CN110205944A - A kind of observation platform device suitable for Large Span Bridges girder steel construction survey - Google Patents

A kind of observation platform device suitable for Large Span Bridges girder steel construction survey Download PDF

Info

Publication number
CN110205944A
CN110205944A CN201910585929.8A CN201910585929A CN110205944A CN 110205944 A CN110205944 A CN 110205944A CN 201910585929 A CN201910585929 A CN 201910585929A CN 110205944 A CN110205944 A CN 110205944A
Authority
CN
China
Prior art keywords
platform
center
pier
girder steel
forced centering
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910585929.8A
Other languages
Chinese (zh)
Inventor
李�杰
庄小刚
黄红林
秦环兵
王坤
葛永飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
2nd Engineering Co Ltd of MBEC
Original Assignee
2nd Engineering Co Ltd of MBEC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 2nd Engineering Co Ltd of MBEC filed Critical 2nd Engineering Co Ltd of MBEC
Priority to CN201910585929.8A priority Critical patent/CN110205944A/en
Publication of CN110205944A publication Critical patent/CN110205944A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The present invention relates to a kind of observation platform devices suitable for Large Span Bridges girder steel construction survey, it is characterized in that including to mid-game, center steel-pipe pile, centering pier, guardrail, platform, frame leg, staircase, wherein the frame leg that is welded with of platform lower surface supports, platform leads to ground by staircase, platform upper surface is surrounded by guardrail, center is equipped with center steel-pipe pile, installation center operating platform, the upstream and downstream of the center operations platform is respectively fixedly welded a forced centering pier, and forced centering plate is installed in forced centering pier top portion.Advantage: stage apparatus stability is strong, durability is strong, unobscured, safe and reliable, provides the reliable control point of most convenient and measuring condition for measurement work, greatly improves the precision and efficiency of measurement work.Apparatus of the present invention are i.e. customizable in steel construction processing factory, project management department using project current material, good and cheap, practical, economical good.

Description

A kind of observation platform device suitable for Large Span Bridges girder steel construction survey
Technical field
The present invention is a kind of observation platform device suitable for Large Span Bridges girder steel construction survey, and it is auxiliary to belong to engineering survey Help engineering device technique field.
Background technique
During the main bridge steel girder erection of Long span, construction survey and monitoring measurement work are particularly critical, often direct relation To the success or failure of engineering.Presence of the observation platform not only as measurement control point is measured, but also provides space and platform for measurement work, It is the important foundation for carrying out measurement work.The main bridge steel truss erection of existing engineering highway and railway bi-purpose cable-stayed bridge, since bank controls Point angle and visual field condition are poor, are unfavorable for the development of girder steel construction survey work, and construction site situation is complicated, and measurement is limited by condition System should not set the method that station is observed using at bank control point.Earlier measurement method is by multiple turning point or repeatedly friendship Instrument, is erected at girder steel and newly sets up on internode and measure by meeting, and field measurement effect reflection, this mode measures workload Greatly, low precision, data integrity are poor.
Summary of the invention
Proposed by the present invention is a kind of observation platform device suitable for Large Span Bridges girder steel construction survey, and purpose exists In overcoming in-site measurement operation difficult, measurement accuracy is poor, and the low problem of working efficiency, the present invention can be within the limited time Rapidly and accurately complete a large amount of main bridge girder steel construction survey work.
Technical solution of the invention: a kind of observation platform device suitable for Large Span Bridges girder steel construction survey, Including to mid-game 1, center steel-pipe pile 2, centering pier 3, guardrail 4, platform 5, frame leg 7, staircase 8, the wherein welding of 5 lower surface of platform There are frame leg 7 and support 6, platform 5 leads to ground by staircase 8, and 5 upper surface of platform is surrounded by guardrail 4, and center is equipped with central steel Tubular pole 2, installation center operating platform, the upstream and downstream of the center operations platform are respectively fixedly welded a forced centering pier 3, force Forced centering plate 1 is installed at the top of centering pier 3.
The diagonal brace 6 is mounted between frame leg 7, plays reinforcement effect.
The observation platform device is welded on Main Pier of Bridges girder steel center, is set at pier top internode.
The long 2m of the observation platform device, width 2m, high 4.5m, the pressure pair of the upstream and downstream welding of Platform center operating platform Middle pier is 1.2 meters high.
The observation platform device uses full steel structure.
Beneficial effects of the present invention:
1) observation platform is arranged at main pier pier top internode, and solid firm, Platform Designing stability is strong, and guarantee sets website stability series Number is substantially reduced compared to setting at the end bay internode of station because of factors bring measurement errors such as girder steel shake and construction infections.For It measures work and the reliable control point of most convenient and measuring condition is provided, greatly improve the precision and efficiency of measurement work.
2) i.e. customizable in steel construction processing factory, project management department using project current material, it is good and cheap, it is practical, it is economical Type is good, is conducive to promote the use of in practice.
3) podium level is high, can cross girder steel itself and block, measurement control point of the backsight to setting on the coast.When observation Construction equipment and heap loading on girder steel are crossed, the visual field is good, reduces the probability that measuring point blocks.
4) platform upstream and downstream is provided with two forced centering piers, and screening of the middle purlin to measurement sight can be avoided when setting up instrument Gear sets station upstream when observing upstream measuring point, station downstream is set when observing downstream measuring point.The sight of all measuring points can be completed by setting station twice It surveys.
Detailed description of the invention
Attached drawing 1 is the position artwork of observation platform device.
Attached drawing 2 is the position artwork of observation platform device.
Attached drawing 3 is observation platform bulking block figure.
Attached drawing 4 is observation platform main view.
Attached drawing 5 is observation platform top view.
1 it is forced centering plate in figure, 2 be center steel-pipe pile, 3 be centering pier, 4 be guardrail, 5 be platform, 6 be diagonal brace, 7 is Frame leg, 8 are staircases.
Specific embodiment
The rigid structure measurement observation platform of long 2m, width 2m, high 4.5m are installed in main bridge girder steel railway face, are weldingly fixed on master On pier pier center segment girder steel, the upstream and downstream of Platform center operating platform respectively welds one 1.2 meters high of forced centering pier.
Further explanation of the technical solution of the present invention with reference to the accompanying drawing
As shown in attached drawing 1,2, rigid structure observation platform is arranged at main pier pier top internode, is weldingly fixed on by frame leg and staircase On main pier pier center segment girder steel.
As shown in attached drawing 3,4,5, a kind of observation platform device suitable for Large Span Bridges girder steel construction survey, including it is right Mid-game 1, center steel-pipe pile 2, centering pier 3, guardrail 4, platform 5, frame leg 7, staircase 8, wherein platform 5 lower surface is welded with frame leg 7 supports, platform 5 lead to ground by staircase 8, and 5 upper surface of platform is surrounded by guardrail 4, and center is equipped with center steel-pipe pile 2, peace Center operations platform is filled, the upstream and downstream of the center operations platform is respectively fixedly welded a forced centering pier 3, forced centering pier 3 Top is installed by forced centering plate 1.
It further include diagonal brace 6, the diagonal brace 6 is mounted between frame leg 7.
The observation platform device is welded on Main Pier of Bridges girder steel center, is set at pier top internode.
Embodiment 1
The rigid structure measurement observation platform of long 2m, width 2m, high 4.5m are installed in main bridge girder steel railway face, are weldingly fixed on main Dun Dun On center segment girder steel, the upstream and downstream of Platform center operating platform respectively welds one 1.2 meters high of forced centering pier.

Claims (4)

1. a kind of observation platform device suitable for Large Span Bridges girder steel construction survey, it is characterized in that include forced centering plate 1, Center steel-pipe pile 2, forced centering pier 3, guardrail 4, platform 5, frame leg 7, staircase 8, wherein platform 5 lower surface is welded with frame leg 7 Support, platform 5 lead to ground by staircase 8, and 5 upper surface of platform is surrounded by guardrail 4, and center is equipped with center steel-pipe pile 2, installation Center operations platform, the upstream and downstream of the center operations platform are respectively fixedly welded a forced centering pier 3, forced centering Dun3Ding Forced centering plate 1 is installed in portion, and the observation platform device is welded on Main Pier of Bridges girder steel center, is set at pier top internode.
2. a kind of observation platform device suitable for Large Span Bridges girder steel construction survey according to claim 1, special Sign be further include diagonal brace 6, the diagonal brace 6 is mounted between frame leg 7, rise reinforcement effect.
3. a kind of observation platform device suitable for Large Span Bridges girder steel construction survey according to claim 1, special Sign is the long 2m of the observation platform device, width 2m, high 4.5m, the forced centering that the upstream and downstream of Platform center operating platform is welded Pier is 1.2 meters high.
4. a kind of observation platform device suitable for Large Span Bridges girder steel construction survey according to claim 1, special Sign is the observation platform device using full steel structure.
CN201910585929.8A 2019-07-01 2019-07-01 A kind of observation platform device suitable for Large Span Bridges girder steel construction survey Pending CN110205944A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910585929.8A CN110205944A (en) 2019-07-01 2019-07-01 A kind of observation platform device suitable for Large Span Bridges girder steel construction survey

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910585929.8A CN110205944A (en) 2019-07-01 2019-07-01 A kind of observation platform device suitable for Large Span Bridges girder steel construction survey

Publications (1)

Publication Number Publication Date
CN110205944A true CN110205944A (en) 2019-09-06

Family

ID=67795719

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910585929.8A Pending CN110205944A (en) 2019-07-01 2019-07-01 A kind of observation platform device suitable for Large Span Bridges girder steel construction survey

Country Status (1)

Country Link
CN (1) CN110205944A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111578913A (en) * 2020-03-25 2020-08-25 中铁大桥局集团第二工程有限公司 Method for positioning and measuring steel anchor beam by self-made height observation platform internal control method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20010054812A (en) * 1999-12-08 2001-07-02 박재만 Apparatus to reinforce the footing part of pier and thereof method
CN102966254A (en) * 2012-12-13 2013-03-13 中铁二局股份有限公司 Measuring tower used for construction of stub matching method and arrangement thereof
JP2018025020A (en) * 2016-08-09 2018-02-15 国立大学法人九州大学 Crack diagnostic device and crack diagnostic method
CN109631867A (en) * 2018-12-26 2019-04-16 中铁大桥局第七工程有限公司 A kind of portable forced centering pier and its installation method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20010054812A (en) * 1999-12-08 2001-07-02 박재만 Apparatus to reinforce the footing part of pier and thereof method
CN102966254A (en) * 2012-12-13 2013-03-13 中铁二局股份有限公司 Measuring tower used for construction of stub matching method and arrangement thereof
JP2018025020A (en) * 2016-08-09 2018-02-15 国立大学法人九州大学 Crack diagnostic device and crack diagnostic method
CN109631867A (en) * 2018-12-26 2019-04-16 中铁大桥局第七工程有限公司 A kind of portable forced centering pier and its installation method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
叶菲: ""建筑基坑工程标准化监测研究",叶菲,城市勘测,第3期,第151页-第153页", 《城市勘测》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111578913A (en) * 2020-03-25 2020-08-25 中铁大桥局集团第二工程有限公司 Method for positioning and measuring steel anchor beam by self-made height observation platform internal control method

Similar Documents

Publication Publication Date Title
CN108457188B (en) A kind of walking incremental launching construction by multipoint jacking construction
CN206512764U (en) A kind of horizontally loading test system for applying vertical load in stake top
CN103981816A (en) Construction method for underpinning of overpass framework pier columns
CN105544412B (en) Incremental launching construction method for three-main-truss rigid suspension cable stiffening continuous steel truss girder with stiffening chord
CN108824193A (en) Bridge superstructure quickly removes, installation method and its replacement system
CN112649046A (en) Overall pushing monitoring method for whole-process simulation tied arch bridge
CN204753411U (en) Resume no stress state's jacking and monitored control system behind steel case roof beam one -tenth bridge
CN109978378B (en) Post-construction evaluation method for new construction to pass through existing road facilities
CN110220626A (en) A kind of I-shaped steel-concrete composite beam support reaction detection method
CN103758359A (en) Safe and reliable construction system for replacing columns by sustaining beams supported by columns and construction method for replacing columns by sustaining beams supported by columns
CN105423880B (en) A kind of method for hanging main push-towing rope measurement deflection of bridge span
CN113622316A (en) Steel truss girder multipoint traction type pushing construction system and construction method thereof
CN110205944A (en) A kind of observation platform device suitable for Large Span Bridges girder steel construction survey
CN102966254B (en) Arrangement method for measuring tower used for construction of stub matching method
CN103376064A (en) Building foundation ditch or side slope deformation monitoring method and building foundation ditch or side slope deformation monitoring reflection device
CN206208430U (en) A kind of tension measuring device and system
CN109440844A (en) A kind of static test settlement observer for exempting from datum line beam
CN105735228A (en) Construction method and installation accuracy control method of rack systems of high-lift rack climbing type ship lift
CN102995668B (en) Field simple assembly ultralong static load reference beam
CN105040992A (en) Reverse inverted-insertion type construction method for structural steel columns
CN205593530U (en) Attaches wall type survey control point
CN204151662U (en) A kind of one across the temporary trestle bridge crossing over river valley
CN209468793U (en) A kind of static test settlement observer for exempting from datum line beam
CN112378375A (en) Bridge support settlement monitoring device
CN105926454A (en) Pushing method and device for middle span of large-span high-bridge-pier prestressed concrete box girder continuous rigid-frame bridge

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190906