CN103628502A - Method for using plastic drainage plates as hollow floor of underground engineering base plates - Google Patents

Method for using plastic drainage plates as hollow floor of underground engineering base plates Download PDF

Info

Publication number
CN103628502A
CN103628502A CN201210298732.4A CN201210298732A CN103628502A CN 103628502 A CN103628502 A CN 103628502A CN 201210298732 A CN201210298732 A CN 201210298732A CN 103628502 A CN103628502 A CN 103628502A
Authority
CN
China
Prior art keywords
base plate
fulcrum
make
plastic
plastic draining
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201210298732.4A
Other languages
Chinese (zh)
Other versions
CN103628502B (en
Inventor
邹新建
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Sancai Technology Development Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201210298732.4A priority Critical patent/CN103628502B/en
Publication of CN103628502A publication Critical patent/CN103628502A/en
Application granted granted Critical
Publication of CN103628502B publication Critical patent/CN103628502B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention relates to a method for using plastic drainage plates as a hollow floor of underground engineering base plates. According to the method, the plastic drainage plates are used as the hollow concrete floor of the indoor underground engineering base plates and used for drainage and moisture insulation, and thus the purpose of engineering water resistance can be achieved. The method relates to multiple items of content such as structural plane slope finding, drainage ditch and drainage plate product connection modes and construction technologies. First, a slope is found on the surface of the structural bottom plates, when the structure surface is an integral plane, leaking water enters a water collection well, and cleaning water firstly enters a drainage ditch and then enters the water collection well. The self-sticking plastic drainage plates have rolled hollow fulcrums and bonded through adhesive tape or connected in an overlapped mode, joint strips are arranged between the drainage plates and the wall, and concrete can be poured and pounded at two times or at one time in the final construction. The fulcrums of the drainage plates are made to be square, polygonal or prismatic, concave and convex reinforcing ribs are arranged on the side faces of the fulcrums, and the fulcrums can be arranged in an orthogonal row and column or crossed row and column mode.

Description

Of plastic draining board, make the method for underground construction base plate hollow terrace
Technical field
The invention belongs to buildings waterproof scope, particularly the indoor position of underground construction base plate is done hollow concrete terrace with plastic draining board and is reached engineering waterproofing object for draining, damp proof insulation, comprises structural plane and look for slope, gutter, band drain product, connecting mode and the multinomial independent claims of construction technology in this total invention of underground construction base plate draining damp proof insulation.
Background technology
< < water-proof technology of underground projects rules > > GB50108-2008, waterproof guard be " 1, cut and cover method underground construction one-level, should select waterproof concrete and waterproofing materials together with other; 2, hidden construction process underground construction one-level, should select liner structure and a kind of waterproofing materials ".The present invention be directed to cut and cover method underground construction, this project all wants to do in addition at the chamber internal surface of structure base slab the concrete terrace that one deck 50~300mm is thick again, the present invention makes void layer exactly between deck and surface layer, can get rid of percolating water, reaches construction work permanent waterproof damp proof insulation object.
Summary of the invention
First analyze source and the drainage direction of percolating water, the percolating water of structure base slab is to flow to collecting well in the surface void layer of deck, take collecting well edge as ± 0.00 measurement total face, on structure base slab surface, to have 30~200mm high look for slope, make underground leakage water naturally flow into collecting well.
Water pipe all will be let slip in every partition wall, threshold and gutter of drainage line of stopping up, and makes current unimpeded.Also will solve the relation in ground cleaning water and gutter: when body structure surface is integral planar, the percolating water of base plate enters collecting well from void layer, ground cleaning water enters gutter and flows into collecting well; When body structure surface has recessed gutter, base plate leakage water enters gutter and collecting well from void layer, and ground cleaning water enters gutter, then enters collecting well.
The plastic draining board of the hollow fulcrum of web-like is that drum-type is produced continuously, squeezes into one~tetra-butyl adhesive tape during production, self-adhesion at normal temperatures, and the release paper slip of adhesive tape upper cover, is self-adhesion plastic draining board.Can hasp about during construction one row's fulcrum bonding or dull and stereotyped superimposed bonding; Front and back hasp one row's fulcrum of band drain, a sticky adhesive tape in the plane between fulcrum.In order to make plastics fulcrum have enough compressive strength to bear working load, fulcrum is done to squarely, polygon, prismatic, there is concavo-convex ribbed stiffener fulcrum side, and it can be quadrature housing in row that fulcrum is arranged, and can be also intersection housing in row.The connection of above plastic draining board can, without viscose glue, be also only all around hasp one row's fulcrum.
At the band drain unifying and wall joints position, in order to prevent concrete spillage, then paste plastic board or a foam lath that 30~100mm is wide, fill and lead up gap.Then be to wire-tie to water concrete surface layer, on the band drain unifying, first hollow fulcrum leveled up with concrete, after maintenance, wire-tie again, after watering whole concrete or directly wire-tiing on plastic plate, property is watered concrete surface layer again.
Accompanying drawing explanation
Fig. 1 is underground construction base arrangement sectional view.
Fig. 2 a, Fig. 2 b are underground construction base arrangement, surface layer gutter sectional view.
Fig. 3 a, Fig. 3 b, Fig. 3 c, Fig. 3 d are the bonding sectional views of self-adhesion plastic draining board left and right adhesive tape.
Fig. 4 a, 4b are front and rear fulcrum overlap joint sectional views.
Fig. 5 a, Fig. 5 b, Fig. 5 c draining board wall edge joint stitch and water concrete process sectional view
Fig. 6 is the water pipe sectional view excessively of partition wall, threshold.
Fig. 7 a, Fig. 7 b, Fig. 7 c, Fig. 7 d be plastics fulcrum, overlook, face, quadrature ranks, the ranks figure that intersects.
The specific embodiment
Fig. 1 underground construction base arrangement is analysed and observe and is seen, take the edge (4) of collecting well (2) is ± 0.00, on structure base slab surface (1), to have 30~200mm high look for slope (3), make underground leakage water naturally flow into collecting well.
Fig. 2 a body structure surface (1) is integral planar, the percolating water of base plate enters collecting well (2) from void layer (5), from gutter, (6) flow into collecting well (2) to ground cleaning water, should bury water pipe (7) in the sloping layer in gutter.Fig. 2 b works as body structure surface (1) recessed gutter (8), and base plate leakage water enters gutter (8) and collecting well (2) from void layer (5), and ground cleaning water enters gutter (8) and enters collecting well (2) again.
Fig. 3 a, Fig. 3 b, Fig. 3 c adopt polyethylene drainage plate (9), squeeze into one~tetra-adhesive tape (10) about during production to cover release liners, tear release liners left and right can hasp one row's fulcrum bonding during construction.Fig. 3 d is that left and right is dull and stereotyped superimposed bonding.
Fig. 4 a, Fig. 4 b are overlap joint one row's fulcrums before and after band drain (9), glue by hand an adhesive tape (10) when Fig. 4 a wherein constructs again.
Fig. 5 a is the band drain (9) that unifies and the position of wall joints, pastes wide plastic board or a foam lath (11) of 30~100mm and fills and leads up gap, deck surface (1), local finding slope (3).Fig. 5 b is upper at the band drain unifying (9), first by hollow for fulcrum concrete (12) level up, after maintenance, wire-tie again and water whole concrete (13).Fig. 5 c directly wire-ties (14) on plastic plate (9), and property is watered concrete surface layer (13) again.
Fig. 6 is that partition wall, threshold etc. are arranged at top, structural plan (1), let slip water pipe (7), makes current unimpeded.
Fig. 7 a, Fig. 7 b are band drain fulcrum profiles, fulcrum flat-top (15), and fulcrum side is concavo-convex ribbed stiffener.
Fig. 7 c is fulcrum quadrature ranks layout, and Fig. 7 d is fulcrum intersection column-row arrangement.

Claims (10)

1. of plastic draining board, make the method for underground construction base plate hollow terrace, to make draining space between the structural plane of base plate and concrete surface layer, it is characterized in that: take collecting well edge as ± 0.00, on structure base slab surface, to have 30~200mm high look for slope, make underground leakage water naturally flow into collecting well.
2. of plastic draining board, making the method for underground construction base plate hollow terrace, is to make draining space between the structural plane of base plate and concrete surface layer, it is characterized in that: water pipe all will be let slip in every partition wall, threshold and gutter of drainage line of stopping up, and makes current unimpeded.
3. of plastic draining board, make the method for underground construction base plate hollow terrace, to make draining space between the structural plane of base plate and concrete surface layer, it is characterized in that: when body structure surface is integral planar, the percolating water of base plate enters collecting well from void layer, ground cleaning water enters gutter and flows into collecting well.
4. of plastic draining board, making the method for underground construction base plate hollow terrace, is with web-like, to have the plastic draining board of hollow fulcrum, it is characterized in that: during production, in left and right, squeezing into one~tetra-adhesive tape, cover release liners, is self-adhesion plastic draining board.
5. according to claim 4, of plastic draining board, make the method for underground construction base plate hollow terrace, it is characterized in that: can hasp about during construction one row's fulcrum bonding or dull and stereotyped superimposed bonding; Hasp one row's fulcrum before and after band drain, a sticky adhesive tape in the plane between fulcrum.
6. of plastic draining board, making the method for underground construction base plate hollow terrace, is with web-like, to have the plastic draining board of hollow fulcrum, it is characterized in that: during construction, without viscose glue, be only all around hasp one row's fulcrum.
7. according to claim 4,5,6 of plastic draining boards, make the method for underground construction base plate hollow terrace, it is characterized in that: at the position of the band drain unifying and wall joints, paste plastic board or a foam lath that 30~100mm is wide, fill and lead up gap.
8. according to claim 4,5,6,7 of plastic draining boards, make the method for underground construction base plate hollow terrace, it is characterized in that: on the band drain unifying, first hollow fulcrum is leveled up with concrete, after maintenance, wire-tie again, water whole concrete, or after directly wire-tiing on plastic plate again property water concrete surface layer.
9. of plastic draining board, make the method for underground construction base plate hollow terrace, relate to raising band drain and prop up compressive strength for point contact, it is characterized in that: fulcrum is done to squarely, polygon, prismatic, and there is concavo-convex ribbed stiffener side.
10. according to claim 9, of plastic draining board, make the method for underground construction base plate hollow terrace, it is characterized in that: it can be quadrature housing in row or the housing in row that intersects that fulcrum is arranged.
CN201210298732.4A 2012-08-21 2012-08-21 The method for doing underground engineering bottom plate hollow floor with plastic draining board Active CN103628502B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210298732.4A CN103628502B (en) 2012-08-21 2012-08-21 The method for doing underground engineering bottom plate hollow floor with plastic draining board

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210298732.4A CN103628502B (en) 2012-08-21 2012-08-21 The method for doing underground engineering bottom plate hollow floor with plastic draining board

Publications (2)

Publication Number Publication Date
CN103628502A true CN103628502A (en) 2014-03-12
CN103628502B CN103628502B (en) 2018-07-27

Family

ID=50209929

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210298732.4A Active CN103628502B (en) 2012-08-21 2012-08-21 The method for doing underground engineering bottom plate hollow floor with plastic draining board

Country Status (1)

Country Link
CN (1) CN103628502B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107059946A (en) * 2017-06-20 2017-08-18 中国华西企业有限公司 A kind of basement drain plate and its construction
CN107700554A (en) * 2017-09-29 2018-02-16 上海三彩科技发展有限公司 Underground engineering hollow floor and wall, the damp proof insulation way of post
CN108589794A (en) * 2018-04-04 2018-09-28 上海三彩塑料排水板工程有限公司 Leakage of underground engineering, moist repairerment method
CN108868185A (en) * 2018-06-30 2018-11-23 厦门防水博士建筑工程有限公司 A kind of flooring channeling water leakage repairerment system
CN111779039A (en) * 2019-04-04 2020-10-16 上海三彩科技发展有限公司 Method for pre-burying cleaning water and structure seepage water collecting observation box on basement bottom plate
CN111851288A (en) * 2019-04-28 2020-10-30 上海三彩科技发展有限公司 Method for arranging seepage water collecting pit in basement bottom plate
WO2021184399A1 (en) * 2019-09-16 2021-09-23 邹新建 Method for installing glass observation sheet on hollow floor in underground engineering room

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108612267B (en) * 2018-04-04 2022-02-11 上海三彩塑料排水板工程有限公司 Method for eliminating water pressure by using cut-off leakage water communicating pipe in roof

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0321726A (en) * 1989-06-16 1991-01-30 Toho:Kk Spring water treating structure using block
CN101307647A (en) * 2008-06-06 2008-11-19 邹新建 Injection moulding cup-shaped concrete mould and methods for using them
CN201593203U (en) * 2010-01-25 2010-09-29 江苏双楼建设集团有限公司 Hiddenly-distributed seepage-proof water guiding system of baseboard of basement

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0321726A (en) * 1989-06-16 1991-01-30 Toho:Kk Spring water treating structure using block
CN101307647A (en) * 2008-06-06 2008-11-19 邹新建 Injection moulding cup-shaped concrete mould and methods for using them
CN201593203U (en) * 2010-01-25 2010-09-29 江苏双楼建设集团有限公司 Hiddenly-distributed seepage-proof water guiding system of baseboard of basement

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107059946A (en) * 2017-06-20 2017-08-18 中国华西企业有限公司 A kind of basement drain plate and its construction
CN107700554A (en) * 2017-09-29 2018-02-16 上海三彩科技发展有限公司 Underground engineering hollow floor and wall, the damp proof insulation way of post
CN108589794A (en) * 2018-04-04 2018-09-28 上海三彩塑料排水板工程有限公司 Leakage of underground engineering, moist repairerment method
CN108868185A (en) * 2018-06-30 2018-11-23 厦门防水博士建筑工程有限公司 A kind of flooring channeling water leakage repairerment system
CN111779039A (en) * 2019-04-04 2020-10-16 上海三彩科技发展有限公司 Method for pre-burying cleaning water and structure seepage water collecting observation box on basement bottom plate
CN111851288A (en) * 2019-04-28 2020-10-30 上海三彩科技发展有限公司 Method for arranging seepage water collecting pit in basement bottom plate
WO2021184399A1 (en) * 2019-09-16 2021-09-23 邹新建 Method for installing glass observation sheet on hollow floor in underground engineering room

Also Published As

Publication number Publication date
CN103628502B (en) 2018-07-27

Similar Documents

Publication Publication Date Title
CN103628502A (en) Method for using plastic drainage plates as hollow floor of underground engineering base plates
CN207775945U (en) A kind of bridging arrangement of Novel underground room bottom plate and side wall difference waterproof material
CN101096850B (en) Plastics water discharge plate application method for underground engineering wall surface
CN105220713B (en) The waterproof construction of outer wall of basement subsiding crack
CN208792809U (en) Basement side wall leakage repairs structure
CN105780940B (en) building expansion joint anti-leakage structure
CN205688670U (en) A kind of roofworks system structure
CN108104164A (en) A kind of underground pipe gallery waterproof construction
CN112962876A (en) Self-adhesion canned type drainage system
CN209066505U (en) A kind of diaphragm wall circular construction joint waterproof construction
CN206448296U (en) Protective barrier for rigid concrete structure
CN206085865U (en) Waterproof roll
CN203247778U (en) Novel high roof seam water resisting structure
CN207959270U (en) A kind of underground pipe gallery waterproof construction
KR101171037B1 (en) Method for compartmentalized tunnel waterproofing
CN205062857U (en) Side wall water proof structure
CN207959269U (en) A kind of waterproof slab node for underground pipe gallery
CN205000360U (en) Basement structure with waterproof structure
CN206706843U (en) A kind of basement induction crack structure with gutter
CN204356808U (en) Basement waterproofing deformation joint
CN103031887B (en) Construction method and water guide system of house bathroom water guide system
CN106700962A (en) Novel waterproof coiled material
CN207919918U (en) Water-proof drainage integrated board
CN207512792U (en) A kind of subsiding crack water distributor of basement bottom board
CN103628630A (en) Comprehensive technology and construction method of planted roof engineering

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20191231

Address after: 201824 room 404, No. 10, Lane 1930, Cao'an Road, Jiading District, Shanghai

Patentee after: SHANGHAI SANCAI TECHNOLOGY DEVELOPMENT Co.,Ltd.

Address before: 200444 Shanghai city Baoshan District Fengxiang Road 128 Lane 101

Patentee before: Zou Xinjian

TR01 Transfer of patent right
OL01 Statement of open license