CN110208626A - The test macro and air-conditioning of air-conditioner outdoor unit - Google Patents

The test macro and air-conditioning of air-conditioner outdoor unit Download PDF

Info

Publication number
CN110208626A
CN110208626A CN201910533057.0A CN201910533057A CN110208626A CN 110208626 A CN110208626 A CN 110208626A CN 201910533057 A CN201910533057 A CN 201910533057A CN 110208626 A CN110208626 A CN 110208626A
Authority
CN
China
Prior art keywords
pressure
controller
electric screwdriver
air
test macro
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910533057.0A
Other languages
Chinese (zh)
Inventor
古湘龙
旷华山
王晓彬
周锴
侯华金
谢静雯
张勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changsha Geli Heating And Ventilating Equipment Co Ltd
Gree Electric Appliances Inc of Zhuhai
Gree Changsha HVAC Equipment Co Ltd
Original Assignee
Changsha Geli Heating And Ventilating Equipment Co Ltd
Gree Electric Appliances Inc of Zhuhai
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changsha Geli Heating And Ventilating Equipment Co Ltd, Gree Electric Appliances Inc of Zhuhai filed Critical Changsha Geli Heating And Ventilating Equipment Co Ltd
Priority to CN201910533057.0A priority Critical patent/CN110208626A/en
Publication of CN110208626A publication Critical patent/CN110208626A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01MTESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
    • G01M99/00Subject matter not provided for in other groups of this subclass
    • G01M99/005Testing of complete machines, e.g. washing-machines or mobile phones
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere

Abstract

The invention discloses the test macro of air-conditioner outdoor unit and air-conditionings, air-conditioner outdoor unit is equipped with high-pressure stop valve and low-pressure shutoff valve, and test macro includes: testboard, is mounted on the first electric screwdriver on testboard for locking high-pressure stop valve and the second electric screwdriver for locking low-pressure shutoff valve, the controller for controlling the first electric screwdriver and the second electric screwdriver working condition.Controller locks high-pressure stop valve and low-pressure shutoff valve successively to recycle refrigerant.The present invention reduces artificial participation, improves outdoor unit detection efficiency by controller automatic test.

Description

The test macro and air-conditioning of air-conditioner outdoor unit
Technical field
The present invention relates to air conditioner test technical field more particularly to the test macros and air-conditioning of air-conditioner outdoor unit.
Background technique
Status air conditioner commodity inspection test operating procedure at present are as follows: the bar code on either scans' air-conditioning, docking facilities clamp high pressure Pipe fitting on shut-off valve and low-pressure shutoff valve connects the power supply line and power supply tooling of air-conditioning, enters commodity inspection system by starting switch Unified test examination;To when freezing, artificial observation electric current, pressure and other parameters numerical value are judged, high-pressure stop valve is manually locked for commodity inspection test; Again when the near 0.03Mpa of observing system refrigerant pressure, low-pressure shutoff valve is manually locked;Powered-down source, by docking facilities from high-pressure stop It is removed on pipe fitting on valve and low-pressure shutoff valve, power supply tooling is extracted from air-conditioning, press outbound button, roller drives complete machine It is automatic outbound;Pipeline latency certain time, roller drive next complete machine to enter the station, recycle above-mentioned movement.Above-mentioned steps In when needing to recycle refrigerant after the completion of test, need manual operation to lock two shut-off valves, uncontrolled, locking that there are torques is not It is reliable to wait hidden danger of quality.In addition, the locking operation of low-pressure shutoff valve judges by the pressure value of artificial timing inspection display, deposit The case where misjudgment, locking shift to an earlier date or is delayed, cause refrigerant recovering unclean.
Therefore, it is that industry technology urgently to be resolved is asked that the test macro of air-conditioner outdoor unit detection efficiency can be improved by, which how designing, Topic.
Summary of the invention
In order to solve existing test mode by operation is manually performed, the defect that testing efficiency is low is caused, the present invention mentions The test macro and air-conditioning of air-conditioner outdoor unit out.
The technical solution adopted by the present invention is that designing the test macro of air-conditioner outdoor unit, air-conditioner outdoor unit is cut equipped with high pressure Only valve and low-pressure shutoff valve, test macro include: testboard, are mounted on testboard for locking the first electricity of high-pressure stop valve Batch and the second electric screwdriver for locking low-pressure shutoff valve, control the first electric screwdriver and the second electric screwdriver working condition controller.Control Device locks high-pressure stop valve and low-pressure shutoff valve successively to recycle refrigerant.
Preferably, controller first starts the first electric screwdriver locking high-pressure stop valve, is down in the refrigerant pressure of outdoor unit default When low voltage value, the second electric screwdriver of starting locks low-pressure shutoff valve.
Preferably, controller closes the first electric screwdriver when the first electric screwdriver feeds back locking signal, and controller is anti-in the second electric screwdriver The second electric screwdriver is closed when feedback locking signal.
Preferably, after controller starts the first electric screwdriver, whether compare the torque of the first electric screwdriver in the first default acceptability limit It is interior, if then judging that high-pressure stop valve locking is qualified, otherwise judge that high-pressure stop valve locking is unqualified.
Preferably, after controller starts the second electric screwdriver, whether compare the torque of the second electric screwdriver in the second default acceptability limit It is interior, if then judging that low-pressure shutoff valve locking is qualified, otherwise judge that low-pressure shutoff valve locking is unqualified.
Preferably, test macro further include: the power supply tooling being mounted on testboard, power supply tooling is equipped with to be connected with controller The connecting column connect, connecting column are used to connect with the binding post on the terminal plate of outdoor unit.
Preferably, power supply tooling is also equipped with magnet, and power supply tooling is adsorbed on the terminal plate of outdoor unit by the magnet.
Preferably, controller control air-conditioning enters the operating parameter of acquisition air-conditioning after refrigeration mode, and comparing operating parameter is It is no in its corresponding default range of operation, if locking high-pressure stop valve and low-pressure shutoff valve successively then to recycle refrigerant.
Preferably, controller is connected with start button, and controller controls air-conditioning after the enabling signal for being connected to start button Into refrigeration mode.
Preferably, controller judges that air-conditioning is unqualified when operating parameter exceeds its corresponding default range of operation.
Preferably, pipe fitting is connected on high-pressure stop valve and/or low-pressure shutoff valve;Test macro further include: be mounted on For positioning the docking facilities of outdoor unit on testboard, docking facilities have the pneumatic pinch head for gripping tube fitting, pneumatically The working condition of clamping head is controlled by controller.
Preferably, controller control pneumatic pinch head after locking high-pressure stop valve and low-pressure shutoff valve unclamps pipe and connects Head.
Preferably, outdoor unit is transported on test position corresponding with testboard by assembly line, and controller is in pneumatic pinch head Feedback completes signal to assembly line when unclamping pipe fitting, and outdoor unit is transported out of test position by assembly line.
Preferably, test macro further include: tip parts connected to the controller, controller are locked not in high-pressure stop valve Control tip parts issues alarm signal when the unqualified or air-conditioning of qualified or low-pressure shutoff valve locking is unqualified.
The invention also provides air-conditioning, outdoor unit is tested using above-mentioned test macro.
Compared with prior art, the invention has the following advantages:
1, electric screwdriver is controlled by controller and locks shut-off valve in order automatically, prevent refrigerant recovering unclean;
2, controller obtains the operating parameter of air-conditioning, judges automatically whether air-conditioning is qualified, realizes the automatic monitoring of test parameter, mention The Supreme People's Procuratorate's mass metering;
3, electric screwdriver, docking facilities and power supply tooling are left test position with air-conditioning and are automatically separated, and reduce manual operation, cut personnel and increase Effect.
Detailed description of the invention
Below with reference to embodiment and attached drawing, the present invention is described in detail, in which:
Fig. 1 is the structural schematic diagram of test macro in the present invention;
Fig. 2 is the lock out operation flow diagram of test macro in the present invention;
Fig. 3 is the testing process schematic diagram of test macro in the present invention.
Specific embodiment
As shown in Figure 1, the present invention proposes that test macro is suitable for air-conditioning, the outdoor unit 1 of air-conditioning is equipped with high-pressure stop valve 11 With low-pressure shutoff valve 12, pipe fitting is respectively connected on high-pressure stop valve and low-pressure shutoff valve, high-pressure stop valve is commonly referred to as small section Only valve, low-pressure shutoff valve are commonly referred to as big shut-off valve.
Test macro includes: testboard, the first electric screwdriver 2, the second electric screwdriver 3, power supply tooling 4, docking facilities 5 and controller 6, First electric screwdriver 2 and the second electric screwdriver 3 are connected on testboard, and the first electric screwdriver 2 is used for locking high-pressure stop valve 11, the second electric screwdriver 3 In locking low-pressure shutoff valve 12, controller control the first electric screwdriver 2 and the second electric screwdriver 3 working condition, by controller automatically according to Secondary locking high-pressure stop valve 11 and low-pressure shutoff valve 12 are to recycle refrigerant.Power supply tooling 4 is equipped with connecting column connected to the controller, Connecting column is used to connect with the binding post on the terminal plate 13 of outdoor unit 1, and power supply tooling 4 is also equipped with magnet, power supply work 4 are filled to be adsorbed on the terminal plate 13 of outdoor unit 1 by the magnet.Docking facilities 5 are connected on testboard, and effect is orientation room Outer machine 1, there are two pneumatic pinch head, a pneumatic pinch heads to be used to clamp the pipe fitting of high-pressure stop valve 11 for the tool of docking facilities 5, separately One pneumatic pinch head is used to clamp the pipe fitting of low-pressure shutoff valve 12, and the working condition of two pneumatic pinch heads is by controller control System.
As shown in Figure 2,3, outdoor unit 1 is transported on test position corresponding with testboard by assembly line, and controller is connected with Start button, pressing start button test macro can start to execute test, before test, the first electric screwdriver 2 is manually inserted into height Second electric screwdriver 3 is inserted into low-pressure shutoff valve 12 by pressure cutoff valve 11, and docking facilities 5 are manually clamped high-pressure stop valve 11 and low pressure Pipe fitting on shut-off valve 12, manually by 13 grafting of terminal plate of power supply tooling 4 and air-conditioning, power supply tooling 4 is adsorbed by magnet It is located on terminal plate 13, start button is pressed after the completion of connection.Controller controls after the enabling signal for being connected to start button Air-conditioning enters refrigeration mode, and controller control air-conditioning enters the operating parameter of acquisition air-conditioning after refrigeration mode, compares operating parameter Whether in its corresponding default range of operation, if locking high-pressure stop valve and low-pressure shutoff valve successively then to recycle refrigerant, Controller judges that air-conditioning is unqualified when operating parameter exceeds its corresponding default range of operation, and operating parameter herein can pass through Corresponding sensor is set to obtain, or the data acquisition by reading air-conditioning mainboard, operating parameter is refrigerant pressure, electric current Value etc..
Controller successively locks high-pressure stop valve and the process of low-pressure shutoff valve is: first starting the first electric screwdriver 2 locking high pressure Shut-off valve 11 compares the torque of the first electric screwdriver 2 whether in the first default acceptability limit, if torque is in the first default acceptability limit It is interior, then judge that high-pressure stop valve 11 locks qualification, controller closes the first electric screwdriver 2 when the first electric screwdriver 2 feeds back locking signal, if It is unqualified then to judge that high-pressure stop valve 11 is locked not in the first default acceptability limit for torque;High-pressure stop valve 11 locks qualification Afterwards, controller is when refrigerant pressure is down to pre-set low pressure value on the pipeline that low-pressure shutoff valve 12 is connected, starting the second electric screwdriver 3 lock Tight low-pressure shutoff valve 12, compares the torque of the second electric screwdriver 3 whether in the second default acceptability limit, if torque is in the second default conjunction Within the scope of lattice, then judge that low-pressure shutoff valve 12 locks qualification, controller closes the second electricity when the second electric screwdriver 3 feeds back locking signal 3 are criticized, if it is unqualified to judge that low-pressure shutoff valve 12 is locked not in the second default acceptability limit for torque.Controller is high in locking Pneumatic pinch head is controlled after pressure cutoff valve 11 and low-pressure shutoff valve 12 and unclamps pipe fitting, and controller is unclamped in pneumatic pinch head manages Feedback completes signal to assembly line when connector, and outdoor unit is transported out of test position by assembly line, the first electric screwdriver 2, the second electric screwdriver 3, Docking facilities 5 and power supply tooling 4 are pulled out in the case where outdoor unit 1 is far from the pulling force of test position, without human intervention, improve test effect Rate.In a preferred embodiment, the first default acceptability limit is 5.25 ± 0.25N.M, and pre-set low pressure value is 0.03Mpa, and second is pre- If acceptability limit is 7.25 ± 0.25N.M.
Preferably, test macro further include: tip parts connected to the controller, controller are locked in high-pressure stop valve 11 Unqualified or low-pressure shutoff valve 12 lock unqualified or air-conditioning it is unqualified when control tip parts issue alarm signal, in time notify Combined aural and visual alarm can be used in operator's handling failure, tip parts.Collected refrigerant pressure value, current value in test process Etc. operating parameters can also save to computer, become more stable data communication, facilitate testing crew carry out science experiment Analysis reduces the problem for the data inaccuracy that manual record process and other intermediate links occur, greatlys improve working efficiency.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all in essence of the invention Made any modifications, equivalent replacements, and improvements etc., should all be included in the protection scope of the present invention within mind and principle.

Claims (10)

1. a kind of test macro of air-conditioner outdoor unit, the air-conditioner outdoor unit is equipped with high-pressure stop valve and low-pressure shutoff valve, special Sign is that the test macro includes: testboard, is mounted on the testboard for locking the first of the high-pressure stop valve The control of electric screwdriver and the second electric screwdriver, control first electric screwdriver and the second electric screwdriver working condition for locking the low-pressure shutoff valve Device processed;The controller locks the high-pressure stop valve and low-pressure shutoff valve successively to recycle refrigerant.
2. test macro as described in claim 1, which is characterized in that the controller first starts the first electric screwdriver locking institute High-pressure stop valve is stated, first electric screwdriver is closed when first electric screwdriver feeds back locking signal, waits the cold of the outdoor unit When matchmaker's pressure is down to pre-set low pressure value, starts second electric screwdriver and lock the low-pressure shutoff valve, the controller is described the Second electric screwdriver is closed when two electric screwdrivers feedback locking signal.
3. test macro as claimed in claim 2, which is characterized in that after the controller starts first electric screwdriver, compare Whether the torque of first electric screwdriver is in the first default acceptability limit, if then judging that the high-pressure stop valve locking is qualified, Otherwise judge that the high-pressure stop valve locking is unqualified;After the controller starts second electric screwdriver, second electricity The torque criticized, if then judging that the low-pressure shutoff valve locking is qualified, otherwise judges institute whether in the second default acceptability limit It is unqualified to state low-pressure shutoff valve locking.
4. test macro as described in claim 1, which is characterized in that the test macro further include: be mounted on testboard Power supply tooling, the power supply tooling be equipped with connecting column connected to the controller, the connecting column be used for and the outdoor unit Binding post on terminal plate connects, and the power supply tooling is also equipped with magnet, and the power supply tooling is adsorbed by the magnet On the terminal plate of the outdoor unit.
5. test macro as claimed in claim 4, which is characterized in that the controller control air-conditioning obtains after entering refrigeration mode The operating parameter of the air-conditioning is taken, the operating parameter is whether in its corresponding default range of operation, if then successively The high-pressure stop valve and low-pressure shutoff valve are locked to recycle refrigerant.
6. test macro as claimed in claim 5, which is characterized in that the controller is connected with start button, the control Device controls the air-conditioning after the enabling signal for being connected to the start button and enters refrigeration mode, and the controller is in the operation Parameter judges that the air-conditioning is unqualified when exceeding its corresponding default range of operation.
7. test macro as described in claim 1, which is characterized in that the high-pressure stop valve and/or the low-pressure shutoff valve On be connected with pipe fitting;The test macro further include: be mounted on the testboard for positioning the docking of the outdoor unit Device, the docking facilities have the pneumatic pinch head for clamping the pipe fitting, and the controller is locking the high pressure The pneumatic pinch head is controlled after shut-off valve and low-pressure shutoff valve unclamps the pipe fitting.
8. test macro as claimed in claim 7, which is characterized in that the outdoor unit is transported to and the test by assembly line On the corresponding test position of platform, controller feedback when the pneumatic pinch head unclamps the pipe fitting completes signal to described The outdoor unit is transported out of test position by the assembly line by assembly line.
9. test macro as described in claim 1, which is characterized in that the test macro further include: connect with the controller The tip parts connect, the controller are locked the unqualified or air-conditioning of unqualified or low-pressure shutoff valve locking in high-pressure stop valve and are not conformed to The tip parts is controlled when lattice issues alarm signal.
10. a kind of air-conditioning, which is characterized in that its outdoor unit is carried out using test macro as described in any one of claim 1 to 9 Test.
CN201910533057.0A 2019-06-19 2019-06-19 The test macro and air-conditioning of air-conditioner outdoor unit Pending CN110208626A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910533057.0A CN110208626A (en) 2019-06-19 2019-06-19 The test macro and air-conditioning of air-conditioner outdoor unit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910533057.0A CN110208626A (en) 2019-06-19 2019-06-19 The test macro and air-conditioning of air-conditioner outdoor unit

Publications (1)

Publication Number Publication Date
CN110208626A true CN110208626A (en) 2019-09-06

Family

ID=67793590

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910533057.0A Pending CN110208626A (en) 2019-06-19 2019-06-19 The test macro and air-conditioning of air-conditioner outdoor unit

Country Status (1)

Country Link
CN (1) CN110208626A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2650104Y (en) * 2003-09-27 2004-10-20 河南新飞电器有限公司 Performance measuring device for outdoor unit of air conditioner
CN101738035A (en) * 2008-11-21 2010-06-16 珠海格力电器股份有限公司 Refrigerant recovery control device and use method thereof
CN202285033U (en) * 2011-10-26 2012-06-27 海信(山东)空调有限公司 Automatic detection device for production line of outdoor unit of air conditioner
CN202869841U (en) * 2012-11-02 2013-04-10 珠海格力电器股份有限公司 Detection system for outdoor unit of air conditioner
CN203282419U (en) * 2013-06-08 2013-11-13 深圳创维-Rgb电子有限公司 Screw bit, screw fastening device and screw fastening equipment
CN106425436A (en) * 2016-11-09 2017-02-22 浙江大学宁波理工学院 Switch cassette screw feeding and tightening machine and control method thereof
CN208866731U (en) * 2018-09-06 2019-05-17 汉威科技集团股份有限公司 A kind of double electric screwdriver automatic screwing systems

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2650104Y (en) * 2003-09-27 2004-10-20 河南新飞电器有限公司 Performance measuring device for outdoor unit of air conditioner
CN101738035A (en) * 2008-11-21 2010-06-16 珠海格力电器股份有限公司 Refrigerant recovery control device and use method thereof
CN202285033U (en) * 2011-10-26 2012-06-27 海信(山东)空调有限公司 Automatic detection device for production line of outdoor unit of air conditioner
CN202869841U (en) * 2012-11-02 2013-04-10 珠海格力电器股份有限公司 Detection system for outdoor unit of air conditioner
CN203282419U (en) * 2013-06-08 2013-11-13 深圳创维-Rgb电子有限公司 Screw bit, screw fastening device and screw fastening equipment
CN106425436A (en) * 2016-11-09 2017-02-22 浙江大学宁波理工学院 Switch cassette screw feeding and tightening machine and control method thereof
CN208866731U (en) * 2018-09-06 2019-05-17 汉威科技集团股份有限公司 A kind of double electric screwdriver automatic screwing systems

Similar Documents

Publication Publication Date Title
CN113606491B (en) Hydrogen discharging system and electrical control method thereof
CN107179169B (en) A kind of nuclear power station check valve action test set and test method
CA2807461C (en) Fastening part tightening management system
CN106015924A (en) Multifunctional full-automatic gas charging device of SF6 equipment
CN108151998B (en) A kind of continuous wind tunnel cooling system safety interlocking method
CN110208626A (en) The test macro and air-conditioning of air-conditioner outdoor unit
CN213874865U (en) Heat exchanger gas tightness testing device
CN109230272A (en) A kind of belt feeder hydraulic tensioning control device
CN109374331A (en) A kind of air-conditioner outdoor unit test device
CN112305391A (en) Electromagnetic valve performance testing method for AP1000 main steam and main water supply isolation valve
CN210399605U (en) Docking device and product production system
CN202770625U (en) Portable and intelligent detection apparatus for safety valve
CN110340576A (en) Nitrogen charging device and its control method for welding
CN210109270U (en) Locomotive wind pressure relay detection equipment
CN102519740B (en) Tubing unit box and hood opening-closing mechanism test bed
CN205483441U (en) Automatic change gas tightness check out test set
CN105738022A (en) Fire-fighting water gun switch moment automatic testing device
CN209727026U (en) End valve detection device
CN204202865U (en) A kind of filling opening performance test experiment table
CN209148316U (en) A kind of air-conditioner outdoor unit test device
CN110131932A (en) The service of connection devices and product production system
CN215806619U (en) Air conditioner connection structure and detection device
CN117212711B (en) Air conditioner piping compression detection device and detection method
CN112114195A (en) Power test system and method for pipeline display
CN109268680A (en) A kind of industrial gasses automatic charging device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190906

RJ01 Rejection of invention patent application after publication