CN110184077A - It is a kind of to make Coke oven lower spray pipe, cleaning construction method and its structure that pipe is precisely installed - Google Patents

It is a kind of to make Coke oven lower spray pipe, cleaning construction method and its structure that pipe is precisely installed Download PDF

Info

Publication number
CN110184077A
CN110184077A CN201910546306.XA CN201910546306A CN110184077A CN 110184077 A CN110184077 A CN 110184077A CN 201910546306 A CN201910546306 A CN 201910546306A CN 110184077 A CN110184077 A CN 110184077A
Authority
CN
China
Prior art keywords
pipe
jet pipe
square tube
lower jet
coke oven
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910546306.XA
Other languages
Chinese (zh)
Other versions
CN110184077B (en
Inventor
陈磊
刘宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC5 Group Corp Ltd
Original Assignee
China MCC5 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC5 Group Corp Ltd filed Critical China MCC5 Group Corp Ltd
Priority to CN201910546306.XA priority Critical patent/CN110184077B/en
Publication of CN110184077A publication Critical patent/CN110184077A/en
Application granted granted Critical
Publication of CN110184077B publication Critical patent/CN110184077B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10BDESTRUCTIVE DISTILLATION OF CARBONACEOUS MATERIALS FOR PRODUCTION OF GAS, COKE, TAR, OR SIMILAR MATERIALS
    • C10B29/00Other details of coke ovens
    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10BDESTRUCTIVE DISTILLATION OF CARBONACEOUS MATERIALS FOR PRODUCTION OF GAS, COKE, TAR, OR SIMILAR MATERIALS
    • C10B45/00Other details

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Materials Engineering (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Organic Chemistry (AREA)
  • Coke Industry (AREA)
  • Cleaning In General (AREA)

Abstract

The invention discloses a kind of construction methods and its structure for installing Coke oven lower spray pipe, cleaning pipe precisely, unwrapping wire on the base, the grid lines for positioning square tube is drawn, using grid lines as origin reference location, installation square tube, lower jet pipe is installed using square tube as benchmark and cleans pipe.The beneficial effects of the present invention are: this programme is high to the positioning accuracy of lower jet pipe or cleaning pipe, coke oven built-in pipe installation requirement can effectively be met, using square tube as lower jet pipe or the installation foundation of cleaning pipe, it can be improved lower jet pipe or clean the positioning accuracy and installation accuracy of pipe, guarantee the installation quality of built-in pipe, the structure of square tube itself is also convenient for positioning and install, and advantageously ensures that the precision of the formed general frame of square tube.

Description

It is a kind of to make Coke oven lower spray pipe, cleaning construction method and its structure that pipe is precisely installed
Technical field
The present invention relates to coke oven construction technical field, it is specifically a kind of make Coke oven lower spray pipe, clean pipe precisely install apply Work method and its structure.
Background technique
Coke oven is the kiln with coal refining coke, is the main Thermal Equipment of coking, between coke oven and coke oven basement It needs to be arranged multiple lower jet pipes and cleans pipe, the distribution of lower jet pipe and cleaning pipe will affect the efficiency of coking, larger creating When the coke oven of scale, lower jet pipe and positioning, the installation for cleaning pipe are particularly important.Under the conditions of the prior art, to lower jet pipe and clean The positioning of pipe is difficult to realize automate with installation, and there are biggish human errors.
Summary of the invention
In order to overcome the deficiencies of the prior art, the present invention provides it is a kind of make Coke oven lower spray pipe, clean pipe precisely install apply Work method and its structure, for improving lower jet pipe and cleaning the positioning of pipe, installation accuracy.
Technical solution used by the present invention solves the above problems is: one kind making Coke oven lower spray pipe, cleans pipe precisely installation Construction method and its structure, unwrapping wire, draws the grid lines for positioning square tube on the base, using grid lines as benchmark determine Position, installation square tube are installed lower jet pipe using square tube as benchmark and clean pipe.
Further, in order to preferably realize the present invention, unwrapping wire on the base including the following steps:
Step S11: resistance wall is extended parallel to one another and perpendicularly relative to using the two sides resistance wall on pedestal as three with reference to extraction Axis, three axis include divide equally pedestal coke oven longitudinal center line and two using coke oven longitudinal center line as the symmetrical coke oven of line of symmetry Longitudinally controlled sideline;
Step S12: drawing two furnace end carbonization chamber center lines, and furnace end carbonization chamber center line is parallel with resistance wall, two furnaces End carbonization chamber center line, coke oven longitudinal center line and two longitudinally controlled sidelines of coke oven form lower jet pipe and clean pipe city's roads Reference line.
Further, further include following steps in order to preferably realize the present invention:
Step S13: several groups are drawn on the basis of coke oven longitudinal center line and two longitudinally controlled sidelines of coke oven respectively and are equidistantly divided The located lateral point of cloth, located lateral point include two cleaning pipe lateral position breakouts and are arranged two cleaning pipe transverse direction positions Set the lower jet pipe lateral position breakout among breakout, the transverse direction on coke oven longitudinal center line and two longitudinally controlled sidelines of coke oven Anchor point corresponds and line is parallel to furnace end carbonization chamber center line;
Step S14: drawing several longitudinal register points being equally spaced on the basis of two furnace end carbonization chamber center lines, longitudinal Anchor point includes that a cleaning pipe lengthwise position breakout and two are symmetricly set on cleaning pipe lengthwise position breakout two sides Lower jet pipe lengthwise position breakout, the longitudinal register point on two furnace end carbonization chamber center lines corresponds and line is parallel to coke Furnace indulges center line.
Further, it in order to preferably realize the present invention, is drawn between two furnace end carbonization chamber center lines several Root is equally spaced and is parallel to the longitudinally controlled reference line of furnace end carbonization chamber center line, draws on longitudinally controlled reference line several A longitudinal register point.
Further, further include following steps in order to preferably realize the present invention:
Step S15: it connects corresponding located lateral point and forms located lateral line, and connect corresponding longitudinal register point The line of formation longitudinal register line, located lateral line and longitudinal register line forms latticed, lower jet pipe lengthwise position breakout company The intersection point of line and lower jet pipe lateral position breakout line is that lower jet pipe installs point, clean pipe lengthwise position breakout line with The intersection point for cleaning pipe lateral position breakout line is to clean pipe to install point.
Further, further include following steps in order to preferably realize the present invention:
Step S21: installing point, clean pipe installation point drilling with jet pipe under installing and clean pipe in lower jet pipe respectively, Being respectively set on the lower jet pipe and cleaning pipe prevents lower jet pipe or cleaning limited block of the pipe to whereabouts.
Further, further include following steps in order to preferably realize the present invention:
Step S31: installing several root longitudinal direction square tubes, longitudinal square tube is equally spaced, it is parallel to each other and with coke oven longitudinal center Line is parallel, installs angle steel in longitudinal square tube to make support construction, and longitudinal direction square tube avoids lower jet pipe and clean to manage when installation;
Step S32: the line of the central point of each horizontally-arranged lower jet pipe is guided to longitudinal square tube of outermost two sides, with this Lower jet pipe transverse axis is drawn between longitudinal square tube of outermost two sides on the basis of two intersection points that line and longitudinal square tube are formed, Following jet pipe transverse axis as jet pipe transverse direction square tube under origin reference location, lower jet pipe transverse direction square tube to lower jet pipe transverse axis away from From the radius for lower jet pipe, after lower jet pipe transverse direction square tube positioning, by lower jet pipe transverse direction square tube and longitudinal square tubes soldering;
Step S33: it after lower jet pipe transverse direction square tube installs, is installed since outermost lower jet pipe, utilizes level Absolute altitude is set, by lower jet pipe righting and reaches elevation location, the cleaning is managed after having surveyed verticality with horizontal ruler and lower jet pipe is horizontal To square tube spot welding,
Step S34: on the basis of the lower jet pipe being welded in lower jet pipe transverse direction square tube, the level of nozzle placement on it is leaned on Ruler is controlled the absolute altitude of adjacent lower jet pipe on the basis of horizontal guiding ruler, surveyed after verticality, and adjacent lower jet pipe is welded in down In jet pipe transverse direction square tube;
Step S35: repeating step S34 until a horizontally-arranged lower jet pipe is all welded and completed, using the horizontally-arranged lower jet pipe as base Standard is controlled the absolute altitude of next horizontally-arranged lower jet pipe using horizontal guiding ruler, then next horizontally-arranged lower jet pipe is welded on down jet pipe cross once To in square tube, construction is repeated with this until the welding of lower jet pipe is completed;
Step S36: similarly with step S32~S35, location and installation cleans pipe transverse direction square tube and cleans pipe;
Step S37: after each horizontally-arranged cleaning pipe welding is completed, another is welded clearly in the horizontally-arranged other side for cleaning pipe Pipe transverse direction square tube is swept, the same horizontally-arranged cleaning pipe transverse direction square tube for cleaning pipe two sides is parallel to each other.
Further, in order to preferably realize the present invention, the lower jet pipe and the end sealing for cleaning pipe.
It is a kind of to make Coke oven lower spray pipe, cleaning the structure precisely installed of pipe, including for coke oven of constructing pedestal, be arranged in base Positioning grid lines on seat and the square tube installed on the basis of positioning grid lines.
Further, in order to preferably realize the present invention, the positioning grid lines includes three parallel to each other and vertical In the furnace end carbonization chamber center line parallel with resistance wall of the axis of resistance wall and two, three axis include the coke oven for dividing pedestal equally Vertical center line and two are using coke oven longitudinal center line as the longitudinally controlled sideline of the symmetrical coke oven of line of symmetry;
The square tube include several with longitudinal square tube of coke oven longitudinal centerline parallel and several be arranged in longitudinal side Lateral square tube on pipe;
The lateral square tube includes lower jet pipe transverse direction square tube for installing lower jet pipe and cleans the clear of pipe for installing Sweep pipe transverse direction square tube.
Beneficial effect acquired by this programme is:
(1) this programme is high to the positioning accuracy of lower jet pipe or cleaning pipe, can effectively meet coke oven built-in pipe installation requirement;
(2) using square tube as lower jet pipe or the installation foundation of cleaning pipe, it can be improved lower jet pipe or clean the positioning of pipe Precision and installation accuracy, guarantee the installation quality of built-in pipe, and the structure of square tube itself is also convenient for positioning and install, is conducive to Guarantee the precision of the formed general frame of square tube.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of pedestal;
Fig. 2 is the schematic diagram of the reference line of lower jet pipe and cleaning pipe city's roads;
Fig. 3 is the schematic diagram of located lateral point;
Fig. 4 is enlarged drawing at the A of Fig. 3;
Fig. 5 is the schematic diagram of longitudinal register point;
Fig. 6 is enlarged drawing at the B of Fig. 5;
Fig. 7 is the structural schematic diagram of longitudinal square tube;
Fig. 8 is enlarged drawing at the C of Fig. 7;
Fig. 9 is lower jet pipe, the scheme of installation for cleaning pipe;
Figure 10 is enlarged drawing at the D of Fig. 9;
Figure 11 is lower jet pipe installation process schematic diagram.
Wherein: 1- pedestal, 2- resistance wall, the longitudinal direction 3- square tube, 4- angle steel, 5- clean pipe transverse direction square tube, and 6- cleans pipe, 7- water Ruler is flatted against, jet pipe transverse direction square tube under 8-, jet pipe under 9-.
Specific embodiment
Below with reference to examples and drawings, the present invention is described in further detail, but embodiments of the present invention are not It is limited to this.
Embodiment 1:
It is a kind of to make Coke oven lower spray pipe, cleaning the structure that pipe is precisely installed in the present embodiment, it is formed by the following method, Unwrapping wire on pedestal 1 draws the grid lines for positioning square tube, using grid lines as origin reference location, installation square tube, using square tube as Benchmark installs lower jet pipe and cleans pipe.
This programme can be accurately positioned the axis of lower jet pipe 9 or cleaning pipe 6 by drawing grid lines, so that it is determined that Lower jet pipe 9 or clean pipe 6 installation site, and can also to as lower jet pipe 9 or clean pipe 6 installation foundation square tube into Row positioning, advantageously ensures that the position precision of steel pipe.
The side of square tube is plane, convenient for the positioning and installation of square tube itself, and is conducive to keep self structure Stability, convenient for being positioned to lower jet pipe 9 or cleaning pipe 6.High-precision positioning, installation are advantageously implemented with this.
Embodiment 2:
As shown in Figure 1 and Figure 2, on the basis of the above embodiments, in the present embodiment, unwrapping wire includes following several on pedestal 1 A step:
Step S11: resistance wall 2 is extended parallel to one another and perpendicularly relative to using the two sides resistance wall 2 on pedestal 1 as three with reference to extraction Axis, three axis include divide equally pedestal 1 coke oven longitudinal center line and two it is symmetrical as line of symmetry using coke oven longitudinal center line The longitudinally controlled sideline of coke oven.In the present embodiment, the position of three axis is measured using measuring instrument, and in two sides resistance wall 2 Fixed point label, needs to carry out measurement of putting on weight to the point of label, to guarantee the depth of parallelism of three axis and relative to resistance wall 2 Verticality.After being measured, with the point and snap the line in line of ink marker connection two sides resistance wall 2, the drawing of three axis is completed with this.
Step S12: drawing two furnace end carbonization chamber center lines, and furnace end carbonization chamber center line is parallel with resistance wall 2.This implementation It in example, or is measured using measuring instrument and has determined that point, drawn lines further according to the point after calibration.Two furnace end carbonization chambers Center line, coke oven longitudinal center line and two longitudinally controlled sidelines of coke oven form lower jet pipe and clean the reference line of pipe city's roads.
Step S13: as shown in Figure 3, Figure 4, respectively on the basis of coke oven longitudinal center line and two longitudinally controlled sidelines of coke oven The located lateral point that several groups are equally spaced is drawn, located lateral point includes two cleaning pipe lateral position breakouts and is arranged two A lower jet pipe lateral position breakout cleaned among the breakout of pipe lateral position, cleans pipe using different color marks respectively Lateral position breakout and lower jet pipe lateral position breakout, the cross on coke oven longitudinal center line and two longitudinally controlled sidelines of coke oven It is corresponded to anchor point and line is parallel to furnace end carbonization chamber center line.After drawing a little, to located lateral point detected with Ensure at 3 points on the same straight line perpendicular to coke oven longitudinal center line, is detected for example, being able to use theodolite.
Step S14: as shown in Figure 5, Figure 6, draw what several were equally spaced on the basis of two furnace end carbonization chamber center lines Longitudinal register point, longitudinal register point include that a cleaning pipe lengthwise position breakout and two are symmetricly set on cleaning pipe longitudinal direction position The lower jet pipe lengthwise position breakout of breakout two sides is set, the longitudinal register point on two furnace end carbonization chamber center lines corresponds And line is parallel to coke oven longitudinal center line.Pipe lengthwise position breakout is cleaned using different color marks respectively and lower jet pipe is vertical To position breakout, keeps cleaning pipe lengthwise position breakout identical as the color of pipe lateral position breakout is cleaned, make lower jet pipe Lengthwise position breakout is identical as the color of lower jet pipe lateral position breakout.
In the present embodiment, since the longitudinal length of pedestal 1 is greater than lateral length, thus two furnace end carbonization chamber center lines Apart from larger, in order to reduce the error of setting-out, several are drawn between two furnace end carbonization chamber center lines and is equally spaced and puts down Row draws several longitudinal register points in the longitudinally controlled reference line of furnace end carbonization chamber center line on longitudinally controlled reference line, The error of setting-out can be reduced with this.
Step S15: longitudinal register point and located lateral point detect it is errorless after, use two different colors of ink fountain snap the line Located lateral line is formed to connect corresponding located lateral point, and connects corresponding longitudinal register point and forms longitudinal direction and determine The line of bit line, located lateral line and longitudinal register line forms latticed.
Wherein, the intersection point of lower jet pipe lengthwise position breakout line and lower jet pipe lateral position breakout line is lower jet pipe Point is installed, cleaning pipe lengthwise position breakout line and cleaning the intersection point of pipe lateral position breakout line is to clean pipe installation Point.Make the color of the line of ink marker mark the color of anchor point corresponding with above-mentioned steps, can be pacified with this convenient for distinguishing lower jet pipe It decorates position and cleans pipe installation point, the intersection point of the line of different colours is not as installation point.
Further include following steps after lower jet pipe installation point and cleaning pipe installation point determine:
Step S21: installing point, clean pipe installation point drilling with jet pipe under installing and clean pipe in lower jet pipe respectively, Being respectively set on the lower jet pipe and cleaning pipe prevents lower jet pipe 9 or cleaning limited block of the pipe 6 to whereabouts.Along in coke oven longitudinal Heart line, every thering are two horizontally-arranged cleaning pipes 6 to be equidistantly uniformly distributed once horizontally-arranged lower jet pipe 9 on pedestal 1.
So that the diameter in bored hole is greater than lower jet pipe 9 or is cleaned the outer diameter 1-3mm of pipe 6, and makes under bored hole and pedestal 1 The coke oven basement connection of side can prevent lower jet pipe 9 using limited block or clean pipe 6 to drop into coke oven basement.
Further include following steps after in lower jet pipe 9 or cleaning 6 load hole of pipe:
Step S31: as shown in fig. 7, install several root longitudinal direction square tubes 3, longitudinal square tube 3 is equally spaced, it is parallel to each other and With coke oven longitudinal centerline parallel, longitudinal square tube 3 uses the specification of 40*40*3mm.When installation, the longitudinal direction side of outermost two sides is first installed Pipe 3, and be higher than the height of longitudinal square tube 3 of outermost two sides and clean pipe absolute altitude 10mm or so, as shown in figure 8, in longitudinal square tube 3 Upper installation angle steel 4 is to make support construction.Longitudinal square tube 3 of outermost two sides installs other longitudinal square tubes 3, this reality again after installing It applies in example, is additionally provided with 8 longitudinal square tubes 3 between longitudinal square tube 3 of outermost two sides, when installation makes longitudinal square tube 3 avoid lower spray Pipe 9 and cleaning pipe 6.
Step S32: the line of the central point of each horizontally-arranged lower jet pipe 9 is guided to longitudinal square tube 3 of outermost two sides, with It is lateral that lower jet pipe is drawn between longitudinal square tube 3 of outermost two sides on the basis of two intersection points that the line and longitudinal square tube 3 are formed Axis, for following jet pipe transverse axis as jet pipe transverse direction square tube 8 under origin reference location, lower jet pipe transverse direction square tube 8 is lateral to lower jet pipe The distance of axis is the radius of lower jet pipe 9, after lower jet pipe transverse direction square tube 8 positions, by lower jet pipe transverse direction square tube 8 and longitudinal square tube 3 welding.
In the present embodiment, the lower jet pipe transverse axis can draw entity line to be indicated.
Step S33: it after lower jet pipe transverse direction square tube 8 installs, is installed since outermost lower jet pipe 9, utilizes level Instrument sets the absolute altitude of lower jet pipe 9, by lower 9 righting of jet pipe and reaches elevation location, has been surveyed after verticality with horizontal ruler 7 by the lower spray Pipe 9 and lower 8 spot welding of jet pipe transverse direction square tube.
Step S34: as shown in figure 11, on the basis of the lower jet pipe 9 being welded in lower jet pipe transverse direction square tube 8 by first, Its upper orifice places horizontal guiding ruler 7, and the absolute altitude of adjacent lower jet pipe 9 is controlled on the basis of horizontal guiding ruler 7, has been surveyed after verticality, Adjacent lower jet pipe 9 is welded in lower jet pipe transverse direction square tube 8;
Step S35: repeating step S34 until horizontally-arranged lower jet pipe 9 all welding completions, are with the horizontally-arranged lower jet pipe 9 Benchmark, controls the absolute altitude of next horizontally-arranged lower jet pipe 9 using horizontal guiding ruler 7, then by next horizontally-arranged lower jet pipe 9 be welded on it is next under In jet pipe transverse direction square tube 8, construction is repeated with this until the welding of lower jet pipe 9 is completed;
Step S36: similarly with step S32~S35, location and installation cleans pipe transverse direction square tube 5 and cleans pipe 6;
Step S37: as shown in Figure 10, after each horizontally-arranged welding of cleaning pipe 6 is completed, in the another of the horizontally-arranged cleaning pipe 6 Another cleaning pipe transverse direction square tube 5 is welded in side, and the same horizontally-arranged cleaning pipe transverse direction square tube 5 for cleaning pipe two sides is parallel to each other.
Embodiment 3:
On the basis of the above embodiments, in the present embodiment, the lower jet pipe 9 and the end sealing for cleaning pipe 6, to keep away Exempt from when being poured concrete, concrete enters lower jet pipe 9 or cleans in pipe 6 and result in blockage.
In the present embodiment, other contents not described are same as the previously described embodiments, therefore do not repeat.
It is above-described, it is only presently preferred embodiments of the present invention, is not intended to limit the present invention in any form, According to the technical essence of the invention, within the spirit and principles in the present invention, to the above embodiments any simply to repair Change, equivalent replacement and improvement etc., fall within the scope of protection of the technical scheme of the present invention within.

Claims (10)

1. a kind of make Coke oven lower spray pipe, clean the construction method that pipe is precisely installed, it is characterised in that: unwrapping wire on the base is drawn For positioning the grid lines of square tube, using grid lines as origin reference location, installation square tube, installed using square tube as benchmark lower jet pipe with Clean pipe.
2. a kind of construction method for installing Coke oven lower spray pipe, cleaning pipe precisely according to claim 1, feature exist In: unwrapping wire on the base including the following steps:
Step S11: using the two sides resistance wall on pedestal as the axis for extending parallel to one another and perpendicularly relative to resistance wall with reference to extraction three, Three axis include divide equally pedestal coke oven longitudinal center line and two it is longitudinal by the symmetrical coke oven of line of symmetry of coke oven longitudinal center line Control sideline;
Step S12: drawing two furnace end carbonization chamber center lines, and furnace end carbonization chamber center line is parallel with resistance wall, two furnace end charcoals Change room center line, coke oven longitudinal center line and two longitudinally controlled sidelines of coke oven to form lower jet pipe and clean the benchmark of pipe city's roads Line.
3. a kind of construction method for installing Coke oven lower spray pipe, cleaning pipe precisely according to claim 2, feature exist In: further include following steps:
Step S13: draw what several groups were equally spaced on the basis of coke oven longitudinal center line and two longitudinally controlled sidelines of coke oven respectively Located lateral point, located lateral point include two cleaning pipe lateral position breakouts and are arranged two cleaning pipe lateral positions minute Lower jet pipe lateral position breakout among line point, the located lateral on coke oven longitudinal center line and two longitudinally controlled sidelines of coke oven Point corresponds and line is parallel to furnace end carbonization chamber center line;
Step S14: several longitudinal register points being equally spaced, longitudinal register are drawn on the basis of two furnace end carbonization chamber center lines Point includes that a cleaning pipe lengthwise position breakout and two are symmetricly set on the lower spray for cleaning pipe lengthwise position breakout two sides Pipe lengthwise position breakout, the longitudinal register point on two furnace end carbonization chamber center lines corresponds and line is parallel to coke oven longitudinal Center line.
4. a kind of construction method for installing Coke oven lower spray pipe, cleaning pipe precisely according to claim 3, feature exist In: several furnace end carbonization chamber center lines that are equally spaced and are parallel to are drawn between two furnace end carbonization chamber center lines Longitudinally controlled reference line draws several longitudinal register points on longitudinally controlled reference line.
5. a kind of construction method for installing Coke oven lower spray pipe, cleaning pipe precisely according to claim 3 or 4, feature It is: further includes following steps:
Step S15: it connects corresponding located lateral point and forms located lateral line, and connect corresponding longitudinal register point and formed The line of longitudinal register line, located lateral line and longitudinal register line formed it is latticed, lower jet pipe lengthwise position breakout line with The intersection point of lower jet pipe lateral position breakout line is that lower jet pipe installs point, cleans pipe lengthwise position breakout line and cleans The intersection point of pipe lateral position breakout line is to clean pipe to install point.
6. a kind of construction method for installing Coke oven lower spray pipe, cleaning pipe precisely according to claim 5, feature exist In: further include following steps:
Step S21: installing point, clean pipe installation point drilling with jet pipe under installing and clean pipe in lower jet pipe respectively, described Lower jet pipe and clean pipe on be respectively set prevent lower jet pipe or clean limited block of the pipe to whereabouts.
7. a kind of construction method for installing Coke oven lower spray pipe, cleaning pipe precisely according to claim 6, feature exist In: further include following steps:
Step S31: installing several root longitudinal direction square tubes, and longitudinal square tube is equally spaced, is parallel to each other and flat with coke oven longitudinal center line Row, installs angle steel in longitudinal square tube to make support construction, and longitudinal direction square tube avoids lower jet pipe and clean to manage when installation;
Step S32: the line of the central point of each horizontally-arranged lower jet pipe is guided to longitudinal square tube of outermost two sides, with the line Lower jet pipe transverse axis is drawn between longitudinal square tube of outermost two sides on the basis of two intersection points formed with longitudinal square tube, below Jet pipe transverse axis is as jet pipe transverse direction square tube under origin reference location, the distance of lower jet pipe transverse direction square tube to lower jet pipe transverse axis The radius of lower jet pipe, after lower jet pipe transverse direction square tube positioning, by lower jet pipe transverse direction square tube and longitudinal square tubes soldering;
Step S33: it after lower jet pipe transverse direction square tube installs, installs since outermost lower jet pipe, is set using level Absolute altitude by lower jet pipe righting and reaches elevation location, manages the cleaning and lower jet pipe transverse direction side after having surveyed verticality with horizontal ruler Pipe spot welding,
Step S34: on the basis of the lower jet pipe being welded in lower jet pipe transverse direction square tube, nozzle places horizontal guiding ruler on it, with The absolute altitude that adjacent lower jet pipe is controlled on the basis of horizontal guiding ruler, has been surveyed after verticality, and adjacent lower jet pipe is welded in lower jet pipe In lateral square tube;
Step S35: step S34 is repeated up to a horizontally-arranged lower jet pipe all welding completions, on the basis of the horizontally-arranged lower jet pipe, benefit The absolute altitude of next horizontally-arranged lower jet pipe is controlled with horizontal guiding ruler, then next horizontally-arranged lower jet pipe is welded on down jet pipe transverse direction square tube once On, construction is repeated with this until the welding of lower jet pipe is completed;
Step S36: similarly with step S32~S35, location and installation cleans pipe transverse direction square tube and cleans pipe;
Step S37: after each horizontally-arranged cleaning pipe welding is completed, another cleaning pipe is welded in the horizontally-arranged other side for cleaning pipe Lateral square tube, the same horizontally-arranged cleaning pipe transverse direction square tube for cleaning pipe two sides are parallel to each other.
8. a kind of construction method for installing Coke oven lower spray pipe, cleaning pipe precisely according to claim 7, feature exist In: the end sealing of the lower jet pipe and cleaning pipe.
9. a kind of make Coke oven lower spray pipe, clean the structure that pipe is precisely installed, it is characterised in that: including the base for coke oven of constructing Seat, the square tube that positioning grid lines on the base is set and is installed on the basis of positioning grid lines.
10. a kind of construction method and its structure for installing Coke oven lower spray pipe, cleaning pipe precisely according to claim 9, It is characterized by: the positioning grid lines includes three axis for extending parallel to one another and perpendicularly relative to resistance wall and two and resistance wall Parallel furnace end carbonization chamber center line, three axis include divide equally pedestal coke oven longitudinal center line and two with coke oven longitudinal center line For the longitudinally controlled sideline of the symmetrical coke oven of line of symmetry;
The square tube include several with longitudinal square tube of coke oven longitudinal centerline parallel and several be arranged in longitudinal square tube Lateral square tube;
The lateral square tube includes the lower jet pipe transverse direction square tube for installing lower jet pipe and the cleaning pipe for installing cleaning pipe Lateral square tube.
CN201910546306.XA 2019-06-21 2019-06-21 Construction method and structure for accurately installing lower spray pipe and cleaning pipe of coke oven Active CN110184077B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910546306.XA CN110184077B (en) 2019-06-21 2019-06-21 Construction method and structure for accurately installing lower spray pipe and cleaning pipe of coke oven

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910546306.XA CN110184077B (en) 2019-06-21 2019-06-21 Construction method and structure for accurately installing lower spray pipe and cleaning pipe of coke oven

Publications (2)

Publication Number Publication Date
CN110184077A true CN110184077A (en) 2019-08-30
CN110184077B CN110184077B (en) 2024-07-05

Family

ID=67722800

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910546306.XA Active CN110184077B (en) 2019-06-21 2019-06-21 Construction method and structure for accurately installing lower spray pipe and cleaning pipe of coke oven

Country Status (1)

Country Link
CN (1) CN110184077B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110331863A (en) * 2019-06-06 2019-10-15 中国五冶集团有限公司 The guard method of lower jet pipe during coke oven basic top plate construction
CN111925810A (en) * 2020-08-19 2020-11-13 中国一冶集团有限公司 Detachable quick positioning device for lower spray pipe of coke oven

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3838017A (en) * 1971-10-21 1974-09-24 Otto & Co Gmbh Dr C Regenerator for coke ovens
CN101294080A (en) * 2008-06-24 2008-10-29 中国第一冶金建设有限责任公司 Method for mounting lower spray pipe, clearing tube of coke oven base roof plate with method of directly burring
CN201301301Y (en) * 2008-11-26 2009-09-02 中国第二冶金建设有限责任公司 Lower nozzle fixing bracket of coke oven top plate
EP2468837A1 (en) * 2010-12-21 2012-06-27 Tata Steel UK Limited Method and device for assessing through-wall leakage of a heating wall of a coke oven
CN103387836A (en) * 2013-07-31 2013-11-13 中国二十二冶集团有限公司 Method for mounting coke oven roof buried pipe
CN203820696U (en) * 2014-03-18 2014-09-10 中国三冶集团有限公司 Mould for mounting downward spraying pipe and cleaning hole burying pipe of coking furnace
DE102014106967B3 (en) * 2014-05-16 2015-07-23 Thyssenkrupp Ag Method and device for reducing filling emissions at a filling opening in the furnace roof of a coke oven
CN106753447A (en) * 2015-11-25 2017-05-31 中冶天工集团有限公司 Coke oven top plate buried pipe assembled fixing frame and assembling method thereof
CN108102669A (en) * 2018-01-04 2018-06-01 中国二十二冶集团有限公司 Dual control method up and down is buried under coke roof after jet pipe
CN210560236U (en) * 2019-06-21 2020-05-19 中国五冶集团有限公司 Structure for accurately installing lower spray pipe and cleaning pipe of coke oven

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3838017A (en) * 1971-10-21 1974-09-24 Otto & Co Gmbh Dr C Regenerator for coke ovens
CN101294080A (en) * 2008-06-24 2008-10-29 中国第一冶金建设有限责任公司 Method for mounting lower spray pipe, clearing tube of coke oven base roof plate with method of directly burring
CN201301301Y (en) * 2008-11-26 2009-09-02 中国第二冶金建设有限责任公司 Lower nozzle fixing bracket of coke oven top plate
EP2468837A1 (en) * 2010-12-21 2012-06-27 Tata Steel UK Limited Method and device for assessing through-wall leakage of a heating wall of a coke oven
CN103387836A (en) * 2013-07-31 2013-11-13 中国二十二冶集团有限公司 Method for mounting coke oven roof buried pipe
CN203820696U (en) * 2014-03-18 2014-09-10 中国三冶集团有限公司 Mould for mounting downward spraying pipe and cleaning hole burying pipe of coking furnace
DE102014106967B3 (en) * 2014-05-16 2015-07-23 Thyssenkrupp Ag Method and device for reducing filling emissions at a filling opening in the furnace roof of a coke oven
CN106753447A (en) * 2015-11-25 2017-05-31 中冶天工集团有限公司 Coke oven top plate buried pipe assembled fixing frame and assembling method thereof
CN108102669A (en) * 2018-01-04 2018-06-01 中国二十二冶集团有限公司 Dual control method up and down is buried under coke roof after jet pipe
CN210560236U (en) * 2019-06-21 2020-05-19 中国五冶集团有限公司 Structure for accurately installing lower spray pipe and cleaning pipe of coke oven

Non-Patent Citations (6)

* Cited by examiner, † Cited by third party
Title
杨杰;: "焦炉煤气下喷管埋设施工方法研究", 四川建材, no. 06 *
葛星明;: "焦炉煤气下喷管预埋施工技术", 低温建筑技术, no. 05 *
董明杰;: "焦炉基础顶板预埋管施工新技术", 门窗, no. 11 *
陈昌俊等: "大型焦炉基础预埋管网格化快速建造施工", 《四川建筑》, vol. 41, pages 129 - 132 *
陈磊;: "焦炉基础顶板埋管施工方法", 四川建筑, no. 01 *
高宝林;钟英卓;雷月华;: "7.63m碳化室焦炉下喷管施工技术", 山西建筑, no. 09 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110331863A (en) * 2019-06-06 2019-10-15 中国五冶集团有限公司 The guard method of lower jet pipe during coke oven basic top plate construction
CN111925810A (en) * 2020-08-19 2020-11-13 中国一冶集团有限公司 Detachable quick positioning device for lower spray pipe of coke oven

Also Published As

Publication number Publication date
CN110184077B (en) 2024-07-05

Similar Documents

Publication Publication Date Title
CN110184077A (en) It is a kind of to make Coke oven lower spray pipe, cleaning construction method and its structure that pipe is precisely installed
CN205002774U (en) Modular suspension bridge main push -towing rope and cord clip unwrapping wire dipperstick
CN206235329U (en) Device for drilling, positioning and paying-off in blasting operation
CN210560236U (en) Structure for accurately installing lower spray pipe and cleaning pipe of coke oven
CN102966254A (en) Measuring tower used for construction of stub matching method and arrangement thereof
CN101294080A (en) Method for mounting lower spray pipe, clearing tube of coke oven base roof plate with method of directly burring
CN109211183A (en) Major long tunnel deep shaft corner intersection measurement method
CN216159888U (en) Fixing support for roadbed and pavement settlement observation scale
CN106949886B (en) Rapid positioning device and positioning method for subway tunnel engineering line measuring point positions
CN108179749B (en) Lattice column positioner and positioning method thereof
CN206648557U (en) A kind of device for being used to measure girder construction height
CN205879182U (en) Lead wire positioner
CN105441614B (en) A kind of blast furnace five-way ball group is to method
CN104713523A (en) Liquid level-type settlement observation auxiliary apparatus and usage method thereof
CN210831214U (en) Tripod for mapping engineering
CN207585648U (en) A kind of measurement water distribution device
CN206784371U (en) Cast-in-situ bored pile building mortion under a kind of Karst Geology
CN211527401U (en) Height marking device for laying underground pipelines
CN215217462U (en) Calibration system of profile blast hole
CN109897925B (en) Process for checking up, down, left and right adjustment quantity of muzzle before clay gun leaves factory
CN211061207U (en) Rectangular large-section pipe curtain underground excavation method simulation device
CN216243317U (en) Tester for urban and rural building planning
CN215909861U (en) Supporting device for standard forced centering observation
CN217541744U (en) Elevation control device
CN210071057U (en) Mud consumption observation device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant