Invention content
An embodiment of the present disclosure technical problem to be solved is that the shadow of human factor is reduced during debugging air conditioner
It rings.
An aspect of this disclosure, proposes a kind of air conditioning control device, and the air conditioning control device is adjusted automatically including air-conditioning
The setting control of die trial formula, the setting control correspond to preset standard debugging routine.
Optionally, preset standard debugging routine includes:Device level debugging routine and, parametric degree debugging routine;Also,
The execution sequence of the device level debugging routine performs sequence prior to the parametric degree debugging routine.
Optionally, the device level debugging routine includes:The debugging of power supply;The debugging of compressor and its pipeline;Cold water system
The debugging of system;The debugging of cooling system;The debugging of end-equipment;The debugging of master control borad.
Optionally, the debugging step that the device level debugging routine includes is that sequence performs.
Optionally, the parametric degree debugging routine includes:The debugging of producer's grade parameter;The debugging of user class parameter.
Optionally, the debugging step that the parametric degree debugging routine includes is that sequence performs.
Optionally, air conditioning control device further includes:Display area is configured as in display standard debugging routine operational process
It was found that trouble point information.
Optionally, the setting control is arranged in the display area of the air conditioning control device.
Another aspect of the disclosure proposes a kind of air-conditioning equipment, therein each including a unit or multi-joint unit
Unit includes host and the aforementioned air conditioning control device being electrically connected with host.
The another aspect of the disclosure proposes a kind of debugging air conditioner method, including:Trigger the air-conditioning in air conditioning control device
The setting control of automatic debugging mode so that according to the corresponding preset standard debugging routine of the setting control automatically to air-conditioning
It is debugged.
The disclosure can debug journey by the setting control of the automatic debugging mode of air-conditioning according to the corresponding standard of setting control
Sequence automatically debugs air-conditioning, so that debugging air conditioner process specification and automation, reduce the influence of human factor, have
Conducive to raising debugging efficiency.
Specific embodiment
Below in conjunction with the attached drawing in the embodiment of the present disclosure, the technical solution in the embodiment of the present disclosure is carried out clear, complete
Site preparation describes.
Fig. 1 is the structure diagram of disclosure air conditioning control device one embodiment.
As shown in Figure 1, the air conditioning control device 10 of the embodiment includes:The setting control 11 of the automatic debugging mode of air-conditioning
(or the setting control 11 of " a key debugging mode "), setting control 11 corresponds to preset standard debugging routine.Setting control 11
Such as it can be arranged in the display area 12 of air conditioning control device 10.
Wherein, air conditioning control device 10 for example can be the display screen with control function, in the display area of display screen
The setting control 11 of an automatic debugging mode of air-conditioning is disposed in 12.The setting control 11 can be triggered by touch control manner.This
Outside, display area 12 can also show the trouble point information found in standard debugging routine operational process, can also show current
The information such as temperature, humidity, can also show the controls such as opening and closing and unlock, can also show needs other letters to be shown
Breath.
The debugging air conditioner method realized based on air conditioning control device 10 is included:The air-conditioning triggered in air conditioning control device is automatic
The setting control 11 of debugging mode, such as setting control 11 can be triggered by touch control manners such as clicks so that according to setting
The corresponding preset standard debugging routine of control 11 automatically debugs air-conditioning.The debugging can be used for the inspection or inspection of air-conditioning
It repaiies and waits application scenarios.So that debugging air conditioner process specification and automation, reduce the influence of human factor, be conducive to improve
Debugging efficiency.
Fig. 2 is the debugging flow diagram of one embodiment of disclosure standard debugging routine.
As shown in Fig. 2, preset standard debugging routine 20 includes:Device level debugging routine 21 and, parametric degree debugging routine
22;Also, the execution sequence of device level debugging routine 21 performs sequence prior to parametric degree debugging routine 22.This debugging routine
Division methods and perform sequence, can further promote debugging efficiency.
As shown in Fig. 2, device level debugging routine 21 includes:The debugging 211 of power supply;The debugging 212 of compressor and its pipeline;
The debugging 213 of chilled water system;The debugging 214 of cooling system;The debugging 215 of end-equipment;The debugging 216 of master control borad.
Wherein, the debugging step that device level debugging routine 21 includes for example can be that sequence performs, that is, perform electricity successively
The debugging 211 in source, the debugging 212 of compressor and its pipeline, the debugging 213 of chilled water system, the debugging 214 of cooling system, end
The debugging 215 of equipment, the debugging 216 of master control borad, can further promote debugging efficiency.
Wherein, parametric degree debugging routine 22 includes:The debugging 221 of producer's grade parameter;The debugging 222 of user class parameter.Its
In, debugging step that parametric degree debugging routine 22 includes is that sequence performs, that is, perform successively producer's grade parameter debugging 221,
The debugging 222 of user class parameter, can further promote debugging efficiency.
Some illustrative adjustment methods of each debugging step are described separately below.
The debugging 211 of power supply, for example, can detect automatically power supply whether normal power-up, driving plate, master control borad etc. can be just
Normal open electricity.If any one detection project is unable to normal power-up, such as can show power failure information in display area 12, with
Staff is facilitated to overhaul, if energy normal power-up, the next item down debug-item can be performed according to the debugging sequence of setting.
The debugging 212 of compressor and its pipeline, such as can detect whether compressor runs well, each pipe of compressor
Road connects whether correct, normal etc..If any one detection project is abnormal, such as can show compressor in display area 12
Or its circuit failure information, staff to be facilitated to overhaul, if detection project is normal, can be performed according to the debugging sequence of setting
The next item down debug-item.
The debugging 213 of chilled water system, such as the cleaning including cold water pipes, the acquisition pressure drop of cold water branch pipe and system stagnation pressure
Data of drop etc..Since pipeline is being installed and easily remaining the foreign matters such as welding slag in welding process, must clean before use
Totally.The no blocking it will cause pipeline can also damage equipment when serious.Cold water pipeline-cleaning is first had to each floor
Fan coil and the inlet valve of air-conditioner host close, open simultaneously for return water communicating valve, be then turned on circulating pump, run number
Hour, the water in system is finally bled off, cleans the filter of fan coil and air-conditioner host one by one.In the pressure of acquisition cold water branch pipe
Before the data of drop and system overall presure drop, the inlet/outlet valve of fan coil and air-conditioner host is fully open, and open the circulation pump is pressed
Design pressure cycle a period of time, the pressure drop of each branch pipe and the overall presure drop of circulating pump are measured, then increases the hydraulic pressure of system
To debugging pressure, circulating pump is closed, is kept for several hours, measures the pressure drop of each branch pipe and the overall presure drop of circulating pump again.Pass through
These gathered datas with design data are compared, the error that chilled water system occurs in fixing link can be searched.It is if arbitrary
One detection project is abnormal, such as can show chilled water system fault message in display area 12, staff to be facilitated to examine
It repaiies, if detection project is normal, the next item down debug-item can be performed according to the debugging sequence of setting.
The debugging 214 of cooling system, such as the detection projects such as the cleaning including cooling line, debugging of cooling tower.Cooling
The cleaning of pipeline and the cleaning of cold water pipeline are basically identical, can refer to the cleaning of cold water pipeline.Further it is proposed that in air-conditioner host
Filter is installed additional with the intake-outlet of cooling tower, this is because cooling tower is to open wide operation, water quality easily pollutes, easily cold
Precipitation is formed inside condenser.Cooling tower is the key equipment of cooling system, first has to determine electricity when debugging cooling tower
Source it is unimpeded.Then the rotating speed of detection blower fan and steering if it find that wind turbine does not turn, will check whether wiring is correct;If hair
The rotating speed of existing wind turbine is very slow, to check circuit whether phase shortage;If it find that blower fan turning mistake will then replace the sequence of circuit.It connects
It, detecting Water distributor for cooling tower, whether water distribution is uniform, whether there is clogging.It finally detects when water level rises or falls, it is cold
But can the fluid level control valve of tower work normally, i.e., water level decreasing when whether the moisturizing into tower, water level controls when being increased to the upper limit
Can valve close in time.If any one detection project is abnormal, such as can show cooling system failure in display area 12
Information staff to be facilitated to overhaul, if detection project is normal, can perform the next item down debugging item according to the debugging sequence of setting
Mesh.
The debugging 215 of end-equipment, such as the debugging including fan coil, debugging of Fresh air handling units etc..Fan coil is
The primary end equipment of air-conditioning, whether the model that fan coil is first checked in debugging is correct, then opens fan coil
Speed-regulating switch, it is ascending to adjust successively, and respectively the air outlet of fan coil measure wind speed, if wind speed does not change
Become, check whether speed-regulating switch wiring is problematic, if wind speed is not to have small to big, but descending, then speed-regulating switch connects
Line sequence is anti-.After wind speed is normal, to check whether wind direction is conducive to return air, the angle of wind direction can be by adjusting fan unit
The air outlet blade of pipe is completed.Condensed water is observed afterwards for a period of time opening fan coil, if go out the drip tray of coil pipe
It flows in the condensation of system, if fan coil has condensed water spilling, illustrates that the condenser pipe gradient of air-conditioning system is inadequate, it is timely
It is corrected.Fresh air handling units are also one of project that emphasis is needed to debug.Since Fresh air handling units are through supercooling by outdoor air
Processing becomes the fresh air that temperature and humidity is suitable for working environment, so the rotating speed of wind turbine and air volume are Fresh air handling units tune
The key of examination.In addition to Fresh air handling units, air-line system is also checked.Since the ajutage of fresh air easily pollutes when mounted,
Air purging is carried out installing.Purging finishes whether the devices such as the ventilation valve in air hose to be tested act, at fresh wind port
Wind pressure whether reach design requirement.If any one detection project is abnormal, such as can show end in display area 12
Device fault information staff to be facilitated to overhaul, if detection project is normal, can perform the next item down according to the debugging sequence of setting
Debug-item.
The debugging 216 of master control borad, such as can check whether master control borad indicator light is just being always on secretly, if it is possible to just it is always on
Secretly, then it represents that master control borad works normally, if cisco unity malfunction, then it represents that master control borad or instruction lamp failure.If any one
Detection project is abnormal, such as can show master control borad fault information in display area 12, staff to be facilitated to overhaul, if inspection
Survey project is normal, can perform the next item down debug-item according to the debugging sequence of setting.
Producer grade parameter debugging 221 for example including all kinds of temperature sensing packages, water flow switch, wind turbine, compressor working frequency
The parameter value of columns is waited, checks whether consistent with design parameter or in the range of design parameter, if inconsistent, such as can shown
Show that region 12 shows producer's grade parametic fault information, staff to be facilitated to overhaul, if unanimously, it can be according to the debugging sequence of setting
Perform the next item down debug-item.
The default value of the debugging 222 of user class parameter parameter such as including air-conditioner temperature, air-conditioning humidity, due to interference etc.
Reason, the parameter value detected and practical parameter value are inconsistent, at this point, can for example show user class ginseng in display area 12
Number fault message, staff to be facilitated to eliminate interference.
The disclosure also proposes a kind of air-conditioning equipment, and including a unit or multi-joint unit, each unit therein includes master
Machine 30 and the air conditioning control device 10 being electrically connected with host 30.Fig. 3, which is shown in the air-conditioning equipment of multi-joint unit, sets air-conditioning control
The situation of device 10 processed, for example, including host A and air conditioning control device A, host B and air conditioning control device B ..., host N and sky
Adjust control device N.
Fig. 4 shows that setting control of the multi-joint unit based on the automatic debugging mode of air-conditioning carries out automatic debugging process signal
Figure.As shown in figure 4, click the setting control 11A of the automatic debugging mode of air-conditioning in the air conditioning control device A in unit A so that
Unit A is debugged automatically according to the corresponding preset standard debugging routines of setting control 11A.The debugging can be used for air-conditioning
Inspection or the application scenarios such as maintenance.It is assumed that the debugging process of unit A is normal, then normal operation is shown.Then, machine is clicked
The setting control 11B of the automatic debugging mode of air-conditioning in air conditioning control device B in group B so that corresponded to according to setting control 11B
Preset standard debugging routine B of Unit is debugged automatically.It is assumed that the debugging process of B of Unit finds trouble point, then
Show trouble point.Then, then carry out other units automation debugging.For example, it clicks in the air conditioning control device N in unit N
The automatic debugging mode of air-conditioning setting control 11N so that according to the corresponding preset standard debugging routines of setting control 11N from
It is dynamic that unit N is debugged.It is assumed that the debugging process of unit N finds trouble point, then trouble point is shown.
So that debugging air conditioner process specification and automation, reduce the influence of human factor, be conducive to improve air-conditioning,
The debugging efficiency of particularly multi-joint air conditioning unit.
Those skilled in the art should be understood that embodiment of the disclosure can be provided as method, system or computer journey
Sequence product.Therefore, in terms of the disclosure can be used complete hardware embodiment, complete software embodiment or combine software and hardware
The form of embodiment.Moreover, the calculating for wherein including computer usable program code in one or more can be used in the disclosure
Machine can use the meter implemented on non-transient storage medium (including but not limited to magnetic disk storage, CD-ROM, optical memory etc.)
The form of calculation machine program product.
The disclosure is with reference to the flow according to the method for the embodiment of the present disclosure, equipment (system) and computer program product
Figure and/or block diagram describe.It is interpreted as to be realized by computer program instructions each in flowchart and/or the block diagram
The combination of flow and/or box in flow and/or box and flowchart and/or the block diagram.These computer journeys can be provided
Sequence instruct to all-purpose computer, special purpose computer, Embedded Processor or other programmable data processing devices processor with
Generate a machine so that the instruction generation performed by computer or the processor of other programmable data processing devices is used for
Realize the dress of function specified in one flow of flow chart or multiple flows and/or one box of block diagram or multiple boxes
It puts.
These computer program instructions, which may also be stored in, can guide computer or other programmable data processing devices with spy
Determine in the computer-readable memory that mode works so that the instruction generation being stored in the computer-readable memory includes referring to
Enable the manufacture of device, the command device realize in one flow of flow chart or multiple flows and/or one box of block diagram or
The function of being specified in multiple boxes.
These computer program instructions can be also loaded into computer or other programmable data processing devices so that counted
Series of operation steps are performed on calculation machine or other programmable devices to generate computer implemented processing, so as in computer or
The instruction offer performed on other programmable devices is used to implement in one flow of flow chart or multiple flows and/or block diagram one
The step of function of being specified in a box or multiple boxes.
The foregoing is merely the preferred embodiment of the disclosure, not to limit the disclosure, all spirit in the disclosure and