CN110184954A - A kind of bridge prestress external tendon method for dismounting - Google Patents

A kind of bridge prestress external tendon method for dismounting Download PDF

Info

Publication number
CN110184954A
CN110184954A CN201910620200.XA CN201910620200A CN110184954A CN 110184954 A CN110184954 A CN 110184954A CN 201910620200 A CN201910620200 A CN 201910620200A CN 110184954 A CN110184954 A CN 110184954A
Authority
CN
China
Prior art keywords
steel strand
strand wires
jack
dismounting
external tendon
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910620200.XA
Other languages
Chinese (zh)
Other versions
CN110184954B (en
Inventor
方健海
郭则棉
李颖
柳子晖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Beihuan Intelligent Transportation Technology Co.,Ltd.
Original Assignee
Guangzhou North Expressway Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou North Expressway Co Ltd filed Critical Guangzhou North Expressway Co Ltd
Priority to CN201910620200.XA priority Critical patent/CN110184954B/en
Publication of CN110184954A publication Critical patent/CN110184954A/en
Application granted granted Critical
Publication of CN110184954B publication Critical patent/CN110184954B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D22/00Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The present invention relates to a kind of method for dismounting of bridge prestress external tendon, in demolishing process, first the intermediate plate of fixing end is removed, due to the presence of grip of concrete, it is excessive in order to avoid extracting pressure, by the way of removing intermediate plate by root steel strand wires drawing after single spreading, efficiently avoids situation excessive to anchorage zone pressure when whole beam is extracted and occur, avoid the destruction to anchorage zone;When steel strand wires are pulled out from stretching end, first using the method by the stretched certain length of root, steel strand wires are slided to be detached from the bond stress of concrete, whole beam steel strand wires are pulled out together again later, since steel strand wires have had been detached from the bond stress of concrete at this time, pulling capacity needed for whole beam drawing has been weakened severely at this time, is efficiently avoided excessive to anchorage zone pressure when whole beam is extracted and is damaged to anchorage zone.

Description

A kind of bridge prestress external tendon method for dismounting
Technical field
The present invention relates to bridge prestress fields, more particularly, to a kind of bridge prestress external tendon method for dismounting.
Background technique
Prestressed concrete bridge is also known as prestressed reinforced concrete bridge, the bridge that bridge span structure uses prestressed concrete to build Beam.This bridge can make concrete in loaded preceding preparatory compression using the counter-force of reinforcing bar or steel wire (rope) pretension.It is runing Stage does not occur tensile stress (claiming fully prestressed concrete), or has tensile stress and do not occur crack or control critical eigenvalue and allowing width It is interior.
Intermediate plate anchoring steel strand wires are to be consolidated the steel strand wires one kind onto anchorage that is strained and fixed with intermediate plate at the both ends of steel strand wires Determine mode, in order to protect prestressing force component (including steel strand wires, anchorage etc.), after the completion of tensioning, generally can in cable guide pipe, it is close Concrete perfusion in sealed tube plays corrosion-resistant protective effect to steel strand wires and anchorage, has extended service life, while can be in anchor head Protective cover is put on outside, fill concrete or injection grease, play corrosion-resistant protective effect in protective cover.In some cases, It needs more to change jobs to the external tendon on bridge, needs first to remove the external tendon being fixed on bridge at this time, by It is filled with concrete in all filling out in sealing drum and cable guide pipe, concrete and steel strand wires, sealing drum, cable guide pipe form entirety, if Steel strand wires are pulled out by the way of the extraction of whole beam, due to there is the presence of grip of concrete simultaneously, entire beam tension withdrawal force will be big It easily causes anchorage zone concrete local stress excessive in the stretching force of former external tendon, withdrawal process and cracks.
Accordingly, it is desirable to provide a kind of new bridge prestress external tendon method for dismounting, it will not be due to pulling out in demolishing process It contributes excessive and causes that anchorage zone concrete local stress is excessive and cracks.
Summary of the invention
It is an object of the invention to overcome the deficiency of the above-mentioned prior art, a kind of bridge prestress external tendon dismounting side is provided Method reduces withdrawal force during extracting whole beam steel strand wires, avoids causing anchorage zone concrete since withdrawal force is excessive The dangerous generation that local stress is excessive and cracks.
The purpose of the present invention is achieved by the following technical programs:
A kind of bridge prestress external tendon method for dismounting, it is described pre- to answer for removing the external prestressed cable on bridge Power external tendon includes stretching end and fixing end, which comprises the following steps:
S1, the protective cover for removing external tendon both ends, cut the concrete wrapped up on the anchor head at external tendon both ends, make outside anchor head Dew;
S2, the intermediate plate for removing fixing end:
S21, choose fixing end expose steel strand wires in one, with steel strand connector by tool steel strand wires with it is selected Steel strand wires connection carry out spreading;
S22, the tool steel strand wires in S21 step are attached fixation across jack, set up support base, the support Seat one end abuts against on the anchor plate end face of fixing end, and the other end supports the jack;
S23, starting jack, jack is by pulling the tool steel strand wires to pull single steel strand, so that fixing end Intermediate plate loosening on the steel strand wires is exited, and after removing the intermediate plate, release steel strand wires make steel strand wires bounce back to unstress state, is removed Tool steel strand wires and steel strand connector;
S24, another steel strand wires for not removing intermediate plate in fixing end are chosen, repeats step S21 to S23;
S25, step S24 is repeated, is removed until by the intermediate plate on all steel strand wires of fixing end;
S3, the bond stress for weakening concrete
S31, choose stretching end expose steel strand wires in one, with steel strand connector by tool steel strand wires with it is selected Steel strand wires connection carry out spreading;
S32, the tool steel strand wires in S31 step are connected and fixed across jack, set up support base, the support base one End abuts against on the anchor plate end face of stretching end, and the other end supports the jack;
S33, starting jack, jack are twisted single steel by pulling the tool steel strand wires to pull single steel strand Line extracts 50cm or more, weakens the bond stress of the concrete on steel strand wires, then discharges steel strand wires to bounce back to steel strand wires unstressed State removes tool steel strand wires and steel strand connector;
S34, another steel strand wires not being pulled out in stretching end are chosen, repeats step S31 to S33;
S35, step S34 is repeated, is gone over until by all steel strand wires extractions of tensioning;
S4, whole beam steel strand wires are drawn out from stretching end using jack.
Further, after step s4, the sealing drum at external tendon both ends is extracted, the concrete in cable guide pipe is removed.
Preferably, in step sl, the specific method for removing the protective cover at the both ends of external tendon is to be cut to protect with oxygen cutting Shield makes the exposed concrete in protective cover.
Preferably, in step S33, used jack is 240Q jack, pulling capacity 5-6T.
Preferably, in step S33, it is 60-70cm that single steel strand, which extracts length,.
Preferably, in step s 4, whole beam steel strand wires are drawn out used jack from stretching end with jack is Punching jack.
Preferably, the steel strand connector in step S21 and step S31 is single steel strand connector.
Preferably, the single steel strand connector includes attaching nut, and the attaching nut left and right ends have External screw thread, the attaching nut left and right ends are threadedly coupled a single hole anchor slab, two single hole anchor slab bilateral symmetries respectively It is arranged, a taper hole is provided in each single hole anchor slab, the tool clamping piece for clamping steel strand wires is equipped in the taper hole.
Preferably, step S22 is identical as the clamping support in step S32, the support base include multiple support columns and Two gasket rings, the both ends of each support column are connect with two gasket rings respectively.
Preferably, in step S22 and step S32, the support base and the jack are directly lined with an anchor slab, described The through-hole that tool steel strand wires pass through in the anchor slab is connect with the jack.
The invention has the following beneficial effects: the present invention relates to a kind of method for dismounting of bridge prestress external tendon, tearing open Except in the process, first removing the intermediate plate of fixing end, since the presence of grip of concrete is adopted in order to avoid extraction pressure is excessive With the mode for removing intermediate plate after single spreading by root steel strand wires drawing, efficiently avoid when whole beam is extracted to anchorage zone pressure mistake Big situation occurs, and avoids the destruction to anchorage zone;When pulling out steel strand wires from stretching end, first using stretched certain by root The method of length makes the mobile bond stress to be detached from concrete of steel strand wires, later again pulls out whole beam steel strand wires together, due to this When steel strand wires had been detached from the bond stress of concrete, pulling capacity needed for whole beam drawing has been weakened severely at this time, effectively It avoids excessive to anchorage zone pressure when whole beam is extracted and anchorage zone is damaged.
Detailed description of the invention
Fig. 1 for the bridge prestress external tendon to be removed in embodiment structural schematic diagram;
Fig. 2 is the construction schematic diagram in embodiment in fixing end;
Fig. 3 is the construction schematic diagram in embodiment in stretching end;
Fig. 4 is the schematic cross-sectional view of the single steel strand connector in embodiment;
Fig. 5 is the structural schematic diagram of the support base in embodiment.
Specific structure explanation: 1 fixing end, 2 stretching ends, 31 steel strand wires, 32 anchor plates, 33 cable guide pipes, 34 protective covers, 35 close Sealed tube, 4 support bases, 41 gasket rings, 42 support columns, 5 anchor slabs, 6 jack, 7 steel strand connectors, 71 attaching nuts, 72 single hole anchors Plate, 721 taper holes, 73 tool clamping pieces, 8 tool steel strand wires.
Specific embodiment
Invention is further described in detail for the embodiment provided with reference to the accompanying drawing.
A kind of bridge prestress external tendon method for dismounting, it is described pre- to answer for removing the external prestressed cable on bridge Power external tendon includes stretching end 2 and fixing end 1, which comprises the following steps:
S1, the protective cover 34 for removing external tendon both ends, cut the concrete wrapped up on the anchor head at external tendon both ends, make anchor head It is exposed;
S2, reference Fig. 2, remove the intermediate plate of fixing end 1:
S21, choose fixing end 1 expose steel strand wires 31 in one, with 31 connector of steel strand wires by tool steel strand wires 8 with The selected connection of steel strand wires 31 carries out spreading;
S22, the tool steel strand wires 73 in S21 step are attached fixation across jack 6, set up support base 4, it is described 4 one end of support base abuts against on 32 end face of anchor plate of fixing end 1, and the other end supports the jack 6;
S23, starting jack 6, jack 6 is by pulling the tool steel strand wires 8 to pull single steel strand 31, so that solid Intermediate plate loosening on the steel strand wires of fixed end is exited, and when intermediate plate is loosened but do not fallen automatically, can be pulled out intermediate plate with screwdriver, be removed After the intermediate plate, release steel strand wires 31 make steel strand wires 31 bounce back to unstress state, remove tool steel strand wires 8 and steel strand connector 7;In jack 6 selected by stretching single steel strand, preferably preceding clip type jack,
S24, another steel strand wires 31 for not removing intermediate plate in fixing end 1 are chosen, repeats step S21 to S23;
S25, step S24 is repeated, after removing the intermediate plate on all steel strand wires 31 of fixing end 1, followed the steps below;
S3, reference Fig. 3, weaken the bond stress of concrete
S31, one in the steel strand wires 31 that stretching end exposes is chosen, with steel strand connector 7 by tool steel strand wires 8 and institute The connection of steel strand wires 31 of selection carries out spreading;
S32, the tool steel strand wires 8 in S31 step are connected and fixed across jack 6, set up support base 4, the support 4 one end of seat abut against on the anchor plate end face of stretching end 2, and the other end supports the jack 6;
S33, starting jack 6, jack 6, will be single by pulling the tool steel strand wires 8 to pull single steel strand 31 Steel strand wires 31 extract 50cm or more, weaken the bond stress of the concrete on steel strand wires 31, then discharging steel strand wires 31 returns steel strand wires It is reduced to unstress state, removes tool steel strand wires 8 and steel strand connector 7;
S34, another steel strand wires not being pulled out in stretching end are chosen, repeats step S31 to S33;
S35, step S34 is repeated, is gone over until by all steel strand wires extractions of tensioning;
S4, whole beam steel strand wires are drawn out from stretching end using jack.Preferably, use jack will from stretching end herein It is centre-hole jack that whole beam steel strand wires, which draw out used jack,.
Further, after step s4, the sealing drum 35 at external tendon both ends is extracted, the coagulation in cable guide pipe 33 is removed Soil.
Preferably, in step sl, the specific method for removing the protective cover at the both ends of external tendon is to be cut to protect with oxygen cutting Shield makes the exposed concrete in protective cover.Oxygen cutting equipment is simple, flexible and convenient, and is suitable for the big material of cutting thickness, It is applicable in this present embodiment.
Preferably, in step S33, used jack is 240Q jack, pulling capacity 5-6T.
Preferably, in step S33, it is 60-70cm that single steel strand, which extracts length,.
Preferably, in step s 4, whole beam steel strand wires are drawn out used jack from stretching end with jack is Punching jack.
Preferably, the steel strand connector 7 in step S21 and step S31 is single steel strand connector.
Preferably, the single steel strand connector includes attaching nut 71,71 left and right ends of the attaching nut difference It is provided with external screw thread, 71 left and right ends of attaching nut are threadedly coupled a single hole anchor slab 72, two single hole anchor slabs respectively 72 are symmetrical set, and a taper hole 721 is provided in each single hole anchor slab 72, is equipped in the taper hole 721 for clamping steel The tool clamping piece 73 of twisted wire.In use, attaching nut 71 is removed, steel strand wires 31 and tool steel strand wires 8 pierce into two lists respectively In the taper hole of hole anchor slab 72, tool clamping piece 73 is put on, is being connected together two single hole anchor slabs 72 using attaching nut 71, is led to Crossing tension steel strand 31 and tool steel strand wires 8 makes intermediate plate shrink clamping.
Preferably, step S22 is identical as the clamping support in step S32, and the support base 4 includes multiple support columns 42 With two gasket rings 41, the both ends of each support column 42 are connect with two gasket rings 41 respectively.Preferably, support base is made 4 material is steel, and the structure of the support base 4 is simple, and support strength is high, is suitable for the present embodiment.
Preferably, in step S22 and step S32, the support base and the jack are directly lined with an anchor slab 5, institute Through-hole of the tool steel strand wires in the anchor slab is stated to connect with the jack.Anchor slab 5 is existing tool, and materials facilitate fast Victory, and intensity is high, the through-hole being provided with originally on anchor slab 5 allows tool steel strand wires to pass through just, is suitable for the present embodiment.
As described above, only presently preferred embodiments of the present invention, when cannot be limited the scope of implementation of the present invention with this, All still belong to this hair according to simple equivalent changes and modifications made by scope of the present invention patent and invention description content generally In the range of bright patent covers.

Claims (10)

1. a kind of bridge prestress external tendon method for dismounting, for the external prestressed cable on bridge to be removed, the prestressing force External tendon includes stretching end and fixing end, which comprises the following steps:
S1, the protective cover for removing external tendon both ends, cut the concrete wrapped up on the anchor head at external tendon both ends, keep anchor head exposed;
S2, the intermediate plate for removing fixing end:
S21, one in the steel strand wires that fixing end is exposed is chosen, with steel strand connector by tool steel strand wires and selected steel Twisted wire connection carries out spreading;
S22, the tool steel strand wires in S21 step are attached fixation across jack, set up support base, the support base one End abuts against on the anchor plate end face of fixing end, and the other end supports the jack;
S23, starting jack, jack is by pulling the tool steel strand wires to pull single steel strand, so that the fixing end steel Intermediate plate loosening on twisted wire is exited, and after removing the intermediate plate, release steel strand wires make steel strand wires bounce back to unstress state, removes tool Steel strand wires and steel strand connector;
S24, another steel strand wires for not removing intermediate plate in fixing end are chosen, repeats step S21 to S23;
S25, step S24 is repeated, is removed until by the intermediate plate on all steel strand wires of fixing end;
S3, the bond stress for weakening concrete
S31, one in the steel strand wires that stretching end exposes is chosen, with steel strand connector by tool steel strand wires and selected steel Twisted wire connection carries out spreading;
S32, the tool steel strand wires in S31 step are connected and fixed across jack, set up support base, support base one end top It is against on the anchor plate end face of stretching end, the other end supports the jack;
S33, starting jack, jack are pulled out single steel strand by pulling the tool steel strand wires to pull single steel strand 50cm or more out weakens the bond stress of the concrete on steel strand wires, then discharging steel strand wires makes steel strand wires bounce back to unstress state, Remove tool steel strand wires and steel strand connector;
S34, another steel strand wires not being pulled out in stretching end are chosen, repeats step S31 to S33;
S35, step S34 is repeated, is gone over until by all steel strand wires extractions of tensioning;
S4, whole beam steel strand wires are drawn out from stretching end using jack.
2. a kind of bridge prestress external tendon method for dismounting as described in claim 1, it is characterised in that: after step s4, The sealing drum at external tendon both ends is extracted, the concrete in cable guide pipe is removed.
3. a kind of bridge prestress external tendon method for dismounting as described in claim 1, it is characterised in that: in step sl, tear open The specific method of the protective cover at the both ends of lower external tendon is to cut protective cover with oxygen cutting, makes the exposed concrete in protective cover.
4. a kind of bridge prestress external tendon method for dismounting as described in claim 1, it is characterised in that: in step S33, adopted Jack is 240Q jack, pulling capacity 5-6T.
5. a kind of bridge prestress external tendon method for dismounting as claimed in claim 4, it is characterised in that: single in step S33 It is 60-70cm that steel strand wires, which extract length,.
6. a kind of bridge prestress external tendon method for dismounting as described in claim 1, it is characterised in that: in step s 4, use It is punching jack that whole beam steel strand wires are drawn out used jack from stretching end by jack.
7. a kind of bridge prestress external tendon method for dismounting as described in claim 1, it is characterised in that: step S21 and step Steel strand connector in S31 is single steel strand connector.
8. a kind of bridge prestress external tendon method for dismounting as claimed in claim 7, it is characterised in that: the single steel strand Connector includes attaching nut, and the attaching nut left and right ends have external screw thread, the attaching nut left and right ends point Not Luo Wenlianjie a single hole anchor slab, two single hole anchor slabs are symmetrical set, and are provided with one in each single hole anchor slab Taper hole, the interior tool clamping piece being equipped with for clamping steel strand wires of the taper hole.
9. a kind of bridge prestress external tendon method for dismounting as described in claim 1, it is characterised in that: step S22 and step Clamping support in S32 is identical, and the support base includes multiple support columns and two gasket rings, the both ends of each support column It is connect respectively with two gasket rings.
10. a kind of bridge prestress external tendon method for dismounting as claimed in claim 9, it is characterised in that: in step S22 and step In rapid S32, the support base and the jack are directly lined with an anchor slab, and the tool steel strand wires pass through logical in the anchor slab Hole is connect with the jack.
CN201910620200.XA 2019-07-10 2019-07-10 Bridge prestressed body outer cable dismantling method Active CN110184954B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910620200.XA CN110184954B (en) 2019-07-10 2019-07-10 Bridge prestressed body outer cable dismantling method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910620200.XA CN110184954B (en) 2019-07-10 2019-07-10 Bridge prestressed body outer cable dismantling method

Publications (2)

Publication Number Publication Date
CN110184954A true CN110184954A (en) 2019-08-30
CN110184954B CN110184954B (en) 2020-10-02

Family

ID=67725673

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910620200.XA Active CN110184954B (en) 2019-07-10 2019-07-10 Bridge prestressed body outer cable dismantling method

Country Status (1)

Country Link
CN (1) CN110184954B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111188286A (en) * 2020-01-13 2020-05-22 上海悍马建筑科技有限公司 Method for disassembling bonded prestressed carbon fiber plate
CN114960482A (en) * 2022-06-20 2022-08-30 保利长大工程有限公司 Method for safely and efficiently removing external prestress

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008095400A (en) * 2006-10-12 2008-04-24 Zenitaka Corp Diagonal cable removal method
CN104372738A (en) * 2014-10-30 2015-02-25 柳州欧维姆机械股份有限公司 Single-cable-replaceable type anchorage pre-stressed anchor device and installation and cable replacement methods thereof
CN104746442A (en) * 2015-04-17 2015-07-01 柳州欧维姆工程有限公司 Steel wire drawing and hole cleaning device assembly for replacing old lifting rod of arched bridge pre-stressed boom and method for dismounting old lifting rod
CN108166491A (en) * 2017-12-06 2018-06-15 苏州市能工基础工程有限责任公司 The method for dismounting of steel strand wires in anchor cable
CN109736213A (en) * 2018-12-29 2019-05-10 柳州欧维姆机械股份有限公司 For the quick-replaceable tooling of intermediate plate group's anchor formula guy of twisted steel cable and its Demolition Construction method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008095400A (en) * 2006-10-12 2008-04-24 Zenitaka Corp Diagonal cable removal method
CN104372738A (en) * 2014-10-30 2015-02-25 柳州欧维姆机械股份有限公司 Single-cable-replaceable type anchorage pre-stressed anchor device and installation and cable replacement methods thereof
CN104746442A (en) * 2015-04-17 2015-07-01 柳州欧维姆工程有限公司 Steel wire drawing and hole cleaning device assembly for replacing old lifting rod of arched bridge pre-stressed boom and method for dismounting old lifting rod
CN108166491A (en) * 2017-12-06 2018-06-15 苏州市能工基础工程有限责任公司 The method for dismounting of steel strand wires in anchor cable
CN109736213A (en) * 2018-12-29 2019-05-10 柳州欧维姆机械股份有限公司 For the quick-replaceable tooling of intermediate plate group's anchor formula guy of twisted steel cable and its Demolition Construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111188286A (en) * 2020-01-13 2020-05-22 上海悍马建筑科技有限公司 Method for disassembling bonded prestressed carbon fiber plate
CN114960482A (en) * 2022-06-20 2022-08-30 保利长大工程有限公司 Method for safely and efficiently removing external prestress

Also Published As

Publication number Publication date
CN110184954B (en) 2020-10-02

Similar Documents

Publication Publication Date Title
JP4712612B2 (en) PC tension material intermediate fixing device and intermediate fixing method
CN109736213B (en) Tool for quickly replacing clamping piece group anchor type steel strand inhaul cable and dismantling construction method thereof
CN110184954A (en) A kind of bridge prestress external tendon method for dismounting
JP3917369B2 (en) Method and apparatus for attaching load transmitting member to cable, and suspension bridge provided with the apparatus
CN107575257A (en) Anchor tool system and its anchoring process for fibre-reinforced high molecular material bar
AU2019286812A1 (en) System and method for destressing braces by incorporation of, or substitution by, improved filler material
JP2020100976A (en) Shear reinforcement construction method for pc box girder bridge
JP6179980B2 (en) Tensile connection method and part replacement method
JP4311748B2 (en) Tension material fixing device and tension material fixing method
KR20050114302A (en) Steel anchor, thermoset anchor and tensioning equipment, and the method to reinforce the concrete structure with the fiber panel tensioned by them
KR200302128Y1 (en) prestressed preflex steel composite beam possible to retensioning
CN106149575A (en) Prestress rope tensioning system and method
KR101645007B1 (en) Device and method for separating wedge
RU2101418C1 (en) Method of extracting anchor link reinforcement and corresponding anchor link
KR100823603B1 (en) Casket anchor
JP2015086534A (en) Repair method of pc structure
JP6209305B1 (en) How to re-tension steel bar anchors
JP2006112189A (en) Tensional material anchoring tool
KR102162956B1 (en) Tension introduction method for thunderbolt protection cable of cable bridge
CN102745608A (en) Fixing structure of wall-attached ear plate of tower crane
JP6284089B1 (en) Anchor re-tensioning method, anchor head structure, and in-hole anchor head
KR200421375Y1 (en) Casket anchor
KR100599332B1 (en) Removable ground anchor using heat treatment
JPH0771007A (en) Temporary fixation method on construction of capital of bridge
CN103510624A (en) Anchor bolt anchoring device and construction method of anchor bolt anchoring device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CB03 Change of inventor or designer information

Inventor after: Fang Jianhai

Inventor after: Guo Zemian

Inventor after: Li Ying

Inventor after: Liu Zihui

Inventor before: Fang Jianhai

Inventor before: Guo Zemian

Inventor before: Li Ying

Inventor before: Liu Zihui

CB03 Change of inventor or designer information
CP01 Change in the name or title of a patent holder

Address after: 510080 20th floor, JIAYE building, 318 Dongfeng Middle Road, Yuexiu District, Guangzhou City, Guangdong Province

Patentee after: Guangzhou Beihuan Intelligent Transportation Technology Co.,Ltd.

Address before: 510080 20th floor, JIAYE building, 318 Dongfeng Middle Road, Yuexiu District, Guangzhou City, Guangdong Province

Patentee before: GUANGZHOU NORTH RING SUPER HIGHWAY Co.,Ltd.

CP01 Change in the name or title of a patent holder