CN110210631A - 一种高速铁路综合维修方案的制定方法 - Google Patents
一种高速铁路综合维修方案的制定方法 Download PDFInfo
- Publication number
- CN110210631A CN110210631A CN201910424232.2A CN201910424232A CN110210631A CN 110210631 A CN110210631 A CN 110210631A CN 201910424232 A CN201910424232 A CN 201910424232A CN 110210631 A CN110210631 A CN 110210631A
- Authority
- CN
- China
- Prior art keywords
- maintenance
- work area
- speed railway
- constraint
- comprehensive
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06311—Scheduling, planning or task assignment for a person or group
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/20—Administration of product repair or maintenance
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/80—Management or planning
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Economics (AREA)
- Physics & Mathematics (AREA)
- Marketing (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Tourism & Hospitality (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Game Theory and Decision Science (AREA)
- Development Economics (AREA)
- Educational Administration (AREA)
- Train Traffic Observation, Control, And Security (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Description
Claims (6)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910424232.2A CN110210631B (zh) | 2019-05-21 | 2019-05-21 | 一种高速铁路综合维修方案的制定方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910424232.2A CN110210631B (zh) | 2019-05-21 | 2019-05-21 | 一种高速铁路综合维修方案的制定方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110210631A true CN110210631A (zh) | 2019-09-06 |
CN110210631B CN110210631B (zh) | 2023-04-07 |
Family
ID=67788067
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910424232.2A Active CN110210631B (zh) | 2019-05-21 | 2019-05-21 | 一种高速铁路综合维修方案的制定方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110210631B (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114548499A (zh) * | 2022-01-14 | 2022-05-27 | 北京全路通信信号研究设计院集团有限公司 | 一种基于常量和变量的维修计划调整方法及系统 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8266066B1 (en) * | 2001-09-04 | 2012-09-11 | Accenture Global Services Limited | Maintenance, repair and overhaul management |
CN103530715A (zh) * | 2013-08-22 | 2014-01-22 | 北京交通大学 | 高速铁路行车固定设备网格化管理系统及管理方法 |
CN106919987A (zh) * | 2017-03-08 | 2017-07-04 | 铁道第三勘察设计院集团有限公司 | 虚拟现实环境下高速铁路客运专线设备运维信息模型的制作与管理方法 |
-
2019
- 2019-05-21 CN CN201910424232.2A patent/CN110210631B/zh active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8266066B1 (en) * | 2001-09-04 | 2012-09-11 | Accenture Global Services Limited | Maintenance, repair and overhaul management |
CN103530715A (zh) * | 2013-08-22 | 2014-01-22 | 北京交通大学 | 高速铁路行车固定设备网格化管理系统及管理方法 |
CN106919987A (zh) * | 2017-03-08 | 2017-07-04 | 铁道第三勘察设计院集团有限公司 | 虚拟现实环境下高速铁路客运专线设备运维信息模型的制作与管理方法 |
Non-Patent Citations (4)
Title |
---|
刘红娇等: "客运专线综合维修工区设计中几个问题的探讨", 《铁道标准设计》 * |
户佐安等: "基于TOPSIS法和灰色理论的交通信息网络布局优选", 《交通运输工程与信息学报》 * |
王宇嘉: "高速铁路综合维修天窗优化研究", 《中国优秀硕士学位论文全文数据库 工程科技Ⅱ辑》 * |
胡朋志: "对连盐线连云港综合维修机构合理设置的分析", 《科技视界》 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114548499A (zh) * | 2022-01-14 | 2022-05-27 | 北京全路通信信号研究设计院集团有限公司 | 一种基于常量和变量的维修计划调整方法及系统 |
Also Published As
Publication number | Publication date |
---|---|
CN110210631B (zh) | 2023-04-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107239874B (zh) | 一种面向轨道交通的电能质量及节能分析系统 | |
CN111882235A (zh) | 一种网格化的企业管理服务监测方法 | |
CN111160815B (zh) | 一种铁路货物运输机车运用计划自动编制方法及系统 | |
CN106779096B (zh) | 配电网报修态势主动预警系统 | |
CN106228300A (zh) | 一种分布式电源运营管理系统 | |
CN108196494B (zh) | 一种建筑管控平台 | |
CN101676932A (zh) | 政府投资建设项目电子监管方法及系统 | |
CN112465661A (zh) | 基于用例图的资源统一规划系统及其工作方法 | |
CN116050879A (zh) | 一种基于城市体检评估的城市更新方法及系统 | |
CN109829658B (zh) | 一种基于不同人群需求的停车泊位分配方法 | |
CN110210631A (zh) | 一种高速铁路综合维修方案的制定方法 | |
CN109767491A (zh) | 一种基于三维地理信息的电网发展数据平台 | |
CN112101754B (zh) | 一种电力应急保障能力评价方法 | |
CN110719366A (zh) | 一种可通过手机实现外勤作业数据的城市园林巡管养系统 | |
CN106682759A (zh) | 针对电动出租车的电池供应系统及网络优化方法 | |
CN104598742A (zh) | 城市发展需求应用测算方法 | |
CN116187772A (zh) | 一种集团级低碳转型决策支持系统 | |
CN115439295A (zh) | 一种变电站基建过程中施工车辆碳排量计算方法 | |
Yu et al. | Research on intelligent assessment model of influencing factors of electricity satisfaction under the “Carbon Peak and Carbon Neutral” | |
CN115358540A (zh) | 一种城市更新项目的全周期碳评估方法及系统 | |
CN114004535A (zh) | 一种电网多级一体化管理分类与评价方法 | |
CN114862059A (zh) | 一种城市重要用能形态优化分析系统 | |
Wang et al. | Study on the risk evaluation model of utility tunnel project under a PPP mode | |
CN108345975A (zh) | 一种油库失效风险评估方法及装置 | |
CN112766801A (zh) | 一种基于层次分析法的高校科研管理绩效评价系统 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information | ||
CB03 | Change of inventor or designer information |
Inventor after: Li Haiying Inventor after: He Zuixin Inventor after: Wang Ying Inventor after: Xie Xiaomin Inventor before: Li Haiying Inventor before: Wang Ying Inventor before: Xie Xiaomin Inventor before: He Zuixin |
|
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20201109 Address after: 100036 Fuxing Road 10, Beijing, Haidian District Applicant after: China National Railway Group Co.,Ltd. Applicant after: Beijing Jiaotong University Address before: 100044 Beijing city Haidian District Xizhimen Shangyuan Village No. 3 Applicant before: Beijing Jiaotong University |
|
GR01 | Patent grant | ||
GR01 | Patent grant |