A kind of lightning protection electrical verification ring insulating shield installation tool Download PDFInfo
- Publication number
- CN110190560A CN110190560A CN201910618280.5A CN201910618280A CN110190560A CN 110190560 A CN110190560 A CN 110190560A CN 201910618280 A CN201910618280 A CN 201910618280A CN 110190560 A CN110190560 A CN 110190560A
- Authority
- CN
- China
- Prior art keywords
- storage device
- insulating shield
- lightning protection
- electrical verification
- insulation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000012795 verification Methods 0.000 title claims abstract description 56
- 238000009434 installation Methods 0.000 title claims abstract description 33
- 238000009413 insulation Methods 0.000 claims abstract description 72
- 230000005540 biological transmission Effects 0.000 claims abstract description 10
- 238000003780 insertion Methods 0.000 claims description 6
- 230000037431 insertion Effects 0.000 claims description 6
- 239000000463 material Substances 0.000 claims description 4
- 229910000831 Steel Inorganic materials 0.000 claims description 3
- 239000011521 glass Substances 0.000 claims description 3
- 239000010959 steel Substances 0.000 claims description 3
- 230000000694 effects Effects 0.000 abstract description 6
- 238000011900 installation process Methods 0.000 abstract description 2
- 238000010586 diagram Methods 0.000 description 5
- 238000000034 method Methods 0.000 description 4
- 230000005489 elastic deformation Effects 0.000 description 3
- 239000007787 solid Substances 0.000 description 2
- 238000012360 testing method Methods 0.000 description 2
- 230000002159 abnormal effect Effects 0.000 description 1
- 230000006835 compression Effects 0.000 description 1
- 238000007906 compression Methods 0.000 description 1
- 239000004020 conductor Substances 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 235000013399 edible fruits Nutrition 0.000 description 1
- 230000005520 electrodynamics Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000003292 glue Substances 0.000 description 1
- 239000012212 insulator Substances 0.000 description 1
- 238000005381 potential energy Methods 0.000 description 1
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G1/00—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
- H02G1/02—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables
- H02G1/04—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables for mounting or stretching
Landscapes
- Aiming, Guidance, Guns With A Light Source, Armor, Camouflage, And Targets (AREA)
- Insulating Bodies (AREA)
Abstract
The application provides a kind of lightning protection electrical verification ring insulating shield installation tool, including insulation outer bar, insulating shield storage device, insulated handle, transmission device and rubber tack locking device;Transmission device is set between insulating shield storage device and insulated handle.Lightning protection electrical verification ring insulating shield installation tool provided herein is by being placed in insulating shield storage device for lightning protection electrical verification ring insulating shield, operate insulated handle, insulating shield storage device is closed through transmission device, and so that rubber tack is inserted into buttonhole by rubber tack locking device and lock, the installation to lightning protection electrical verification ring insulating shield can be realized in the case where overhead line charges, without cutting off the power and without the direct contact aerial of manpower in installation process, the safety of operator ensure that;By may be implemented to charge adjustment lightning protection electrical verification ring at any time with the cooperation of other tools, lightning protection effect is improved, to improve the reliability in city and rural power service net.
Description
Technical field
This application involves insulating shield mounting technique field more particularly to a kind of lightning protection electrical verification ring insulating shield erectors
Tool.
Background technique
In 10kV insulated overhead conductor operational process, conducting wire can be due to abnormal electrodynamic action and construction technology etc.
Reason occurs from torsion phenomenon and is difficult to restore, and the lightning protection electrical verification ring on conducting wire twists also with conducting wire and is difficult to multiple
It is former.Its lightning protection effect will receive influence after lightning protection electrical verification ring is torqued into certain angle, need to restore by adjusting to realize.?
When adjustment, need to use the extracting tool of lightning protection electrical verification ring insulating shield, exposed lightning protection electrical verification ring position adjustment tool and
The installation tool of lightning protection electrical verification ring insulating shield.And the electrification extracting tool of lightning protection electrical verification ring insulating shield and exposed lightning protection
Electrical verification annulus electric position adjustment tool has been succeeded in developing, a kind of for using under live state therefore, it is necessary to design
Lightning protection electrical verification ring insulating shield installation tool, to charge extracting tool and exposed lightning protection electrical verification with lightning protection electrical verification ring insulating shield
The adjustment tool cooperation of annulus electric position, to realize the lightning protection electrical verification ring of electrification adjustment at any time, this is to raising lightning protection effect, Jin Erti
The reliability of high city and rural power service net is of great significance.
Summary of the invention
The purpose of the application is in view of the above problems, providing a kind of lightning protection electrical verification ring insulating shield installation tool.
The application provides a kind of lightning protection electrical verification ring insulating shield installation tool, and lightning protection electrical verification ring insulating shield includes insulation shield
Cover main body, the rubber tack being set in insulating shield main body and the buttonhole for rubber tack insertion.Lightning protection electrical verification ring insulating shield
Installation tool includes hollow insulation outer bar;The one end for the outer bar that insulate is equipped with insulating shield storage device, and the other end is equipped with insulation
Handle;Transmission device is equipped between insulated handle and insulating shield storage device, to adjust the opening and closing of insulating shield storage device;
Insulating shield storage device includes first storage device and the second storage device;It is outer that insulation is fixed in one end of first storage device
Axial setting on bar and along insulation outer bar, the other end are hinged by hinge and the second storage device;First storage device and
The shield that insulating shield main body is temporarily fixed on insulating shield storage device is respectively provided on second storage device to hang
Hook;One end in first storage device far from hinge is equipped with the groove to match with buttonhole, for rubber tack insertion;Second storage
Device is equipped with the first through hole for accommodating the head of a nail of rubber tack;Second storage device is hinged with connecting rod in one end close to hinge;
Connecting rod is hinged with rubber tack locking device far from one end of the second storage device;It also opens the one end of connecting rod far from the second storage device
Equipped with the second through-hole;The first bolt is equipped between connecting rod and the second storage device;First bolt passes through the second through-hole and and connecting rod
Slidable connection;One end of first bolt is fixed on the second storage device, and the other end is equipped with stop nut;First bolt is located at
Part between second storage device and connecting rod is arranged with third spring;Transmission device includes being placed in insulation outer bar and along insulation
The insulated pull rod that outer bar is axially arranged;One end of insulated pull rod is hinged with insulated handle, and the other end is fixedly connected with drawstring;It draws
The fixed pulley that one end far from insulated pull rod restrict around being set to inside insulation outer bar is connected with oblique pull plate;Oblique pull plate is freely worn
Set on the upper end of insulation outer bar, oblique pull plate is hinged with connection frame far from one end of drawstring;The hinged place of connection frame and oblique pull plate is set
There is the first spring;First spring is fixedly connected far from one end of connection frame with first storage device;Connection frame is far from oblique pull plate
It is fixedly connected in the middle part of one end and connecting rod;Insulation outer bar is arranged with the first insulation clip in one end close to insulated handle;Insulation
Handle includes operating stick and the connecting rod that is fixed in operating stick;Connecting rod is arranged in the lower end of insulation outer bar and draws with insulation
Bar is hinged;The one end of connecting rod far from operating stick is hinged with the first insulation clip.
According to the technical solution that the application some embodiments provide, rubber tack locking device includes support frame;Support frame
Two sides are symmetrically arranged with fixing seat;Fixing seat is equipped with the impact head that can run through first through hole;Third spring is fixed on support frame;
Third spring is fixedly connected far from one end of support frame with connecting rod.
According to the technical solution that the application some embodiments provide, impact head is cylindrical, and the radius of impact head is less than the
The radius of one through-hole.
According to the technical solution that the application some embodiments provide, the arc-shaped setting of support frame, the curved opening of support frame
Towards the second storage device.
According to the technical solution that the application some embodiments provide, articulation piece is fixedly connected in the middle part of support frame;Hingedly
The one end of part far from support frame is hinged with connecting rod.
According to the technical solution that the application some embodiments provide, second spring is arranged in insulated pull rod;Second spring
One end be connected with the spring limiting board being fixed in insulation outer bar, the other end is connected with bullet of the fixing sleeve in the insulated pull rod
Spring position-limiting tube.
According to the technical solution that the application some embodiments provide, the outer cover for the outer bar that insulate is equipped with the second insulation clip;
First storage device is fixedly connected on the second insulation clip.
According to the technical solution that the application some embodiments provide, the both ends for the outer bar that insulate are respectively equipped with insulation plug.
According to the technical solution that the application some embodiments provide, insulation outer bar, first storage device, the second storage dress
It sets, insulated handle, insulated pull rod, fixed pulley, oblique pull plate, connection frame, connecting rod, support frame, articulation piece, impact head, the first insulation
Clip and the second insulation clip are expoxy glass Steel material.
The application's the utility model has the advantages that by by lightning protection electrical verification ring insulating shield be placed in insulating shield storage device and with shield
Cover hook is fixed temporarily, and one end with buttonhole is placed in first storage device and buttonhole is aligned with groove, with rubber tack
One end is placed in the second storage device and the head of a nail of rubber tack is placed in first through hole, and lightning protection electrical verification ring insulating shield is moved to
At lightning protection electrical verification ring, hold with a firm grip for the first time insulated handle when, close first storage device with the second storage device by transmission device
It closes;Hold with a firm grip again insulated handle when, be inserted into rubber tack by rubber tack locking device and buttonhole and lock, that is, complete lightning protection and test
The installation of electric ring insulating shield.Without cutting off the power and without the direct contact aerial of manpower in installation process, operation ensure that
The safety of personnel;By by the lightning protection electrical verification ring insulating shield installation tool and lightning protection electrical verification ring insulating shield extracting tool and naked
The lightning protection electrical verification ring adjustment tool of dew matches, and may be implemented to charge adjustment lightning protection electrical verification ring at any time, to improve lightning protection effect
Fruit, and then improve the reliability in city and rural power service net.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of lightning protection electrical verification ring insulating shield installation tool provided by the embodiments of the present application;
The structural schematic diagram that the local A that Fig. 2 is Fig. 1 amplifies;
Fig. 3 is the knot of the rubber tack locking device of lightning protection electrical verification ring insulating shield installation tool provided by the embodiments of the present application
Structure schematic diagram;
Fig. 4 is the structure of the first storage device of lightning protection electrical verification ring insulating shield installation tool provided by the embodiments of the present application
Schematic diagram;
Fig. 5 is the structure of the second storage device of lightning protection electrical verification ring insulating shield installation tool provided by the embodiments of the present application
Schematic diagram.
Label character described in figure indicates are as follows:
1, insulate outer bar;2, first storage device;3, the second storage device;4, hinge;5, shield is linked up with;6, groove;7,
First through hole;8, connecting rod;9, insulated pull rod;10, drawstring;11, fixed pulley;12, oblique pull plate;13, connection frame;14, the first spring;
15, the first insulation clip;16, operating stick;17, connecting rod;18, support frame;19, fixing seat;20, impact head;21, third bullet
Spring;22, articulation piece;23, second spring;24, spring limiting board;25, spring retainer pipe;26, the second insulation clip;27, rubber
Follow closely locking device;28, the first bolt;29, stop nut.
Specific embodiment
In order to make those skilled in the art more fully understand the technical solution of the application, with reference to the accompanying drawing to the application into
Row detailed description, the description of this part be only it is exemplary and explanatory, should not have any limitation to the protection scope of the application
Effect.
As shown in Figures 1 to 5, the present embodiment provides a kind of lightning protection electrical verification ring insulating shield installation tool, lightning protection electrical verification rings
Insulating shield includes insulating shield main body, the rubber tack being set in insulating shield main body and the buttonhole for rubber tack insertion.
Lightning protection electrical verification ring insulating shield installation tool includes hollow insulation outer bar 1;The one end for the outer bar 1 that insulate is stored equipped with insulating shield
Device, the other end are equipped with insulated handle;Transmission device is equipped between insulated handle and insulating shield storage device, to adjust insulation
The opening and closing of shield storage device;Insulating shield storage device includes first storage device 2 and the second storage device 3;First storage
The axial setting in insulation outer bar 1 and along insulation outer bar 1 is fixed in one end of device 2, and the other end passes through hinge 4 and the second storage
Device 3 is hinged;It is respectively provided in first storage device 2 and the second storage device 3 and is fixed temporarily insulating shield main body
In the shield hook 5 on insulating shield storage device;One end in first storage device 2 far from hinge 4 is equipped with and buttonhole phase
The groove 6 matched, for rubber tack insertion;Second storage device 3 is equipped with the first through hole 7 for accommodating the head of a nail of rubber tack;Second
Storage device 3 is hinged with connecting rod 8 in one end close to hinge 4;Connecting rod 8 is hinged with rubber far from one end of the second storage device 3
Follow closely locking device 27;Connecting rod 8 is also provided with the second through-hole far from one end of the second storage device 3;Connecting rod 8 and the second storage device
The first bolt 28 is equipped between 3;First bolt 28 pass through the second through-hole and with 8 slidable connection of connecting rod;The one of first bolt 28
End is fixed on the second storage device 3, and the other end is equipped with stop nut 29;First bolt 28 is located at the second storage device 3 and connects
Part between bar 8 is arranged with third spring 21;Transmission device includes being placed in insulation outer bar 1 and axially setting along insulation outer bar 1
The insulated pull rod 9 set;One end of insulated pull rod 9 is hinged with insulated handle, and the other end is fixedly connected with drawstring 10;Drawstring 10 is remote
One end from insulated pull rod 9 bypasses the fixed pulley 11 being set to inside insulation outer bar 1 and is connected with oblique pull plate 12;Oblique pull plate 12 is certainly
By being arranged in the upper end of insulation outer bar 1, oblique pull plate 12 is hinged with connection frame 13 far from one end of drawstring 10;Connection frame 13 and oblique pull
The hinged place of plate 12 is equipped with the first spring 14;The one end of first spring 14 far from connection frame 13 and the fixed company of first storage device 2
It connects;The one end of connection frame 13 far from oblique pull plate 12 is fixedly connected with the middle part of connecting rod 8;The outer bar 1 that insulate is in close to insulated handle
One end is arranged with the first insulation clip 15;Insulated handle includes operating stick 16 and the connecting rod being fixed in operating stick 16 17;
Operating stick 16 is curved rod;Connecting rod 17 is arranged in the lower end of insulation outer bar 1 and is hinged with insulated pull rod 9;Connecting rod 17 is remote
One end from operating stick 16 is hinged with the first insulation clip 15.
In a preferred embodiment, rubber tack locking device 27 includes support frame 18;The two sides of support frame 18 are symmetrically arranged with
Fixing seat 19;Fixing seat 19 is equipped with the impact head 20 that can run through first through hole 7;Third spring 21 is fixed on support frame 18;
The one end of third spring 21 far from support frame 18 is fixedly connected with connecting rod 8.
In a preferred embodiment, impact head 20 is cylindrical, and the radius of impact head 20 is less than the radius of first through hole 7.
In a preferred embodiment, the curved opening of the arc-shaped setting of support frame 18, support frame 18 is filled towards the second storage
Set 3.
In a preferred embodiment, the middle part of support frame 18 is fixedly connected with articulation piece 22;Articulation piece 22 is far from support frame
18 one end is hinged with connecting rod 8.
In a preferred embodiment, second spring 23 is arranged in insulated pull rod 9;One end of second spring 23 is connected with solid
Spring limiting board 24 in insulation outer bar 1, the other end are connected with spring retainer pipe of the fixing sleeve in insulated pull rod 9
25。
In a preferred embodiment, the outer cover for the outer bar 1 that insulate is equipped with the second insulation clip 26;First storage device 2 is solid
Surely it is connected on the second insulation clip 26.
In a preferred embodiment, the both ends for the outer bar 1 that insulate are respectively equipped with insulation plug.
In a preferred embodiment, insulate outer bar 1, first storage device 2, the second storage device 3, insulated handle, insulation
Pull rod 9, fixed pulley 11, oblique pull plate 12, connection frame 13, connecting rod 8, support frame 18, articulation piece 22, impact head 20, the first edge insulator
Hoop 15 and the second insulation clip 26 are expoxy glass Steel material.In the other embodiments of the application, insulate outer bar 1, first
Storage device 2, the second storage device 3, insulated handle, insulated pull rod 9, fixed pulley 11, oblique pull plate 12, connection frame 13, connecting rod 8,
It is high mechanical that support frame 18, articulation piece 22, the insulation clip 15 of impact head 20, first and the second insulation clip 26 may be alternatively provided as other
The material of intensity and the high class of insulation.
Lightning protection electrical verification ring insulating shield installation tool provided by the embodiments of the present application, when in use, the first step will be to be installed
Insulating shield main body be placed in insulating shield storage device and be fixed temporarily with shield hook 5, wherein having one end of buttonhole
It is placed in first storage device 2 and buttonhole is aligned with groove 6, one end with rubber tack is placed in the second storage device 3 and rubber
The head of a nail of glue nail is placed in first through hole 7;Second step is held the insulation one end of outer bar 1 far from insulating shield storage device, will be prevented
Thunder electrical verification ring insulating shield is transferred at the lightning protection electrical verification ring adjusted and covers in the outside of lightning protection electrical verification ring, insulated handle of holding with a firm grip
Operating stick 16 middle part, the connecting rod 17 of insulated handle drives insulated pull rod 9 hinged therewith to move down, while spring limits
Position pipe 25, which moves down and compresses second spring 23, to be allowed to deform, and the drawstring 10 being connected with insulated pull rod 9 moves down, fixed pulley 11
It rotates, oblique pull plate 12 is generated the trend moved to the right by the pulling force from drawstring 10, and the first spring 14 is stretched
Deformation, connection frame 13 is rotated by the thrust from oblique pull plate 12 to close to the side of insulation outer bar 1, to drive the
Two storage devices 3 are gradually fastened to first storage device 2 until closure;Third step, under the operating stick 16 for insulated handle of holding with a firm grip
The connecting rod 17 in portion, insulated handle drives insulated pull rod 9 hinged therewith to continue to move down, while spring retainer pipe 25 continues
Move down and compress second spring 23 and continue to deform, the drawstring 10 being connected with insulated pull rod 9 continues to move down, fixed pulley 11 after
Continuous to rotate, oblique pull plate 12 is moved to the right by from the continuation of the biggish pulling force of drawstring 10, and the first spring 14 continues quilt
It stretches, connection frame 13 is continued to rotate to close to the side of insulation outer bar 1 by the thrust from oblique pull plate 12, connecting rod 8
Compression third spring 21 is allowed to be deformed, while pushing rubber tack locking device 27 to the side close to first storage device 2
It is mobile, the trend for needing to restore itself original state, the elastic potential energy of third spring 21 are generated while third spring 21 is pressurized
So that the spring has certain momentum;Impact head 20 acts on power on the head of a nail of the rubber tack in through-hole, third spring 21
The effect that movement accelerates is also played, rapidly rubber tack is lock onto buttonhole so as to laborsaving, that is, completes lightning protection and tests
The installation of electric ring insulating shield;Finally, unclamping the operating stick 16 of insulated handle, second spring 23 restores the elastic deformation of itself,
Insulated pull rod 9 and spring retainer pipe 25 thereon is driven to move up, insulated pull rod 9, which moves up, drives drawstring 10 to loosen, the first bullet
Spring 14 generates the elastic deformation for restoring itself, and connection frame 13 is caused to rotate to the side far from insulation outer bar 1, thus the second storage
Device 3 is gradually distance from first storage device 2 until fully opening, and third spring 21 restores the elastic deformation of itself, rubber tack lock
Tight device 27 is moved to initial position to far from 3 side of the second storage device under the action of connecting rod 8 and third spring 21, is
The installation of the ring insulating shield of lightning protection electrical verification next time is ready.
Lightning protection electrical verification ring insulating shield installation tool provided by the embodiments of the present application may be implemented to charge in 10kv overhead line
In the case where, using without completing the installation to lightning protection electrical verification ring insulating shield by the way of the direct contact aerial of manpower, guarantee
The safety of operator;Meanwhile by the way that the device and lightning protection electrical verification ring insulating shield extracting tool and exposed lightning protection are tested
Electric ring adjustment tool matches, and may be implemented to charge adjustment lightning protection electrical verification ring at any time, to improve city and rural power service net
Reliability.
Specific examples are used herein to illustrate the principle and implementation manner of the present application, and above embodiments are said
It is bright to be merely used to help understand the present processes and its core concept.The above is only the preferred embodiment of the application,
It should be pointed out that due to the finiteness of literal expression, and objectively there is unlimited specific structure, for the common of the art
For technical staff, without departing from the principle of the present invention, can also make it is several improve, retouching or variation, can also be with
Above-mentioned technical characteristic is combined in the right way;These improve retouching, variation or combination, or not improved by invention
Conception and technical scheme directly apply to other occasions, are regarded as the protection scope of the application.
Claims (9)
1. a kind of lightning protection electrical verification ring insulating shield installation tool, lightning protection electrical verification ring insulating shield includes insulating shield main body, setting
In the rubber tack in the insulating shield main body and for the buttonhole of rubber tack insertion, which is characterized in that the lightning protection is tested
Electric ring insulating shield installation tool includes hollow insulation outer bar (1);It is deposited equipped with insulating shield one end of insulation outer bar (1)
Storage device, the other end are equipped with insulated handle;Transmission device is equipped between the insulated handle and the insulating shield storage device,
To adjust the opening and closing of the insulating shield storage device;
The insulating shield storage device includes first storage device (2) and the second storage device (3);The first storage device
(2) the axial setting on insulation outer bar (1) and along insulation outer bar (1) is fixed in one end, and the other end passes through hinge
(4) it is hinged with second storage device (3);On the first storage device (2) and second storage device (3) respectively
(5) are linked up with equipped with the shield for being temporarily fixed on the insulating shield main body on the insulating shield storage device;It is described
One end in first storage device (2) far from the hinge (4) is equipped with the groove (6) to match with the buttonhole, for described
Rubber tack insertion;Second storage device (3) is equipped with the first through hole (7) for accommodating the head of a nail of the rubber tack;Described
Two storage devices (3) are hinged with connecting rod (8) in one end close to the hinge (4);The connecting rod (8) is far from second storage
One end of device (3) is hinged with rubber tack locking device (27);The one of separate second storage device (3) of the connecting rod (8)
End is also provided with the second through-hole;The first bolt (28) are equipped between the connecting rod (8) and second storage device (3);It is described
First bolt (28) pass through second through-hole and with the connecting rod (8) slidable connection;One end of first bolt (28)
It is fixed on second storage device (3), the other end is equipped with stop nut (29);First bolt (28) is located at described the
Part between two storage devices (3) and the connecting rod (8) is arranged with third spring (21);
The transmission device includes being placed in insulation outer bar (1) and drawing along the insulation that insulation outer bar (1) is axially arranged
Bar (9);One end of the insulated pull rod (9) is hinged with the insulated handle, and the other end is fixedly connected with drawstring (10);It is described
Drawstring (10) bypassed far from the one end of the insulated pull rod (9) be set to the internal fixed pulley (11) of insulation outer bar (1) with
Oblique pull plate (12) is connected;The oblique pull plate (12) is freely arranged in the upper end of insulation outer bar (1), the oblique pull plate (12)
One end far from the drawstring (10) is hinged with connection frame (13);The hinged place of the connection frame (13) and the oblique pull plate (12)
Equipped with the first spring (14);First spring (14) one end and the first storage device far from the connection frame (13)
(2) it is fixedly connected;The middle part of the connection frame (13) one end and the connecting rod (8) far from the oblique pull plate (12) is fixed to be connected
It connects;
Insulation outer bar (1) is arranged with the first insulation clip (15) in one end close to the insulated handle;The insulation hand
Handle includes operating stick (16) and the connecting rod (17) being fixed on the operating stick (16);The connecting rod (17) is arranged in institute
It states the lower end of insulation outer bar (1) and is hinged with the insulated pull rod (9);The connecting rod (17) is far from the operating stick (16)
One end with it is described first insulation clip (15) be hinged.
2. lightning protection electrical verification ring insulating shield installation tool according to claim 1, which is characterized in that the rubber tack locking
Device (27) includes support frame (18);The two sides of support frame as described above (18) are symmetrically arranged with fixing seat (19);The fixing seat (19)
It is equipped with the impact head (20) that can run through the first through hole (7);Third spring (21) are fixed on support frame as described above (18);Institute
Third spring (21) are stated to be fixedly connected far from the one end of support frame as described above (18) with the connecting rod (8).
3. lightning protection electrical verification ring insulating shield installation tool according to claim 2, which is characterized in that the impact head (20)
Cylindrical, the radius of the impact head (20) is less than the radius of the first through hole (7).
4. lightning protection electrical verification ring insulating shield installation tool according to claim 2, which is characterized in that support frame as described above (18)
Arc-shaped setting, the curved opening of support frame as described above (18) is towards second storage device (3).
5. lightning protection electrical verification ring insulating shield installation tool according to claim 2, which is characterized in that support frame as described above (18)
Middle part be fixedly connected with articulation piece (22);The articulation piece (22) one end and the connecting rod far from support frame as described above (18)
(8) it is hinged.
6. lightning protection electrical verification ring insulating shield installation tool according to claim 1, which is characterized in that the insulated pull rod
(9) second spring (23) are arranged on;One end of the second spring (23), which is connected with, to be fixed on the insulation outer bar (1)
Spring limiting board (24), the other end are connected with spring retainer pipe (25) of the fixing sleeve on the insulated pull rod (9).
7. lightning protection electrical verification ring insulating shield installation tool according to claim 1, which is characterized in that the insulation outer bar
(1) outer cover is equipped with the second insulation clip (26);The first storage device (2) is fixedly connected on the second insulation clip
(26) on.
8. lightning protection electrical verification ring insulating shield installation tool according to claim 1, which is characterized in that the insulation outer bar
(1) both ends are respectively equipped with insulation plug.
9. lightning protection electrical verification ring insulating shield installation tool according to claim 5, which is characterized in that the insulation outer bar
(1), the first storage device (2), second storage device (3), the insulated handle, the insulated pull rod (9), described
It is fixed pulley (11), the oblique pull plate (12), the connection frame (13), the connecting rod (8), support frame as described above (18), described hinged
Part (22), the impact head (20), first insulation clip (15) and second insulation clip (26) are expoxy glass
Steel material.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910618280.5A CN110190560B (en) | 2019-07-10 | 2019-07-10 | Lightning protection electricity inspection ring insulation shield mounting tool |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910618280.5A CN110190560B (en) | 2019-07-10 | 2019-07-10 | Lightning protection electricity inspection ring insulation shield mounting tool |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110190560A true CN110190560A (en) | 2019-08-30 |
CN110190560B CN110190560B (en) | 2024-02-27 |
Family
ID=67725614
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910618280.5A Active CN110190560B (en) | 2019-07-10 | 2019-07-10 | Lightning protection electricity inspection ring insulation shield mounting tool |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110190560B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110797800A (en) * | 2019-12-10 | 2020-02-14 | 国网青海省电力公司海北供电公司 | Insulating isolation baffle |
CN114243543A (en) * | 2022-02-14 | 2022-03-25 | 国网山东省电力公司临沂供电公司 | Tool for additionally installing insulating sheath without power failure |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH01279520A (en) * | 1988-05-02 | 1989-11-09 | Ngk Insulators Ltd | Anti-lightening horn insulator device |
US20020020049A1 (en) * | 1999-01-21 | 2002-02-21 | Decker Edward H. | Anti-flashover ring installation tool and method for using the same |
JP2010233420A (en) * | 2009-03-30 | 2010-10-14 | Chudenko Corp | Insulation cover mounting tool |
US20120228025A1 (en) * | 2011-03-12 | 2012-09-13 | Ricardo Nieto Lopez | Safety Device for Live Electrical Wire |
CN205123131U (en) * | 2015-11-27 | 2016-03-30 | 国网北京市电力公司 | Insulating guard shield mounting tool |
CN205231469U (en) * | 2015-12-15 | 2016-05-11 | 国网四川省电力公司自贡供电公司 | Insulating cover |
CN108599003A (en) * | 2018-06-21 | 2018-09-28 | 国网冀北电力有限公司廊坊供电公司 | Overhead line electricity testing grounding ring wire clamp shield Electrified installation tool |
CN109818297A (en) * | 2019-04-01 | 2019-05-28 | 国网冀北电力有限公司廊坊供电公司 | A kind of overhead line arc-preventing metal utensil insulated shielding cover installation tool |
CN210142873U (en) * | 2019-07-10 | 2020-03-13 | 国网冀北电力有限公司廊坊供电公司 | Lightning protection electricity testing ring insulation shield mounting tool |
-
2019
- 2019-07-10 CN CN201910618280.5A patent/CN110190560B/en active Active
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH01279520A (en) * | 1988-05-02 | 1989-11-09 | Ngk Insulators Ltd | Anti-lightening horn insulator device |
US20020020049A1 (en) * | 1999-01-21 | 2002-02-21 | Decker Edward H. | Anti-flashover ring installation tool and method for using the same |
JP2010233420A (en) * | 2009-03-30 | 2010-10-14 | Chudenko Corp | Insulation cover mounting tool |
US20120228025A1 (en) * | 2011-03-12 | 2012-09-13 | Ricardo Nieto Lopez | Safety Device for Live Electrical Wire |
CN205123131U (en) * | 2015-11-27 | 2016-03-30 | 国网北京市电力公司 | Insulating guard shield mounting tool |
CN205231469U (en) * | 2015-12-15 | 2016-05-11 | 国网四川省电力公司自贡供电公司 | Insulating cover |
CN108599003A (en) * | 2018-06-21 | 2018-09-28 | 国网冀北电力有限公司廊坊供电公司 | Overhead line electricity testing grounding ring wire clamp shield Electrified installation tool |
CN109818297A (en) * | 2019-04-01 | 2019-05-28 | 国网冀北电力有限公司廊坊供电公司 | A kind of overhead line arc-preventing metal utensil insulated shielding cover installation tool |
CN210142873U (en) * | 2019-07-10 | 2020-03-13 | 国网冀北电力有限公司廊坊供电公司 | Lightning protection electricity testing ring insulation shield mounting tool |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110797800A (en) * | 2019-12-10 | 2020-02-14 | 国网青海省电力公司海北供电公司 | Insulating isolation baffle |
CN114243543A (en) * | 2022-02-14 | 2022-03-25 | 国网山东省电力公司临沂供电公司 | Tool for additionally installing insulating sheath without power failure |
Also Published As
Publication number | Publication date |
---|---|
CN110190560B (en) | 2024-02-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110265923A (en) | A kind of preventing arc wire clamp insulating shield installation tool | |
CN108599003B (en) | Electrified mounting tool for overhead line electricity-checking grounding loop clamp shield | |
CN110190560A (en) | A kind of lightning protection electrical verification ring insulating shield installation tool | |
CN201374397Y (en) | Portable type short-circuit grounding device | |
CN104167617B (en) | KYN28 type switch cabinet bus static contact grounding device | |
CN112332133A (en) | Grounding clamp, grounding wire suspension device and method for suspending grounding wire by unmanned aerial vehicle | |
CN209805251U (en) | Silicon rubber insulating cover plugging buckle locker | |
CN105846378B (en) | Rotary spacer capable of being installed rapidly and installation method thereof | |
CN217215689U (en) | Light-weight overhead ground wire repairing robot | |
CN206098795U (en) | Locking ground connection wire hook of duckbilled formula hangs device | |
CN210142873U (en) | Lightning protection electricity testing ring insulation shield mounting tool | |
CN104538895B (en) | The double string anti-fouling type porcelain insulator splittings of earth potential live replacing | |
CN203277304U (en) | Built-in high-voltage fuse sleeve installation apparatus | |
CN109888532A (en) | A kind of short-circuit grounding wire temporarily locked out | |
JP2018082519A (en) | Connector cover for indirect hot-line work | |
CN114069279B (en) | Protective high-voltage grounding wire overhauling device | |
CN206834006U (en) | A kind of Multifunctional combined protective insulator | |
CN109888667B (en) | Overhead line clamp insulation shield dismounting device | |
CN208539447U (en) | Overhead line electricity testing grounding ring wire clamp shield Electrified installation tool | |
CN209087470U (en) | A kind of substation's Zinc-Oxide Arrester | |
CN107732781B (en) | Automatic traction insulation shielding device | |
CN209119717U (en) | A kind of drainage thread folds up device | |
CN207281232U (en) | A kind of plug-in type cable test tool work-saving device | |
CN213988638U (en) | Spring operating device for high-voltage electrical equipment switch | |
CN219142897U (en) | Low-cost high-voltage alternating current power grid detection device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |