CN110174880A - Debugging control program, device and system based on central control device - Google Patents
Debugging control program, device and system based on central control device Download PDFInfo
- Publication number
- CN110174880A CN110174880A CN201910445317.9A CN201910445317A CN110174880A CN 110174880 A CN110174880 A CN 110174880A CN 201910445317 A CN201910445317 A CN 201910445317A CN 110174880 A CN110174880 A CN 110174880A
- Authority
- CN
- China
- Prior art keywords
- equipment
- debugging
- data
- engineering
- instruction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Programme-control systems
- G05B19/02—Programme-control systems electric
- G05B19/418—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM]
- G05B19/4184—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM] characterised by fault tolerance, reliability of production system
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/02—Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
Abstract
This application involves a kind of debugging control program based on central control device, device and system, central control device receiving device debugging instruction obtains the device data of all connection equipment according to equipment debugging instruction;Device data is analyzed to obtain device status data;When determining equipment according to device status data, there is no failures, and when receiving the instruction of engineering debugging control, engineering debug command is sent to corresponding equipment, so that corresponding equipment is completed to debug according to engineering debug command with position corresponding relationship according to the instruction of engineering debugging control and preset equipment.Central control device can support engineering to debug, and staff no longer needs self-contained debugger to debug, easy to operate, be convenient for field adjustable, and convenience is high.
Description
Technical field
This application involves central control device technical fields, more particularly to a kind of debugging control based on central control device
Methods, devices and systems processed.
Background technique
Centralized control refers to establishes a metastable control centre in the tissue, inside and outside to tissue by control centre
Various information carry out unified working process, find the problem and propose solution to the problem.The characteristics of this form is all
Information (including internal, external) all flow into center, handled by control centre's concentrated processing, and all control instructions also all
It is uniformly assigned by control centre.
The central control device common problem of building can be achieved on the centralized management to building at present, but nothing
Method carry out engineering debugging so that after-sales staff must self-contained debugger debugged, troublesome in poeration, convenience is low.
Summary of the invention
Based on this, it is necessary to which, for the low technical problem of traditional debugging convenience, debugging can be effectively improved by providing one kind
The debugging control program based on central control device of convenience, device and system.
A kind of debugging control program based on central control device, method include:
Receiving device debugging instruction obtains the device data of all connection equipment according to equipment debugging instruction;
Device data is analyzed to obtain device status data;
When determining that failure is not present in equipment according to device status data, and receiving the instruction of engineering debugging control, according to
The instruction of engineering debugging control and the transmission engineering debug command of preset equipment and position corresponding relationship are to corresponding equipment, so that right
The equipment answered is completed to debug according to engineering debug command.
In one of the embodiments, is analyzed to device data the step of obtaining device status data, comprising:
Device data is filtered and parsing obtains equipment valid data;
Classified to obtain device status data according to equipment valid data and preset classifying rules.
Receiving device debugging instruction in one of the embodiments, obtains all connection equipment according to equipment debugging instruction
Device data the step of, comprising:
Receiving device debugging instruction instructs output verification tip information according to equipment debugging;
Receive the verification information according to verification tip information input;
After being verified according to verification information, the device data of all connection equipment is obtained.
After the step of receiving the verification information according to verification tip information input in one of the embodiments, comprising:
It is obstructed out-of-date verify according to verification information, exits Debugging interface.
After being analyzed the step of obtaining device status data to device data in one of the embodiments, also wrap
It includes:
When according to equipment state determination, there are when equipment fault, export fault cues and investigation information;
It receives and is instructed according to the malfunction elimination of fault cues and investigation information input, instructed according to malfunction elimination and determine failure
Point;
Receive fault restoration debugging instruction, according to fault restoration debugging instruction repair failure, and return to device data into
The step of row analysis obtains device status data.
When determining equipment according to device status data, there is no failures in one of the embodiments, and receive engineering
When debugging control instructs, engineering debug command is sent according to the instruction of engineering debugging control and preset equipment and position corresponding relationship
After the step of to corresponding equipment, further includes:
It obtains tune-up data and is sent to server, wherein tune-up data is to produce in equipment debugging and engineering debugging process
Raw data,
Receive the Optimization Debugging scheme that server is analyzed according to tune-up data.
Receiving device debugging instruction in one of the embodiments, obtains all connection equipment according to equipment debugging instruction
Device data the step of after, according to engineering debugging control instruction and preset equipment and position corresponding relationship transmission engineering tune
Before the step of examination order is to corresponding equipment, further include according to device data and preset building location information creation equipment and
The corresponding relationship of building position where equipment as preset equipment and position corresponding relationship and stores.
A kind of debugging control device based on central control device, device include:
Equipment debugging module is used for receiving device debugging instruction, obtains all connection equipment according to equipment debugging instruction
Device data;
Equipment state determining module obtains device status data for being analyzed device data;
Engineering debugging module determines that failure is not present in equipment according to device status data for working as, and receives engineering tune
When trying control instruction, engineering debug command is sent extremely according to the instruction of engineering debugging control and preset equipment and position corresponding relationship
Corresponding equipment, so that corresponding equipment is completed to debug according to engineering debug command.
A kind of computer readable storage medium is stored thereon with computer program, when computer program is executed by processor
It performs the steps of
Receiving device debugging instruction obtains the device data of all connection equipment according to equipment debugging instruction;
Device data is analyzed to obtain device status data;
When determining that failure is not present in equipment according to device status data, and receiving the instruction of engineering debugging control, according to
The instruction of engineering debugging control and the transmission engineering debug command of preset equipment and position corresponding relationship are to corresponding equipment, so that right
The equipment answered is completed to debug according to engineering debug command.
A kind of debugging control system, including central control device, server and equipment, central control device communication connection clothes
Business device and equipment,
Central control device is used to execute above-mentioned step and sends engineering debug command to corresponding equipment;And it sends and sets
For status data to server;
Server is for receiving device status data and backs up;
Equipment completes debugging for responding engineering debug command.
The above-mentioned debugging control program based on central control device, device and system, central control device receiving device tune
Examination instruction obtains the device data of all connection equipment according to equipment debugging instruction;Device data is analyzed to obtain equipment
Status data;When determining that failure is not present in equipment according to device status data, and receiving the instruction of engineering debugging control, according to
The instruction of engineering debugging control and the transmission engineering debug command of preset equipment and position corresponding relationship are to corresponding equipment, so that right
The equipment answered is completed to debug according to engineering debug command.Central control device can support engineering to debug, and staff no longer needs
Self-contained debugger is debugged, easy to operate, is convenient for field adjustable, and convenience is high.
Detailed description of the invention
Fig. 1 is the debugging control program flow chart based on Centralized Controller in one embodiment;
Fig. 2 is the structural block diagram of central control device in one embodiment;
Fig. 3 is the debugging control program flow chart based on central control device in another embodiment;
Fig. 4 is the debugging control program flow chart based on central control device in another embodiment;
Fig. 5 is the debugging control program flow chart based on central control device in another embodiment;
Fig. 6 is the debugging control program flow diagram based on central control device in one embodiment;
Fig. 7 is the debugging control apparatus structure block diagram based on central control device in one embodiment;
Fig. 8 is debugging system structural block diagram in one embodiment;
Fig. 9 is debugging system structural schematic diagram in one embodiment.
Specific embodiment
It is with reference to the accompanying drawings and embodiments, right in order to which the objects, technical solutions and advantages of the application are more clearly understood
The application is further elaborated.It should be appreciated that specific embodiment described herein is only used to explain the application, not
For limiting the application.
In one embodiment, as shown in Figure 1, providing a kind of debugging control program based on central control device, with
This method is applied to be illustrated for central control device, comprising the following steps:
Step S110: receiving device debugging instruction obtains the device data of all connection equipment according to equipment debugging instruction.
Specifically, in the present embodiment, equipment refers to air-conditioning equipment, when user is setting unit using central control device
It there is a problem during for being controlled, corresponding output debugging application after sale, commissioning staff debugs unit equipment.
Commissioning staff passes through display device, that is, screen processing module of central control device, clicks debugging button, into debugging log in page
Face, corresponding central control device receiving device debugging instruction, after central control device receiving device debugging instruction, acquisition connection
The device data of equipment.
Step S120: device data is analyzed to obtain device status data.
Specifically, the device data of central control device acquisition is all communication datas of unit network, including control number
According to, status data, self information etc., status data such as switching on and shutting down, mode, temperature etc., self information include bar code, MAC Address,
Model, control data are the data that the user terminals such as line control machine, remote controler carry out control generation to air-conditioning equipment.According to preset point
Rule-like is analyzed to obtain device status data to collected above equipment data, i.e., such as switching on and shutting down, mode, temperature, wind
Speed etc., the screen processing modular display devices status data of central control device.
Step S130: when determining equipment according to device status data, there is no failures, and receive engineering debugging control and refer to
When enabling, engineering debug command is sent with position corresponding relationship according to the instruction of engineering debugging control and preset equipment and is set to corresponding
It is standby, so that corresponding equipment is completed to debug according to engineering debug command.
Specifically, when according to device status data determine there is no equipment fault when, then unit Networked E-Journals complete, start into
The debugging of row engineering receives the instruction of engineering debugging control, in conjunction with preset equipment and position corresponding relationship, engineering debugging control is referred to
Order is converted into the identifiable engineering debug command of unit and is sent to corresponding unit, and corresponding unit is complete according to engineering debug command
Debugging interface is exited after the completion of engineering debugging at debugging, returns to user using the page, user can carry out normal use.
Further, the structural block diagram for the central control device applied in the application is as shown in Fig. 2, central control device packet
Module containing equipment information collection, data analysis module, screen processing module, control module, data uploading module.The centralized control
Device working principle is as follows: 1, equipment information collection module acquisition facility information (corresponding device data) is transferred to data analysis
Module;2, data analysis module is filtered and parses to device data, obtain valid data, be transferred to screen processing module into
Row display, synchronized upload server are backed up;3, when user carries out operation control by screen, control module orders operation
It enables and carries out Protocol reassembling, be converted to unit agreement and issued.
The above-mentioned debugging control program based on central control device, central control device receiving device debugging instruction, according to
Equipment debugging instruction obtains the device data of all connection equipment;Device data is analyzed to obtain device status data;When
When determining that failure is not present in equipment according to device status data, and receiving the instruction of engineering debugging control, is debugged and controlled according to engineering
It makes instruction and preset equipment and sends engineering debug command to corresponding equipment, so that corresponding equipment root with position corresponding relationship
It completes to debug according to engineering debug command.Central control device can support engineering to debug, and staff no longer needs self-contained tune
Examination device is debugged, easy to operate, is convenient for field adjustable, and convenience is high, effectively improves project installation quality.
In one embodiment, as shown in figure 3, step S120 includes step S122 and step S124.
Step S122: being filtered device data and parsing obtains equipment valid data.
Specifically, central control device acquisition device data is filtered and parses, and filters out the control in device data
Data and non-set state data, analyzing device data obtain valid data, and valid data include set state data, such as switch
Machine, mode, wind speed etc. store that data in database there are also MAC Address and bar code etc. after parsing, and are transferred to screen
Curtain processing module is shown that synchronized upload server is backed up.
Step S124: classified to obtain device status data according to equipment valid data and preset classifying rules.
Specifically, according to preset classifying rules from obtained equipment valid data i.e. set state, MAC Address, bar code
Etc. in data classification obtain device status data i.e. set state data, preset classifying rules can be to classify according to data suffix
Obtain device status data, it will be understood that preset classifying rules is not unique, as long as can screen from equipment valid data
To the rule of device status data.Screen processing module receives set state data and is shown, the shape of presentation device
State, such as switching on and shutting down, mode, temperature, wind speed.
In one embodiment, as shown in figure 4, step S110 further includes step S112 to step S116.
Step S112: receiving device debugging instruction instructs output verification tip information according to equipment debugging.
Specifically, it is provided with debugging permission, only commissioning staff's (after-sales staff) can debug, and commissioning staff passes through display
Device clicks debugging button, into after debugging login interface, can jump out input account, cryptographic interface.
Step S114: the verification information according to verification tip information input is received.Specifically, it is jumped out after debugging login interface
After inputting account, cryptographic interface, commissioning staff logs in the account of debugging login interface input debugging, password.
Step S116: after being verified according to verification information, the device data of all connection equipment is obtained.Specifically, it steps on
Enter debugging mode after recording successfully, obtains the data of all connection equipment.Setting debugging permission, avoids user from voluntarily debugging appearance
Engineering problem.
In one embodiment, step S114 includes obstructed out-of-date according to verification information verifying later, exits Debugging interface.
Specifically, when the account number cipher mistake of commissioning staff's input, verifying does not pass through, and exits Debugging interface, returns to user and uses page
Face, setting debugging permission, avoids user from voluntarily debugging and engineering problem occurs, further increase the safety of debugging.
In one embodiment, as shown in figure 5, including step S140 to step S160 after step S120.
Step S140: when there are when equipment fault, export fault cues and investigation information according to equipment state determination.Specifically
Ground, as discovery has equipment fault, output fault cues and investigation information to interface display can be at interface when there is equipment fault
Upper display failure icon, equipment are unable to control, can be checked according to interface prompt.
Step S150: it receives and is instructed according to the malfunction elimination of fault cues and investigation information input, referred to according to malfunction elimination
It enables and determines fault point.Specifically, commissioning staff click failure, check fault type, wherein fault type include communication failure,
There is troubleshooting procedure policy paper in sensor fault, interior machine failure and outer machine failure, interface, commissioning staff according to policy paper into
Row investigation, determines fault point.Commissioning staff can be directly viewable failure particular problem, and treatment effeciency after sale is high.
Step S160: receiving fault restoration debugging instruction, repairs failure, return step according to fault restoration debugging instruction
S120.Specifically, after determining failure particular problem, fault restoration is carried out by debugging on line, debugging cannot when passing through on line
Carry out fault restoration when, commissioning staff according to failure particular problem carry out line under fault restoration, to troubleshooting after, again
The device data for obtaining all connection equipment, obtains device status data according to device data, until determining equipment, there is no events
Barrier.
It in one embodiment, further include obtaining tune-up data and being sent to server after step S130, wherein debugging
Data are the data generated in equipment debugging and engineering debugging process;Receive what server was obtained according to tune-up data optimization analysis
Optimization Debugging scheme.
Specifically, tune-up data is the data of all communication buses generated in debugging process.The acquisition of tune-up data can
It is actively acquired after the completion of equipment debugging for central control device, can also be equipment after the completion of debugging, summarize debugging
The data of all communication buses generated in the process simultaneously feed back to central control device, and central control device is obtaining tune-up data
Afterwards, tune-up data is uploaded to server, server carries out big data analysis for tune-up data, counts debug time and debugging
Situation (the problem of debugging encounters) formulates solution for debugging frequently problem and obtains Optimization Debugging scheme, optimizes
Process is debugged, and is pushed to user terminal, when commissioning staff encounters problems in debugging process, can be asked according to prompt high efficiency solution
Topic improves Product Experience.
It in one embodiment, further include according to device data and preset building before step S130 after step S110
The corresponding relationship of building position where space location information creates equipment and equipment, as preset equipment and position corresponding relationship.
Specifically, when being debugged for the first time, debugging includes two aspects, and after engineering is installed for the first time, debugging ensures own
Equipment works normally, in addition, carrying out the reality that engineering debugs determining equipment according to device data and preset building location information
Position, is filtered device data and parsing obtains equipment valid data;According to equipment valid data and preset positional number
Classify to obtain device location data according to classifying rules, according to device location data and preset building location information creation equipment and
The corresponding relationship of building position where equipment, as preset equipment and position corresponding relationship.Wherein, device location data are to set
Standby MAC Address, equipment and position corresponding relationship are the corresponding relationship in unit and building, floor, room.It is appreciated that preset
Equipment is also possible to import in advance with position corresponding relationship, for example No. 1 unit is located at 12 buildings No. 1 room.
In a detailed embodiment, as shown in fig. 6, the central control device in the application can realize the tune to engineering
Examination, debugging process are as follows: 1, commissioning staff clicks debugging button, into debugging login page;2, the account number of input debugging, password
It is logged in;3, after logining successfully, into debugging mode, the data of all connection equipment is obtained, check equipment state;4, it such as sends out
Existing equipment failure, checks fault type, is checked according to interface prompt;5, interface fault-free, then unit Networked E-Journals are complete
At the debugging of beginning engineering (in the debugging of first time engineering, according to engineering practice, imports unit and building, floor, room
Equal mapping tables;Or creation building, floor, room, corresponding unit is added in the room);6, it after the completion of engineering debugging, moves back
Debugging interface out returns to user using the page, and user can carry out normal use;7, in user's use process if there is problem,
Then repeat to step 1.
The above-mentioned debugging control program based on central control device, central control device combination centralized control functions and engineering
Debugging function, convenient for field adjustable and problem verification after sale, staff no longer needs self-contained debugger to debug, and grasps
Facilitate, be convenient for field adjustable, convenience is high, can be directly viewable when effectively improving project installation quality, and problem after sale occur
Particular problem, after sale treatment effeciency are high;Setting debugging permission, only after-sales staff can be debugged, and be can avoid user and voluntarily debugged
There is engineering problem, improves safety;Tune-up data is uploaded to server, by big data analysis, encounters for debugging process
The problem of push solution, Optimization Debugging process improves Product Experience.
It should be understood that although each step in the flow chart of Fig. 1,3-5 is successively shown according to the instruction of arrow,
It is these steps is not that the inevitable sequence according to arrow instruction successively executes.Unless expressly stating otherwise herein, these steps
There is no stringent sequences to limit for rapid execution, these steps can execute in other order.Moreover, in Fig. 1,3-5 extremely
Few a part of step may include that perhaps these sub-steps of multiple stages or stage are not necessarily same to multiple sub-steps
Moment executes completion, but can execute at different times, and the execution sequence in these sub-steps or stage is also not necessarily
It successively carries out, but in turn or can be handed over at least part of the sub-step or stage of other steps or other steps
Alternately execute.
In one embodiment, as shown in fig. 7, providing a kind of debugging control device based on central control device, dress
It sets including equipment debugging module 110, equipment state determining module 120 and engineering debugging module 130, wherein
Equipment debugging module 110 is used for receiving device debugging instruction, obtains all connection equipment according to equipment debugging instruction
Device data;Equipment state determining module 120 obtains device status data for being analyzed device data;Engineering tune
Die trial block 130 determines that failure is not present in equipment according to device status data for working as, and receives the instruction of engineering debugging control
When, engineering debug command is sent with position corresponding relationship according to the instruction of engineering debugging control and preset equipment and is set to corresponding
It is standby, so that corresponding equipment is completed to debug according to engineering debug command.
In one embodiment, equipment state determining module includes that equipment valid data determination unit and equipment state determine
Unit, equipment valid data determination unit is used to be filtered device data and parsing obtains equipment valid data;Equipment shape
State determination unit according to equipment valid data and preset classifying rules for being classified to obtain device status data.
In one embodiment, equipment debugging module includes verification tip unit, authentication unit and is verified unit, is tested
It demonstrate,proves prompt unit and is used for receiving device debugging instruction, output verification tip information is instructed according to equipment debugging;Authentication unit is used for
Receive the verification information according to verification tip information input;Unit is verified for being verified according to verification information
Afterwards, the device data of all connection equipment is obtained.
It in one embodiment, include authentication failed unit after authentication unit, authentication failed unit is used for according to verifying
It is obstructed out-of-date that information verify, and exits Debugging interface.
It in one embodiment, further include that fault cues and investigation module, failure determine after equipment state determining module
Module and fault restoration module, fault cues and investigation module are used to determine when according to equipment state there are when equipment fault, defeated
Be out of order prompt and investigation information;Fault determination module is used to receive the malfunction elimination according to fault cues and investigation information input
Instruction instructs according to malfunction elimination and determines fault point;Fault restoration module is for receiving fault restoration debugging instruction, according to failure
It repairs debugging instruction and repairs failure, and control equipment state determining module analyzes device data to obtain equipment state again
Data.
It in one embodiment, further include that tune-up data acquisition module and Optimization Debugging scheme obtain after engineering debugging module
Modulus block, tune-up data obtain module for obtaining tune-up data and being sent to server, wherein tune-up data is equipment debugging
With the data generated in engineering debugging process, Optimization Debugging scheme obtains module and is analyzed for receiving server according to tune-up data
Obtained Optimization Debugging scheme.
It in one embodiment, further include that equipment is corresponding with position before engineering debugging module after equipment debugging module
Relationship creation module, equipment and position corresponding relationship creation module are used to be created according to device data and preset building location information
The corresponding relationship of building position where building standby and equipment as preset equipment and position corresponding relationship and stores.
The above-mentioned debugging control device based on central control device, central control device combination centralized control functions and engineering
Debugging function, convenient for field adjustable and problem verification after sale, staff no longer needs self-contained debugger to debug, and grasps
Facilitate, be convenient for field adjustable, convenience is high, can be directly viewable when effectively improving project installation quality, and problem after sale occur
Particular problem, after sale treatment effeciency are high;Setting debugging permission, only after-sales staff can be debugged, and be can avoid user and voluntarily debugged
There is engineering problem, improves safety;Tune-up data is uploaded to server, by big data analysis, encounters for debugging process
The problem of push solution, Optimization Debugging process improves Product Experience.
In one embodiment, a kind of computer readable storage medium is provided, computer program is stored thereon with, is calculated
Machine program performs the steps of receiving device debugging instruction when being executed by processor, obtain all companies according to equipment debugging instruction
Connect the device data of equipment;Device data is analyzed to obtain device status data;It is set when according to device status data determination
When for failure is not present, and receives the instruction of engineering debugging control, according to the instruction of engineering debugging control and preset equipment and position
It sets corresponding relationship and sends engineering debug command to corresponding equipment, so that corresponding equipment is completed to adjust according to engineering debug command
Examination.
In one embodiment, when computer program is executed by processor, device data is analyzed to obtain equipment shape
The step of state data, comprising: device data is filtered and parsing obtains equipment valid data;According to equipment valid data and
Preset classifying rules is classified to obtain device status data.
In one embodiment, when computer program is executed by processor, receiving device debugging instruction, according to equipment debugging
Instruction obtains the step of device data of all connection equipment, comprising: receiving device debugging instruction instructs defeated according to equipment debugging
Verification tip information out;Receive the verification information according to verification tip information input;After being verified according to verification information,
Obtain the device data of all connection equipment.
In one embodiment, when computer program is executed by processor, testing according to verification tip information input is received
After the step of demonstrate,proving information, comprising: it is obstructed out-of-date verify according to verification information, exits Debugging interface.
In one embodiment, when computer program is executed by processor, device data is analyzed to obtain equipment shape
After the step of state data, further includes: determine when according to equipment state there are when equipment fault, output fault cues and investigation letter
Breath;It receives and is instructed according to the malfunction elimination of fault cues and investigation information input, instructed according to malfunction elimination and determine fault point;It connects
Fault restoration debugging instruction is received, failure is repaired according to fault restoration debugging instruction, and return and analyzed to obtain to device data
The step of device status data.
In one embodiment, when computer program is executed by processor, when determining equipment not according to device status data
There are failures, and when receiving the instruction of engineering debugging control, according to the instruction of engineering debugging control and preset equipment and position pair
It should be related to after the step of sending engineering debug command to corresponding equipment, further includes: obtain tune-up data and be sent to service
Device, wherein tune-up data is the data generated in equipment debugging and engineering debugging process, receives server according to tune-up data point
Analyse obtained Optimization Debugging scheme.
In one embodiment, when computer program is executed by processor, receiving device debugging instruction, according to equipment debugging
After instruction obtains the step of device data of all connection equipment, according to the instruction of engineering debugging control and preset equipment and position
It further include according to device data and preset building before setting the step of corresponding relationship sends engineering debug command to corresponding equipment
The corresponding relationship of building position where space location information creates equipment and equipment, simultaneously as preset equipment and position corresponding relationship
Storage.
Those of ordinary skill in the art will appreciate that realizing all or part of the process in above-described embodiment method, being can be with
Instruct relevant hardware to complete by computer program, computer program to can be stored in a non-volatile computer readable
It takes in storage medium, the computer program is when being executed, it may include such as the process of the embodiment of above-mentioned each method.Wherein, this Shen
Please provided by any reference used in each embodiment to memory, storage, database or other media, may each comprise
Non-volatile and/or volatile memory.Nonvolatile memory may include read-only memory (ROM), programming ROM
(PROM), electrically programmable ROM (EPROM), electrically erasable ROM (EEPROM) or flash memory.Volatile memory may include
Random access memory (RAM) or external cache.By way of illustration and not limitation, RAM is available in many forms,
Such as static state RAM (SRAM), dynamic ram (DRAM), synchronous dram (SDRAM), double data rate sdram (DDRSDRAM), enhancing
Type SDRAM (ESDRAM), synchronization link (Synchlink) DRAM (SLDRAM), memory bus (Rambus) direct RAM
(RDRAM), direct memory bus dynamic ram (DRDRAM) and memory bus dynamic ram (RDRAM) etc..
In one embodiment, as shown in figure 8, a kind of debugging control system, including central control device 210, server
220 and equipment 230, central control device 210 communicates to connect server 220 and equipment, and central control device 210 is set for receiving
Standby debugging instruction obtains the device data of all connection equipment 230 according to equipment debugging instruction;Device data analyze
To device status data;And when determining equipment according to device status data, there is no failures, and receive engineering debugging control
When instruction, according to the instruction of engineering debugging control and the transmission engineering debug command of preset equipment and position corresponding relationship to corresponding
Equipment 230;Server 220 is for receiving device status data and backs up;Equipment 230 is completed to adjust for responding engineering debug command
Examination.
Specifically, the composition schematic diagram of debugging system is as shown in figure 9, debugging system includes air-conditioning equipment, centralized control dress
Set and server, the debugging system working principle are as follows: 1, central control device acquisition facility information is filtered and parses,
Useful data is obtained, is displayed on the screen, and synchronized upload is to server;2, screen receives data and is shown, shows
The state of equipment, such as switching on and shutting down, mode, temperature, wind speed;3, user controls equipment by screen, and control is comprising single
Equipment control and more equipment centralized controls;4, user operation commands are converted the identifiable order of unit by central control device,
It is handed down to unit;5, unit responds the order, and screen state synchronous change.
In one embodiment, central control device is also used to obtain tune-up data and is sent to server;And it receives
The Optimization Debugging scheme that server is sent;Server is also used to tune-up data based on the received and analyzes to obtain Optimization Debugging scheme,
And it is sent to central control device.
Specifically, server is analyzed tune-up data is uploaded, Optimization Debugging process, and process is as follows: 1, for debugging
The problem of data are analyzed, and statistics debug time and debugging encounter;2, solution party is formulated for debugging frequently problem
Case, and it is pushed to user terminal, commissioning staff can solve the problems, such as according to prompt high efficiency;3, tune-up data is analyzed, existing tune is optimized
Examination scheme, actively upgrades debugging function.
Specific about debugging system limits the debugging control program that may refer to above for central control device
It limits, details are not described herein.
Above-mentioned debugging system, central control device combination centralized control functions and engineering debugging function are convenient for field adjustable
Problem is verified after sale, and staff no longer needs self-contained debugger to debug, easy to operate, is convenient for field adjustable,
Convenience is high, and particular problem, after sale treatment effeciency can be directly viewable when effectively improving project installation quality, and problem after sale occur
It is high;Setting debugging permission, only after-sales staff can be debugged, and avoidable user, which voluntarily debugs, engineering problem occurs, improve safety
Property;Tune-up data is uploaded to server, and by big data analysis, solution is pushed aiming at the problem that debugging process encounters, excellent
Change debugging process, improves Product Experience.
Each technical characteristic of above embodiments can be combined arbitrarily, for simplicity of description, not to above-described embodiment
In each technical characteristic it is all possible combination be all described, as long as however, the combination of these technical characteristics be not present lance
Shield all should be considered as described in this specification.
The several embodiments of the application above described embodiment only expresses, the description thereof is more specific and detailed, but simultaneously
It cannot therefore be construed as limiting the scope of the patent.It should be pointed out that coming for those of ordinary skill in the art
It says, without departing from the concept of this application, various modifications and improvements can be made, these belong to the protection of the application
Range.Therefore, the scope of protection shall be subject to the appended claims for the application patent.
Claims (11)
1. a kind of debugging control program based on central control device, which comprises
Receiving device debugging instruction obtains the device data of all connection equipment according to equipment debugging instruction;
The device data is analyzed to obtain device status data;
When determining that failure is not present in equipment according to the device status data, and receiving the instruction of engineering debugging control, according to
Engineering debugging control instruction and preset equipment and position corresponding relationship transmission engineering debug command to corresponding equipment, with
Corresponding equipment is set to complete to debug according to the engineering debug command.
2. the method according to claim 1, wherein described analyze the device data to obtain equipment shape
The step of state data, comprising:
The device data is filtered and parsing obtains equipment valid data;
Classified to obtain device status data according to the equipment valid data and preset classifying rules.
3. the method according to claim 1, wherein the receiving device debugging instruction, according to the equipment tune
Examination instruction obtains the step of device data of all connection equipment, comprising:
Receiving device debugging instruction instructs output verification tip information according to the equipment debugging;
Receive the verification information according to the verification tip information input;
After being verified according to the verification information, the device data of all connection equipment is obtained.
4. according to the method described in claim 3, it is characterized in that, reception the testing according to the verification tip information input
After the step of demonstrate,proving information, comprising:
It is obstructed out-of-date verify according to the verification information, exits Debugging interface.
5. the method according to claim 1, wherein described analyze the device data to obtain equipment shape
After the step of state data, further includes:
When according to equipment state determination, there are when equipment fault, export fault cues and investigation information;
It receives and is instructed according to the malfunction elimination of the fault cues and investigation information input, instructed and determined according to the malfunction elimination
Fault point;
Fault restoration debugging instruction is received, failure is repaired according to the fault restoration debugging instruction, and return and described set to described
Standby data are analyzed the step of obtaining device status data.
6. the method according to claim 1, wherein described ought determine equipment not according to the device status data
There are failures, and when receiving the instruction of engineering debugging control, according to engineering debugging control instruction and preset equipment and position
After the step of setting corresponding relationship transmission engineering debug command to corresponding equipment, further includes:
It obtains tune-up data and is sent to server, wherein the tune-up data is to produce in equipment debugging and engineering debugging process
Raw data,
Receive the Optimization Debugging scheme that the server is analyzed according to the tune-up data.
7. the method according to claim 1, wherein the receiving device debugging instruction, according to the equipment tune
It is described according to engineering debugging control instruction and default after examination instruction obtains the step of device data of all connection equipment
Equipment and position corresponding relationship the step of sending engineering debug command to corresponding equipment before, further include according to the equipment
The corresponding relationship of building positions where data and preset building location information creation equipment and equipment, as preset equipment with
Position corresponding relationship simultaneously stores.
8. a kind of debugging control device based on central control device, which is characterized in that described device includes:
Equipment debugging module is used for receiving device debugging instruction, obtains all connection equipment according to equipment debugging instruction
Device data;
Equipment state determining module, for being analyzed to obtain device status data to the device data;
Engineering debugging module determines that failure is not present in equipment according to the device status data for working as, and receives engineering tune
When trying control instruction, engineering debugging is sent according to engineering debugging control instruction and preset equipment and position corresponding relationship and is ordered
It enables to corresponding equipment, so that corresponding equipment is completed to debug according to the engineering debug command.
9. a kind of computer readable storage medium, is stored thereon with computer program, which is characterized in that the computer program quilt
Processor realizes step described in any one of claims 1 to 7 when executing.
10. a kind of debugging control system, which is characterized in that including central control device, server and equipment, the centralized control
Device communicates to connect the server and the equipment,
The central control device requires step described in any one of 1-7 to send engineering debug command to right for perform claim
The equipment answered;And sending device status data is to the server;
The server is for receiving the device status data and backing up;
The equipment completes debugging for responding the engineering debug command.
11. system according to claim 10, which is characterized in that the central control device is also used to obtain tune-up data
And it is sent to the server;And receive the Optimization Debugging scheme that the server is sent;
The server is also used to the tune-up data based on the received and analyzes to obtain the Optimization Debugging scheme, and is sent to institute
State central control device.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910445317.9A CN110174880A (en) | 2019-05-27 | 2019-05-27 | Debugging control program, device and system based on central control device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910445317.9A CN110174880A (en) | 2019-05-27 | 2019-05-27 | Debugging control program, device and system based on central control device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110174880A true CN110174880A (en) | 2019-08-27 |
Family
ID=67695819
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910445317.9A Pending CN110174880A (en) | 2019-05-27 | 2019-05-27 | Debugging control program, device and system based on central control device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110174880A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110531696A (en) * | 2019-09-10 | 2019-12-03 | 浙江中控技术股份有限公司 | Equipment controlling plan design framework and method, apparatus control method |
CN110779159A (en) * | 2019-10-31 | 2020-02-11 | 珠海格力电器股份有限公司 | Equipment detection method, device, system, control equipment and air conditioner |
CN112363874A (en) * | 2020-10-19 | 2021-02-12 | 珠海格力电器股份有限公司 | Equipment debugging method and device, heating and ventilation equipment and computer readable storage medium |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104089377A (en) * | 2014-07-21 | 2014-10-08 | 珠海格力电器股份有限公司 | Air conditioner, control method and device thereof and controller |
CN108224682A (en) * | 2018-01-10 | 2018-06-29 | 珠海格力电器股份有限公司 | Air-conditioning equipment and air conditioning control device and debugging air conditioner method |
US20180202680A1 (en) * | 2012-09-15 | 2018-07-19 | Honeywell International Inc. | Asynchronous reporting system |
CN109059198A (en) * | 2018-07-23 | 2018-12-21 | 珠海格力电器股份有限公司 | Equipment automatic engineering adjustment method, device, system and computer equipment |
CN109539485A (en) * | 2018-11-22 | 2019-03-29 | 广东美的暖通设备有限公司 | Air-conditioning group control system and air-conditioning plant system |
-
2019
- 2019-05-27 CN CN201910445317.9A patent/CN110174880A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20180202680A1 (en) * | 2012-09-15 | 2018-07-19 | Honeywell International Inc. | Asynchronous reporting system |
CN104089377A (en) * | 2014-07-21 | 2014-10-08 | 珠海格力电器股份有限公司 | Air conditioner, control method and device thereof and controller |
CN108224682A (en) * | 2018-01-10 | 2018-06-29 | 珠海格力电器股份有限公司 | Air-conditioning equipment and air conditioning control device and debugging air conditioner method |
CN109059198A (en) * | 2018-07-23 | 2018-12-21 | 珠海格力电器股份有限公司 | Equipment automatic engineering adjustment method, device, system and computer equipment |
CN109539485A (en) * | 2018-11-22 | 2019-03-29 | 广东美的暖通设备有限公司 | Air-conditioning group control system and air-conditioning plant system |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110531696A (en) * | 2019-09-10 | 2019-12-03 | 浙江中控技术股份有限公司 | Equipment controlling plan design framework and method, apparatus control method |
CN110779159A (en) * | 2019-10-31 | 2020-02-11 | 珠海格力电器股份有限公司 | Equipment detection method, device, system, control equipment and air conditioner |
CN110779159B (en) * | 2019-10-31 | 2020-12-04 | 珠海格力电器股份有限公司 | Equipment detection method, device, system, control equipment and air conditioner |
CN112363874A (en) * | 2020-10-19 | 2021-02-12 | 珠海格力电器股份有限公司 | Equipment debugging method and device, heating and ventilation equipment and computer readable storage medium |
CN112363874B (en) * | 2020-10-19 | 2023-02-24 | 珠海格力电器股份有限公司 | Equipment debugging method and device, heating and ventilation equipment and computer readable storage medium |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US6993683B2 (en) | Analysis of pipelined networks | |
CN110174880A (en) | Debugging control program, device and system based on central control device | |
CN110928774A (en) | Automatic test system based on node formula | |
US9984244B2 (en) | Controller, information processing apparatus, and recording medium | |
CN106382726A (en) | Fault positioning method and system of precise air conditioner equipment | |
JP6171386B2 (en) | Controller, information processing apparatus and program | |
WO2021185107A1 (en) | Hardware circuit fault injection test method, apparatus, and device, medium and system | |
CN111052087B (en) | Control system, information processing apparatus, and recording medium | |
AU2017219158A1 (en) | Method and device for unlocking air conditioning unit and server | |
US11316748B2 (en) | Method and system for generating and managing virtual industrial devices in an industrial network | |
CN112733369B (en) | Intelligent equipment maintenance method, terminal and system and electronic equipment | |
DE102014116865A1 (en) | Analysis device for analyzing and manipulating a communication sequence | |
CN108910642A (en) | Elevator debugging information processing method, system, readable storage medium storing program for executing and commissioning device | |
CN108946370B (en) | Elevator fault information processing method, system, equipment and readable storage medium | |
WO2016188223A1 (en) | Fault information collection method and apparatus | |
CN116545891A (en) | Automatic distribution network testing method based on intelligent equipment | |
CN113691669B (en) | Android mobile phone APP control vehicle full-process test analysis system and method | |
CN115220974A (en) | Dynamic checking system, method, device and medium for network information of operating system | |
CN110018846A (en) | A kind of automatic operational system and its operating method | |
CN111025916A (en) | Household appliance detection control method and system | |
CN115395652A (en) | Distribution network terminal abnormity analysis system and terminal abnormity query method | |
CN115623195A (en) | Television fault diagnosis method, device, equipment and storage medium | |
CN108270868B (en) | Open type numerical control cluster control system based on Web technology | |
CN106254156B (en) | Equipment access method and device | |
CN112099922B (en) | Simulator control method and system based on image recognition and positioning and electronic equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190827 |
|
RJ01 | Rejection of invention patent application after publication |