CN205593530U - Attaches wall type survey control point - Google Patents
Attaches wall type survey control point Download PDFInfo
- Publication number
- CN205593530U CN205593530U CN201620357677.5U CN201620357677U CN205593530U CN 205593530 U CN205593530 U CN 205593530U CN 201620357677 U CN201620357677 U CN 201620357677U CN 205593530 U CN205593530 U CN 205593530U
- Authority
- CN
- China
- Prior art keywords
- control point
- sarasota
- measuring instrument
- sidewall
- operating platform
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model relates to a measuring point technical field on the bridge specifically indicates an attaches wall type survey control point. Including measuring instrument setpoint and survey crew setpoint, the measuring instrument setpoint including fix the dead lever of cable tower lateral wall with install its up end on the dead lever and keep the backup pad of level, the survey crew setpoint including fixing the operation platform at the cable tower lateral wall, operation platform be located fixed plate and backup pad under, the spacing distance is 1~1.5m between operation platform and the backup pad. The utility model discloses simple structure, through at solid dead lever of suo te lateral wall installation and backup pad support measuring instrument equipment, the operation platform of cable tower lateral wall stands a little as operating personnel's, and this is that the checked problem of sight has been solved to the measuring point on cable tower, has reduced measuring operation's the degree of difficulty, has improved measurement of efficiency, has also saved a large amount of manpower and material resources, has very big spreading value.
Description
Technical field
This utility model relates to measuring on bridge dot structure technical field, measures control point in particular to a kind of wall-attachment.
Background technology
Cable-stayed bridge main-beam is owing to being limited by the intervisibility between the influence of topography, installation accuracy and girder measuring control point and ground control point, often survey when setting main beam linear and lack enough measurement control point or checkpoint, thus add task difficulty and operating cost, cause the waste of man power and material, installation accuracy does not reaches requirement yet, have impact on site operation progress.
The prior art point of observation that generally broad view, place are higher near bridge is installed total powerstation and is observed, such as mountain top or the area of hill-side broad view.But total powerstation is set up on mountain top, one total powerstation can only be in the different same sections of time period control, end bay girder, or two total powerstations are in the same sections of control of same time period, end bay girder, and end bay control point can only control end bay, in in control point can only control across, have a strong impact on scene construction speed.
Summary of the invention
The purpose of this utility model seeks to solve the deficiency of above-mentioned background technology, it is provided that a kind of wall-attachment measures control point.
The technical solution of the utility model is: a kind of wall-attachment measures control point, it is characterised in that: include measuring instrument anchor point and survey crew anchor point;Described measuring instrument anchor point includes the fixing bar being fixed on Sarasota sidewall and the gripper shoe of its upper surface holding level being arranged on fixing bar;Described survey crew anchor point includes the operating platform being fixed on Sarasota sidewall;Described operating platform is positioned at the underface of fixing bar and gripper shoe, and between operating platform and gripper shoe, spacing distance is 1~1.5m.
Further also include the first pre-embedded steel slab being embedded in Sarasota sidewall;The end of described fixing bar is fixed on the first pre-embedded steel slab by bolt arrangement.
Further also including the diagonal brace that lower end is fixed on Sarasota sidewall, diagonal brace upper end is fixing forms stable three-legged structure on the supporting plate with gripper shoe.
Further also include the second pre-embedded steel slab being embedded in Sarasota sidewall;The end of described operating platform is fixed on the second pre-embedded steel slab by bolt arrangement.
The end, one end of the most described operating platform Sarasota dorsad is provided with guardrail.
This utility model simple in construction, by installing fixing bar and gripper shoe support measuring instrument equipment at Sarasota sidewall, the operating platform of Sarasota sidewall is as the standpoint of operator, on Sarasota, this is to measure point to solve unsighted problem, reduce the difficulty measuring operation, improve measurement efficiency, also save substantial amounts of man power and material, there is great promotional value.
Accompanying drawing explanation
Fig. 1: structural representation of the present utility model;
Fig. 2: front view of the present utility model;
Wherein: 1 operating platform;2 guardrails;3 first pre-embedded steel slabs;4 diagonal braces;5 fix bar;6 gripper shoes;7 second pre-embedded steel slabs.
Detailed description of the invention
The utility model is described in further detail with specific embodiment below in conjunction with the accompanying drawings.
Such as Fig. 1~2, a kind of wall-attachment measurement control point, including measuring instrument anchor point and survey crew anchor point, measuring instrument anchor point is used for installing measuring instrument, and survey crew anchor point is for the standpoint as survey crew.Wherein, measuring instrument anchor point includes the gripper shoe 6 of fixing bar 5 and its upper surface holding level being arranged on fixing bar 5 being fixed on Sarasota sidewall, the present embodiment pre-buried first pre-embedded steel slab 3 on Sarasota sidewall in advance, by the way of bolt or welding, the end of fixing bar 5 is fixed on the first pre-embedded steel slab 3 again, fixes and between bar 5 and Sarasota sidewall, be additionally provided with diagonal brace 4.The lower end of diagonal brace 4 is fixed on Sarasota sidewall, and its upper end is fixed on the lower surface of fixing bar 5, forms stable triangular support configurations with fixing bar 5.Junction point between diagonal brace 4 and fixing bar 5 is positioned at the lower section of gripper shoe 6.Placing measuring instrument in gripper shoe 6, therefore, the upper surface of the gripper shoe 6 of the present embodiment keeps level.
Survey crew anchor point includes the operating platform 1 being fixed on Sarasota sidewall, operating platform 1 is positioned at fixing bar 5 and the underface of gripper shoe 6, operating platform 1 is for the standpoint as survey crew, for flat board or truss structure, between operating platform 1 and gripper shoe 6, spacing distance is 1~1.5m, it is simple to operator stand measurement.
Being embedded with the second pre-embedded steel slab 7 on Sarasota sidewall, the second pre-embedded steel slab 7 is positioned at the lower section of the first built-in fitting 3, and operating platform 1 is fixed on the second built-in fitting 7 by bolt or welding manner.The end, one end of operating platform 1 Sarasota dorsad is provided with guardrail 2.Guardrail 2 is vertically fixed on the upper surface of operating platform 1.
During use, by adapter, measuring instrument is arranged in gripper shoe 6, on operating platform 1 on survey crew, measures measuring and calculating by the measuring instrument in gripper shoe 6.
During measurement: 1, according to GPS control point or JM control point coordinate, utilize total powerstation to do connecting traverse or back traverse calculates girder wall-attachment and measures the coordinate at control point;
The Coordinate Conversion that 2, wall-attachment is measured control point becomes with bridge longitudinally as X-axis, is laterally the construction coordinate system of Y-axis, controls the plan-position of girder;
3, measuring installation total powerstation on control point at a wall-attachment and make survey station point, on another wall-attachment measurement control point, installation pedestal is as backsight point, and on ground, a control point is as checkpoint, sets up coordinate system, coordinates centering prism directly can carry out field lofting;
4, two wall-attachments are measured control point and are all located at the top of girder, do not affected by sight line during measurement, and the distance between 2 can control longer than the length of on-the-spot girder, thus can reach, with the measuring method of " long limit control minor face ", to decrease the measurement error that girder plane is first.
By this utility model, the elevation face measuring girder is turned to above girder by ground, it is possible to make the measurement work of girder not affected by sight line, improve work efficiency.And checked by identical control point when measuring girder, it is to avoid error of centralization when sighting mark error during Instrument observation and different control point observation, improve the installation accuracy of cable-stayed bridge main-beam, also ensure that site operation progress.
Of the present utility model ultimate principle, principal character and of the present utility model advantage have more than been shown and described.Skilled person will appreciate that of the industry; this utility model is not restricted to the described embodiments; described in above-described embodiment and description, principle of the present utility model is simply described; on the premise of without departing from this utility model spirit and scope, this utility model also has various changes and modifications, in the range of these changes and improvements both fall within claimed this utility model.This utility model claims scope and is defined by appending claims and equivalent thereof.
Claims (5)
1. a wall-attachment measures control point, it is characterised in that: include measuring instrument anchor point and survey crew anchor point;Described measuring instrument anchor point includes that the fixing bar (5) being fixed on Sarasota sidewall and its upper surface being arranged on fixing bar (5) keep the gripper shoe (6) of level;Described survey crew anchor point includes the operating platform (1) being fixed on Sarasota sidewall;Described operating platform (1) is positioned at fixing bar (5) and the underface of gripper shoe (6), and between operating platform (1) and gripper shoe (6), spacing distance is 1~1.5m.
2. a kind of wall-attachment as claimed in claim 1 measures control point, it is characterised in that: also include the first pre-embedded steel slab (3) being embedded in Sarasota sidewall;The end of described fixing bar (5) is fixed on the first pre-embedded steel slab (3) by bolt arrangement.
3. a kind of wall-attachment as claimed in claim 2 measures control point, it is characterized in that: also include the diagonal brace (4) that lower end is fixed on Sarasota sidewall, diagonal brace (4) upper end is fixed on gripper shoe (6), and above and gripper shoe (6) forms stable three-legged structure.
4. a kind of wall-attachment as claimed in claim 1 measures control point, it is characterised in that: also include the second pre-embedded steel slab (7) being embedded in Sarasota sidewall;The end of described operating platform (1) is fixed on the second pre-embedded steel slab (7) by bolt arrangement.
5. a kind of wall-attachment as claimed in claim 4 measures control point, it is characterised in that: the end, one end of described operating platform (1) Sarasota dorsad is provided with guardrail (2).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620357677.5U CN205593530U (en) | 2016-04-26 | 2016-04-26 | Attaches wall type survey control point |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620357677.5U CN205593530U (en) | 2016-04-26 | 2016-04-26 | Attaches wall type survey control point |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205593530U true CN205593530U (en) | 2016-09-21 |
Family
ID=56934829
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620357677.5U Expired - Fee Related CN205593530U (en) | 2016-04-26 | 2016-04-26 | Attaches wall type survey control point |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205593530U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108890558A (en) * | 2018-09-19 | 2018-11-27 | 南京工程学院 | A kind of structure innovation model-aided space positioning apparatus and space orientation production method |
CN109945906A (en) * | 2019-04-19 | 2019-06-28 | 中国水利水电第三工程局有限公司 | A kind of inclined shaft penstock installation measuring table and its application method |
-
2016
- 2016-04-26 CN CN201620357677.5U patent/CN205593530U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108890558A (en) * | 2018-09-19 | 2018-11-27 | 南京工程学院 | A kind of structure innovation model-aided space positioning apparatus and space orientation production method |
CN109945906A (en) * | 2019-04-19 | 2019-06-28 | 中国水利水电第三工程局有限公司 | A kind of inclined shaft penstock installation measuring table and its application method |
CN109945906B (en) * | 2019-04-19 | 2024-02-02 | 中国水利水电第三工程局有限公司 | Inclined shaft steel pipe installation and measurement platform and application method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103437279B (en) | Overhead cast-in-place box compression struts and construction technology thereof | |
CN101985824B (en) | For the embedded part installation device of bridge pad | |
CN205593530U (en) | Attaches wall type survey control point | |
CN106223623A (en) | Steel construction box arched roof truss installation method | |
CN101748746B (en) | Construction method of base of secondary cooling support oriented device of continuous casting machine | |
CN115387221A (en) | High pier line type control method for high altitude area | |
CN105334014B (en) | A kind of adjustable suspension cable method for testing deflection of bridge span | |
CN105423880B (en) | A kind of method for hanging main push-towing rope measurement deflection of bridge span | |
CN102966254B (en) | Arrangement method for measuring tower used for construction of stub matching method | |
CN108560369B (en) | Lofting construction method for high-speed loop curved surface paving | |
CN109736591A (en) | A kind of ruggedized construction and reinforcement means suitable for building hoist basement roof | |
CN207259974U (en) | A kind of hand-held mode transfer instrument of Railway Bridges And Piers model sheetinstallat | |
CN207300237U (en) | The quick monitoring device of pier slope | |
CN105977889A (en) | Method for installing enclosed busbar and auxiliary adjusting tool | |
CN102071780A (en) | Method for manufacturing and mounting 120-meter long roof tile at high altitude | |
CN201738248U (en) | Embedded part installation device for bridge bearing | |
CN201794280U (en) | High-accuracy stone terrace laying support structure | |
CN102995570A (en) | Stiffening steel truss lower node location die | |
CN110207661A (en) | A method of installation reflector plate establishes reference line measurement tower crane verticality | |
CN206208430U (en) | A kind of tension measuring device and system | |
CN104060838A (en) | Grouping and air-pairing installation method for corridor | |
CN212477455U (en) | Pre-buried positioner of bridge suspension cable anchor cylinder | |
CN205591587U (en) | Steel structure box formula board house | |
CN209670395U (en) | A kind of ruggedized construction suitable for building hoist basement roof | |
CN102494579A (en) | Box body state measurement method in one-dimensional jacking construction process of large box body |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |