CN110186030A - Power generating plants are boiler dedicated - Google Patents

Power generating plants are boiler dedicated Download PDF

Info

Publication number
CN110186030A
CN110186030A CN201910528422.9A CN201910528422A CN110186030A CN 110186030 A CN110186030 A CN 110186030A CN 201910528422 A CN201910528422 A CN 201910528422A CN 110186030 A CN110186030 A CN 110186030A
Authority
CN
China
Prior art keywords
heater box
shaft
iron
piston
combustion furnace
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910528422.9A
Other languages
Chinese (zh)
Inventor
陈双塔
黄文博
郜力军
强龙
刘军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
West Extension Energy Group Co Ltd
Original Assignee
West Extension Energy Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by West Extension Energy Group Co Ltd filed Critical West Extension Energy Group Co Ltd
Priority to CN201910528422.9A priority Critical patent/CN110186030A/en
Publication of CN110186030A publication Critical patent/CN110186030A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D46/00Filters or filtering processes specially modified for separating dispersed particles from gases or vapours
    • B01D46/0039Filters or filtering processes specially modified for separating dispersed particles from gases or vapours with flow guiding by feed or discharge devices
    • B01D46/0041Filters or filtering processes specially modified for separating dispersed particles from gases or vapours with flow guiding by feed or discharge devices for feeding
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B02CRUSHING, PULVERISING, OR DISINTEGRATING; PREPARATORY TREATMENT OF GRAIN FOR MILLING
    • B02CCRUSHING, PULVERISING, OR DISINTEGRATING IN GENERAL; MILLING GRAIN
    • B02C1/00Crushing or disintegrating by reciprocating members
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B02CRUSHING, PULVERISING, OR DISINTEGRATING; PREPARATORY TREATMENT OF GRAIN FOR MILLING
    • B02CCRUSHING, PULVERISING, OR DISINTEGRATING IN GENERAL; MILLING GRAIN
    • B02C23/00Auxiliary methods or auxiliary devices or accessories specially adapted for crushing or disintegrating not provided for in preceding groups or not specially adapted to apparatus covered by a single preceding group
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F22STEAM GENERATION
    • F22DPREHEATING, OR ACCUMULATING PREHEATED, FEED-WATER FOR STEAM GENERATION; FEED-WATER SUPPLY FOR STEAM GENERATION; CONTROLLING WATER LEVEL FOR STEAM GENERATION; AUXILIARY DEVICES FOR PROMOTING WATER CIRCULATION WITHIN STEAM BOILERS
    • F22D1/00Feed-water heaters, i.e. economisers or like preheaters
    • F22D1/24Feed-water heaters, i.e. economisers or like preheaters with fire tubes or flue ways traversing feed-water vessels
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F22STEAM GENERATION
    • F22DPREHEATING, OR ACCUMULATING PREHEATED, FEED-WATER FOR STEAM GENERATION; FEED-WATER SUPPLY FOR STEAM GENERATION; CONTROLLING WATER LEVEL FOR STEAM GENERATION; AUXILIARY DEVICES FOR PROMOTING WATER CIRCULATION WITHIN STEAM BOILERS
    • F22D5/00Controlling water feed or water level; Automatic water feeding or water-level regulators
    • F22D5/26Automatic feed-control systems
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23LSUPPLYING AIR OR NON-COMBUSTIBLE LIQUIDS OR GASES TO COMBUSTION APPARATUS IN GENERAL ; VALVES OR DAMPERS SPECIALLY ADAPTED FOR CONTROLLING AIR SUPPLY OR DRAUGHT IN COMBUSTION APPARATUS; INDUCING DRAUGHT IN COMBUSTION APPARATUS; TOPS FOR CHIMNEYS OR VENTILATING SHAFTS; TERMINALS FOR FLUES
    • F23L5/00Blast-producing apparatus before the fire

Abstract

This patent belongs to boiler technology field, it is boiler dedicated to specifically disclose a kind of power generating plants, including heater box and water compensation mechanism, the water compensation mechanism includes water supply tank, water inlet pipe, rack gear, shaft and insulated case, the water supply tank is connected to heater box by water inlet pipe, the water inlet pipe is equipped with solenoid valve, the first spring is connected between the rack gear top and heater box top inner side, the shaft runs through the left side of heater box, and it extends on the outside of heater box, one end that the shaft is located in heater box is arranged with gear, the gear and rack gear engagement, one end that the shaft is located on the outside of heater box is connected with magnet and push rod, said supply unit is set to insulation box inner wall, the iron and insulated case are slidably connected towards the side of shaft, the iron is located at one end in insulated case and is equipped with connection bar, the solenoid valve and company Through rod is electrically connected.Compared with prior art, the present invention can from trend boiler replenishing water and can by coal in combustion furnace full combustion.

Description

Power generating plants are boiler dedicated
Technical field
The present invention relates to boiler technology fields, and in particular to a kind of power generating plants are boiler dedicated.
Background technique
Boiler is the mechanical equipment for water being heated as using the thermal energy of fuel or other energy hot water or steam.In boiler The hot water or steam of generation directly can provide required thermal energy for industrial production and people's lives, can also be filled by steam power It sets and is converted to mechanical energy, or electric energy is converted mechanical energy by generator again.The boiler for generating steam is known as steam boiler, often Referred to as boiler is chiefly used in thermal power station, ship, locomotive and industrial and mining enterprises.
And boiler used in existing power generation there are the problem of have: 1, existing power generation boiler be typically all directly will Coal is added to furnace interior and is directly burnt, not of uniform size due to coal, not only will appear showing for incomplete combustion As occurring, and the pernicious gas of incomplete combustion generation is drained into atmosphere and will lead to serious environmental pollution, and burns The heat of boiler exhaust gas cylinder discharge will also result in the loss of heat;2, existing power generation boiler is all manual control water valve to adding Moisturizing in hot tank, when staff neglect and forget plus water or add water too late when, be easy to burn out boiler, thus need one can With from the boiler of trend heater box moisturizing.
Summary of the invention
The purpose of the present invention is to provide a kind of power generating plants are boiler dedicated, cannot be mended automatically with solving existing boiler The problem of water.
In order to achieve the above objectives, it is boiler dedicated to provide a kind of power generating plants by the present invention, including heater box, combustion furnace and Pedestal, the combustion furnace are set on pedestal, and the heater box is set to the top of combustion furnace, and the right side of the heater box, which is equipped with, to steam Steam pipe further includes water compensation mechanism, and the water compensation mechanism includes water supply tank, water inlet pipe, rack gear, shaft, bearing and insulated case, described Water supply tank is set to the top of heater box, and the water supply tank is connected to heater box by water inlet pipe, and the water inlet pipe is equipped with electromagnetism Valve is connected with the first spring between the rack gear top and heater box top inner side, the shaft runs through the left side of heater box, and It extends on the outside of heater box, the shaft and heater box are rotatablely connected by bearing, and the shaft is located at one end in heater box It is arranged with gear, the gear and rack gear engagement, one end that the shaft is located on the outside of heater box are connected with magnet and push rod, institute It states magnet and push rod is symmetrical about rotating shaft core, the insulated case is set on water inlet pipe, and the insulated case is equipped with power supply unit And iron, said supply unit are set to insulation box inner wall, the iron runs through side of the insulated case towards shaft, the iron It is slidably connected with insulated case towards the side of shaft, the iron is located at one end in insulated case and is equipped with connection bar, the electromagnetism Valve is electrically connected with bar is connected to, and the connection bar is conductor.
The principle of the present invention and beneficial effect are: when combustion furnace persistently heats the water in heater box, in heater box Water persistently reduce, and when the water in heater box gradually decreases, rack gear moves down under the action of the first spring stress, works as tooth When tooth contact on the tooth and gear on item, gear rotates clockwise under the action of rack gear moves down, clockwise in gear During rotation, magnet on gear is mobile to the direction far from iron, and the push rod on gear is to the direction close to iron It is mobile, when push rod contact with iron and push rod by iron to when pushing inside insulated case, connection bar is as iron is to close confession The direction of electric unit is mobile, and while being connected to bar and power supply unit contacts, the stress of the first spring discharges completely just, then Rack gear stopping moves down, while gear also stops operating;And the electricity when being connected to bar and power supply unit contacts, on power supply unit Stream is transferred to solenoid valve along connection bar, and solenoid valves are opened at this time, and the water in subsequent water supply tank enters along water inlet pipe and adds In hot tank.
When the liquid level of water in heater box is gradually increasing, rack gear moves up under the buoyancy of water, while compressing the One spring, when the tooth contact on the tooth and gear on rack gear, gear rotates counterclockwise under the action of rack gear moves up, During gear rotates counterclockwise, magnet on gear is to mobile close to the direction of iron, and the push rod on gear is to separate The direction of iron is mobile, and when magnet face iron, iron is moved under the action of magnet magnetic force to the direction far from power supply unit It is dynamic, while it being connected to bar and power supply unit disengaging, solenoid valve power-off at this time is closed, and the water in water supply tank stops to heater box moisturizing, Initial position is risen to hour rack, and gear also stops operating, is recycled with this, it can be achieved that being automatically replenished to boiler.With it is existing There is technology to compare, it is of the invention not need extra work personnel timing to adding from moisturizing in the heater box of trend boiler Hot tank moisturizing, human cost needed on the one hand can reducing power-generating enterprise on the other hand can be to avoid because of work people Damage in boilers and economic loss caused by the carelessness of member or no timely moisturizing.
Scheme two, this is the preferred of basic scheme, and the iron is equipped with insulating tape, and the connection bar and iron pass through Insulating tape separates, and the left side of combustion furnace is equipped with coal feeding pipe, and the top of the combustion furnace is communicated with pipe, and the pipe passes through The top of heater box is worn, and is extended on the outside of heater box.Due to containing a large amount of heat in the cigarette of pipe discharge, so will combustion The pipe of furnace is burnt inside heater box, and the heat that can greatly generate using combustion furnace avoids combustion furnace from generating Partial heat by pipe be discharged, cause energy waste.
Scheme three, it further includes coal pulverizer structure that this is preferred for scheme two, and the coal pulverizer structure includes pulverizing chamber, the One bracket, second support, first connecting rod, second connecting rod and the motor with output shaft, described second support one end are connect with pedestal, The other end is connect with pulverizing chamber, and the right side inner wall of the pulverizing chamber is equipped with the first crushing tooth, the top of the pulverizing chamber be equipped with into The bottom end of coal mouth, the pulverizing chamber is connected to coal feeding pipe, and sliding is equipped with sliding panel, the right side of the sliding panel in the pulverizing chamber Equipped with the second crushing tooth, first crushing tooth and the second crushing tooth are arranged in a crossed manner, and one end of the first connecting rod is through crushing The left side of room is simultaneously connect with the left side of sliding panel, and the other end and second connecting rod of the first connecting rod are hinged, the second connecting rod Free end and motor output axis connection, one end of the first support connect with pedestal, and the other end is connected to motor, described Sliding panel, first connecting rod and second connecting rod constitute slider-crank mechanism.In electric motor starting, motor passes through first connecting rod and second Connecting rod drives sliding panel to horizontally slip in pulverizing chamber, and after the coal of bulk enters pulverizing chamber by coal feed point, sliding panel is driven Second crushing tooth slides to the right, and matches with the first crushing tooth, bulk is not squeezed it is broken, then squeeze broken coal by coal feeding pipe into Enter burning in combustion furnace.The coal of bulk is crushed, coal is can be and burns in combustion furnace more thoroughly, keep the utilization rate of coal bigger Change, the pernicious gas for avoiding coarse coal incomplete combustion from generating, which is drained into atmosphere, pollutes environment.
Scheme four, it further includes blowing afloat mechanism, the inflatable body includes piston cylinder, gas blow pipe that this is preferred for scheme three And cam, the cam are connected on the output shaft of motor, the piston cylinder is set in first support, and the piston cylinder is set to convex The underface of wheel slidably connects piston in the piston cylinder, and the piston is connected with piston far from piston cylinder bottom end on one side Second spring, the bottom end of the piston cylinder and combustion furnace right side wall are connected between on the inside of bar, the piston and piston cylinder bottom end Between pass through gas blow pipe be connected to.While motor rotation, cam when cam and plunger rod contacts and presses work also with rotation When stopper rod moves down, piston also moves down simultaneously, and compresses second spring, and the gas in piston cylinder is blown by gas blow pipe Into combustion furnace, subsequent cam and piston rod are detached from, and piston is moved up under the action of second spring stress, recycled with this, It is sustainable to blow to combustion furnace.It blows into combustion furnace, the coal combustion in combustion furnace can be made more thorough, while can allow combustion Burning furnace endogenous fire is more vigorous, and the heat for generating combustion furnace in the unit time is more, to make the water in heater box in unit The interior more steam of conversion, use for subsequent processing.
Scheme five, this is preferred for scheme four, and the junction of the gas blow pipe and combustion furnace right side wall is equipped with strainer.It is blowing Strainer is arranged in the junction of tracheae and combustion furnace right side wall, can obstruct the dust in combustion furnace and enter gas blow pipe accumulation, influence Blowing effect.
Scheme six, this is the preferred of basic scheme, and the junction of the shaft and heater box is equipped with gasket.In shaft and Gasket is arranged in the junction of heater box, can leak from the gap of the junction of shaft and heater box to avoid the water in heater box Out, the waste of water is caused.
Detailed description of the invention
Fig. 1 is a kind of structural schematic diagram that power generating plants are boiler dedicated of the present invention;
Fig. 2 is the perspective view of partial structurtes in Fig. 1;
Fig. 3 is Fig. 2 rearview;
Fig. 4 is the left view of Fig. 2;
Fig. 5 is the sectional view of insulated case in Fig. 1;
Fig. 6 is the left view in Fig. 1 at A;
Fig. 7 is the enlarged drawing in Fig. 1 at B.
Specific embodiment
Below by specific embodiment, the present invention is described in further detail:
Appended drawing reference in Figure of description includes: pedestal 1, first support 2, piston cylinder 3, piston rod 4, piston 5, cam 6, electricity Machine 7, second connecting rod 8, first connecting rod 9, pulverizing chamber 10, coal feed point 11, sliding panel 12, the first crushing tooth 13, the second crushing tooth 14, Second support 15, coal feeding pipe 16, gas blow pipe 17, combustion furnace 18, strainer 19, heater box 20, go out steam pipe 21, water supply tank 22, into Water pipe 23, solenoid valve 24, the first spring 25, rack gear 26, gear 27, gasket 28, bearing 29, magnet 30, push rod 31, insulated case 32, iron 33, connection bar 34, power supply unit 35, second spring 36, shaft 37.
As shown in Figure 1 and Figure 7: power generating plants are boiler dedicated, including heater box 20, combustion furnace 18 and pedestal 1, burning Furnace 18 is set to 1 top of pedestal, and heater box 20 is set to the top of combustion furnace 18, and the right side of heater box 20 is equipped with steam pipe 21, combustion The left side for burning furnace 18 is equipped with coal feeding pipe 16, and the top of combustion furnace 18 is communicated with pipe, and pipe sequentially passes through heater box 20 Bottom end and top, and extend to 20 apical lateral of heater box.It further include water compensation mechanism, water compensation mechanism includes water supply tank 22, water inlet Pipe 23, rack gear 26, shaft 37, bearing 29 and insulated case 32, water supply tank 22 are set to the top of heater box 20, one end of water inlet pipe 23 It is connected to water supply tank 22, the other end is connected to the left side of heater box 20, and water inlet pipe 23 is equipped with solenoid valve 24, and rack gear 26, which is set to, to be added Inside hot tank 20, the first spring 25 is connected between the top of rack gear 26 and the top inner side of heater box 20, shaft 37, which runs through, to be added The left side of hot tank 20, and 20 outside of heater box is extended to, shaft 37 and heater box 20 are rotatablely connected by bearing 29,37 He of shaft The junction of heater box 20 is equipped with gasket 28.
As shown in Figure 2, Figure 3 and Figure 4, one end that shaft 37 is located in heater box 20 is arranged with gear 27, gear 27 and tooth Item 26 engages, and one end that shaft 37 is located on the outside of heater box 20 is connected with magnet 30 and push rod 31, magnet 30 and push rod 31 about 37 axle center of shaft is symmetrical, and insulated case 32 is set on water inlet pipe 23;As shown in figure 5, being equipped with power supply unit 35 inside insulated case 32, supply Electric unit 35 is used to power to solenoid valve 24, and insulated case 32 is equipped with iron 33 towards the side of shaft 37, and iron 33 and power supply are single Member 35 is oppositely arranged, and iron 33 runs through side of the insulated case 32 towards shaft 37, and is slidably connected with insulated case 32, and iron 33 It is equipped with connection bar 34 in one end in insulated case 32, iron 33 is equipped with insulating tape, and the connection bar 34 and iron 33 pass through Insulating tape separates, and solenoid valve 24 is electrically connected with bar 34 is connected to, and connection bar 34 is conductor, and insulated case 32 cannot be conductive.
It further include coal pulverizer structure, coal pulverizer structure includes pulverizing chamber 10, first support 2, second support 15, first connecting rod 9, second connecting rod 8 and the motor 7 with output shaft, 15 one end of second support are connect with pedestal 1, and the other end is connect with pulverizing chamber 10, The right side inner wall of pulverizing chamber 10 is equipped with the first crushing tooth 13, and the top of pulverizing chamber 10 is equipped with coal feed point 11, the bottom end of pulverizing chamber 10 It being connected to coal feeding pipe 16, sliding is equipped with sliding panel 12 in pulverizing chamber 10, and the right side of sliding panel 12 is equipped with the second crushing tooth 14, and first Crushing tooth 13 and the second crushing tooth 14 are arranged in a crossed manner, one end of first connecting rod 9 through pulverizing chamber 10 left side and with sliding panel 12 Left side connection, the other end of first connecting rod 9 and second connecting rod 8 are hinged, the free end of second connecting rod 8 and the output shaft of motor 7 Connection, one end of first support 2 are connect with pedestal 1, and the other end is connect with motor 7, and sliding panel 12, first connecting rod 9 and second connect Bar 8 constitutes slider-crank mechanism.
It as shown in figures 1 to 6, further include blowing afloat mechanism, inflatable body includes piston cylinder 3, gas blow pipe 17 and cam 6, convex Wheel 6 is connected on the output shaft of motor 7, and piston cylinder 3 is set in first support 2, and piston cylinder 3 is set to the underface of cam 6, piston Piston 5 is slidably connected in cylinder 3, piston 5 is connected with piston rod 4,3 bottom of piston 5 and piston cylinder far from 3 bottom end of piston cylinder on one side It is connected with second spring 36 between the inside of end, is connected between 18 right side wall of bottom end and combustion furnace of piston cylinder 3 by gas blow pipe 17, The junction of gas blow pipe 17 and 18 right side wall of combustion furnace is equipped with strainer 19.
The embodiment of the present embodiment moisturizing into heater box 20 are as follows: when combustion furnace 18 persistently adds the water in heater box 20 When hot, the water in heater box 20 is persistently reduced, and when the water in heater box 20 gradually decreases, rack gear 26 is in 25 stress of the first spring Under the action of move down, when on rack gear 26 tooth and gear 27 on tooth contact when, gear 27 is moved down in rack gear 26 It is rotated clockwise under effect, during gear 27 rotates clockwise, magnet 30 on gear 27 is to the side far from iron 33 To movement, and the push rod 31 on gear 27 is to mobile close to the direction of iron 33, when push rod 31 contacts and push rod with iron 33 31 by iron 33 to when pushing inside insulated case 32, connection bar 34 as iron 33 is to mobile close to the direction of power supply unit 35, While being connected to bar 34 and power supply unit 35 contacts, the stress of the first spring 25 discharges completely just, and subsequent rack gear 26 stops It moves down, while gear 27 also stops operating;And the electricity when being connected to bar 34 and power supply unit 35 contacts, on power supply unit 35 Stream is transferred to solenoid valve 24 along connection bar 34, and solenoid valve 24, which is powered, at this time opens, and the water in subsequent water supply tank 22 is along water inlet Pipe 23 enters in heater box 20.
When the liquid level of water in heater box 20 is gradually increasing, rack gear 26 moves up under the buoyancy of water, presses simultaneously Contract the first spring 25, when the tooth contact on the tooth and gear 27 on rack gear 26, effect that gear 27 is moved up in rack gear 26 Under rotate counterclockwise, during gear 27 rotates counterclockwise, magnet 30 on gear 27 is moved to the direction close to iron 33 It is dynamic, and the push rod 31 on gear 27 is mobile to the direction far from iron 33, when 30 face iron 33 of magnet, iron 33 is in magnet It is mobile to the direction far from power supply unit 35 under the action of 30 magnetic force, while it being connected to bar 34 and the disengaging of power supply unit 35, it is electric at this time The power-off of magnet valve 24 is closed, and the water in water supply tank 22 stops rising to initial position with hour rack 26 to 20 moisturizing of heater box, and Gear 27 also stops operating, and is recycled with this, it can be achieved that being automatically replenished to boiler.
The embodiment of the present embodiment stoking and air blowing into combustion furnace 18 are as follows: when needing to heating furnace coal, work Personnel start motor 7 first, and the subsequent rotation of motor 7 drives first connecting rod 9 and second connecting rod 8 to rotate, and first connecting rod 9 and second connects The rotation of bar 8 drives sliding panel 12 to horizontally slip in pulverizing chamber 10, after the coal of bulk enters pulverizing chamber 10 by coal feed point 11, Sliding panel 12 drives the second crushing tooth 14 to slide to the right, and matches with the first crushing tooth 13, bulk is not squeezed broken, then squeezes broken Coal by coal feeding pipe 16 enter combustion furnace 18 in burning;While motor 7 rotates, cam 6 is also with rotation, when cam 6 When contacting and pressing piston rod 4 with piston rod 4 and moving down, piston 5 also moves down simultaneously, and compresses second spring 36, and Gas in piston cylinder 3 is blowed in combustion furnace 18 by gas blow pipe 17, and subsequent cam 6 is detached from piston rod 4, and piston 5 is second It moves up under the action of 36 stress of spring, is recycled with this, it is sustainable to blow to combustion furnace 18.
What has been described above is only an embodiment of the present invention, and the common sense such as well known specific structure and characteristic are not made herein in scheme Excessive description.It, without departing from the structure of the invention, can be with it should be pointed out that for those skilled in the art Several modifications and improvements are made, these also should be considered as protection scope of the present invention, these all will not influence what the present invention was implemented Effect and patent practicability.The scope of protection required by this application should be based on the content of the claims, in specification The records such as specific embodiment can be used for explaining the content of claim.

Claims (6)

1. power generating plants are boiler dedicated, including heater box, combustion furnace and pedestal, the combustion furnace is set on pedestal, described Heater box is set to the top of combustion furnace, and the right side of the heater box is equipped with steam pipe, which is characterized in that further includes moisturizing machine Structure, the water compensation mechanism include water supply tank, water inlet pipe, rack gear, shaft, bearing and insulated case, and the water supply tank is set to heater box Top, the water supply tank is connected to heater box by water inlet pipe, and the water inlet pipe is equipped with solenoid valve, the rack gear top and The first spring is connected between heater box top inner side, the shaft runs through the left side of heater box, and extends on the outside of heater box, The shaft and heater box are rotatablely connected by bearing, and one end that the shaft is located in heater box is arranged with gear, the tooth Wheel and rack gear engagement, one end that the shaft is located on the outside of heater box are connected with magnet and push rod, the magnet and push rod about Rotating shaft core is symmetrical, and the insulated case is set on water inlet pipe, and the insulated case is equipped with power supply unit and iron, and the power supply is single Member is set to insulation box inner wall, and the iron runs through side of the insulated case towards shaft, and the iron and insulated case are towards shaft Side be slidably connected, the iron is located at one end in insulated case and is equipped with connection bar, the solenoid valve be connected to bar and electrically connect It connects, the connection bar is conductor.
2. power generating plants according to claim 1 are boiler dedicated, which is characterized in that the iron is equipped with insulating cement Band, the connection bar and iron are separated by insulating tape, and the left side of combustion furnace is equipped with coal feeding pipe, and the top of the combustion furnace connects It is connected with pipe, the pipe runs through the top of heater box, and extends on the outside of heater box.
3. power generating plants according to claim 2 are boiler dedicated, which is characterized in that further include coal pulverizer structure, institute Stating coal pulverizer structure includes pulverizing chamber, first support, second support, first connecting rod, second connecting rod and the motor with output shaft, institute It states second support one end to connect with pedestal, the other end is connect with pulverizing chamber, and the right side inner wall of the pulverizing chamber is equipped with first and crushes The top of tooth, the pulverizing chamber is equipped with coal feed point, and the bottom end of the pulverizing chamber is connected to coal feeding pipe, and sliding is set in the pulverizing chamber There is sliding panel, the right side of the sliding panel is equipped with the second crushing tooth, and first crushing tooth and the second crushing tooth are arranged in a crossed manner, institute One end of first connecting rod is stated through the left side of pulverizing chamber and is connect with the left side of sliding panel, the other end of the first connecting rod and the Two connecting rods are hinged, the free end of the second connecting rod and the output axis connection of motor, and one end of the first support and pedestal connect It connects, the other end is connected to motor, and the sliding panel, first connecting rod and second connecting rod constitute slider-crank mechanism.
4. power generating plants according to claim 3 are boiler dedicated, which is characterized in that it further include blowing afloat mechanism, it is described Inflatable body includes piston cylinder, gas blow pipe and cam, and the cam is connected on the output shaft of motor, and the piston cylinder is set to the On one bracket, piston is slidably connected in the piston cylinder, piston is movably equipped in the piston cylinder, the piston is far from piston Cylinder bottom end is connected with piston rod on one side, is connected with second spring, the piston between the piston and piston cylinder bottom end inside It is connected between the bottom end and combustion furnace right side wall of cylinder by gas blow pipe.
5. power generating plants according to claim 4 are boiler dedicated, which is characterized in that the gas blow pipe and combustion furnace are right The junction of side wall is equipped with strainer.
6. power generating plants according to claim 1 are boiler dedicated, which is characterized in that the company of the shaft and heater box It meets place and is equipped with gasket.
CN201910528422.9A 2019-06-18 2019-06-18 Power generating plants are boiler dedicated Pending CN110186030A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910528422.9A CN110186030A (en) 2019-06-18 2019-06-18 Power generating plants are boiler dedicated

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910528422.9A CN110186030A (en) 2019-06-18 2019-06-18 Power generating plants are boiler dedicated

Publications (1)

Publication Number Publication Date
CN110186030A true CN110186030A (en) 2019-08-30

Family

ID=67722310

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910528422.9A Pending CN110186030A (en) 2019-06-18 2019-06-18 Power generating plants are boiler dedicated

Country Status (1)

Country Link
CN (1) CN110186030A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110548577A (en) * 2019-10-09 2019-12-10 温州盖一机械有限公司 continuous rubbing crusher of traditional chinese medicine
CN111976052A (en) * 2020-08-19 2020-11-24 兰国忠 Rubber continuous mixing mill
CN112255359A (en) * 2020-11-11 2021-01-22 海南电网有限责任公司电力科学研究院 Oil chromatography advanced diagnostic device

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102707035A (en) * 2012-06-28 2012-10-03 长安大学 Fully-automatic earth pillar leaching experiment device
CN204059471U (en) * 2014-07-15 2014-12-31 蒙焕书 A kind of magnetic red family expenses water level automatic control switch
CN205844920U (en) * 2016-08-05 2016-12-28 吉林工程技术师范学院 A kind of Water level electronic automatic controller
CN107570279A (en) * 2017-10-24 2018-01-12 王红丹 A kind of biomass fuel crushes disintegrating mechanism
CN207113009U (en) * 2017-07-21 2018-03-16 天津市津能双鹤热力设备有限公司 A kind of water tank automatic water replenishing system
CN108162244A (en) * 2017-12-26 2018-06-15 宁波高新区新柯保汽车科技有限公司 For the integration apparatus of plastics dries pulverizing
CN108668874A (en) * 2018-04-26 2018-10-19 凤冈县高山有机莲藕种植专业合作社 A kind of device for lotus rhizome plantation
CN208025501U (en) * 2018-01-31 2018-10-30 安徽慧能环境科技有限公司 A kind of efficient, energy-saving cooker furnace system
CN109006542A (en) * 2018-10-17 2018-12-18 江门市浩森五金电器有限公司 A kind of livestock-raising self-watering equipment
CN210088829U (en) * 2019-06-18 2020-02-18 西拓能源集团有限公司 Boiler special for electric power production factory

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102707035A (en) * 2012-06-28 2012-10-03 长安大学 Fully-automatic earth pillar leaching experiment device
CN204059471U (en) * 2014-07-15 2014-12-31 蒙焕书 A kind of magnetic red family expenses water level automatic control switch
CN205844920U (en) * 2016-08-05 2016-12-28 吉林工程技术师范学院 A kind of Water level electronic automatic controller
CN207113009U (en) * 2017-07-21 2018-03-16 天津市津能双鹤热力设备有限公司 A kind of water tank automatic water replenishing system
CN107570279A (en) * 2017-10-24 2018-01-12 王红丹 A kind of biomass fuel crushes disintegrating mechanism
CN108162244A (en) * 2017-12-26 2018-06-15 宁波高新区新柯保汽车科技有限公司 For the integration apparatus of plastics dries pulverizing
CN208025501U (en) * 2018-01-31 2018-10-30 安徽慧能环境科技有限公司 A kind of efficient, energy-saving cooker furnace system
CN108668874A (en) * 2018-04-26 2018-10-19 凤冈县高山有机莲藕种植专业合作社 A kind of device for lotus rhizome plantation
CN109006542A (en) * 2018-10-17 2018-12-18 江门市浩森五金电器有限公司 A kind of livestock-raising self-watering equipment
CN210088829U (en) * 2019-06-18 2020-02-18 西拓能源集团有限公司 Boiler special for electric power production factory

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110548577A (en) * 2019-10-09 2019-12-10 温州盖一机械有限公司 continuous rubbing crusher of traditional chinese medicine
CN111976052A (en) * 2020-08-19 2020-11-24 兰国忠 Rubber continuous mixing mill
CN111976052B (en) * 2020-08-19 2022-01-25 赵乾 Rubber continuous mixing mill
CN112255359A (en) * 2020-11-11 2021-01-22 海南电网有限责任公司电力科学研究院 Oil chromatography advanced diagnostic device
CN112255359B (en) * 2020-11-11 2021-11-09 海南电网有限责任公司电力科学研究院 Oil chromatography advanced diagnostic device

Similar Documents

Publication Publication Date Title
CN110186030A (en) Power generating plants are boiler dedicated
CN106196134B (en) A kind of fume afterheat energy conservation and environmental protection coal dust preparation system
CN210088829U (en) Boiler special for electric power production factory
CN202032874U (en) Integrated tunnel kiln with functions including drying, baking and power generation by waste heat
CN104373924A (en) Biomass steam generator
CN205965990U (en) Special coal pulverizer of thermal power plant
CN203116057U (en) Gas-exhaust brown coal fluidifying medium-speed mill direct-blowing type powder manufacturing and heat energy water recovery power generation system
CN107300255A (en) A kind of dual-purpose water heater of electric coal
CN104242111A (en) Automatic cooling switch cabinet
CN204957845U (en) Thermal power plant uses buggy conveyor
CN103528048A (en) Steam combustion-supporting burner
CN204240320U (en) Biomass steam generator
CN1793720A (en) Environmental protection destructive distillation coal gasification laminar burning boiler
CN107300167A (en) A kind of biomass gasification fired technology of integral type and application
CN205859973U (en) A kind of integral biomass steam generator
CN205482289U (en) Raw coal steam drying system of power plant suitable for operate in a variable working condition
CN208253605U (en) A kind of fired power generating unit and waste incinerator working medium combined generating system
CN206919380U (en) A kind of dual-purpose water heater of electric coal
CN206755195U (en) A kind of energy-saving, environmental protection boiler equipment with self-cleaning function
CN204963495U (en) Thermal power plant uses raw materials drying device
CN205191908U (en) Hot -blast case
CN207049895U (en) The backhaul steam boiler of multi fuel four
CN213686757U (en) Boiler heating device is used in steel casting production
CN204555718U (en) Cement kiln end waste gas dries coal mill deliming system
CN204718117U (en) Alcohol-group fuel boiler

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination