characterized in that when step (6) third time stepping, according to termination Voltage is divided into third gear, specific as follows:
First grade of final voltage < 10.0V
Second gear 10.0V≤final voltage < 10.5V
Third gear 10.5V≤final voltage.
10. reparation as described in claim 1 and method for group matching, which is characterized in that step (7) carries out the 4th according to open-circuit voltage When secondary stepping, it is divided into 4 grades, specific as follows:
CN201910328203.6A 2019-04-23 2019-04-23 Repairing and matching method for returned storage batteries Active CN110212256B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910328203.6A CN110212256B (en) 2019-04-23 2019-04-23 Repairing and matching method for returned storage batteries

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910328203.6A CN110212256B (en) 2019-04-23 2019-04-23 Repairing and matching method for returned storage batteries

Publications (2)

Publication Number Publication Date
CN110212256A true CN110212256A (en) 2019-09-06
CN110212256B CN110212256B (en) 2020-10-23

Family

ID=67786196

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910328203.6A Active CN110212256B (en) 2019-04-23 2019-04-23 Repairing and matching method for returned storage batteries

Country Status (1)

Country Link
CN (1) CN110212256B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112349977A (en) * 2020-09-30 2021-02-09 天能电池集团股份有限公司 Method for improving charging qualification rate of returned battery
CN113884906A (en) * 2021-10-08 2022-01-04 浙江天能动力能源有限公司 Power storage battery grouping method based on normal distribution analysis

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101093904A (en) * 2007-07-24 2007-12-26 卧龙电气集团股份有限公司 Recovery method for abnormal capacity loss of storage battery
CN103633388A (en) * 2013-11-08 2014-03-12 超威电源有限公司 Formation system of internal formation lead-acid storage battery
CN104953191A (en) * 2015-05-07 2015-09-30 国网河南省电力公司电力科学研究院 Restoration method for performances of transformer substation returned lead-acid storage battery
JP2015176829A (en) * 2014-03-17 2015-10-05 株式会社ハウステック Lead acid battery charging/discharging device
CN106025407A (en) * 2016-06-21 2016-10-12 天能电池集团有限公司 Method for restoring capacity of electric bicycle batteries
CN108281718A (en) * 2017-12-28 2018-07-13 浙江赫克力能源有限公司 A kind of restorative procedure of waste and old lead acid accumulator
CN108987831A (en) * 2018-08-28 2018-12-11 双登集团股份有限公司 Lead-acid accumulator activation method for off-capacity

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101093904A (en) * 2007-07-24 2007-12-26 卧龙电气集团股份有限公司 Recovery method for abnormal capacity loss of storage battery
CN103633388A (en) * 2013-11-08 2014-03-12 超威电源有限公司 Formation system of internal formation lead-acid storage battery
JP2015176829A (en) * 2014-03-17 2015-10-05 株式会社ハウステック Lead acid battery charging/discharging device
CN104953191A (en) * 2015-05-07 2015-09-30 国网河南省电力公司电力科学研究院 Restoration method for performances of transformer substation returned lead-acid storage battery
CN106025407A (en) * 2016-06-21 2016-10-12 天能电池集团有限公司 Method for restoring capacity of electric bicycle batteries
CN108281718A (en) * 2017-12-28 2018-07-13 浙江赫克力能源有限公司 A kind of restorative procedure of waste and old lead acid accumulator
CN108987831A (en) * 2018-08-28 2018-12-11 双登集团股份有限公司 Lead-acid accumulator activation method for off-capacity

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112349977A (en) * 2020-09-30 2021-02-09 天能电池集团股份有限公司 Method for improving charging qualification rate of returned battery
CN112349977B (en) * 2020-09-30 2022-03-29 天能电池集团股份有限公司 Method for improving charging qualification rate of returned battery
CN113884906A (en) * 2021-10-08 2022-01-04 浙江天能动力能源有限公司 Power storage battery grouping method based on normal distribution analysis
CN113884906B (en) * 2021-10-08 2024-05-03 浙江天能动力能源有限公司 Power storage battery matching method based on normal distribution analysis

Also Published As

Publication number Publication date
CN110212256B (en) 2020-10-23

Similar Documents

Publication Publication Date Title
CN107511340B (en) A kind of lithium-ion-power cell sorting method for group matching
CN104617339B (en) Lithium ion battery group matching method
CN104269574B (en) A kind of set of cells method for separating
CN101924247B (en) Lithium ion battery grouping method
CN109768342B (en) Matching method of power lead storage batteries
CN106972212B (en) A kind of lead storage battery is internalized into and method for group matching
CN103579696B (en) Battery grouping method
CN109759354B (en) Return storage battery shunting screening method
CN105280969B (en) The ferric phosphate lithium cell method for group matching of electric discharge pressure difference between a kind of diminution series battery
CN105728352B (en) A kind of battery sorting method
CN111082167B (en) Method for repairing returned storage battery
CN101614793B (en) Method for evaluating consistency of batteries
CN108232337A (en) A kind of retired battery step check and evaluation of electric vehicle utilizes method
CN110212256A (en) A kind of reparation returning to battery and method for group matching
CN111564669B (en) Lead storage battery matching method based on internal formation process
CN110865307B (en) Battery module complementary energy detection method
CN112397788A (en) Novel battery capacity grading and grouping method
CN112349977B (en) Method for improving charging qualification rate of returned battery
CN105093126A (en) Battery state discrimination method based on battery management system
CN106785170A (en) A kind of return of goods lead accumulator processing method
CN114798502A (en) Method, system and production line for classifying and grouping batteries in echelon utilization
CN107632267A (en) A kind of battery exception monomer localization method and system
CN111416164B (en) Storage battery container formation and matching method
CN104282950B (en) Lead-acid accumulator desulfuration activation repairing catalyst and activation repairing method
CN102509650A (en) Grouping method of organic super-capacitor modules

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant