CN110158559A CN201910476217.2A CN201910476217A CN110158559A CN 110158559 A CN110158559 A CN 110158559A CN 201910476217 A CN201910476217 A CN 201910476217A CN 110158559 A CN110158559 A CN 110158559A
Authority
CN
China
Prior art keywords
bucket
plate
arc rack
spring
mentioned
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910476217.2A
Other languages
Chinese (zh)
Other versions
CN110158559B (en
Inventor
何佳遥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HANGZHOU SHUIDUN TECHNOLOGY CO LTD
Original Assignee
Hangzhou Green One Environmental Protection Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Green One Environmental Protection Technology Co Ltd filed Critical Hangzhou Green One Environmental Protection Technology Co Ltd
Priority to CN201910476217.2A priority Critical patent/CN110158559B/en
Publication of CN110158559A publication Critical patent/CN110158559A/en
Application granted granted Critical
Publication of CN110158559B publication Critical patent/CN110158559B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B15/00Cleaning or keeping clear the surface of open water; Apparatus therefor
    • E02B15/04Devices for cleaning or keeping clear the surface of open water from oil or like floating materials by separating or removing these materials
    • E02B15/10Devices for removing the material from the surface

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Processing Of Solid Wastes (AREA)
  • Sewage (AREA)

Abstract

The invention belongs to technical field of sewage, more particularly to a kind of equipment for handling cesspool, it includes separating mechanism, tipping mechanism, drainage canal, it is not limited by water in cesspool is suddenly big or suddenly small by the design of tipping mechanism wherein, so that toppling over the water that impact Fang Dou enough is poured out of bucket energy intermittent, guarantee the normal operation of separating mechanism;By the design of separating mechanism, so that the floating refuse in sewage is collected into Fang Dou, the impact energy of sewage runs tipping mechanism interval, so that the rubbish of Fang Dou is completed from being collected into the whole process for being poured into trash repository;A arc rack makes Fang Dou can be carried out the shake of certain amplitude, so that the wet refuse adhered in Fang Dou is easier to fall in trash repository out of side bucket;B arc rack makes Fang Dou receive the no longer large area covering side bucket import of sewage when side lid, guarantees that sewage can enter Fang Douzhong, so that floating refuse is separated with sewage.The present invention has preferable practical function.

Description

A kind of equipment handling cesspool
Technical field
The invention belongs to technical field of sewage more particularly to a kind of equipment for handling cesspool.
Background technique
At present processing cesspool rubbish be sewage treatment process early period important step, in existing cesspool rubbish compared with It is more, if garbage disposal not in time or deal with improperly and work as, it is easy to heap generates stench, has in these foul gas to people The pernicious gas that body causes damages.The rubbish that settles in existing cesspool has special process to be handled, such as using defeated It send with the rubbish for carrying out the clear subaqueous deposit of rubbish.But the floating refuse on the sewage water surface is generally used irregularly artificial The mode of salvaging is cleared up, and the working efficiency of this method is lower, and cost of labor is higher, and there are biggish security risks. In order to improve working efficiency and cost of labor can also be reduced, so setting for cesspool floating refuse can be handled with regard to needing to design one kind It is standby.
The equipment that the present invention designs a kind of processing cesspool solves the problems, such as above.
Summary of the invention
To solve drawbacks described above in the prior art, the present invention discloses a kind of equipment for handling cesspool, it be use with Lower technical solution is realized.
In the description of the present invention, it should be noted that the indicating positions such as term "inner", "lower", "upper" or position are closed System be orientation based on the figure perhaps positional relationship or the invention product using when the orientation or position usually put Set relationship, it is only for convenient for the description present invention and simplify description, rather than the device or element of indication or suggestion meaning must There must be specific orientation, be constructed or operated with specific orientation, therefore be not considered as limiting the invention.In addition, art Language " first ", " second " etc. are only used for distinguishing description, are not understood to indicate or imply relative importance.
It is a kind of handle cesspool equipment, it is characterised in that: it include uniformly be equipped with along its length on pedestal it is more A processing module is fixed with the drainage canal with the cooperation of multiple processing modules on pedestal.
Above-mentioned processing module is cooperated by separating mechanism and tipping mechanism, separating mechanism and tipping mechanism.
Above-mentioned tipping mechanism includes toppling over bucket, L support, counterweight, limit wobble plate, U-shaped board, collection bucket, square set, hindering block, Middle A supports that one end is packed in pedestal and the other end is hinged with and topples over bucket;Topple over bucket bottom end and is fixed with counterweight, counterweight side dress Limited wobble plate;U-shaped board and L support are mounted in A branch support same side;L support is matched with the bottom equipped with counterweight one end of struggling against is toppled over It closes;Wobble plate is limited between U-shaped board and is cooperated at the top of U-shaped board;A is mounted in by B solid plate positioned at the collection bucket for toppling over bucket lower section It supports on the side far from U-shaped board;Topple over bucket and collection bucket cooperates;Square set below collection bucket is mounted in A branch by A solid plate It supports on the side far from U-shaped board;One end has bevelled obstruction block and is slidably mounted in square set, has in square set multiple to block is hindered The A spring of position;A spring is in compressive state always;Drainage canal is located at the underface of collection bucket.
Above-mentioned separating mechanism includes base-mounted trash repository, supports by B base-mounted rotary column, rotary column last week To equally distributed multiple rotary units, B arc rack, A arc rack, wherein the side of B support is equipped with A curved tooth by L-type arc plate A Item, the other side are equipped with B arc rack by L-type arc plate B;B support is located between A support and trash repository;A arc rack is located at trash repository Top and be located at rotary column obliquely downward, B arc rack be located at rotary column and A support between and B arc rack be located at rotary column oblique upper;A curved tooth Teeth section in the middle and top part of item is circumferentially uniformly provided with multiple arc notches;Multiple rotary units respectively with B arc rack and A arc rack Cooperation;Trash repository is located at below rotary column;B arc rack is located at the oblique upper of A arc rack.
Above-mentioned rotary unit includes that spiral arm, the Fang Dou that circular hole is all had in all plate faces, slide plate, shift plate, one end are fixed with The spur rack that just covers, both ends are respectively provided with the shaft of A gear and B gear, and wherein one end of spiral arm is packed on rotary column, the other end It is slidably fitted with slide plate;Equipped with the B spring resetted for slide plate on spiral arm;Slide plate is fixed with Fang Dou far from one end of spiral arm;Straight-tooth Item is slidably mounted on spiral arm, Fang Gai and side's bucket import cooperation;Equipped with the C spring resetted for spur rack on spiral arm;Shaft assembly On spiral arm, A gear is engaged with spur rack, and B gear cooperates with B arc rack and A arc rack respectively;Side is covered equipped with shift plate, is begun Final position is in shift plate and side's bucket inner wall cooperation in just bucket.
Above-mentioned Fang Dou and trash repository cooperate, and Fang Douyu hinders the inclined-plane cooperation of block.
As the further improvement of this technology, above-mentioned to topple over bucket bottom with protrusion, the axis that raised two sides are filled passes through Bearing is in the circular hole of two supporting plates of A branch support;Topple over bucket cross section be it is trapezoidal, topple over struggle against far from counterweight inclined plate with Topple over the acute angle that bucket bottom surface is constituted and abuts the inclined plate of counterweight and the acute angle for toppling over bucket bottom surface composition less than bucket is toppled over.Topple over setting for bucket Meter is: during toppling over bucket gradually collection sewage, so that the weight for toppling over one end far from counterweight of struggling against is gradually increased, directly To being greater than the weight toppled over and struggled against close to counterweight one end, it a large amount of will gather sewage moment so that toppling over bucket and can overturn and be poured into collection In bucket;In addition, toppling over bucket collects the influence that sewage is also avoided that water is suddenly big or suddenly small in cesspool, guarantee the normal of separating mechanism Operation.
As the further improvement of this technology, above-mentioned collection bucket is made of two ladder type buckets, the ladder type bucket above collection bucket Import be greater than the outlet of the ladder type bucket above collection bucket, the import of the ladder type bucket below collection bucket and the ladder type above collection bucket The outlet of bucket is equal, and the import of the ladder type bucket below collection bucket is greater than the outlet of the ladder type bucket below collection bucket.Collection bucket is set Meter is: collection bucket top inlet maximum can to topple over the sewage that bucket pours and all be collected to struggle against to obtain import and collect;And Collection bucket outlet at bottom is minimum, and sewage can be enabled to drain and preferably impact water flow for one, when preventing collection bucket that sewage is discharged Excessively spluttering spray, and collection bucket discharge is preferable and the lesser impact water flow of water flow section also contributes to Fang Dou and collects impact water Stream.
As the further improvement of this technology, the inner wall up and down of above-mentioned square set is symmetrically opened there are two A guide groove;Hinder block separate There are two A guide blocks for dress symmetrical above and below at the one end on its inclined-plane;Two A guide blocks are slided on respectively in two A guide grooves;The one of A spring End is connect with square set inner wall, and the other end is connect with block is hindered far from the one end on its inclined-plane.The effect of A guide block prevents from hindering block from side It is detached from set, moreover it is possible to guarantee that A spring is in pre-compressed state in the initial state.
As the further improvement of this technology, above-mentioned rotary column and B spring bearing cooperate, and it is logical that trash repository side is provided with supplier's bucket The pendulum mouth crossed.The design of pendulum mouth enables trash repository to be entered in the range of rotary unit swing to greatest extent, reduces rubbish Space of the storehouse in actual installation.
As the further improvement of this technology, above-mentioned A gear is identical with the size of B gear;The center of circle where A arc rack radian It is overlapped with the axis of rotary column with the center of circle where B arc rack radian.
As the further improvement of this technology, for any one above-mentioned rotary unit: being provided with trapezoidal lead on spiral arm side Slot;The lower surface of spur rack has trapezoidal guide block;Trapezoidal guide block is slidably mounted in trapezoidal guide groove;C spring one end is led with trapezoidal The connection of slot inner wall, the other end are connect with trapezoidal guide block;C spring is extension spring.The effect of trapezoidal guide block prevent spur rack from It is separated on spiral arm.
As the further improvement of this technology, for any one above-mentioned rotary unit: spiral arm is opened far from one end of rotary column There is a sliding slot, the two sides of sliding slot symmetrically open that there are two B guide grooves;The one end of slide plate far from Fang Dou is symmetrically filled there are two B guide block, two B Guide block is slidably mounted on respectively in two B guide grooves;One end of B spring is connected in sliding slot inner groove surface, and the other end is connect with slide plate;B Spring is compressed spring.The anti-limited slip plate of the effect of B guide block is detached from from spiral arm.
As the further improvement of this technology, above-mentioned counterweight is metallic material;For any one above-mentioned rotation list Member: shaft is mounted on spiral arm by L solid plate, shaft and L solid plate bearing fit;L solid plate is between A gear and B gear.
As the further improvement of this technology, above-mentioned drainage canal is located between B support and A support;Drain the cross section of canal To be trapezoidal, such design is convenient for collecting the sewage that Fang Dou is stayed from surrounding.
The inlet -duct area of Fang Dou is greater than collection bucket draining open area in the present invention, to guarantee the sewage energy of collection bucket discharge It is struggled against by side and well receives.
Collection bucket of the present invention meets with the impact energy for hindering the distance between block to meet when impact water impact side struggles against The driving energy of separating mechanism operation.
Relative to the processing technique of floating refuse in traditional wastewater, the present invention does not need worker to the floating on the sewage water surface Rubbish carries out irregularly artificial salvage, it is only necessary to periodic cleaning trash repository is just able to achieve, reduce it is artificial salvage floating refuse at Sheet and workload improve working efficiency;In addition, due to avoiding artificial salvaging, thus exist when also avoiding manually salvaging compared with Big security risk ensure that the safety of worker's work.The configuration of the present invention is simple does not need to can be achieved with rubbish using electric drive The separation of rubbish reaches the green energy conservation requirement of country's promotion, has preferable using effect.
Detailed description of the invention
Fig. 1 is equipment overall schematic.
Fig. 2 is single processing module schematic diagram.
Fig. 3 is single processing module schematic elevation view.
Fig. 4 is tipping mechanism schematic diagram.
Fig. 5 is tipping mechanism partial enlargement and schematic section elevation.
Fig. 6 is with re-mounting, block is hindered to be slidably installed section, square set section, A guide block scheme of installation.
Fig. 7 is separating mechanism schematic diagram.
Fig. 8 is the schematic elevation view that multiple rotary units and A arc rack, B arc rack cooperate.
Fig. 9 is details partial enlargement diagram at the two of Fig. 8.
Figure 10 is the scheme of installation of A arc rack and B arc rack.
Figure 11 is the schematic section elevation that Fang Douyu hinders block cooperation.
Figure 12 is rotary unit entirety and diagrammatic cross-section.
Figure 13 is spiral arm perspective and the schematic diagram that A gear is engaged with spur rack.
Figure 14 is the installation and diagrammatic cross-section of slide plate.
Figure label title: 1, pedestal;2, processing module;3, canal is drained;4, separating mechanism;5, tipping mechanism;6, it rotates Unit;7, A is supported;8, A solid plate;9, square set;10, topple over bucket;12, collection bucket;13, B solid plate;14, U-shaped board;15, wobble plate is limited; 16, block is hindered;17, raised;18, counterweight;19, L is supported;20, A guide groove;21, A spring;22, A guide block;23, by-pass channel;25, rubbish Rubbish storehouse;26, Bai Kou;27, L-type arc plate A;28, A arc rack;29, L-type arc plate B;30, B arc rack;31, rotary column;32, B is supported; 33, arc notch;35, spiral arm;36, spur rack;37, A gear;38, Fang Gai;39, Fang Dou;40, B gear;41, L solid plate;42, sliding Plate;43, shift plate;44, sliding slot;45, B spring;46, C spring;47, trapezoidal guide block;48, trapezoidal guide groove;49, B guide groove;50, turn Axis;51, B guide block.
Specific embodiment
Hereinafter reference will be made to the drawings to describe the present invention;However, it should be understood that these descriptions are merely illustrative, and do not really want It limits the scope of the present disclosure.In addition, in the following description, descriptions of well-known structures and technologies are omitted, to avoid unnecessary Obscure the concept of the disclosure in ground.All terms (including technical and scientific term) as used herein are logical with those skilled in the art The meaning often understood, unless otherwise defined.It should be noted that term used herein should be interpreted that with upper and lower with this specification Text consistent meaning, without that should be explained with idealization or excessively mechanical mode.
A kind of equipment handling cesspool, as shown in Figure 1, 2, it includes uniformly being equipped with along its length on pedestal 1 Multiple processing modules 2 are fixed with the drainage canal 3 with the cooperation of multiple processing modules 2 on pedestal 1.
As shown in Fig. 2, above-mentioned processing module 2, by separating mechanism 4 and tipping mechanism 5, separating mechanism 4 is matched with tipping mechanism 5 It closes.
As shown in Figure 3,4, above-mentioned tipping mechanism 5 includes toppling over bucket 10, L support 19, counterweight 18, limit wobble plate 15, U-shaped board 14, collection bucket 12, square set 9, obstruction block 16, as shown in figure 3, wherein 7 one end of A support are packed in pedestal 1 and the other end is hinged with Topple over bucket 10;As shown in Figure 5,6, topple over 10 bottom ends of bucket and be fixed with counterweight 18,18 side of counterweight is equipped with limit wobble plate 15;It is U-shaped Plate 14 and L support 19 support 7 top same sides mounted in A;L support 19 is matched with 10 bottoms equipped with 18 one end of counterweight of struggling against are toppled over It closes;Limit wobble plate 15 between U-shaped board 14 and with cooperate at the top of U-shaped board 14;Pass through B positioned at the collection bucket 12 for toppling over 10 lower section of bucket Solid plate 13 supports on 7 sides far from U-shaped board 14 mounted in A;Topple over bucket 10 to cooperate with collection bucket 12;As shown in Figure 3,4, it is located at and receives The square set 9 of 12 lower section of collection bucket is supported on 7 sides far from U-shaped board 14 by A solid plate 8 mounted in A;As shown in fig. 6, one end has tiltedly The obstruction block 16 in face is slidably mounted in square set 9, is had in square set 9 to the A spring 21 for hindering block 16 to reset;A spring 21 is always In compressive state;As shown in Figure 2,3, drainage canal 3 is located at the underface of collection bucket 12.
As shown in Figure 2,3, above-mentioned separating mechanism 4 includes the trash repository 25 being mounted on pedestal 1, as shown in Fig. 3,10, passes through B Rotary column 31, as shown in Figure 7,8, rotary column 31 on circumferential equally distributed multiple rotary units 6, B arc of the support 32 on pedestal 1 Rack gear 30, A arc rack 28, as shown in Figure 10, wherein the side of B support 32 is equipped with A arc rack 28 by L-type arc plate A27, another Side is equipped with B arc rack 30 by L-type arc plate B29;As shown in figure 3, B support 32 is located between A support 7 and trash repository 25;A curved tooth Item 28 is located at 25 top of trash repository and is located at 31 obliquely downward of rotary column, and B arc rack 30 is located between rotary column 31 and A support 7 and B curved tooth Item 30 is located at 31 oblique upper of rotary column;As shown in Figure 10, the teeth section of 28 middle and top part of A arc rack is circumferentially uniformly provided with multiple arcs Notch 33;As shown in figure 8, multiple rotary units 6 cooperate with B arc rack 30 and A arc rack 28 respectively;As shown in figure 3, trash repository 25 are located at 31 lower section of rotary column;B arc rack 30 is located at the oblique upper of A arc rack 28.
As shown in Figure 12,13,14, Fang Dou of the above-mentioned rotary unit 6 including all having circular hole in spiral arm 35, all plate faces 39, slide plate 42, shift plate 43, the spur rack 36 of one end side of being fixed with lid 38, both ends are respectively provided with turning for A gear 37 and B gear 40 Axis 50, as shown in Fig. 9,11, wherein one end of spiral arm 35 is packed on rotary column 31, and the other end is slidably fitted with slide plate 42;Spiral arm Equipped with the B spring 45 resetted for slide plate 42 on 35;As shown in Figure 11,12,13, one end be fixed with side of the slide plate 42 far from spiral arm 35 Bucket 39;Spur rack 36 is slidably mounted on spiral arm 35, square lid 38 and side's bucket 39 imports cooperation;Equipped with for spur rack 36 on spiral arm 35 The C spring 46 of reset;Shaft 50 is assemblied on spiral arm 35, and A gear 37 is engaged with spur rack 36, B gear 40 respectively with B arc rack 30 and A arc rack 28 cooperates;Shift plate 43 is housed, the shift plate 43 in the side's of being always positioned at bucket 39 is matched with side's 39 inner walls of bucket on square lid 38 It closes.
As shown in fig. 7, above-mentioned side's bucket 39 cooperates, as shown in figure 11, Fang Dou 39 and the inclined-plane for hindering block 16 with trash repository 25 Cooperation.
As shown in Figure 5,6, above-mentioned to topple over 10 bottoms of bucket with protrusion 17, the axis that the two sides of protrusion 17 are filled passes through bearing and fills In the circular hole of two supporting plates at 7 top of A support;Topple over bucket 10 cross sections be it is trapezoidal, topple over bucket 10 inclined plates far from counterweight 18 The inclined plate of counterweight 18 and the acute angle for toppling over 10 bottom surfaces of bucket composition are abutted less than bucket 10 is toppled over the acute angle that 10 bottom surfaces of bucket are constituted is toppled over. The design for toppling over bucket 10 is: during toppling over the gradually collection sewage of bucket 10, so that toppling over one of bucket 10 far from counterweight 18 The weight at end is gradually increased, until be greater than topple over bucket 10 close to 18 one end of counterweight weight, enable topple over bucket 10 overturn will be big Amount gathers sewage moment and is poured into collection bucket 12;In addition, toppling over 10 collection sewage of bucket is also avoided that water is neglected in cesspool Small influence is neglected greatly, guarantees the normal operation of separating mechanism 4.
As shown in Figure 4,5, above-mentioned collection bucket 12 is made of two ladder type buckets, and the import of the ladder type bucket of 12 top of collection bucket is big The outlet of ladder type bucket above collection bucket 12, the ladder type bucket of 12 top of import and collection bucket of the ladder type bucket of 12 lower section of collection bucket Outlet it is equal, the import of the ladder type bucket of the lower section of collection bucket 12 is greater than the outlet of the ladder type bucket of 12 lower section of collection bucket.Collection bucket 12 Design be: 12 top inlet maximum of collection bucket can to topple over the sewage that bucket 10 pours all be collected bucket 12 into Mouth is collected;And 12 outlet at bottom of collection bucket is minimum, and sewage can be enabled to drain and preferably impact water flow for one, prevent collection bucket Excessively spluttering spray when 12 discharge sewage, and collection bucket 12 is discharged the preferable and lesser impact water flow of water flow section and also contributes to Side's bucket 39 collects impact water flow.
As shown in fig. 6, the inner wall up and down of above-mentioned square set 9 is symmetrically opened, there are two A guide grooves 20;Hinder block 16 far from its inclined-plane There are two A guide blocks 22 for dress symmetrical above and below at one end;Two A guide blocks 22 are slided on respectively in two A guide grooves 20;The one of A spring 21 End is connect with 9 inner wall of square set, and the other end is connect with block 16 is hindered far from the one end on its inclined-plane.The effect of A guide block 22 prevents from hindering Block 16 is detached from from square set 9, moreover it is possible to guarantee A spring 21 in the initial state in pre-compressed state.
As shown in fig. 7, above-mentioned rotary column 31 and B supports 32 bearing fits, 25 side of trash repository is provided with what supplier's bucket 39 passed through Put mouth 26.The design of pendulum mouth 26 enables trash repository 25 to be entered in the range of the swing of rotary unit 6 to greatest extent, reduces rubbish Space of the rubbish storehouse 25 in actual installation.
As shown in figure 13, the size of above-mentioned A gear 37 and B gear 40 is identical;As shown in figure 8, where 28 radian of A arc rack The center of circle where 30 radian of the center of circle and B arc rack is overlapped with the axis of rotary column 31, when ensure that rotary unit 6 rotates, B gear 40 It can be engaged with A arc rack 28 or B arc rack 30.
As shown in Figure 12,13, for any one above-mentioned rotary unit 6: being provided with trapezoidal guide groove 48 on 35 side of spiral arm;Directly The lower surface of rack gear 36 has trapezoidal guide block 47;Trapezoidal guide block 47 is slidably mounted in trapezoidal guide groove 48;46 one end of C spring and ladder The connection of 48 inner wall of shape guide groove, the other end are connect with trapezoidal guide block 47;C spring 46 is extension spring.The effect of trapezoidal guide block 47 is anti- Stop spur rack 36 to separate from spiral arm 35.
As shown in figure 14, for any one above-mentioned rotary unit 6: spiral arm 35 is provided with sliding slot far from one end of rotary column 31 44, the two sides of sliding slot 44 are symmetrically opened there are two B guide groove 49;Slide plate 42 is symmetrically filled far from one end of side's bucket 39 there are two B guide block 51, Two B guide blocks 51 are slidably mounted on respectively in two B guide grooves 49;One end of B spring 45 is connected in 44 inner groove surface of sliding slot, the other end It is connect with slide plate 42;B spring 45 is compressed spring.The anti-limited slip plate 42 of the effect of B guide block 51 is detached from from spiral arm 35.
Above-mentioned counterweight 18 is metallic material;As shown in Figure 12,13, for any one above-mentioned rotary unit 6: shaft 50 are mounted on spiral arm 35 by L solid plate 41, shaft 50 and 41 bearing fit of L solid plate;L solid plate 41 is located at A gear 37 and B gear 40 Between.
It is supported between 32 and A support 7 as shown in Fig. 2, above-mentioned drainage canal 3 is located at B;Drain canal 3 cross section be it is trapezoidal, this The sewage that the design of sample stays convenient for collection side's bucket 39 from surrounding.
The specific of rotary unit 6 is determined according to the vertical distance between 12 bottom of collection bucket and obstruction block 16 in the present invention Number, to meet actual requirement of the invention;As reference, the number of rotary unit 6 is 8 in attached drawing of the present invention.When having one Spiral arm 35 in a rotary unit 6 is horizontally situated and side's bucket 39 of the rotary unit 6 is squeezed with the inclined-plane on block 16 is hindered When, have on the vertical plane that collection bucket 12 drains and only one side bucket 39 exists.
Usage scenario requirement of the invention: as shown in figure 3, multiple by-pass channels 23, multiple shuntings are distributed on cesspool Canal 23 topples over 10 one-to-one correspondence of bucket with multiple respectively, and the water of cesspool upper surface is flowed into the protrusion for toppling over bucket 10 through by-pass channel 23 17 in the region where counterweight 18, to guarantee that water that by-pass channel 23 flows out directly will not topple over trend to toppling over bucket 10 and generate.
Workflow of the invention: topple over bucket 10 and do not have under the original state of sewage, the bottom for toppling over bucket 10 is in water Level state, L support 19 pairs to topple over 10 bottoms of bucket and are supported, and there are spacing with 14 top of U-shaped board for limit wobble plate 15;In A guide block 22 Under the action of, A spring 21 is in compressive state;There is side's bucket 39 an of rotary unit 6 to be located at the vertical plane that collection bucket 12 drains When above and being higher than obstruction block 16, the B gear 40 on the rotary unit 6 is engaged with B arc rack 30, and C spring 46 is in tensional state, Square lid 38 by a small margin covering side bucket 39 import and have substantially no effect on the sewage side of entrance bucket 39, shift plate 43 side of not stirring bucket 39 and slide When side's 39 side plate of bucket that plate 42 is connected, B spring 45 is uncompressed;In side's 39 trash repositories 25 of bucket of another rotary unit 6, and The party bucket 39 on square lid 38 by a small margin the side of coveringing struggle against 39 import.Rotation is not driven for A gear 37 in other rotary units 6 When turning, the import of square 38 side of being completely covered by of lid bucket 39.
When topple over that bucket 10 is collected into include floating refuse sewage it is more and more when, topple over bucket 10 far from counterweight 18 The weight of one end is gradually increased, and when being more than to topple over bucket 10 close to the weight of one end of counterweight 18, topples over bucket 10 far from counterweight 18 one end, which downwardly turns over, topples over the sewage containing floating refuse toppled in bucket 10;Due to toppling over bucket 10 close to counterweight The upper pendulum meeting of 18 one end is so that limit wobble plate 15 follows and topples over bucket 10 and move synchronously, so when limit wobble plate 15 and 14 top of U-shaped board When limit contact, toppling over bucket 10 can not continue to overturn, topple at this time bucket 10 one end and collection bucket 12 far from counterweight 18 into Mouth supports corresponding to 7 sides close to A, to guarantee that toppling over the sewage that bucket 10 is poured can be collected from start to end Collected by the import of bucket 12;The water that by-pass channel 23 flows out at this time can be still flowed into where the protrusion 17 for toppling over bucket 10 and counterweight 18 Region in.When topple over bucket 10 topple over finish sewage after, with counterweight 18 one end topple over bucket 10 lay particular stress on, counterweight 18 act on Under, 10 reverse flips of bucket, which are toppled over, until toppling over bucket 10 returns to original state position.
When collection bucket 12 collect include that the sewage of floating refuse is discharged vertically from the outlet of collection bucket 12 when, include The sewage of floating refuse can impact corresponding side's bucket 39, Fang Dou 39 can drive spiral arm 35 to lower swing through slide plate 42, this is actively revolved The spiral arm 35 turned drives other passively rotations of rotary unit 6 through rotary column 31.The rotation list of the active bottom under Sewage shock In member 6, shaft 50 follows 35 bottom of spiral arm, and under the guiding function of B arc rack 30, B gear 40 rotates, and B gear 40 is through shaft 50, A gear 37 drives spur rack 36 mobile to the direction far from side's bucket 39, and C spring 46 continues to be stretched, and spur rack 36 is followed to transport The dynamic drive shift plate 43 of square lid 38 connect the side plane contact of slide plate 42 with side's bucket 39;Continue to rotate with B gear 40, B gear The last one teeth engages with 36 end of spur rack for 40 meetings, and spur rack 36 is moved to the limit, and C spring 46 is stretched to the limit;Directly 36 classical prescription lid 38 of rack gear, 43 side of drive of shift plate bucket 39 are mobile to 35 direction of spiral arm, and slide plate 42 is mobile to 35 direction of spiral arm, B spring 45 are compressed.It is engaged since B gear 40 can continue pulsating with the last one teeth of 36 end of spur rack, the position of spur rack 36 Substantially it remains unchanged, then the position of square lid 38, shift plate 43, Fang Dou 39, slide plate 42 on spiral arm 35 remains unchanged substantially.Into The sewage of side's bucket 39 is flowed out from the circular hole around side's bucket 39, in the rubbish side of the being deposited in bucket 39 in sewage.
Sewage is poured out with 10 interval of bucket is toppled over, then side's bucket 39 of 12 lower section of collection bucket can be spaced and receive rushing for sewage It hits, each Secondary Shocks can make corresponding 6 bottom certain amplitude distance of rotary unit.When the side's bucket 39 for being located at 12 lower section of collection bucket Under swing to hinder block 16 contact of incline plane when, B gear 40 is still engaged with B arc rack 30, square lid 38, shift plate 43, Fang Dou 39, Position of the slide plate 42 on spiral arm 35 still remains unchanged substantially.It is adjacent with the top for the side's bucket 39 for hindering block 16 to be engaged Side's bucket 39 in rotary unit 6 drains vertical plane close to collection bucket 12, but the water that collection bucket 12 is discharged will not be impacted close to receipts Side's bucket 39 of 12 draining vertical plane of collection bucket.
As shown in Fig. 6,12, since A spring 21 is in compressive state, hinder to need one when block 16 so side's bucket 39 will be crossed Determine the impact force of strength.Next, struggling against 39 with the side for hindering block 16 to be engaged when toppling over 10 Sewage shock that is poured out of bucket and arriving When, if collection rubbish is not more than half in side's bucket 39, sewage is easy quickly to be discharged from side's bucket 39, so 39 institutes of side's bucket in this case Can received impact less, and then side struggles against and 39 is difficult to cross and hinders block 16;When collection rubbish is more than half in just bucket 39, sewage is not allowed Easily from the quickly discharge of side's bucket 39, thus in this case 39 institute of side's bucket can received impact it is larger, and then side struggles against and 39 can quickly cross Hinder block 16;When bucket 39 extruding in side's hinders 16 inclined-plane of block, the continuation of A spring 21 is compressed, after just bucket 39 crosses obstruction block 16, A Spring 21 can make to hinder block 16 is mobile to reset.The side's bucket 39 for hindering block 16 is gone just past, under the inertia of greater impact power still It can make corresponding 6 bottom of rotary unit by a relatively large margin, to guarantee the adjacent side in the top for crossing the side's bucket 39 for hindering block 16 all It can enter collection bucket 12 and drain vertical plane, the water energy that collection bucket 12 is discharged impacts corresponding side's bucket 39.For going just past Hinder the rotary unit 6 where side's bucket 39 of block 16: after going just past side's 39 bottom certain amplitude of bucket for hindering block 16, the party The disengaging of A gear 37 to struggle against on 39 place spiral arms 35 is engaged with B arc rack 30, at this time the party's 39 place spiral arms 35 of bucket and horizontal plane Composition acute angle between 10 °~15 °;So under the reset response of C spring 46,36 side's of drive lid 38 of spur rack is mobile multiple 39 are struggled against when not entering into trash repository 25 with guarantor, in Fang Dou 39 until the import of square 38 side of being completely covered by of lid bucket 39 in position Rubbish will not drop out;Under the reset response of B spring 45,42 side of drive of slide plate bucket 39 is mobile to be resetted, and shift plate 43 is far from side The side plate of 39 connection slide plate 42 of bucket.
During toppling over 10 interval discharge sewage of bucket, shock insulation collection bucket 12 drains vertical plane between being spaced the sewage of discharge Interior side's bucket 39, then 6 sync interval of rotary unit in shaft 50 and shaft 50 rotates certain amplitude.
When just struggling against in corresponding rotary unit 6 39 vertical plane is drained to completely into collection bucket 12 from close to collection bucket 12 During draining in vertical plane, in the rotary unit 6: as shown in figure 9, B gear 40 enters the designation range of B arc rack 30 Interior, B gear 40 is engaged with B arc rack 30, and B gear 40 rotates, and B gear 40 drives spur rack 36 to remote through shaft 50, A gear 37 Direction from side's bucket 39 is mobile, and C spring 46 is stretched, and the square lid 38 for following spur rack 36 to move drives shift plate 43 and side's bucket 39 to connect Connect the side plane contact of slide plate 42, the movement of square lid 38 from covering side struggle against 39 inlet conditions be changed into the side of coveringing by a small margin struggle against 39 into Mouthful;Square lid 38 by a small margin covering side bucket 39 import have substantially no effect on the sewage side of entrance struggle against 39 in.Party's bucket 39 waits sewage Impact.
During multiple rotary units 6 are spaced and rotate, to cross obstruction block 16 and be equipped with where side's bucket 39 of rubbish Rotary unit 6 describe for: when just bucket 39 does not enter trash repository 25, square 38 side of being completely covered by of lid struggle against 39 import;Work as rotation When turning the entrance trash repository 25 of unit 6, Fang Dou 39 and spiral arm 35 get over overswing mouth 26, as shown in figure 9, B gear 40 enters A arc rack In 28 designation range, B gear 40 is engaged with the lower part of A arc rack 28, and B gear 40 rotates, and B gear 40 is through shaft 50, A gear 37 drive spur rack 36 mobile to the direction far from side's bucket 39, and C spring 46 is stretched, 38 band of square lid for following spur rack 36 to move Dynamic shift plate 43 connect the side plane contact of slide plate 42 with side's bucket 39, and the movement of square lid 38 is changed into small from covering side's 39 inlet conditions of bucket Struggle against 39 imports for amplitude covering side, then rubbish is fallen in trash repository 25 from the import of side's bucket 39;Spiral arm 35 and side bucket 39 after Continuous to swing, B gear 40 continues to rotate, and B gear 40 can the last one teeth engages with 36 end of spur rack, and spur rack 36 is mobile To the limit, C spring 46 is stretched to the limit;36 classical prescription lid 38 of spur rack, 43 side of drive of shift plate bucket 39 are mobile to 35 direction of spiral arm, Slide plate 42 is mobile to 35 direction of spiral arm, and B spring 45 is compressed.Since B gear 40 can be with the last one teeth of 36 end of spur rack Continue pulsating engagement, the position of spur rack 36 remains unchanged substantially, then square lid 38, shift plate 43, Fang Dou 39, slide plate 42 are revolving Position on arm 35 remains unchanged substantially;As spiral arm 35 and side's bucket 39 continue to swing, B gear 40 can and A arc rack 28 The arc notch of middle and top part cooperates, and when B gear 40 is located at corresponding arc notch, B gear 40 is detached from and A arc rack 28 Engagement, then Fang Dou 39 and Fang Gai 38 are simultaneously and rapidly to separate spiral arm 35 under the reset response of B spring 45 and C spring 46 The mobile distance by a small margin in direction, shift plate 43 are close to the side plate of 39 connection slide plate 42 of side's bucket always;With spiral arm 35 and side's bucket 39 Continue swing, B gear 40 is engaged with A arc rack 28 again after crossing corresponding arc notch, in the rotation of B gear 40, A gear 37 Under turning, Fang Dou 39 and Fang Gai 38 are at the same speed to the mobile distance by a small margin in the direction of spiral arm 35;Next, B gear 40 again with it is another A arc notch cooperation, then repeating above-mentioned process.During B gear 40 successively crosses multiple arcs notch, Fang Dou 39 It can back and forth be fast moved along 35 length direction of spiral arm with square lid 38, so that the wet refuse of the adherency in other side's bucket 39 carries out certain journey The shake of degree, so that the wet refuse adhered in side's bucket 39 is easier to fall in trash repository 25 out of side's bucket 39, thus as far as possible Always there is the efficiency of rubbish and 39 collection rubbish of the side's of influence bucket in reduction side's bucket 39.When just bucket 39 and spiral arm 35 cross A curved tooth After item 28, under the reset response of B spring 45 and C spring 46, Fang Dou 39 and the mobile reset of Fang Gai 38, square lid 38 hide completely again The import of the side's of covering bucket 39.
Multiple 6 intermittent of rotary unit rotations repeat above-mentioned process side's bucket 39 collection rubbish and dumped rubbish;Entirely In the process, it after the complete respective party bucket 39 of Sewage shock being discharged in vertical plane is drained in collection bucket 12, is leaked out from respective party bucket 39 Water is flowed into the drainage canal 3 of lower section, and drainage canal 3 is by the next place collected again and drain into sewage treatment to sewage In science and engineering skill.Regular manual cleaning can be carried out for the rubbish in trash repository 25.
In conclusion main beneficial effect of the invention is: by the design of tipping mechanism not by water in cesspool Suddenly big or suddenly small limitation guarantees separating mechanism just so that toppling over the water that impact Fang Dou enough is poured out of bucket energy intermittent Often operation;By the design of separating mechanism, so that the floating refuse in sewage is collected into Fang Dou, the impact energy of sewage makes to topple over It is inter-agency every operation so that the rubbish of Fang Dou is completed from being collected into the whole process for being poured into trash repository;A arc rack applies energy So that Fang Dou, which dumps rubbish, can be carried out the shake of certain amplitude, so that the wet refuse adhered in Fang Dou is easier to fall out of side bucket Into trash repository, there is rubbish to reduce in Fang Dou as far as possible always and influences the efficiency that Fang Dou collects rubbish;B arc rack Using so that Fang Dou guarantees that sewage can enter Fang Douzhong, makes in the no longer large area covering side bucket import of reception sewage when side lid Floating refuse is obtained to separate with sewage.Relative to the processing technique of traditional floating refuse, the present invention does not need worker to sewage water Floating refuse on face carries out irregularly artificial salvage, it is only necessary to which periodic cleaning trash repository is just able to achieve, and reduction is artificial to salvage drift The cost and workload of floating rubbish, improve working efficiency;In addition, due to avoiding artificial salvaging, so also avoiding manually beating There are biggish security risks when fishing, ensure that the safety of worker's work.The configuration of the present invention is simple is not needed using electric drive It can be achieved with the separation of rubbish, there is preferable using effect.

Claims (10)

1. it is a kind of handle cesspool equipment, it is characterised in that: it include uniformly be equipped with along its length on pedestal it is multiple Processing module is fixed with the drainage canal with the cooperation of multiple processing modules on pedestal;
Above-mentioned processing module is cooperated by separating mechanism and tipping mechanism, separating mechanism and tipping mechanism;
Above-mentioned tipping mechanism includes toppling over bucket, L support, counterweight, limit wobble plate, U-shaped board, collection bucket, square set, hindering block, wherein A branch Support one end is packed in pedestal and the other end is hinged with and topples over bucket;Topple over bucket bottom end and be fixed with counterweight, counterweight side is equipped with limit Wobble plate;U-shaped board and L support are mounted in A branch support same side;L is supported and is toppled over the bottom cooperation equipped with counterweight one end that struggles against;Limit Wobble plate cooperates between U-shaped board and at the top of U-shaped board;It is remote mounted in A support by B solid plate positioned at the collection bucket for toppling over bucket lower section From on the side of U-shaped board;Topple over bucket and collection bucket cooperates;Square set below collection bucket is supported by A solid plate mounted in A separate On the side of U-shaped board;One end has bevelled obstruction block and is slidably mounted in square set, has in square set to the A for hindering block reset Spring;A spring is in compressive state always;Drainage canal is located at the underface of collection bucket;
Above-mentioned separating mechanism include base-mounted trash repository, supported by B base-mounted rotary column, on rotary column it is circumferential Multiple rotary units, B arc rack, the A arc rack of even distribution, wherein the side of B support is equipped with A arc rack by L-type arc plate A, The other side is equipped with B arc rack by L-type arc plate B;B support is located between A support and trash repository;A arc rack is located in trash repository Just and it is located at rotary column obliquely downward, B arc rack is located between rotary column and A support and B arc rack is located at rotary column oblique upper;A arc rack The teeth section of middle and top part is circumferentially uniformly provided with multiple arc notches;Multiple rotary units are matched with B arc rack and A arc rack respectively It closes;Trash repository is located at below rotary column;B arc rack is located at the oblique upper of A arc rack;
Above-mentioned rotary unit includes spiral arm, Fang Dou, slide plate, shift plate, one end side of the being fixed with lid that circular hole is all had in all plate faces Spur rack, both ends be respectively provided with the shaft of A gear and B gear, wherein one end of spiral arm is packed on rotary column, other end sliding Slide plate is installed;Equipped with the B spring resetted for slide plate on spiral arm;Slide plate is fixed with Fang Dou far from one end of spiral arm;Spur rack is sliding It is dynamic to be mounted on spiral arm, Fang Gai and side's bucket import cooperation;Equipped with the C spring resetted for spur rack on spiral arm;Shaft is assemblied in rotation On arm, A gear is engaged with spur rack, and B gear cooperates with B arc rack and A arc rack respectively;Side is covered equipped with shift plate, always position Shift plate and side's bucket inner wall cooperation in Yu Fangdou;
Above-mentioned Fang Dou and trash repository cooperate, and Fang Douyu hinders the inclined-plane cooperation of block.
2. a kind of equipment for handling cesspool according to claim 1, it is characterised in that: above-mentioned to topple over bucket bottom with convex It rises, the axis that raised two sides are filled is by bearing in the circular hole of two supporting plates of A branch support;Bucket cross section is toppled over for ladder Shape topples over the inclined plate to struggle against far from counterweight and is less than the inclined plate for toppling over bucket against counterweight with the acute angle for toppling over the bottom surface composition that struggles against and topples over bucket The acute angle that bottom surface is constituted.
3. a kind of equipment for handling cesspool according to claim 1, it is characterised in that: above-mentioned collection bucket is by two ladder types Bucket is constituted, and the import of the ladder type bucket above collection bucket is greater than the outlet of the ladder type bucket above collection bucket, the ladder type below collection bucket The import of bucket is equal with the outlet of ladder type bucket above collection bucket, and the import of the ladder type bucket below collection bucket is greater than below collection bucket Ladder type bucket outlet.
4. a kind of equipment for handling cesspool according to claim 1, it is characterised in that: the inner wall pair up and down of above-mentioned square set Title is opened there are two A guide groove;Hindering block far from dress symmetrical above and below at the one end on its inclined-plane, there are two A guide blocks;Two A guide blocks are slided respectively It moves in two A guide grooves;One end of A spring is connect with square set inner wall, and the other end is connect with block is hindered far from the one end on its inclined-plane.
5. a kind of equipment for handling cesspool according to claim 1, it is characterised in that: above-mentioned rotary column and B spring bearing Cooperation, trash repository side are provided with the pendulum mouth that supplier's bucket passes through.
6. a kind of equipment for handling cesspool according to claim 1, it is characterised in that: above-mentioned A gear and B gear it is big It is small identical;The center of circle where the center of circle where A arc rack radian and B arc rack radian is overlapped with the axis of rotary column.
7. a kind of equipment for handling cesspool according to claim 1, it is characterised in that: for any one above-mentioned rotation Unit: trapezoidal guide groove is provided on spiral arm side;The lower surface of spur rack has trapezoidal guide block;Trapezoidal guide block is slidably mounted on trapezoidal In guide groove;C spring one end is connect with trapezoidal guide groove inner wall, and the other end is connect with trapezoidal guide block;C spring is extension spring.
8. a kind of equipment for handling cesspool according to claim 1, it is characterised in that: for any one above-mentioned rotation Unit: spiral arm is provided with sliding slot far from one end of rotary column, and the two sides of sliding slot symmetrically open that there are two B guide grooves;Slide plate far from Fang Dou one There are two B guide block, two B guide blocks are slidably mounted in two B guide grooves the symmetrical dress in end respectively;One end of B spring is in sliding slot inside groove Face connection, the other end are connect with slide plate;B spring is compressed spring.
9. a kind of equipment for handling cesspool according to claim 1, it is characterised in that: above-mentioned counterweight is metal material branch Support;For any one above-mentioned rotary unit: shaft is mounted on spiral arm by L solid plate, shaft and L solid plate bearing fit;L solid plate Between A gear and B gear.
10. a kind of equipment for handling cesspool according to claim 1, it is characterised in that: above-mentioned drainage canal is located at B support Between A support;It is trapezoidal for draining the cross section of canal.
CN201910476217.2A 2019-06-03 2019-06-03 Equipment for treating sewage pool Active CN110158559B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910476217.2A CN110158559B (en) 2019-06-03 2019-06-03 Equipment for treating sewage pool

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910476217.2A CN110158559B (en) 2019-06-03 2019-06-03 Equipment for treating sewage pool

Publications (2)

Publication Number Publication Date
CN110158559A true CN110158559A (en) 2019-08-23
CN110158559B CN110158559B (en) 2021-04-30

Family

ID=67627176

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910476217.2A Active CN110158559B (en) 2019-06-03 2019-06-03 Equipment for treating sewage pool

Country Status (1)

Country Link
CN (1) CN110158559B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114991099A (en) * 2022-06-02 2022-09-02 广东白云学院 River riparian garbage salvage classification collector based on ecological environment protection

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07259065A (en) * 1994-03-28 1995-10-09 Hitachi Zosen Corp Rubbish collecting device
KR20130096108A (en) * 2012-02-21 2013-08-29 주식회사 엠에스테크 Trash remover with sub-remover
CN204343274U (en) * 2014-12-15 2015-05-20 重庆市合川区海常关船舶修造有限公司 Floating refuse pick-up boat
CN105392541A (en) * 2013-06-03 2016-03-09 贝尔芬格水技术有限公司 Continuous belt screen
CN108314097A (en) * 2018-01-05 2018-07-24 佛山杰致信息科技有限公司 A kind of industrial wastewater recycles processing equipment
CN108689438A (en) * 2018-07-31 2018-10-23 邱会奇 A kind of machinery plant's sewage disinfection treatment swinging grid sewage-removing machine

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07259065A (en) * 1994-03-28 1995-10-09 Hitachi Zosen Corp Rubbish collecting device
KR20130096108A (en) * 2012-02-21 2013-08-29 주식회사 엠에스테크 Trash remover with sub-remover
CN105392541A (en) * 2013-06-03 2016-03-09 贝尔芬格水技术有限公司 Continuous belt screen
CN204343274U (en) * 2014-12-15 2015-05-20 重庆市合川区海常关船舶修造有限公司 Floating refuse pick-up boat
CN108314097A (en) * 2018-01-05 2018-07-24 佛山杰致信息科技有限公司 A kind of industrial wastewater recycles processing equipment
CN108689438A (en) * 2018-07-31 2018-10-23 邱会奇 A kind of machinery plant's sewage disinfection treatment swinging grid sewage-removing machine

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114991099A (en) * 2022-06-02 2022-09-02 广东白云学院 River riparian garbage salvage classification collector based on ecological environment protection

Also Published As

Publication number Publication date
CN110158559B (en) 2021-04-30

Similar Documents

Publication Publication Date Title
CN113718922B (en) Self-cleaning anti-blocking device for municipal underground drainage pipeline
CN106759829B (en) A kind of municipal wastewater collection system
CN207512873U (en) A kind of rain dirt separator
CN111001206A (en) Catering sewage deslagging equipment and working method thereof
CN113047401B (en) Drainage structures of town road
CN108914903A (en) A kind of cleaning plant of the rubbish isolation strainer rope based on municipal river
CN110258759A (en) One kind being applied to municipal sewage canal and decontaminates treatment facilities
CN110158559A (en) A kind of equipment handling cesspool
CN109806663A (en) Automated sewage processing equipment and method with precipitating mechanism
CN108252285A (en) A kind of device for cleaning water surface rubbish and its application method
CN214993650U (en) Rural river dredging device
CN108926895A (en) Working method of factory sewage and waste residue separation equipment
CN113731540A (en) Building waste water, building rubbish recycle device that construction environment disturbed little
CN212896792U (en) Dredging equipment for building drainage
CN110152383A (en) A kind of processing equipment of cesspool
CN114159852B (en) Chemical sewage treatment equipment
CN211898828U (en) Garden road drainage system
CN214658334U (en) Drainage system for house building engineering
KR102516599B1 (en) A portable duster that is easy to lift
CN208465332U (en) A kind of vegetables juice filter device
CN110374172B (en) Vegetable washing basin capable of automatically treating garbage
CN212427480U (en) Novel lifting pump station
CN215276411U (en) A concentrate ash disposal device that is used for ferrosilicon production process to remove dust and uses
CN210809216U (en) A rubbish clearance pond for apple transmission
CN211513671U (en) Wastewater treatment device with floater collecting function

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20221031

Address after: 311404 No. 29, Jincheng South Road, Xindeng Town, Fuyang District, Hangzhou, Zhejiang

Patentee after: Hangzhou Shuidun Technology Co.,Ltd.

Address before: 311414 No. 810, Kou Kou, Dayuan Town, Fuyang District, Hangzhou, Zhejiang

Patentee before: HANGZHOU LYUYI ENVIRONMENTAL PROTECTION TECHNOLOGY Co.,Ltd.

PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Equipment for treating sewage pool

Effective date of registration: 20230109

Granted publication date: 20210430

Pledgee: Zhejiang Fuyang Rural Commercial Bank branch of the new Limited by Share Ltd.

Pledgor: Hangzhou Shuidun Technology Co.,Ltd.

Registration number: Y2023980030427

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20231212

Granted publication date: 20210430

Pledgee: Zhejiang Fuyang Rural Commercial Bank branch of the new Limited by Share Ltd.

Pledgor: Hangzhou Shuidun Technology Co.,Ltd.

Registration number: Y2023980030427

PC01 Cancellation of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A device for treating sewage tanks

Granted publication date: 20210430

Pledgee: The Bank of Hangzhou Fuyang branch of the new Limited by Share Ltd.

Pledgor: Hangzhou Shuidun Technology Co.,Ltd.