CN110158543A - A kind of dam face slab joint seal construction technology - Google Patents

A kind of dam face slab joint seal construction technology Download PDF

Info

Publication number
CN110158543A
CN110158543A CN201910534765.6A CN201910534765A CN110158543A CN 110158543 A CN110158543 A CN 110158543A CN 201910534765 A CN201910534765 A CN 201910534765A CN 110158543 A CN110158543 A CN 110158543A
Authority
CN
China
Prior art keywords
concrete
dam
concrete slab
joint seal
construction technology
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910534765.6A
Other languages
Chinese (zh)
Inventor
马正斌
邓宏
杨耀明
王代军
朱爱峰
孙志杰
张宏斌
杨东
周涛
李登峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Engineering Bureau 4 Co Ltd
Original Assignee
Sinohydro Engineering Bureau 4 Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Engineering Bureau 4 Co Ltd filed Critical Sinohydro Engineering Bureau 4 Co Ltd
Priority to CN201910534765.6A priority Critical patent/CN110158543A/en
Publication of CN110158543A publication Critical patent/CN110158543A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/16Sealings or joints

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Road Paving Structures (AREA)

Abstract

The invention discloses a kind of dam face slab joint seal construction technologies, comprising the following steps: S1: disconnected digging extrusion side wall along concrete slab vertical lap seam direction;S2: periphery fissure crack gauge is installed on bracket, and measures the width of the depth in gap, the width of gap bottom and sealing, clears up seam face;S3: in concrete squeezing sidewall slope surface;The concrete slab stage construction seam crossing of concrete face rockfill dam is provided with bituminizing Chinese fir board, bituminizing Chinese fir board bottom sets the second rubber bar and foam sealing, bituminizing Chinese fir board bottom dome is equipped with the first rubber bar, waveform sealing piece is arranged in surface layer, so that concrete slab deforms with dam settlement and rotates and settle, so that concrete slab and dam settlement compatible deformation, i.e. patch is rotated with concrete slab slope surface and is rotated, it can be effectively solved quality problems caused by leading to the disconnected plate of concrete slab horizontal direction because of the sedimentation of dam filing rockfill or collapse.

Description

A kind of dam face slab joint seal construction technology
Technical field:
The present invention relates to joint technique field, specially a kind of dam face slab joint seal construction technology.
Background technique:
The joint seal of concrete face rockfill dam is that face dam is built compared with the main thoroughfare and face dam for easily causing leak One of the key of dam technology specially works out this standard in power industry standard, summarizes China's warp that face dam is built over 15 years Lesson and scientific achievement are tested, the needs of engineering practice are not only, and has basis, by the implementation of this specification, makes every effort to make Joint of CFRD water sealing structure, material and the technology of construction comply with standard, and advantageously ensure that joint of CFRD sealing quality, avoid The generation of accident reduces pollution of the non-renewable energy to atmospheric environment to preserve the ecological environment, and makes full use of regeneration and cleaning energy Hydropower Industry is greatly developed in source, and Hydropower Dam is the main hydraulic structure that must be built, and concrete face rockfill dam is Local material dam is made full use of, it is not only economical but also quick, it is modern particularly suitable for remote mountain areas, especially Chinese west area In the structure of concrete face rockfill dam, the continuous construction concrete slab of use is the concrete slab of a rigidity after hardening, Due to being rigid connection between concrete slab by stages, dam settlement deformation easily causes concrete slab to come to nothing with bedding material, and Any measure is not taken, be easy to cause concrete slab to be broken or collapse with coming to nothing for dam body bedding material, to dam safety It is unfavorable to run.
The prior art has the following problems:
Existing joint seal technique weakens the anti-extrusion useful area of concrete slab in concrete slab edge fluting Area, it is unfavorable to the anti-extrusion damage capability of concrete slab, it not can solve because the sedimentation of dam filing rockfill leads to concrete Panel-level is to disconnected plate or collapses caused quality problems.
Summary of the invention:
The purpose of the present invention is to provide a kind of dam face slab joint seal construction technologies, to solve in above-mentioned background technique It is proposed that existing joint seal technique weakens the anti-extrusion useful area area of concrete slab in concrete slab edge fluting, It is unfavorable to the anti-extrusion damage capability of concrete slab, it not can solve because the sedimentation of dam filing rockfill leads to concrete slab water The problem of putting down to disconnected plate or collapsing caused quality problems.
To achieve the above object, the invention provides the following technical scheme: a kind of dam face slab joint seal construction technology, packet Include following steps:
S1: disconnected digging extrusion side wall along concrete slab vertical lap seam direction;
S2: periphery fissure crack gauge is installed on bracket, and measures the width and sealing of the depth in gap, gap bottom Width, clear up seam face;
S3: in concrete squeezing sidewall slope surface, determining the position of concrete slab vertical lap seam and the range of mortar bed, The raggle in range with crooked chisel, is laid with the mortar bed of M20;
S4: after vertical lap seam mortar bed is constructed, trimming processing is carried out to concrete squeezing sidewall face on the basis of it;
S5: one layer of antiseepage film is coated on concrete slab;
S6: foam is inserted in the bottom in gap, and places the second rubber bar at the top of foam;
S7: bituminizing Chinese fir board is placed in the top of the first rubber bar, and is placed at the top of bituminizing Chinese fir board First rubber bar;
S8: waterstop is installed to the top of the first rubber bar, and with fixed plate, screw bolt and nut, by sealing Band is stabilized in V-shaped groove, clears up waterstop surface dirt;
S9: filler, filler bulge landfill and molding are inserted on waterstop;
S10: in the top covered protection cover of waterstop, shield is simultaneously stabilized on concrete slab by bolt.
As the technical program further preferred that the sealing piece is waveform shape.
As the technical program further preferred that the foam is polyurethane foam.
As the technical program further preferred that the shield is semicircular structure.
As the technical program further preferred that the filler is GB plastic filler, the area of filler is 1410 flat Square centimetre.
As the technical program further preferred that the antiseepage film is PVC smooth surface antiseepage film, the formula that stops dropping relaxation is rich Remaining >=50 millimeter.
As the technical program further preferred that the bottom of the antiseepage film is equipped with closure PVC sleeve.
As the technical program further preferred that S4 supplement the following steps are included:
After step 1), the trimming of extrusion side wall slope surface, pitch spraying machine from top to bottom starts to spray emulsified asphalt, first An emulsified asphalt is sprayed in slope surface, second time emulsified asphalt of fill-before-fire after dry sheds sand, then sprays third all over cream Change pitch, spills one layer of sand again in slope surface, emulsified asphalt is the solvent diluting emulsion that bitumen content is 60%;
Step 2), the every block concrete slab reinforcement of field fabrication, the connector of concrete slab reinforcing bar are straight using ripping rib and rolling depressing Screw shell connection;Reinforcing bar two ends are machined to screw-type with dedicated thread, and is covered and is protected with rigid plastics.
Compared with prior art, the beneficial effects of the present invention are: concrete face rockfill dam concrete slab by stages Bituminizing Chinese fir board is provided at Construction Joint, bituminizing Chinese fir board bottom sets the second rubber bar and foam sealing, pitch It impregnates Chinese fir board bottom dome and is equipped with the first rubber bar, waveform sealing piece is arranged in surface layer, so that concrete slab is heavy with dam Drop deformation and rotate sedimentation so that concrete slab and dam settlement compatible deformation, i.e. patch with the rotation of concrete slab slope surface and Rotation can be effectively solved because the sedimentation of dam filing rockfill leads to the disconnected plate of concrete slab horizontal direction or collapse to cause Quality problems.
Specific embodiment:
Embodiment
The present invention provides a kind of technical solution: a kind of dam face slab joint seal construction technology, comprising the following steps:
S1: disconnected digging extrusion side wall along concrete slab vertical lap seam direction;
S2: periphery fissure crack gauge is installed on bracket, and measures the width and sealing of the depth in gap, gap bottom Width, clear up seam face;
S3: in concrete squeezing sidewall slope surface, determining the position of concrete slab vertical lap seam and the range of mortar bed, The raggle in range with crooked chisel, is laid with the mortar bed of M20;
S4: after vertical lap seam mortar bed is constructed, trimming processing is carried out to concrete squeezing sidewall face on the basis of it;
S5: one layer of antiseepage film is coated on concrete slab;
S6: foam is inserted in the bottom in gap, and places the second rubber bar at the top of foam;
S7: bituminizing Chinese fir board is placed in the top of the first rubber bar, and is placed at the top of bituminizing Chinese fir board First rubber bar;
S8: waterstop is installed to the top of the first rubber bar, and with fixed plate, screw bolt and nut, by sealing Band is stabilized in V-shaped groove, clears up waterstop surface dirt;
S9: filler, filler bulge landfill and molding are inserted on waterstop;
S10: in the top covered protection cover of waterstop, shield is simultaneously stabilized on concrete slab by bolt.
Specific in the present embodiment: the sealing piece is waveform shape;By the setting of sealing piece waveform, sealing is enhanced Effect.
Specific in the present embodiment: the foam is polyurethane foam;Hard polyurethane foam is with isocyanates and to gather Ether is primary raw material, under the action of a variety of auxiliary agents such as foaming agent, catalyst, fire retardant, is mixed by special equipment, through high pressure High molecular polymer made of foam-in-place is sprayed, polyurethane foam has soft bubble and two kinds of hard bubble, and soft bubble is open-celled structure, and hard bubble is Hole-closing structure;Soft bubble is divided into skinning and not two kinds of skinning again.
Specific in the present embodiment: the shield is semicircular structure;By the setting of shield, convenient for filler is filled out Enter in gap.
It is specific in the present embodiment: to dig disconnected depth and be not less than 150cm, seam bottom width degree is not less than 25cm, and seam width is not Less than 500cm.
It is specific in the present embodiment: S4 supplement the following steps are included:
After step 1), the trimming of extrusion side wall slope surface, pitch spraying machine from top to bottom starts to spray emulsified asphalt, first An emulsified asphalt is sprayed in slope surface, second time emulsified asphalt of fill-before-fire after dry sheds sand, then sprays third all over cream Change pitch, spills one layer of sand again in slope surface, emulsified asphalt is the solvent diluting emulsion that bitumen content is 60%;
Step 2), the every block concrete slab reinforcement of field fabrication, the connector of concrete slab reinforcing bar are straight using ripping rib and rolling depressing Screw shell connection;Reinforcing bar two ends are machined to screw-type with dedicated thread, and is covered and is protected with rigid plastics.
Specific in the present embodiment: the filler is GB plastic filler, and the area of filler is 1410 square centimeters.
Specific in the present embodiment: the antiseepage film is PVC smooth surface antiseepage film, the formula that stops dropping relaxation, >=50 milli of degree of having more than needed Rice;Antiseepage film title be polyethylene film for earthwork, mainly translucent to the opaque thermoplastic resin material of milky with Polyvinyl resin is made, and polyethylene is high molecular polymer, is nontoxic, tasteless, odorless white particle, and fusing point is about 110 DEG C -130 DEG C, relative density 0.918-0.965;Antiseepage film has good heat resistance and cold resistance, and chemical stability is good, Rigidity and toughness with higher, mechanical strength is good, and resisting environmental stress and cracking is good with tear-resistant strength character, upper with density It rises, mechanical performance and barrier property can correspondingly increase, and heat-resisting and tensile strength is also higher;It can the corruption such as acid and alkali resistance, organic solvent Erosion.
In the present embodiment, specific: the bottom of the antiseepage film is equipped with closure PVC sleeve;PVC sleeve, which has, meets The specific function of thermal contraction, 98 DEG C of heating or more is i.e. shrinkable, easy to use.
In the present embodiment, first seam to be processed is checked, and whether the treatment measures of the clearly seam can be to other portions Position has an adverse effect, secondly, the concrete surface of this seam of palpus wire brushing, removes grease stain, the mortar of concrete surface Skin and sundries, again, along seam middle line according to the size positions underlining of design drawing, later, along this line according to the ratio of 1:1 Example chisel is handled at " V " type groove, and using electric angle grinder to concrete surface there are polishing at Asperity model and faulting of slab ends, cleaning is mixed Solidifying soil surface scum and loose material, then remove surface dust with cotton yarn or hairbrush and swim, joint concrete surface must be smooth, close In fact, the defects of must not having leakage muscle, voids and pits, peeling, dusting and loosening, 2m long allow to rise and fall difference for 5mm, and it is uniformly flat to rise and fall It is suitable, such as concrete surface will lead to sealing and generates after the installation is completed and ask around infiltration there are spillage, voids and pits, dusting, loosening The defect of topic, the processing of Ying Caiyong polymer mortar, last opposite joint face are checked, and guarantee that concrete surface is clean, dry.
In the present embodiment, along the seam uniform brushing primer in two sides, it is unable to holiday, concrete surface must be clean, dry, mixed Solidifying soil first of primer of external coating, primer brushing width should be at fixed flat steels;After primer is dry (1h or more), the 2nd SR is brushed Road primer waits primers surface drying (touch with one's hand, do not touch with one's hand, about 0.5h), can carry out plastic filler filleting construction;If primer is excessively dry When dry (tack-free), need to mend brush primer again.It must assure that Nian Jie with concrete surface close.
In the present embodiment, after SR primer is dry, one layer of plastic sealing material is pasted in slot bottom, it will using tack of materials PVC rubber bar is fixed on slot bottom, and PVC bar wall and seam wall answer panelling, and PVC stick connector should be fixed, prevent from misplacing, PVC Connection between stick is attached using the method for dislocation lap joint at the scene.
In the present embodiment, wave can be carried out after the completion of rubber bar and corrugated rubber sealing lower part filling and pointing in " V " type groove The installation of line rubber water-proof, it is first that its removing surface is clean before carrying out installation ripple waterstop;After wiped clean Concrete surface brushing primer after, by the bonding partially of corrugated seal belt composite plastic material sealing rod on concrete surface, Then it is risen in concrete surface and successively spreads PVC press strip from bottom to up, ripple waterstop and composite water-stop item are set up and accomplished fluently in advance The band steel in hole is punched on concrete surface with impact drill through the hole above band steel, and punching spacing is 40cm, and punching depth is not Less than 75mm, the size in hole is 10mm, the dust on concrete is removed to clean, loading expansion bolt, and fasten after pore-forming, makes It combines closely between PVC press strip and concrete surface.
In the present embodiment, plasticity filler construction principle: in first stitching, rear seam is outer, first both sides, rear intermediate;Plastic filler is applied Work basal plane must be solid, dry;After plastic filler is constructed, it must be protected, avoid mechanically actuated;After primer surface drying, Plastic filler is twisted into small item and pressed and pinches into thick 10mm or so pancake shape, on concrete joint face, is pressed from seam is intermediate to both sides 3~5mm thickness material screed-coat is pasted to cover plate width.When stickup filler along its length, progressive from one end to the other side to paste simultaneously Pressurization, it should be noted that its air between concrete surface is discharged, to enhance bond effect, pressurization can be by hand and by rubber Hammer carries out, and to ensure filler and concrete surface tight bond, segmentation is constructed from below to up, and should be complete before panel water blocking At filling construction preferably carries out on daytime 5 DEG C high, without rain in daily mean temperature, should be by the end of seam when stage construction plastic filler It is sealed.
In the present embodiment, the separate paper of packaging is torn when construction off, first fill out filler in V-arrangement slot bottom, pressurization is allowed to viscous Patch securely, is then pasted in layer again, and closely knit, side adhesive rim exhaust is pasted from middle part to both sides, between filler connector mutually Overlap joint, makes to be connected as closely knit entirety between filler and interface, makes Simple steel structure mold according to bulge structure size, will only After the cutting into strips of water material, stacks molding in a mold, utilize jack extrusion molding;It utilizes and adds in advance at the construction field (site) The plastic filler bulge of work forming is placed directly in the V-groove top filled and led up, and gas is discharged by modes such as manual compressions, It is allowed to paste with lower material close.
In the present embodiment, antiseepage cover plate is gradually spread out, the anti-sticking protection sheet on removing face, along reserved slot by antiseepage cover plate It is pasted on plastic material, firmly lose no time from cover plate middle part to both sides air, is beaten in fact with rubber hammer, makes cover plate and filler, lid Piece and two sides basal plane paste it is closely knit, for the position that needs that overlapped, it is necessary to do screed-coat with plastic material, and the lap of splice is wanted Greater than 20cm, overlapping part first brushes mating primer, then is overlapped.
In the present embodiment, antiseepage passings: antiseepage passings length is 20cm~40cm, and in lap segment antiseepage lid On piece first brushes mating primer, after primer surface drying, then carries out overlap joint stickup, and for the various opposite sex, such as " T ", Y-shaped, "+" type are connect Head provides approved product by producer, directly pastes overlap joint at the construction field (site);Using electric impacting drilling holes, hole depth 10cm, aperture 15mm, spacing 15cm are filled two component of HK981 type Anchor Agent A, B using accumulated powder in high-pressure blast cleaning hole respectively Divide stirring, make it uniformly, mixture proportion is A:B=4:1 (mass ratio), Anchor Agent is perfused in hole using filleting rifle, conduit is inserted Enter bottom hole, be perfused by bottom hole, is conducive to air discharge, perfusion volume is about the 2/3 of pore volume.Bolt surface is removed Rust processing, it is clean with alcohol wipe, and buried depth is marked, it is inserted into bolt, Anchor Agent will expire to aperture, and Anchor Agent can not during solidifying Disturbance, specific time field test determines, finally tightens bolt, is fixed cover plate by band steel.
In the present embodiment, the flat guiding principle (60*6mm) after punching (spacing 15cm) is placed on cover plate and is positioned, by riding Hole punching is first drilled on cover plate using punch before with expansion bolt fixed flat steel, is then beaten on concrete with electric hammer Concrete powder is removed with pressure wind after pore-forming in hole, and the naturally flat microdilatancy type cement paste of W/C < 0.35 is perfused in hole, it After be put into expansion bolt, and expansion bolt is fastened before cement paste loses flowability, tightening for expansion bolt should divide for three phases Carry out, second with first time fastening time interval is 7 days, last time fastening should overlay clay or powder fine sand bedding and It is carried out before lower lock water storage, each position 10cm of the concrete at antiseepage cover plate edge and periphery is polished with coarse sand skin and wire brush and is done Only, and removing is drifted along, and keeps basal plane dry;HK rigidity edge sealing is scratched along the painting brush brushing of antiseepage cover plate both sides of edges or with scraper Adhesive pays attention to scratching edge sealing agent on two flank side of antiseepage cover plate, two flank sides is bonded on concrete surface, it is desirable that packet Reinforcing rib, edge sealing width G T.GT.GT 100mm are covered, antiseepage cover plate after the installation is completed should closely be tied with plastic filler and concrete surface It closes, must not there is phenomenon of coming to nothing, band steel securely will guarantee to form seal cavity between cover plate and concrete to the anchor pressure of cover plate.
In the present embodiment,
1, to keep concrete surface dry in work progress, rainy day construction need to take shielding measure, otherwise should not construct.
If 2, requirement of engineering is constructed in the rainy day, need to build rain-proof shelter above construction part, blocks construction surface Circulating water, then the concrete surface constructed will be needed to dry with blowtorch, then construct by above-mentioned operational procedure.
3, according to the requirement of the construction speed at scene, construction personnel is grouped 5~6 people/group, basal plane cleaning is each responsible for, cuts Material is cut, pointing material and surface cover antiseepage cover plate, to guarantee progress and quality.
4, plastic filler bulge is examined: after the completion of material pointing, with 10m for one section, checking that it gathers ruler with mold slide calliper rule It is very little whether to meet design requirement.
5, with mono- section of 100m, filler bulge is cut and checks whether sealing material and concrete surface cohere securely, filler Whether fill closely knit.Such as have that size is undesirable or the poor position of bond quality, then reworked processing.
6, the pointing size of sealing material, the bond quality with concrete surface can be in sealing materials after qualified by inspection Expect that antiseepage protective cover sheet is installed on bulge surface.
7, sealing material and antiseepage cover plate, not tear separate paper when unused, to prevent material surface to be contaminated, Influence using effect.
8, the key of wave sealing belt construction is that waterstop is smooth, and the quality of connection of connector is reliable.Due to entire week Side seam water stopping trough has many places turnover, and for transition location, directly construction will cause waterstop to distort, and has shadow to the construction of later period filler It rings.In the rotation angle position of periphery fissure when constructing thus, according to the Angular Dimension at the position, using the bend connector customized in advance, To guarantee that sealing reaches design requirement.After expansion bolt is tightened, the Luo bar saw that nut top is exposed should be fallen, in case it pokes table Layer antiseepage cover plate.The installation of corrugated seal belt need to be carried out according to the requirement of design drawing, the peace of waterstop center line and design lines Dress tolerance is ± 5mm.
9, joint seal professional construction group is set up, carry out system professional training, takes appointment with certificate before constructing, and establishes corresponding Economic responsibility system.Be on duty personnel's irresponsibility, the person of being careless in one's work, replacement in time or laid-off, the strictly reinforcement pair from construction organization The management of joint seal construction.
10, reinforce sealing piece raw material quality examination, it is underproof forbid using.
11, reinforce field management and supervision, improve processing quality.Rubber water-proof belt lacing presses relevant design requirement respectively It tests.Rubber fastening band is conscientiously installed by the control point of measuring, guarantees that position is accurate, it is rationally secured to reinforce;It is small when installation The heart is careful, handles with care, avoid with the collision such as reinforcing bar, template, squeeze, to prevent waterstop scratch;After installing, in time by sealing Piece band is cleaned out.
12, reinforce the protection of waterstop, it is ensured that sealing is intact.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with A variety of variations, modification, replacement can be carried out to these embodiments without departing from the principles and spirit of the present invention by understanding And modification, the scope of the present invention is defined by the appended.

Claims (9)

1. a kind of dam face slab joint seal construction technology, which comprises the following steps:
S1: disconnected digging extrusion side wall along concrete slab vertical lap seam direction;
S2: periphery fissure crack gauge is installed on bracket, and measures the width of the depth in gap, the width of gap bottom and sealing Degree clears up seam face;
S3: in concrete squeezing sidewall slope surface, the position of concrete slab vertical lap seam and the range of mortar bed is determined, iron is used Pricker raggle in range is laid with the mortar bed of M20;
S4: after vertical lap seam mortar bed is constructed, trimming processing is carried out to concrete squeezing sidewall face on the basis of it;
S5: one layer of antiseepage film is coated on concrete slab;
S6: foam is inserted in the bottom in gap, and places the second rubber bar at the top of foam;
S7: bituminizing Chinese fir board is placed in the top of the first rubber bar, and places first at the top of bituminizing Chinese fir board Rubber bar;
Waterstop: being installed to the top of the first rubber bar, and with fixed plate, screw bolt and nut by S8, and waterstop is steady Gu clearing up waterstop surface dirt in V-shaped groove;
S9: filler, filler bulge landfill and molding are inserted on waterstop;
S10: in the top covered protection cover of waterstop, shield is simultaneously stabilized on concrete slab by bolt.
2. a kind of dam face slab joint seal construction technology according to claim 1, it is characterised in that: the sealing piece is Waveform shape.
3. a kind of dam face slab joint seal construction technology according to claim 1, it is characterised in that: the foam is poly- Urethane foam.
4. a kind of dam face slab joint seal construction technology according to claim 1, it is characterised in that: the shield is Semicircular structure.
5. a kind of dam face slab joint seal construction technology according to claim 1, it is characterised in that: the filler is GB Plastic filler, the area of filler are 1410 square centimeters.
6. a kind of dam face slab joint seal construction technology according to claim 1, it is characterised in that: the antiseepage film is PVC smooth surface antiseepage film, the formula that stops dropping relaxation, >=50 millimeters of degree of having more than needed.
7. a kind of dam face slab joint seal construction technology according to claim 1, it is characterised in that: the antiseepage film Bottom is equipped with closure PVC sleeve.
8. a kind of dam face slab joint seal construction technology according to claim 1, it is characterised in that: it is not small to dig disconnected depth In 150cm, stitches bottom width degree and be not less than 25cm, seam width is not less than 500cm.
9. a kind of dam face slab joint seal construction technology according to claim 1, it is characterised in that: S4 supplement include with Lower step:
After step 1), the trimming of extrusion side wall slope surface, pitch spraying machine from top to bottom starts to spray emulsified asphalt, first on slope An emulsified asphalt is sprayed on face, second time emulsified asphalt of fill-before-fire after dry sheds sand, then sprays third all over emulsification drip Blueness, spills one layer of sand again in slope surface, and emulsified asphalt is the solvent diluting emulsion that bitumen content is 60%;
Step 2), the every block concrete slab reinforcement of field fabrication, the connector of concrete slab reinforcing bar use peel rolled straight thread Sleeve connection;Reinforcing bar two ends are machined to screw-type with dedicated thread, and is covered and is protected with rigid plastics.
CN201910534765.6A 2019-06-20 2019-06-20 A kind of dam face slab joint seal construction technology Pending CN110158543A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910534765.6A CN110158543A (en) 2019-06-20 2019-06-20 A kind of dam face slab joint seal construction technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910534765.6A CN110158543A (en) 2019-06-20 2019-06-20 A kind of dam face slab joint seal construction technology

Publications (1)

Publication Number Publication Date
CN110158543A true CN110158543A (en) 2019-08-23

Family

ID=67625291

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910534765.6A Pending CN110158543A (en) 2019-06-20 2019-06-20 A kind of dam face slab joint seal construction technology

Country Status (1)

Country Link
CN (1) CN110158543A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112709195A (en) * 2020-12-28 2021-04-27 国网福建省电力有限公司电力科学研究院 Method for water-stopping repair and cavity backfill of concrete panel structure joint of rock-fill dam

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103924554A (en) * 2014-04-17 2014-07-16 黄河勘测规划设计有限公司 Water stopping method of peripheral joint of concrete face rockfill dam built on deep covering layer
CN105155471A (en) * 2015-09-02 2015-12-16 国家电网公司 Water stopping method applied to joint of hydropower station and water stopping structure thereof
CN106192898A (en) * 2016-07-11 2016-12-07 中国水利水电第十工程局有限公司 The joint construction method of Face Slab of Concrete-faced Rockfill anti-settling deformation
CN106836133A (en) * 2017-03-31 2017-06-13 长江勘测规划设计研究有限责任公司 Structure and construction method are repaired in a kind of concrete slab extruding destruction
CN108221866A (en) * 2018-01-23 2018-06-29 中国水利水电科学研究院 Severe cold area slab joint surface layer, which is put down, covers type flexibility water sealing structure and installation method
CN109596113A (en) * 2019-01-14 2019-04-09 中国电建集团贵阳勘测设计研究院有限公司 A kind of guard method and device for protecting concrete face rockfill dam Three-direction gap detector
JP2019060169A (en) * 2017-09-27 2019-04-18 Dic株式会社 Method for sealing concrete structure

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103924554A (en) * 2014-04-17 2014-07-16 黄河勘测规划设计有限公司 Water stopping method of peripheral joint of concrete face rockfill dam built on deep covering layer
CN105155471A (en) * 2015-09-02 2015-12-16 国家电网公司 Water stopping method applied to joint of hydropower station and water stopping structure thereof
CN106192898A (en) * 2016-07-11 2016-12-07 中国水利水电第十工程局有限公司 The joint construction method of Face Slab of Concrete-faced Rockfill anti-settling deformation
CN106836133A (en) * 2017-03-31 2017-06-13 长江勘测规划设计研究有限责任公司 Structure and construction method are repaired in a kind of concrete slab extruding destruction
JP2019060169A (en) * 2017-09-27 2019-04-18 Dic株式会社 Method for sealing concrete structure
CN108221866A (en) * 2018-01-23 2018-06-29 中国水利水电科学研究院 Severe cold area slab joint surface layer, which is put down, covers type flexibility water sealing structure and installation method
CN109596113A (en) * 2019-01-14 2019-04-09 中国电建集团贵阳勘测设计研究院有限公司 A kind of guard method and device for protecting concrete face rockfill dam Three-direction gap detector

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
成 斌,崔 忠: "《卡拉贝利面板砂砾石坝接缝止水设计》", 《甘肃水利水电技术》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112709195A (en) * 2020-12-28 2021-04-27 国网福建省电力有限公司电力科学研究院 Method for water-stopping repair and cavity backfill of concrete panel structure joint of rock-fill dam

Similar Documents

Publication Publication Date Title
CN101481931B (en) Sticking modified asphalt waterproof coiled material and adhesive, as well as preparation method and application thereof
CN110130506A (en) Now coil waterproof layer processed and its construction method
CN207775945U (en) A kind of bridging arrangement of Novel underground room bottom plate and side wall difference waterproof material
CN101096850B (en) Plastics water discharge plate application method for underground engineering wall surface
CN101748757B (en) Construction method of bentonite waterproof blankets
KR101368711B1 (en) Construction method of waterproof and root barrier for rooftop landscape architecture
CN104594387A (en) Improved post-pouring strip advanced water-stopping construction method
CN108412222A (en) A kind of construction leakage internal maintenance waterproof layer structure and construction technology
CN106988440B (en) Waterproof structure for main body and auxiliary interface of subway station and construction method of waterproof structure
CN205557856U (en) Leakage structure is prevented at building expansion joint
CN105089208A (en) Polyurethane waterproof roll, production equipment and process, composite waterproof layer and practice thereof
CN103628502A (en) Method for using plastic drainage plates as hollow floor of underground engineering base plates
CN106869169A (en) A kind of three-dimensional interval construction method of underground pipe gallery warehouse
CN110158543A (en) A kind of dam face slab joint seal construction technology
CN205688670U (en) A kind of roofworks system structure
CN108086603A (en) A kind of anti-water-stopping system of existing roofing and prevent water roofing
CN107345406A (en) A kind of method for the sealing of piping lane waterproofing of movement joints
CN110541431A (en) waterproof structure of pipe gallery and construction method thereof
CN112081143B (en) Anti-seepage construction method for preventing and draining combination of top plate deformation joints
CN105133855A (en) Energy-saving and environment-friendly waterproof warming construction method for existing roof surface
CN112195970A (en) River-crossing tunnel engineering waterproof construction method
CN110273404A (en) A kind of dam face slab surface anti-seepage reinforcement construction technology
CN108868186A (en) A kind of piping shaft and ventilation shaft percolating water repair system
KR101171037B1 (en) Method for compartmentalized tunnel waterproofing
CN108560608A (en) Garbage power plant structures pond body engineering level construction joint construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190823

RJ01 Rejection of invention patent application after publication