CN110198249A - A kind of electrical power distribution automatization system test method and system - Google Patents
A kind of electrical power distribution automatization system test method and system Download PDFInfo
- Publication number
- CN110198249A CN110198249A CN201810164586.3A CN201810164586A CN110198249A CN 110198249 A CN110198249 A CN 110198249A CN 201810164586 A CN201810164586 A CN 201810164586A CN 110198249 A CN110198249 A CN 110198249A
- Authority
- CN
- China
- Prior art keywords
- main website
- equipment
- test
- uniformity test
- automatically
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L41/00—Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
- H04L41/08—Configuration management of networks or network elements
- H04L41/0866—Checking the configuration
- H04L41/0869—Validating the configuration within one network element
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L43/00—Arrangements for monitoring or testing data switching networks
- H04L43/50—Testing arrangements
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L41/00—Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
- H04L41/08—Configuration management of networks or network elements
- H04L41/0803—Configuration setting
- H04L41/0806—Configuration setting for initial configuration or provisioning, e.g. plug-and-play
- H04L41/0809—Plug-and-play configuration
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L41/00—Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
- H04L41/08—Configuration management of networks or network elements
- H04L41/0876—Aspects of the degree of configuration automation
- H04L41/0886—Fully automatic configuration
Abstract
The present invention provides a kind of electrical power distribution automatization system test method and systems, comprising: accesses the logon message and configuration file when main website to equipment, carries out registration management and automatically configure uniformity test;Registration management and abnormal conditions are automatically configured when analog machine accesses main website, and uniformity test is carried out to the treatment mechanism of the abnormal conditions;According to the registration management and automatically configures the registration management of uniformity test and equipment and automatically configure the treatment mechanism uniformity test of abnormal conditions as a result, by the electrical power distribution automatization system of test when determining the equipment access main website.When technical solution provided by the invention is for equipment access main website, to the registration management of main website, automatically configure and fault-tolerance carries out consistency desired result, determine the electrical power distribution automatization system when equipment accesses main website by test, it is ensured that distribution power automation terminal plug and play mechanism runs well.
Description
Technical field
The present invention relates to distribution automation fields, and in particular to a kind of electrical power distribution automatization system test method and system.
Background technique
Currently, with supporting the distribution power automation terminal of plug and play and IEC61850 standard gradually to put into operation, Practical Project
Middle distribution main website needs the distribution terminal of integrated tens different vendors, carries out registration management, configuration mould in terminal access link
Board management and definition, configuration file version checksum verification etc., auxiliary terminal completion are automatically accessed and are configured.Therefore in practice,
Except distribution terminal manufacturer is in the realization for needing to guarantee terminal plug-and-play feature, and other than being verified, it is also necessary to certainly to distribution
Dynamicization system is tested, comprising: management, test and the fault-tolerance of main website are tested, and the power distribution automation of test will be passed through
System is as equipment access system, it is ensured that equipment plug and play mechanism runs well, and accesses distribution certainly currently without for equipment
The test of dynamicization system.
It includes uniformity test that management, test and the fault-tolerance of main website, which carry out test, and so-called uniformity test is that agreement is surveyed
One importance of examination, is the basis of performance test, interoperability testing and robustness testing, is that protocol development personnel are primary
Concern.It is intended to the matching degree of protocol entity (or system) and protocol specification of inspection institute's realization, and verifying then is inspection
The internal consistency of Formal Specification is looked into, that is, tests the specification whether given external behavior realized of an agreement meets agreement.
For this reason, it may be necessary to which a kind of pair of electrical power distribution automatization system carries out uniformity test, it is ensured that equipment plug and play mechanism is normal
The method of operating becomes those skilled in the art's problem in the urgent need to address.
Summary of the invention
In order to solve the above-mentioned deficiency in the presence of the prior art, the present invention provides a kind of electrical power distribution automatization system test side
Method and system, wherein the described method includes:
The logon message and configuration file when main website are accessed to equipment, carry out registration management and automatically configure consistency survey
Examination;
Analog machine access main website when registration management and automatically configure abnormal conditions, and the processing to the abnormal conditions
Mechanism carries out uniformity test;
According to the registration management and automatically configures the registration management of uniformity test and equipment and automatically configure exception
The treatment mechanism uniformity test of situation is as a result, pass through the electrical power distribution automatization system of test when determining the equipment access main website.
Preferably, the logon message progress registration management uniformity test when access main website to equipment includes:
The registration request initiated when accessing main website based on equipment is handled;
According to the processing of the registration request, the survey of registration management consistency whether is met when determining the equipment access main website
Examination.
Preferably, whether the processing according to the registration request meets consistent when determining the equipment access main website
Property test include:
Whether the processing for judging the registration request includes the judgement of networking scene, the update of registration service management list, terminal
The integrality judgement of registration generation, history registry record queries and registration information;
When included, equipment access main website meets registration management uniformity test, is otherwise unsatisfactory for.
Preferably, the logon message includes: that terminal IP, ID, terminal function describe file and terminal profile version
Number information.
Preferably, the configuration file when access main website to equipment carries out automatically configuring uniformity test, comprising:
The configuring request that configuration information based on equipment is initiated is received, and records the main website to the place of the configuring request
Reason;
According to the processing to the configuring request, whether meets when determining the equipment access main website and automatically configure consistency
Test.
Preferably, processing of the basis to the configuring request of the equipment, when determining equipment access main website whether
Satisfaction automatically configures uniformity test and includes:
Whether the processing for judging the configuring request includes that authority configuration function, point table template management function, point table are made by oneself
Justice, Automatic Update of File, standardized terminals automatically configure service, correct resolution file, check code verifying file, FileVersion school
It tests, and checks configuration file;
When included, meet when equipment access main website and automatically configure uniformity test, be otherwise unsatisfactory for.
Preferably, registration management when analog machine access main website and abnormal conditions are automatically configured, and to described different
The treatment mechanism of reason condition carries out uniformity test
Analog machine registers for the first time, non-registration for the first time and when continuous registration the main website registration management of equipment with automatically configure it is different
Reason condition, and uniformity test is carried out to the abnormal conditions.
Preferably, the main website registration management of equipment and abnormal feelings are automatically configured when the mock standard terminal is registered for the first time
Condition, and uniformity test is carried out to the abnormal conditions and includes:
Login network access condition, change standardize the ICD file of distribution terminal to mock standard distribution terminal for the first time, equipment
The cyclic redundancy check of cyclic redundancy check and logon message that main website calculates is inconsistent, occurs abnormal;The main website is detected at this time to institute
State whether abnormal processing meets uniformity test.
Preferably, the detection main website includes: to whether the abnormal processing meets uniformity test
It is serviced when detecting that main website alerts and re-initiates the calling of ICD file;And
When the exception is still unresolved in the calling number of setting, termination device automatically configures service, and generates exception
When handling log, meets uniformity test, be otherwise unsatisfactory for.
Preferably, the main website registration management of equipment that the equipment is non-when registering for the first time and abnormal conditions are automatically configured, and it is right
The abnormal conditions carry out uniformity test
The non-login network access condition for the first time of analog machine, main website receive modified using standardization distribution terminal configuration tool
Configuration file, and logon message is parsed, the logon message after parsing and the newest registration information of main website are inconsistent, occur
It is abnormal;When the fileversion number for detecting configuration file is inconsistent, whether main website alerts and generation error log;When main website accuses
When alert and generation error log, meets uniformity test, be otherwise unsatisfactory for.
Preferably, the main website registration management of equipment and abnormal conditions are automatically configured when the analog machine is continuously registered, and
Uniformity test is carried out to the abnormal conditions, comprising:
The logon message negative response of initiation is restarted to device power in the continuous login network access condition of analog machine, main website, inspection
Measurement equipment repeats to initiate registration request, and when request frequency is greater than predeterminated frequency, whether main website is alerted and remote reset terminal;
When main website issues alarm and remote reset terminal, meets uniformity test, be otherwise unsatisfactory for.
Preferably, it is described according to the registration management and automatically configure the registration management of uniformity test and equipment with from
The treatment mechanism uniformity test of dynamic arrangement abnormalities situation is as a result, when determining the equipment access main website certainly by the distribution of test
Dynamicization system, comprising:
Registration management will be passed through and automatically configures the registration management of uniformity test and equipment and automatically configure abnormal feelings
The electrical power distribution automatization system of the treatment mechanism uniformity test of condition is determined as automatic by the distribution of test when equipment access main website
Change system.
A kind of test macro of electrical power distribution automatization system, the system comprises:
Uniformity test module: for equipment access main website when logon message and configuration file carry out registration management and
Automatically configure uniformity test;
Scrnario testing module: registration management when accessing main website for analog machine and automatically configuring abnormal conditions, and right
The treatment mechanism of the abnormal conditions carries out uniformity test;
Determining module: for according to the registration management and automatically configuring the main website registration pipe of uniformity test and equipment
The treatment mechanism uniformity test of abnormal conditions is managed and automatically configured as a result, by test when determining the equipment access main website
Electrical power distribution automatization system.
Preferably, the uniformity test module includes:
Registration management submodule carries out the uniformity test of registration management for logon message based on equipment to equipment;
Submodule is automatically configured, equipment is carried out for configuration file based on equipment to automatically configure uniformity test.
Preferably, the scrnario testing module includes:
Submodule is registered for the first time, main website registers and automatically configures automatically abnormal conditions when registering for the first time for analog machine,
And uniformity test is carried out to the abnormal conditions;
It is non-to register submodule for the first time, for analog machine is non-register for the first time when main website registration management and automatically configure abnormal feelings
Condition, and consistency desired result is carried out to the abnormal conditions;
Continuous registration submodule, main website registers and automatically configures automatically abnormal conditions when continuously registering for analog machine,
And uniformity test is carried out to the abnormal conditions.
Compared with prior art, the invention has the benefit that
A kind of electrical power distribution automatization system test method provided by the invention, to equipment access main website when carry out registration management,
Uniformity test is automatically configured, and consistency survey is carried out with the treatment mechanism for automatically configuring abnormal conditions to the registration management of equipment
Examination, the equipment tested by electrical power distribution automatization system is, it can be achieved that plug and play mechanism runs well;
Present invention is alternatively directed to the manufacturers, main website of equipment to carry out registration management, automatically configure and its consistency of abnormality processing is surveyed
Examination, the consistency and mechanism fault-tolerance that the master function of detection device is realized, promotes distribution power automation terminal plug and play mechanism
Reliability and robustness, auxiliary realize the networking management of extensive distribution terminal and automatically configure management.
Detailed description of the invention
Fig. 1 is electrical power distribution automatization system test method flow chart of the invention;
Fig. 2 is the registration management test method flow chart of specific embodiments of the present invention;
Fig. 3 automatically configures uniformity test flow chart for specific embodiments of the present invention;
Fig. 4 is that exception handling realization consistency school is registered and automatically configure automatically to power distribution automation main station of the invention
Test flow chart.
Specific embodiment
For a better understanding of the present invention, following will be combined with the drawings in the embodiments of the present invention, in the embodiment of the present invention
Technical solution be clearly and completely described, it is clear that described embodiments are some of the embodiments of the present invention, rather than
Whole embodiments.Based on the embodiments of the present invention, those of ordinary skill in the art are not making creative work premise
Under all other embodiment obtained, shall fall within the protection scope of the present invention.
The present invention provides a kind of electrical power distribution automatization system test method and systems, for electrical power distribution automatization system main website
Registration management, automatically configure and fault-tolerance carry out consistency desired result, it is ensured that distribution power automation terminal plug and play mechanism is normally transported
Turn, as shown in Figure 1:
Specific embodiment 1:
Step 1: accessing the logon message and configuration file when main website to equipment, it is consistent with automatically configuring to carry out registration management
Property test;
Step 2: registration management when analog machine access main website and abnormal conditions are automatically configured, and to the abnormal conditions
Treatment mechanism carry out uniformity test;
Step 3: according to the registration management and automatically configuring the registration management of uniformity test and equipment and match automatically
The treatment mechanism uniformity test of abnormal conditions is set as a result, by the power distribution automation of test when determining the equipment access main website
System.
Wherein, step 1: accessing the logon message and configuration file when main website to equipment, carry out registration management and match automatically
Set uniformity test:
(1) manufacturer, main website submission system specification, submission electrical power distribution automatization system, tester configure test environment.
(2) standardization distribution terminal initiates correct registration request to power distribution automation test main website, and tester checks master
Stand whether judge terminal for for the first time or it is non-network for the first time, network whether properly generate endpoint to register management table for the first time, it is non-to enter for the first time
Whether net increases endpoint to register record, whether includes at least terminal IP, ID, ICD, CID fileversion number in registration management table and believes
Breath.Check whether main website supports that inquiring three conditions independent or combined according to Termination ID inquiry, period inquiry, IP carries out history
Registration inquiry.
(3) check whether power distribution automation main station has authority configuration management, supports permission in test main website main interface
Setting;Point table template management function supports template to have access to inquiry, and point table custom feature supports that data point is newly-increased, deletes, saves
For new template, configuration file automatically updating function supports that the configuration that personnel provide is configured according to main website updates table progress CID file
It automatically updates.It chooses terminal to network for the first time condition, starting automatically configures service, after checking that main website receives registration request, if lead
It is dynamic to have access to ICD file, if correct parsing ICD file, if verification ICD, CID file cyclic redundancy check verifying, if carry out
ICD, CID FileVersion verification, if properly generate CID file, check whether CID configuration file meets configuration and update list.
Step 2: registration management when analog machine access main website and abnormal conditions are automatically configured, and to the abnormal conditions
Treatment mechanism carry out uniformity test:
(3) terminal is for the first time under the conditions of login network access, ICD file cyclic redundancy check abnormality test;Terminal electrifying startup registration clothes
Business, main website correctly parse logon message, and main website automatically initiates configuration flow, call terminal ICD file, and main website calculates CRC check
Code is inconsistent with the cyclic redundancy check of registration information, exception occurs, and whether detection main website alerts and re-initiate the calling of ICD file
It services, it is abnormal in the calling number of setting still to solve, if to terminate distribution terminal and automatically configure service, main website generates abnormal
Handle log.
(4) under the conditions of the non-login network access for the first time of terminal, terminal, which powers on, restarts, and sends registration information, main website from trend main website
Parsing logon message notes abnormalities with the newest registration information comparison of main website.Whether main website detects ICD file version
This number is inconsistent with registration information, if alarm, and whether verification is consistent with main website side ICD fileversion number, when inconsistent
Generation error log.Whether main website detects that CID fileversion number and main website side CID fileversion number are inconsistent, terminates configuration
Service simultaneously generation error log.
(5) distribution terminal is continuously registered, and negative response is replied by main website, and distribution terminal repeats to initiate registration request, and requests
Frequency is greater than 10 beats/min, and whether main website alerts and remote reset terminal.
Step 3: according to the registration management and automatically configuring the registration management of uniformity test and equipment and match automatically
The treatment mechanism uniformity test of abnormal conditions is set as a result, by the power distribution automation of test when determining the equipment access main website
System.
Embodiment 2:
A kind of electrical power distribution automatization system test method provided by the invention, in which:
<1>registration management uniformity test is carried out to electrical power distribution automatization system, it is specific as shown in Figure 2, comprising:
(1) main website receives terminal registration request;
(2) main website carries out registration scene Recognition and whether judging result is correct, when result is correct, enters step (3), no
Then, (7) are entered step;
(3) judge whether main website generates terminal test record, when generating terminal test record, enter step (4), otherwise
Enter step (7);
(4) look forward to whether entering step when comprising hard core control information comprising hard core control information in test record
(5), (7) are otherwise entered step;
(5) judge whether history registry record is supported according to condition to inquire and whether query result is correct, when supporting according to condition
Inquiry and query result it is correct when, enter step (6) and otherwise enter step (7);
(6) project testing report is generated;
(7) generation error log terminates registration management uniformity test.
Configuration file when accessing main website to equipment carries out automatically configuring uniformity test, specific as shown in Figure 3, comprising:
1, judge whether distribution main website supports a table Template Manager and point table sub-definite function, be to enter step 2, otherwise
Enter step 12;
2, judge whether distribution main website has a table custom feature, be to enter step 3, otherwise enter step 11;
3, judge whether distribution main website has authority configuration management function, be, enter step 4, otherwise enter step 11;
4, administrator right is set;
5, standardized terminals ICD and CID configuration file is called;
6, judge file CRC check and whether judging result is correct, when result is correct, enter step 7, otherwise judgement master
It stands and whether alerts, when main website alarm, judge to repeat to call whether file is less than setting maximum times, when maximum not less than setting
When number, 5 are entered step;
Otherwise 11 are entered step;
7, FileVersion verification is judged whether to, is to enter step 8, otherwise generation error log;
8, judge whether FileVersion and a newest registration are consistent, are to enter step 9, otherwise enter step
11;
9, starting automatically configures service, generates CID file, and judge CID file and configuration update list information whether one
It causes, if unanimously, entering step 10, otherwise entering step 11;
10, project testing report is generated;
11, generation error log, end automatically configure uniformity test.
<2>power distribution automation main station is registered and is automatically configured automatically uniformity test such as Fig. 4 institute of exception handling
Show:
4.1: distribution terminal CID and ICD file being updated, distribution terminal, which powers on, restarts, and initiates automatic registration service, main website
Logon message is parsed, registration information is compared;
4.2: judge whether CID and ICD fileversion number is consistent with logon message, enters step 4.2.1 when there is inconsistency,
Otherwise 4.5 are entered step;
4.2.1: judge main website whether auto-alarming, 4.2.2 is entered step when auto-alarming, otherwise enters step 4.5;
4.2.2 registration negative response is replied, terminates file calling service, artificial treatment, and enter step 4.4;
4.3 judge CRC check result whether mistake, be to enter step 4.3.1, otherwise enter step 4.5;
4.3.1: judge main website whether auto-alarming, be to enter step 4.3.2, otherwise enter step 4.5;
4.3.2: configuration file is called by main website, into 4.3.3;
4.3.3: judging whether to be more than setting number, be to enter step 4.5, otherwise enter step 4.4;
4.4 generation use-case test results simultaneously terminate exception handling uniformity test;
4.5 generation test errors logs simultaneously terminate exception handling uniformity test.
<3>it according to registration management and automatically configures the registration management of uniformity test and equipment and automatically configures exception
The uniformity test for the treatment of mechanism is as a result, pass through the electrical power distribution automatization system of test when determining equipment access main website.
Embodiment 3:
The present invention also provides a kind of test macros of electrical power distribution automatization system, comprising:
Uniformity test module: for equipment access main website when logon message and configuration file carry out registration management and
Automatically configure uniformity test;
Scrnario testing module: registration management when accessing main website for analog machine and automatically configuring abnormal conditions, and right
The treatment mechanism of the abnormal conditions carries out uniformity test;
Determining module: for according to the registration management and automatically configuring the main website registration pipe of uniformity test and equipment
The treatment mechanism uniformity test of abnormal conditions is managed and automatically configured as a result, by test when determining the equipment access main website
Electrical power distribution automatization system.
Uniformity test module includes: registration management submodule, is infused for logon message based on equipment to equipment
The uniformity test of volume management;
Submodule is automatically configured, equipment is carried out for configuration file based on equipment to automatically configure uniformity test.
Scrnario testing module includes:
Submodule is registered for the first time, main website registers and automatically configures automatically abnormal conditions when registering for the first time for analog machine,
And uniformity test is carried out to the abnormal conditions;
It is non-to register submodule for the first time, for analog machine is non-register for the first time when main website registration management and automatically configure abnormal feelings
Condition, and consistency desired result is carried out to the abnormal conditions;
Continuous registration submodule, main website registers and automatically configures automatically abnormal conditions when continuously registering for analog machine,
And uniformity test is carried out to the abnormal conditions.
Registration submodule includes: the first analogue unit for the first time, with analog machine login network access condition for the first time, changes equipment
The cyclic redundancy check of ICD file, cyclic redundancy check and registration information that main website calculates is inconsistent, occurs abnormal;
Whether first detection unit meets consistency desired result to the abnormal processing for detecting main website;When detecting
Main website alerts and re-initiates the calling service of ICD file;And when the exception is still unresolved in the calling number of setting, terminate
Distribution terminal automatically configures service, and when generating abnormality processing log, meets consistency desired result, be otherwise unsatisfactory for.
It is non-for the first time registration submodule include:
Second analogue unit is used for the non-login network access condition for the first time of analog machine, modifies device configuration file, main website parsing
Logon message notes abnormalities with the newest registration information comparison of main website;
Second detection unit, when the fileversion number for detecting configuration file is inconsistent, whether main website alerts and gives birth to
At error log, when main website alarm and generation error log, otherwise met consistency desired result is unsatisfactory for.
Continuous registration submodule includes: third analogue unit, is used for the continuous login network access condition of analog machine, and main website is to setting
It is standby to power on the logon message negative response for restarting initiation;
Third detection unit repeats to initiate registration request for detection device, and when request frequency is greater than predeterminated frequency, main
It stands and whether alerts simultaneously remote reset terminal;When main website issues alarm and remote reset terminal, meet consistency desired result, otherwise not
Meet.
It should be understood by those skilled in the art that, embodiments herein can provide as method, system or computer program
Product.Therefore, complete hardware embodiment, complete software embodiment or reality combining software and hardware aspects can be used in the application
Apply the form of example.Moreover, it wherein includes the computer of computer usable program code that the application, which can be used in one or more,
The computer program implemented in usable storage medium (including but not limited to magnetic disk storage, CD-ROM, optical memory etc.) produces
The form of product.
The application is referring to method, the process of equipment (system) and computer program product according to the embodiment of the present application
Figure and/or block diagram describe.It should be understood that every one stream in flowchart and/or the block diagram can be realized by computer program instructions
The combination of process and/or box in journey and/or box and flowchart and/or the block diagram.It can provide these computer programs
Instruct the processor of general purpose computer, special purpose computer, Embedded Processor or other programmable data processing devices to produce
A raw machine, so that being generated by the instruction that computer or the processor of other programmable data processing devices execute for real
The device for the function of being specified in present one or more flows of the flowchart and/or one or more blocks of the block diagram.
These computer program instructions, which may also be stored in, is able to guide computer or other programmable data processing devices with spy
Determine in the computer-readable memory that mode works, so that it includes referring to that instruction stored in the computer readable memory, which generates,
Enable the manufacture of device, the command device realize in one box of one or more flows of the flowchart and/or block diagram or
The function of being specified in multiple boxes.
These computer program instructions also can be loaded onto a computer or other programmable data processing device, so that counting
Series of operation steps are executed on calculation machine or other programmable devices to generate computer implemented processing, thus in computer or
The instruction executed on other programmable devices is provided for realizing in one or more flows of the flowchart and/or block diagram one
The step of function of being specified in a box or multiple boxes.
The above is only the embodiment of the present invention, are not intended to restrict the invention, all in the spirit and principles in the present invention
Within, any modification, equivalent substitution, improvement and etc. done, be all contained in apply pending scope of the presently claimed invention it
It is interior.
Claims (15)
1. a kind of electrical power distribution automatization system test method, which is characterized in that the described method includes:
The logon message and configuration file when main website are accessed to equipment, carry out registration management and automatically configure uniformity test;
Registration management when analog machine accesses main website and abnormal conditions are automatically configured, and to the treatment mechanism of the abnormal conditions
Carry out uniformity test;
According to the registration management and automatically configures the registration management of uniformity test and equipment and automatically configure abnormal conditions
Treatment mechanism uniformity test pass through the electrical power distribution automatization system of test when as a result, determining equipment access main website.
2. electrical power distribution automatization system test method as described in claim 1, it is characterised in that: when the access main website to equipment
Logon message carry out registration management uniformity test include:
The registration request initiated when accessing main website based on equipment is handled;
According to the processing of the registration request, whether meet registration management uniformity test when determining the equipment access main website.
3. electrical power distribution automatization system test method as claimed in claim 2, it is characterised in that: described according to the registration request
Processing, whether meeting uniformity test when determining equipment access main website includes:
Whether the processing for judging the registration request includes the judgement of networking scene, the update of registration service management list, endpoint to register
The integrality judgement of record generation, history registry record queries and registration information;
When included, equipment access main website meets registration management uniformity test, is otherwise unsatisfactory for.
4. electrical power distribution automatization system test method as described in claim 1, it is characterised in that: the logon message includes: end
End IP, ID, terminal function describe file and terminal profile version number information.
5. electrical power distribution automatization system test method as described in claim 1, it is characterised in that: when the access main website to equipment
Configuration file carry out automatically configuring uniformity test, comprising:
The configuring request that configuration information based on equipment is initiated is received, and records processing of the main website to the configuring request;
According to the processing to the configuring request, whether meets when determining the equipment access main website and automatically configure consistency survey
Examination.
6. electrical power distribution automatization system test method as claimed in claim 5, it is characterised in that: the basis is to the equipment
Whether the processing of configuring request meets when determining equipment access main website and automatically configures uniformity test and include:
Whether the processing for judging the configuring request includes that authority configuration function, point table template management function, point table are customized, literary
Part automatically updates, standardized terminals automatically configure service, correct resolution file, check code verifying file, FileVersion verification, with
And check configuration file;
When included, meet when equipment access main website and automatically configure uniformity test, be otherwise unsatisfactory for.
7. electrical power distribution automatization system test method as described in claim 1, it is characterised in that: the analog machine accesses main website
When registration management and automatically configure abnormal conditions, and uniformity test is carried out to the treatment mechanism of the abnormal conditions and includes:
Analog machine registers for the first time, non-registration for the first time and the main website registration management of equipment and automatically configures abnormal feelings when continuous registration
Condition, and uniformity test is carried out to the abnormal conditions.
8. electrical power distribution automatization system test method as claimed in claim 7, it is characterised in that: the mock standard terminal is first
The main website registration management of equipment and abnormal conditions are automatically configured when secondary registration, and uniformity test packet is carried out to the abnormal conditions
It includes:
Login network access condition, change standardize the ICD file of distribution terminal, the main website of equipment to mock standard distribution terminal for the first time
The cyclic redundancy check of calculating and the cyclic redundancy check of logon message are inconsistent, occur abnormal;The main website is detected at this time to described different
Whether normal processing meets uniformity test.
9. electrical power distribution automatization system test method as claimed in claim 8, it is characterised in that: the detection main website is to institute
It states abnormal processing and whether meets uniformity test and include:
It is serviced when detecting that main website alerts and re-initiates the calling of ICD file;And
When the exception is still unresolved in the calling number of setting, termination device automatically configures service, and generates abnormality processing
When log, meets uniformity test, be otherwise unsatisfactory for.
10. electrical power distribution automatization system test method as claimed in claim 7, it is characterised in that: the equipment is non-to be registered for the first time
When equipment main website registration management and automatically configure abnormal conditions, and uniformity test is carried out to the abnormal conditions and includes:
The non-login network access condition for the first time of analog machine, main website are received using the standardization modified configuration of distribution terminal configuration tool
File, and logon message is parsed, the logon message after parsing and the newest registration information of main website are inconsistent, occur different
Often;When the fileversion number for detecting configuration file is inconsistent, whether main website alerts and generation error log;When main website alerts
And when generation error log, meets uniformity test, be otherwise unsatisfactory for.
11. electrical power distribution automatization system test method as claimed in claim 7, it is characterised in that: the analog machine is continuously infused
The main website registration management of equipment and abnormal conditions are automatically configured when volume, and uniformity test is carried out to the abnormal conditions, comprising:
The logon message negative response of initiation is restarted to device power in the continuous login network access condition of analog machine, main website, and detection is set
It is standby to repeat to initiate registration request, and when request frequency is greater than predeterminated frequency, whether main website alerts and remote reset terminal;
When main website issues alarm and remote reset terminal, meets uniformity test, be otherwise unsatisfactory for.
12. electrical power distribution automatization system test method as described in claim 1, it is characterised in that: described to be managed according to the registration
The registration management for managing and automatically configuring uniformity test and equipment is surveyed with the treatment mechanism consistency for automatically configuring abnormal conditions
Test result determines the electrical power distribution automatization system when equipment accesses main website by test, comprising:
Registration management will be passed through and automatically configures the registration management of uniformity test and equipment and automatically configure abnormal conditions
By the power distribution automation system of test when the electrical power distribution automatization system for the treatment of mechanism uniformity test is determined as equipment access main website
System.
13. a kind of test macro of electrical power distribution automatization system, it is characterised in that, the system comprises:
Uniformity test module: logon message and configuration file when for accessing main website to equipment carry out registration management and automatic
Configuration conformance test;
Scrnario testing module: registration management when accessing main website for analog machine and automatically configuring abnormal conditions, and to described
The treatment mechanism of abnormal conditions carries out uniformity test;
Determining module: for according to the registration management and automatically configure the main website registration management of uniformity test and equipment with
The treatment mechanism uniformity test of abnormal conditions is automatically configured as a result, by the distribution of test when determining the equipment access main website
Automated system.
14. system as claimed in claim 13, which is characterized in that the uniformity test module includes:
Registration management submodule carries out the uniformity test of registration management for logon message based on equipment to equipment;
Submodule is automatically configured, equipment is carried out for configuration file based on equipment to automatically configure uniformity test.
15. system as claimed in claim 13, which is characterized in that the scrnario testing module includes:
Submodule is registered for the first time, and main website registers and automatically configure automatically abnormal conditions when registering for the first time for analog machine, and right
The abnormal conditions carry out uniformity test;
It is non-to register submodule for the first time, for analog machine is non-register for the first time when main website registration management and automatically configure abnormal conditions,
And consistency desired result is carried out to the abnormal conditions;
Continuous registration submodule, main website registers and automatically configures automatically abnormal conditions when continuously registering for analog machine, and right
The abnormal conditions carry out uniformity test.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810164586.3A CN110198249B (en) | 2018-02-27 | 2018-02-27 | Power distribution automation system testing method and system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810164586.3A CN110198249B (en) | 2018-02-27 | 2018-02-27 | Power distribution automation system testing method and system |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110198249A true CN110198249A (en) | 2019-09-03 |
CN110198249B CN110198249B (en) | 2022-10-04 |
Family
ID=67751268
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810164586.3A Active CN110198249B (en) | 2018-02-27 | 2018-02-27 | Power distribution automation system testing method and system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110198249B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111308242A (en) * | 2020-03-06 | 2020-06-19 | 南方电网科学研究院有限责任公司 | Test platform and test method of distribution automation system |
Citations (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2005100317A (en) * | 2003-08-28 | 2005-04-14 | F Wiseman Consulting Japan:Kk | Method for inspecting information, method for processing vehicle information, vehicle information management device, and method for recording information |
US20100299441A1 (en) * | 2009-05-22 | 2010-11-25 | Silver Spring Networks, Inc. | Multi-protocol network registration and address resolution |
CN102779321A (en) * | 2012-06-15 | 2012-11-14 | 杭州市电力局 | Method and device used for verifying message and based on integrated Ethernet chip (IEC) 61968 message type definition |
CN102970175A (en) * | 2012-02-08 | 2013-03-13 | 深圳市金宏威技术股份有限公司 | Power distribution network protocol test analytical method and system |
CN103326465A (en) * | 2013-05-17 | 2013-09-25 | 国家电网公司 | Power distribution network terminal access method based on IEC61850 standard |
CN103888291A (en) * | 2014-02-24 | 2014-06-25 | 北京科东电力控制系统有限责任公司 | Power distribution terminal plug-and-play communication method based on IEC 61850 standard |
WO2014101850A1 (en) * | 2012-12-31 | 2014-07-03 | 瑞斯康微电子(深圳)有限公司 | Automatic registration algorithm for low-voltage distribution network carrier terminal |
CN104065167A (en) * | 2014-06-26 | 2014-09-24 | 国家电网公司 | Method for realizing automatic registration of intelligent distribution terminal |
CN104269924A (en) * | 2014-09-17 | 2015-01-07 | 国家电网公司 | Power distribution terminal system based on IEC 61850 and realizing plug and play mechanism |
CN104993591A (en) * | 2015-07-06 | 2015-10-21 | 江苏省电力公司南京供电公司 | Power distribution system remote maintenance method based on IEC61850 standard |
CN105207366A (en) * | 2015-10-22 | 2015-12-30 | 江苏省电力公司南京供电公司 | IEC61850-based power distribution terminal, namely plug and play model configuration tool and realization method of IEC61850-based power distribution terminal |
CN105305418A (en) * | 2015-10-10 | 2016-02-03 | 国家电网公司 | Power distribution terminal self-description method based on IEC61850 standard |
CN105389166A (en) * | 2015-10-21 | 2016-03-09 | 珠海许继电气有限公司 | Automatic access method for self-describing plug-and-play power distribution terminal |
CN106340968A (en) * | 2016-10-21 | 2017-01-18 | 国网山东省电力公司电力科学研究院 | Integrated support system and method for management and control of power distribution network |
CN106487589A (en) * | 2016-10-18 | 2017-03-08 | 中国电力科学研究院 | A kind of terminal automatically accesses and configuring management method |
CN106771762A (en) * | 2016-12-30 | 2017-05-31 | 国网天津市电力公司 | The distribution terminal closed loop detecting system and method with secondary injection are transmitted based on simulation |
CN107069950A (en) * | 2016-12-30 | 2017-08-18 | 国网天津市电力公司 | Automatic identifying method and system of a kind of distribution main website to terminal device |
-
2018
- 2018-02-27 CN CN201810164586.3A patent/CN110198249B/en active Active
Patent Citations (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2005100317A (en) * | 2003-08-28 | 2005-04-14 | F Wiseman Consulting Japan:Kk | Method for inspecting information, method for processing vehicle information, vehicle information management device, and method for recording information |
US20100299441A1 (en) * | 2009-05-22 | 2010-11-25 | Silver Spring Networks, Inc. | Multi-protocol network registration and address resolution |
CN102970175A (en) * | 2012-02-08 | 2013-03-13 | 深圳市金宏威技术股份有限公司 | Power distribution network protocol test analytical method and system |
CN102779321A (en) * | 2012-06-15 | 2012-11-14 | 杭州市电力局 | Method and device used for verifying message and based on integrated Ethernet chip (IEC) 61968 message type definition |
WO2014101850A1 (en) * | 2012-12-31 | 2014-07-03 | 瑞斯康微电子(深圳)有限公司 | Automatic registration algorithm for low-voltage distribution network carrier terminal |
CN103326465A (en) * | 2013-05-17 | 2013-09-25 | 国家电网公司 | Power distribution network terminal access method based on IEC61850 standard |
CN103888291A (en) * | 2014-02-24 | 2014-06-25 | 北京科东电力控制系统有限责任公司 | Power distribution terminal plug-and-play communication method based on IEC 61850 standard |
CN104065167A (en) * | 2014-06-26 | 2014-09-24 | 国家电网公司 | Method for realizing automatic registration of intelligent distribution terminal |
CN104269924A (en) * | 2014-09-17 | 2015-01-07 | 国家电网公司 | Power distribution terminal system based on IEC 61850 and realizing plug and play mechanism |
CN104993591A (en) * | 2015-07-06 | 2015-10-21 | 江苏省电力公司南京供电公司 | Power distribution system remote maintenance method based on IEC61850 standard |
CN105305418A (en) * | 2015-10-10 | 2016-02-03 | 国家电网公司 | Power distribution terminal self-description method based on IEC61850 standard |
CN105389166A (en) * | 2015-10-21 | 2016-03-09 | 珠海许继电气有限公司 | Automatic access method for self-describing plug-and-play power distribution terminal |
CN105207366A (en) * | 2015-10-22 | 2015-12-30 | 江苏省电力公司南京供电公司 | IEC61850-based power distribution terminal, namely plug and play model configuration tool and realization method of IEC61850-based power distribution terminal |
CN106487589A (en) * | 2016-10-18 | 2017-03-08 | 中国电力科学研究院 | A kind of terminal automatically accesses and configuring management method |
CN106340968A (en) * | 2016-10-21 | 2017-01-18 | 国网山东省电力公司电力科学研究院 | Integrated support system and method for management and control of power distribution network |
CN106771762A (en) * | 2016-12-30 | 2017-05-31 | 国网天津市电力公司 | The distribution terminal closed loop detecting system and method with secondary injection are transmitted based on simulation |
CN107069950A (en) * | 2016-12-30 | 2017-08-18 | 国网天津市电力公司 | Automatic identifying method and system of a kind of distribution main website to terminal device |
Non-Patent Citations (14)
Title |
---|
TANG XUEYONG等: "Research on automatic testing based model validation framework for distribution automation system", 《2016 CHINA INTERNATIONAL CONFERENCE ON ELECTRICITY DISTRIBUTION (CICED)》 * |
严小文等: "基于IEC 61968的营配一体化系统互操作研究", 《电气应用》 * |
傅军等: "配网自动化终端之精度、功能、通信协议综合检测技术研究", 《电测与仪表》 * |
周靖: "配电终端自动发现技术的实现", 《中国战略新兴产业》 * |
周鸿鹄等: "IEC 61850一致性测试技术", 《电气应用》 * |
唐明等: "配电自动化设备通信协议的一致性测试系统设计与实现", 《电气技术》 * |
徐娟萍等: "IEC 61850标准一致性仿真测试系统", 《电网技术》 * |
栗大维等: "主动配电网信息集成一致性测试方法", 《电气自动化》 * |
王勇等: "基于IEC61850的配网终端自动识别技术", 《电测与仪表》 * |
肖永立等: "智能变电站配置文件全过程校核方法研究", 《电工技术》 * |
舒伟等: "基于无线VPDN组网的馈线自动化测试方法与应用", 《供用电》 * |
陈慧民等: "智能用电信息采集终端检测系统探讨", 《广西电业》 * |
马晓轩等: "基于UDDI的应用服务注册中心的设计与实现", 《北京航空航天大学学报》 * |
黄飞等: "基于营配数据融合的智能配用电信息系统架构", 《电工技术》 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111308242A (en) * | 2020-03-06 | 2020-06-19 | 南方电网科学研究院有限责任公司 | Test platform and test method of distribution automation system |
Also Published As
Publication number | Publication date |
---|---|
CN110198249B (en) | 2022-10-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101212357B (en) | Interface testing method and device | |
US8079017B2 (en) | Automated QS interface testing framework | |
US10169203B2 (en) | Test simulation for software defined networking environments | |
CN110088744B (en) | Database maintenance method and system | |
US11893331B2 (en) | Device verification method, UVM verification platform, electronic apparatus and storage medium | |
WO2020000758A1 (en) | Server acceptance method and apparatus, computer device, and storage medium | |
CN110063042A (en) | A kind of response method and its terminal of database failure | |
CN110198222B (en) | Plug-and-play test method and test master station for power distribution automation terminal | |
CN110198249A (en) | A kind of electrical power distribution automatization system test method and system | |
CN108829495A (en) | Verification method, device, equipment and the storage medium of multiple database modification affairs | |
CN106656592B (en) | Service management method and device based on role configuration | |
CN112561690A (en) | Method, system, equipment and storage medium for testing credit card staging service interface | |
CN112835802A (en) | Equipment testing method, device, equipment and storage medium | |
CN112905437A (en) | Method and device for testing case and storage medium | |
US20160267172A1 (en) | Constraint free model | |
KR101862617B1 (en) | System of testing iot sensor for power facility management | |
CN112948195B (en) | Interface testing method, device, electronic equipment and storage medium | |
CN115185819A (en) | System testing method, device, equipment and computer readable storage medium | |
CN110058995A (en) | A kind of the data library test method and system of the interference of avoidable type of database | |
CN111475400A (en) | Verification method of service platform and related equipment | |
CN112433946A (en) | Interface test management method, device, equipment and storage medium | |
CN110851254A (en) | Equipment production method, device, server and storage medium based on microservice | |
CN111082984A (en) | Method and device for simulating login of network equipment to carry out command line interaction | |
CN115994097B (en) | Method and device for generating abnormal cash-out use cases based on error codes | |
CN113992491B (en) | Application server group operation and maintenance management system, method and device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |