CN110205944A - A kind of observation platform device suitable for Large Span Bridges girder steel construction survey - Google Patents
A kind of observation platform device suitable for Large Span Bridges girder steel construction survey Download PDFInfo
- Publication number
- CN110205944A CN110205944A CN201910585929.8A CN201910585929A CN110205944A CN 110205944 A CN110205944 A CN 110205944A CN 201910585929 A CN201910585929 A CN 201910585929A CN 110205944 A CN110205944 A CN 110205944A
- Authority
- CN
- China
- Prior art keywords
- platform
- center
- pier
- girder steel
- forced centering
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
The present invention relates to a kind of observation platform devices suitable for Large Span Bridges girder steel construction survey, it is characterized in that including to mid-game, center steel-pipe pile, centering pier, guardrail, platform, frame leg, staircase, wherein the frame leg that is welded with of platform lower surface supports, platform leads to ground by staircase, platform upper surface is surrounded by guardrail, center is equipped with center steel-pipe pile, installation center operating platform, the upstream and downstream of the center operations platform is respectively fixedly welded a forced centering pier, and forced centering plate is installed in forced centering pier top portion.Advantage: stage apparatus stability is strong, durability is strong, unobscured, safe and reliable, provides the reliable control point of most convenient and measuring condition for measurement work, greatly improves the precision and efficiency of measurement work.Apparatus of the present invention are i.e. customizable in steel construction processing factory, project management department using project current material, good and cheap, practical, economical good.
Description
Technical field
The present invention is a kind of observation platform device suitable for Large Span Bridges girder steel construction survey, and it is auxiliary to belong to engineering survey
Help engineering device technique field.
Background technique
During the main bridge steel girder erection of Long span, construction survey and monitoring measurement work are particularly critical, often direct relation
To the success or failure of engineering.Presence of the observation platform not only as measurement control point is measured, but also provides space and platform for measurement work,
It is the important foundation for carrying out measurement work.The main bridge steel truss erection of existing engineering highway and railway bi-purpose cable-stayed bridge, since bank controls
Point angle and visual field condition are poor, are unfavorable for the development of girder steel construction survey work, and construction site situation is complicated, and measurement is limited by condition
System should not set the method that station is observed using at bank control point.Earlier measurement method is by multiple turning point or repeatedly friendship
Instrument, is erected at girder steel and newly sets up on internode and measure by meeting, and field measurement effect reflection, this mode measures workload
Greatly, low precision, data integrity are poor.
Summary of the invention
Proposed by the present invention is a kind of observation platform device suitable for Large Span Bridges girder steel construction survey, and purpose exists
In overcoming in-site measurement operation difficult, measurement accuracy is poor, and the low problem of working efficiency, the present invention can be within the limited time
Rapidly and accurately complete a large amount of main bridge girder steel construction survey work.
Technical solution of the invention: a kind of observation platform device suitable for Large Span Bridges girder steel construction survey,
Including to mid-game 1, center steel-pipe pile 2, centering pier 3, guardrail 4, platform 5, frame leg 7, staircase 8, the wherein welding of 5 lower surface of platform
There are frame leg 7 and support 6, platform 5 leads to ground by staircase 8, and 5 upper surface of platform is surrounded by guardrail 4, and center is equipped with central steel
Tubular pole 2, installation center operating platform, the upstream and downstream of the center operations platform are respectively fixedly welded a forced centering pier 3, force
Forced centering plate 1 is installed at the top of centering pier 3.
The diagonal brace 6 is mounted between frame leg 7, plays reinforcement effect.
The observation platform device is welded on Main Pier of Bridges girder steel center, is set at pier top internode.
The long 2m of the observation platform device, width 2m, high 4.5m, the pressure pair of the upstream and downstream welding of Platform center operating platform
Middle pier is 1.2 meters high.
The observation platform device uses full steel structure.
Beneficial effects of the present invention:
1) observation platform is arranged at main pier pier top internode, and solid firm, Platform Designing stability is strong, and guarantee sets website stability series
Number is substantially reduced compared to setting at the end bay internode of station because of factors bring measurement errors such as girder steel shake and construction infections.For
It measures work and the reliable control point of most convenient and measuring condition is provided, greatly improve the precision and efficiency of measurement work.
2) i.e. customizable in steel construction processing factory, project management department using project current material, it is good and cheap, it is practical, it is economical
Type is good, is conducive to promote the use of in practice.
3) podium level is high, can cross girder steel itself and block, measurement control point of the backsight to setting on the coast.When observation
Construction equipment and heap loading on girder steel are crossed, the visual field is good, reduces the probability that measuring point blocks.
4) platform upstream and downstream is provided with two forced centering piers, and screening of the middle purlin to measurement sight can be avoided when setting up instrument
Gear sets station upstream when observing upstream measuring point, station downstream is set when observing downstream measuring point.The sight of all measuring points can be completed by setting station twice
It surveys.
Detailed description of the invention
Attached drawing 1 is the position artwork of observation platform device.
Attached drawing 2 is the position artwork of observation platform device.
Attached drawing 3 is observation platform bulking block figure.
Attached drawing 4 is observation platform main view.
Attached drawing 5 is observation platform top view.
1 it is forced centering plate in figure, 2 be center steel-pipe pile, 3 be centering pier, 4 be guardrail, 5 be platform, 6 be diagonal brace, 7 is
Frame leg, 8 are staircases.
Specific embodiment
The rigid structure measurement observation platform of long 2m, width 2m, high 4.5m are installed in main bridge girder steel railway face, are weldingly fixed on master
On pier pier center segment girder steel, the upstream and downstream of Platform center operating platform respectively welds one 1.2 meters high of forced centering pier.
Further explanation of the technical solution of the present invention with reference to the accompanying drawing
As shown in attached drawing 1,2, rigid structure observation platform is arranged at main pier pier top internode, is weldingly fixed on by frame leg and staircase
On main pier pier center segment girder steel.
As shown in attached drawing 3,4,5, a kind of observation platform device suitable for Large Span Bridges girder steel construction survey, including it is right
Mid-game 1, center steel-pipe pile 2, centering pier 3, guardrail 4, platform 5, frame leg 7, staircase 8, wherein platform 5 lower surface is welded with frame leg
7 supports, platform 5 lead to ground by staircase 8, and 5 upper surface of platform is surrounded by guardrail 4, and center is equipped with center steel-pipe pile 2, peace
Center operations platform is filled, the upstream and downstream of the center operations platform is respectively fixedly welded a forced centering pier 3, forced centering pier 3
Top is installed by forced centering plate 1.
It further include diagonal brace 6, the diagonal brace 6 is mounted between frame leg 7.
The observation platform device is welded on Main Pier of Bridges girder steel center, is set at pier top internode.
Embodiment 1
The rigid structure measurement observation platform of long 2m, width 2m, high 4.5m are installed in main bridge girder steel railway face, are weldingly fixed on main Dun Dun
On center segment girder steel, the upstream and downstream of Platform center operating platform respectively welds one 1.2 meters high of forced centering pier.
Claims (4)
1. a kind of observation platform device suitable for Large Span Bridges girder steel construction survey, it is characterized in that include forced centering plate 1,
Center steel-pipe pile 2, forced centering pier 3, guardrail 4, platform 5, frame leg 7, staircase 8, wherein platform 5 lower surface is welded with frame leg 7
Support, platform 5 lead to ground by staircase 8, and 5 upper surface of platform is surrounded by guardrail 4, and center is equipped with center steel-pipe pile 2, installation
Center operations platform, the upstream and downstream of the center operations platform are respectively fixedly welded a forced centering pier 3, forced centering Dun3Ding
Forced centering plate 1 is installed in portion, and the observation platform device is welded on Main Pier of Bridges girder steel center, is set at pier top internode.
2. a kind of observation platform device suitable for Large Span Bridges girder steel construction survey according to claim 1, special
Sign be further include diagonal brace 6, the diagonal brace 6 is mounted between frame leg 7, rise reinforcement effect.
3. a kind of observation platform device suitable for Large Span Bridges girder steel construction survey according to claim 1, special
Sign is the long 2m of the observation platform device, width 2m, high 4.5m, the forced centering that the upstream and downstream of Platform center operating platform is welded
Pier is 1.2 meters high.
4. a kind of observation platform device suitable for Large Span Bridges girder steel construction survey according to claim 1, special
Sign is the observation platform device using full steel structure.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910585929.8A CN110205944A (en) | 2019-07-01 | 2019-07-01 | A kind of observation platform device suitable for Large Span Bridges girder steel construction survey |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910585929.8A CN110205944A (en) | 2019-07-01 | 2019-07-01 | A kind of observation platform device suitable for Large Span Bridges girder steel construction survey |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110205944A true CN110205944A (en) | 2019-09-06 |
Family
ID=67795719
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910585929.8A Pending CN110205944A (en) | 2019-07-01 | 2019-07-01 | A kind of observation platform device suitable for Large Span Bridges girder steel construction survey |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110205944A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111578913A (en) * | 2020-03-25 | 2020-08-25 | 中铁大桥局集团第二工程有限公司 | Method for positioning and measuring steel anchor beam by self-made height observation platform internal control method |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20010054812A (en) * | 1999-12-08 | 2001-07-02 | 박재만 | Apparatus to reinforce the footing part of pier and thereof method |
CN102966254A (en) * | 2012-12-13 | 2013-03-13 | 中铁二局股份有限公司 | Measuring tower used for construction of stub matching method and arrangement thereof |
JP2018025020A (en) * | 2016-08-09 | 2018-02-15 | 国立大学法人九州大学 | Crack diagnostic device and crack diagnostic method |
CN109631867A (en) * | 2018-12-26 | 2019-04-16 | 中铁大桥局第七工程有限公司 | A kind of portable forced centering pier and its installation method |
-
2019
- 2019-07-01 CN CN201910585929.8A patent/CN110205944A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20010054812A (en) * | 1999-12-08 | 2001-07-02 | 박재만 | Apparatus to reinforce the footing part of pier and thereof method |
CN102966254A (en) * | 2012-12-13 | 2013-03-13 | 中铁二局股份有限公司 | Measuring tower used for construction of stub matching method and arrangement thereof |
JP2018025020A (en) * | 2016-08-09 | 2018-02-15 | 国立大学法人九州大学 | Crack diagnostic device and crack diagnostic method |
CN109631867A (en) * | 2018-12-26 | 2019-04-16 | 中铁大桥局第七工程有限公司 | A kind of portable forced centering pier and its installation method |
Non-Patent Citations (1)
Title |
---|
叶菲: ""建筑基坑工程标准化监测研究",叶菲,城市勘测,第3期,第151页-第153页", 《城市勘测》 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111578913A (en) * | 2020-03-25 | 2020-08-25 | 中铁大桥局集团第二工程有限公司 | Method for positioning and measuring steel anchor beam by self-made height observation platform internal control method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108457188B (en) | A kind of walking incremental launching construction by multipoint jacking construction | |
CN206512764U (en) | A kind of horizontally loading test system for applying vertical load in stake top | |
CN103981816A (en) | Construction method for underpinning of overpass framework pier columns | |
CN105544412B (en) | Incremental launching construction method for three-main-truss rigid suspension cable stiffening continuous steel truss girder with stiffening chord | |
CN108824193A (en) | Bridge superstructure quickly removes, installation method and its replacement system | |
CN112649046A (en) | Overall pushing monitoring method for whole-process simulation tied arch bridge | |
CN204753411U (en) | Resume no stress state's jacking and monitored control system behind steel case roof beam one -tenth bridge | |
CN109978378B (en) | Post-construction evaluation method for new construction to pass through existing road facilities | |
CN110220626A (en) | A kind of I-shaped steel-concrete composite beam support reaction detection method | |
CN103758359A (en) | Safe and reliable construction system for replacing columns by sustaining beams supported by columns and construction method for replacing columns by sustaining beams supported by columns | |
CN105423880B (en) | A kind of method for hanging main push-towing rope measurement deflection of bridge span | |
CN113622316A (en) | Steel truss girder multipoint traction type pushing construction system and construction method thereof | |
CN110205944A (en) | A kind of observation platform device suitable for Large Span Bridges girder steel construction survey | |
CN102966254B (en) | Arrangement method for measuring tower used for construction of stub matching method | |
CN103376064A (en) | Building foundation ditch or side slope deformation monitoring method and building foundation ditch or side slope deformation monitoring reflection device | |
CN206208430U (en) | A kind of tension measuring device and system | |
CN109440844A (en) | A kind of static test settlement observer for exempting from datum line beam | |
CN105735228A (en) | Construction method and installation accuracy control method of rack systems of high-lift rack climbing type ship lift | |
CN102995668B (en) | Field simple assembly ultralong static load reference beam | |
CN105040992A (en) | Reverse inverted-insertion type construction method for structural steel columns | |
CN205593530U (en) | Attaches wall type survey control point | |
CN204151662U (en) | A kind of one across the temporary trestle bridge crossing over river valley | |
CN209468793U (en) | A kind of static test settlement observer for exempting from datum line beam | |
CN112378375A (en) | Bridge support settlement monitoring device | |
CN105926454A (en) | Pushing method and device for middle span of large-span high-bridge-pier prestressed concrete box girder continuous rigid-frame bridge |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190906 |