CN208792809U - Basement side wall leakage repairs structure - Google Patents

Basement side wall leakage repairs structure Download PDF

Info

Publication number
CN208792809U
CN208792809U CN201821401808.0U CN201821401808U CN208792809U CN 208792809 U CN208792809 U CN 208792809U CN 201821401808 U CN201821401808 U CN 201821401808U CN 208792809 U CN208792809 U CN 208792809U
Authority
CN
China
Prior art keywords
waterproof
layer
slip casting
waterproof layer
side wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821401808.0U
Other languages
Chinese (zh)
Inventor
朱荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Pi Waterproofing Technology Engineering Co Ltd
Original Assignee
Guangdong Pi Waterproofing Technology Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Pi Waterproofing Technology Engineering Co Ltd filed Critical Guangdong Pi Waterproofing Technology Engineering Co Ltd
Priority to CN201821401808.0U priority Critical patent/CN208792809U/en
Application granted granted Critical
Publication of CN208792809U publication Critical patent/CN208792809U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

It is leaked the utility model discloses a kind of basement side wall and repairs structure; it is disposed with from outside to inside: back fill course, waterproof protective layer, the first waterproof layer and lateral wall substrate; the lateral wall substrate is provided with equally distributed several slip casting nails, and the slip casting nail is extend between first waterproof layer and waterproof protective layer;Spacing between each slip casting nail is identical, and length is identical;The second waterproof layer is additionally provided between first waterproof layer and waterproof protective layer, the material of second waterproof layer is acrylates water-repellent paint;The acrylates water-repellent paint is injected between first waterproof layer and waterproof protective layer by slip casting nail and forms the second waterproof layer;The lateral wall substrate surface is additionally provided with repair layer, and the slip casting is followed closely and covered by the repair layer;The utility model is easy to operate, good water-proof effect, does not need to destroy entire basement side wall, reproduces waterproof layer again.

Description

Basement side wall leakage repairs structure
Technical field
The utility model relates to buildings waterproof fields, leak more particularly to a kind of basement side wall and repair structure.
Background technique
At present although the building in underground engineering has corresponding waterproof layer and waterproof measure, but due in building Crossed construction, repeating construction destroys the waterproof layer of building in underground engineering, and waterproof layer is made to fail;Especially exist The side wall of basement is provided with waterproof layer outside side wall, and waterproof protective layer is provided with outside waterproof layer, and is ground outside waterproof protective layer Backfill below table, in normal work progress, due to the overlapping construction to side wall, along with waterproof protective layer is old Existing crack is dissolved, the waterproof layer outside basement side wall is destroyed, showing for infiltration leak occurs in water-proof function failure, basement As;But need to destroy basement side wall if re-replacing waterproof layer, it is long in time limit, it is at high cost;
Existing Granted publication a kind of basement waterproofing side wall, notification number CN205224089U, the structure include: back Fill stratum, the first waterproof layer and lateral wall substrate and other waterproof layers.The structure realizes " fusion type " waterproof, so that first is anti- Water layer is combined closely with lateral wall substrate, to reduce permeability, is prevented water penetration the one thousandth of rate up to tradition " raincoat-type ". But such basement waterproofing side wall is in the overlapping work progress to side wall, since the first waterproof layer and lateral wall substrate are tight Close combination, it is easy to destroy waterproof layer, infiltration drainage occur, such waterproof side wall is once destroyed, and is just needed By the reparation again of entire basement side wall waterproof construction from outside to inside, rehabilitation cost is high, long in time limit.
Utility model content
If being destroyed for existing waterproof side wall, it is necessary to again by the waterproof construction of entire basement waterproofing side wall The technical issues of reparation, the utility model provide a kind of basement side wall leakage reparation structure, the basement side wall leakage Structure is repaired by being disposed with outside wall to indoor direction: back fill course, waterproof protective layer, the first waterproof layer and lateral wall substrate, Several slip casting nails being uniformly arranged are placed on the lateral wall substrate surface, one end of the slip casting nail is exposed at the appearance of lateral wall substrate Face, the other end are arranged between the waterproof protective layer and the first waterproof layer;
One end that the slip casting nail is exposed at lateral wall substrate outer surface is grouting equipment connecting pin, and the slip casting nail is arranged in institute Stating one end between waterproof protective layer and the first waterproof layer is grouting port end;The diameter of the grouting equipment connecting pin is greater than described The diameter at grouting port end;
Spacing between each slip casting nail is identical, and it is identical to hammer into depth;The diameter of the grouting equipment connecting pin is 25- 50mm, the diameter at the grouting port end are 15-25mm;
The second waterproof layer, the material of second waterproof layer are additionally provided between first waterproof layer and waterproof protective layer For acrylates water-repellent paint;The acrylates water-repellent paint is injected into first waterproof layer by slip casting nail and prevents The second waterproof layer is formed between water conservation layer;
The lateral wall substrate surface is additionally provided with repair layer, and the slip casting is followed closely and covered by the repair layer;
The thickness of the waterproof protective layer is greater than the thickness of first waterproof layer, and the thickness of first waterproof layer is greater than The thickness of second waterproof layer, the thickness of the lateral wall substrate are greater than the thickness of the waterproof protective layer, the repair layer Thickness is less than the thickness of the lateral wall substrate.
Specifically, when side wall because crossed construction etc. the reason is that side wall waterproof construction water-proof function failure when, using It is provided with the second waterproof layer between first waterproof layer and waterproof protective layer, follows closely in lateral wall substrate setting slip casting and is followed closely by slip casting by third The second waterproof layer is formed between the first waterproof layer and waterproof protective layer of olefin(e) acid salt water-repellent paint assistant failure, reaches reconstruction waterproof The effect of layer;And slip casting nail is uniformly distributed in side wall, therefore can be passed through by the acrylates water-repellent paint of slip casting nail injection Equally distributed slip casting nail injection is uniformly spread, and keeps the second waterproofing layer thickness generated uniform, good water-proof effect.Slip casting The grouting port end diameter of nail is greater than grouting equipment connecting pin, and slip casting nail can be made preferably to pierce lateral wall substrate and the first waterproof Layer;It is this to be followed closely in lateral wall substrate setting slip casting, the underground of the second waterproof layer is set between the first waterproof layer and waterproof protective layer Room side wall repairs structure, and easy to operate, good water-proof effect does not need to destroy entire basement side wall, reproduces waterproof layer again; And acrylates water-repellent paint has disposable whole film forming, meets water self-healing, the excellent performance such as environmental protection flame retardant, using acrylic acid Salt water-repellent paint can play better waterproof effect;Repair layer is set on the lateral wall substrate surface, slip casting is followed closely and is hidden, is reached To the effect on beautification lateral wall substrate surface, make entire side wall leakage reparation structure that can either reach repairing effect will not influence side again Wall entire surface is beautiful.
Preferably, the acrylates water-repellent paint of second waterproof layer is followed closely using constant pressure grouting equipment by the slip casting It is injected between first waterproof layer and the waterproof protective layer, through diffuseing to form after the acrylates water-repellent paint injection Second waterproof layer.
Acrylates water-repellent paint is equably injected into the first waterproof specifically, following closely using constant pressure grouting equipment by slip casting Between layer and waterproof protective layer, enables acrylates water-repellent paint to be uniformly injected into form one layer of uniform second waterproof layer, reach To the waterproof effect of reconstruction waterproof layer.
Preferably, the grouting port end of the slip casting nail is internally provided with sealing device;The grouting equipment of the slip casting nail connects It connects end and is provided with junction, the junction is connect with constant pressure grouting equipment.
Make slip casting nail to be not injected into acrylates anti-specifically, the grouting port end of slip casting nail is internally provided with sealing device It is sealed before water paint, plays the effect of waterproof;The grouting equipment connecting pin and constant pressure that the setting of junction follows closely slip casting Grouting equipment is stably connected with, and avoids occurring constant pressure grouting equipment during slip casting and slip casting nail connects the case where falling off.
Preferably, slip casting nail using perforating device from the surface of the lateral wall substrate pierce first waterproof layer and Between the waterproof protective layer.
Preferably, the surface of the slip casting nail is provided with scale;According to the lateral wall substrate and the thickness of the first waterproof layer, Slip casting nail is accurately pierced first waterproof layer to the scale that the perforating device is nailed on according to slip casting and the waterproof is protected Between sheath.
Specifically, following closely using the slip casting with exact scale, enable perforating device according to the lateral wall substrate and first Accurately the depth that hammers into of slip casting nail is arranged between the first waterproof layer and waterproof protective layer for the thickness of waterproof layer, is not in note Starch the too deep or excessively shallow situation of the depth of nail.
Preferably, the spacing range between each slip casting nail is 0.8m-1.2m.
Specifically, the spacing range between each slip casting nail is 0.8m-1.2m, the acrylates water-repellent paint of injection is avoided It repeats to be superimposed when diffusion, forms non-uniform second waterproof layer.
Preferably, the waterproof protective layer is using rigid cement mortar waterproof material;First waterproof layer is using flexible Waterproof coiled material material;The material of the lateral wall substrate is rigid reinforced concrete material.
Specifically, basement waterproofing effect can either be played using the waterproof protective layer of rigid cement mortar waterproof material, The stability of rigid cement mortar is strong simultaneously, can play good supporting role;The flexible web that first waterproof layer uses is anti- Water material is a kind of rollable flexible building material product at web-like of one kind that can be played and resist extraneous rainwater, underground water leakage, It is connected as ne-leakage between engineering foundation and building, is the first barrier of entire engineering waterproofing, entire engineering is played Vital effect.
Preferably, the waterproof protective layer is disposed with insulating layer, extruded sheet protective layer, separation layer from outside to inside and prevents Water-base.
Preferably, the material of the insulating layer uses polyurethane rigid foam material, and the material of the separation layer is polyethylene third Synthetic fibre waterproof sheet;The material of the waterproof matrix is uncured rubber asphalt waterproof coating.
Specifically, the waterproof protective layer is disposed with insulating layer, extruded sheet protective layer, separation layer from outside to inside and prevents Water-base improves the protecting effect and waterproof effect of the waterproof protective layer, makes the reparation structure of entire basement side wall Waterproof effect is more stable.
Beneficial effect
The utility model provides a kind of basement side wall leakage and repairs structure, the first waterproof layer and waterproof protective layer it Between be provided with the second waterproof layer, using lateral wall substrate be arranged Grouting Pipe, acrylates water-repellent paint is injected by Grouting Pipe The second waterproof layer is generated between the first waterproof layer and waterproof protective layer of failure, achievees the effect that reproduce waterproof layer;Using in side Grouting Pipe is arranged in plinth course, and the basement side wall leakage that the second waterproof layer is arranged between the first waterproof layer and waterproof protective layer is repaired Complex structure, easy to operate, good water-proof effect do not need to destroy entire basement side wall, reproduce waterproof layer again.
Detailed description of the invention
Fig. 1 is that a kind of basement side wall leakage repairs structural schematic diagram;
Fig. 2 is that side wall leakage in room repairs structure front view under a kind of;
Fig. 3 is that schematic diagram is followed closely in slip casting;
Fig. 4 is that side wall leakage in room repairs structurally waterproof protective layer schematic diagram under a kind of.
In attached drawing:
1 is back fill course, and 2 be waterproof protective layer, and 3 be the first waterproof layer, and 4 be lateral wall substrate, and 5 be the second waterproof layer, and 6 are Slip casting nail, 7 be repair layer;
21 be insulating layer, and 22 be extruded sheet protective layer, and 23 be separation layer, and 24 be waterproof matrix;
61 be sealing device, and 62 be junction, and 63 be scale.
Specific embodiment
Specific embodiment of the present utility model is described further with reference to the accompanying drawing:
Embodiment 1
As shown in Figure 1-3, a kind of basement side wall leakage repairs structure, the basement side wall leakage repairs structure by wall Outer extremely indoor direction is disposed with: back fill course 1, waterproof protective layer 2, the first waterproof layer 3 and lateral wall substrate 4, in the side 4 surface of plinth course is placed in several slip casting nails 6 being uniformly arranged, and one end of the slip casting nail 6 is exposed at the outer surface of lateral wall substrate 4, The other end is arranged between the waterproof protective layer 2 and the first waterproof layer 3;
One end that the slip casting nail 6 is exposed at 4 outer surface of lateral wall substrate is grouting equipment connecting pin, 6 setting of slip casting nail One end between the waterproof protective layer 2 and the first waterproof layer 3 is grouting port end;The diameter of the grouting equipment connecting pin is big Diameter in the grouting port end;
Spacing between each slip casting nail 6 is identical, and it is identical to hammer into depth;The diameter of the grouting equipment connecting pin is 25- 50mm, the diameter at the grouting port end are 15-25mm;
The second waterproof layer 5 is additionally provided between first waterproof layer 3 and waterproof protective layer 2, second waterproof layer 5 Material is acrylates water-repellent paint;The acrylates water-repellent paint is injected into first waterproof by slip casting nail 6 The second waterproof layer 5 is formed between layer 3 and waterproof protective layer 2;
4 surface of lateral wall substrate is additionally provided with repair layer 7, and the repair layer 7 covers slip casting nail 6;
The thickness of the waterproof protective layer 2 is greater than the thickness of first waterproof layer 3, the thickness of first waterproof layer 3 Greater than the thickness of second waterproof layer 5, the thickness of the lateral wall substrate 4 is greater than the thickness of the waterproof protective layer 2, described to repair The thickness of cladding 7 is less than the thickness of the lateral wall substrate 4.
When side wall because crossed construction etc. the reason is that side wall waterproof construction water-proof function failure when, using in the first waterproof It is provided with the second waterproof layer 5 between layer 3 and waterproof protective layer 2, slip casting nail is set in lateral wall substrate 4 and follows closely 6 for propylene by slip casting The second waterproof layer 5 is formed between the first waterproof layer 3 and waterproof protective layer 2 of hydrochlorate water-repellent paint assistant failure, it is anti-to reach reconstruction The effect of water layer;And slip casting nail 6 is uniformly distributed in side wall, therefore can by the acrylates water-repellent paint of 6 injection of slip casting nail It is uniformly spread by 6 injection of equally distributed slip casting nail, keeps 5 thickness of the second waterproof layer generated uniform, waterproof effect It is good.The grouting port end diameter of slip casting nail 6 is greater than grouting equipment connecting pin, and slip casting nail 6 can be made preferably to pierce 4 He of lateral wall substrate First waterproof layer 3;It is this that in lateral wall substrate 4, slip casting nail 6 is set, it is arranged second between the first waterproof layer 3 and waterproof protective layer 2 The basement side wall of waterproof layer 5 repairs structure, and easy to operate, good water-proof effect does not need to destroy entire basement side wall, weight New reconstruction waterproof layer;And acrylates water-repellent paint has disposable whole film forming, meets water self-healing, the excellent property such as environmental protection flame retardant Can, better waterproof effect can be played using acrylates water-repellent paint;On 4 surface of lateral wall substrate, repair layer 7 is set, Slip casting nail 6 is hidden, achievees the effect that beautify 4 surface of lateral wall substrate, reach entire side wall leakage reparation structure can either and repair It is beautiful that multiple effect will not influence side wall entire surface again.
The acrylates water-repellent paint of second waterproof layer 5 passes through 6 injection of slip casting nail using constant pressure grouting equipment To between first waterproof layer 3 and the waterproof protective layer 2, the is diffuseed to form after the acrylates water-repellent paint injection Two waterproof layers 5.
Acrylates water-repellent paint is equably injected by slip casting nail 6 by 3 He of the first waterproof layer using constant pressure grouting equipment Between waterproof protective layer 2, enables acrylates water-repellent paint to be uniformly injected into form one layer of uniform second waterproof layer 5, reach Reproduce the waterproof effect of waterproof layer.
The grouting port end of the slip casting nail 6 is internally provided with sealing device 61;The grouting equipment connecting pin of the slip casting nail 6 It is provided with junction 62, the junction 62 is connect with constant pressure grouting equipment.
The grouting port end of slip casting nail 6, which is internally provided with sealing device 61, makes slip casting nail be not injected into the painting of acrylates waterproof It is sealed before material, plays the effect of waterproof;The setting of junction 62 infuses the grouting equipment connecting pin of slip casting nail 6 and constant pressure Slurry equipment is stably connected with, and avoids occurring during slip casting constant pressure grouting equipment and follow closely 6 with slip casting connecting the case where falling off.
Slip casting nail 6 pierces first waterproof layer 3 and described from the surface of the lateral wall substrate 4 using perforating devices Between waterproof protective layer 2.
The surface of the slip casting nail 6 is provided with scale 63;According to the lateral wall substrate 4 and the thickness of the first waterproof layer 3, institute It states perforating device and slip casting nail 6 is accurately pierced into first waterproof layer 3 and the waterproof according to the scale 63 on slip casting nail 6 Between protective layer 2.
Using the slip casting nail 6 with exact scale 63, enable perforating device according to the lateral wall substrate 4 and the first waterproof Accurately the depth that hammers into of slip casting nail 6 is arranged between the first waterproof layer 3 and waterproof protective layer 2 for the thickness of layer 3, is not in note Starch the too deep or excessively shallow situation of the depth of nail.
Spacing range between each slip casting nail 6 is 0.8m-1.2m.Spacing range between each slip casting nail 6 is 0.8m- 1.2m avoids repeating to be superimposed when the acrylates water-repellent paint diffusion of injection, forms non-uniform second waterproof layer.
The waterproof protective layer 2 is using rigid cement mortar waterproof material;First waterproof layer is anti-using flexible web Water material;The material of the lateral wall substrate is rigid reinforced concrete material.
Basement waterproofing effect can either be played using the waterproof protective layer 2 of rigid cement mortar waterproof material, while just The stability of property cement mortar is strong, can play good supporting role;The flexible web waterproof material that first waterproof layer 3 uses It is a kind of rollable flexible building material product at web-like of one kind that can be played and resist extraneous rainwater, underground water leakage, as work Ne-leakage connects between journey basis and building, is the first barrier of entire engineering waterproofing, plays entire engineering to Guan Chong The effect wanted.
Embodiment 2
As shown in Figs 1-4, a kind of basement side wall leakage repairs structure, and the basement side wall leakage repairs structure by wall Outer extremely indoor direction is disposed with: back fill course 1, waterproof protective layer 2, the first waterproof layer 3 and lateral wall substrate 4, in the side 4 surface of plinth course is placed in several slip casting nails 6 being uniformly arranged, and one end of the slip casting nail 6 is exposed at the outer surface of lateral wall substrate 4, The other end is arranged between the waterproof protective layer 2 and the first waterproof layer 3;
One end that the slip casting nail 6 is exposed at 4 outer surface of lateral wall substrate is grouting equipment connecting pin, 6 setting of slip casting nail One end between the waterproof protective layer 2 and the first waterproof layer 3 is grouting port end;The diameter of the grouting equipment connecting pin is big Diameter in the grouting port end;
Spacing between each slip casting nail 6 is identical, and it is identical to hammer into depth;The diameter of the grouting equipment connecting pin is 25- 50mm, the diameter at the grouting port end are 15-25mm;
The second waterproof layer 5 is additionally provided between first waterproof layer 3 and waterproof protective layer 2, second waterproof layer 5 Material is acrylates water-repellent paint;The acrylates water-repellent paint is injected into first waterproof by slip casting nail 6 The second waterproof layer 5 is formed between layer 3 and waterproof protective layer 2;
4 surface of lateral wall substrate is additionally provided with repair layer 7, and the repair layer 7 covers slip casting nail 6;
The thickness of the waterproof protective layer 2 is greater than the thickness of first waterproof layer 3, the thickness of first waterproof layer 3 Greater than the thickness of second waterproof layer 5, the thickness of the lateral wall substrate 4 is greater than the thickness of the waterproof protective layer 2, described to repair The thickness of cladding 7 is less than the thickness of the lateral wall substrate 4.
When side wall because crossed construction etc. the reason is that side wall waterproof construction water-proof function failure when, using in the first waterproof It is provided with the second waterproof layer 5 between layer 3 and waterproof protective layer 2, slip casting nail is set in lateral wall substrate 4 and follows closely 6 for propylene by slip casting The second waterproof layer 5 is formed between the first waterproof layer 3 and waterproof protective layer 2 of hydrochlorate water-repellent paint assistant failure, it is anti-to reach reconstruction The effect of water layer;And slip casting nail 6 is uniformly distributed in side wall, therefore can by the acrylates water-repellent paint of 6 injection of slip casting nail It is uniformly spread by 6 injection of equally distributed slip casting nail, keeps 5 thickness of the second waterproof layer generated uniform, waterproof effect It is good.The grouting port end diameter of slip casting nail 6 is greater than grouting equipment connecting pin, and slip casting nail 6 can be made preferably to pierce 4 He of lateral wall substrate First waterproof layer 3;It is this that in lateral wall substrate 4, slip casting nail 6 is set, it is arranged second between the first waterproof layer 3 and waterproof protective layer 2 The basement side wall of waterproof layer 5 repairs structure, and easy to operate, good water-proof effect does not need to destroy entire basement side wall, weight New reconstruction waterproof layer;And acrylates water-repellent paint has disposable whole film forming, meets water self-healing, the excellent property such as environmental protection flame retardant Can, better waterproof effect can be played using acrylates water-repellent paint;On 4 surface of lateral wall substrate, repair layer 7 is set, Slip casting nail 6 is hidden, achievees the effect that beautify 4 surface of lateral wall substrate, reach entire side wall leakage reparation structure can either and repair It is beautiful that multiple effect will not influence side wall entire surface again.
The acrylates water-repellent paint of second waterproof layer 5 passes through 6 injection of slip casting nail using constant pressure grouting equipment To between first waterproof layer 3 and the waterproof protective layer 2, the is diffuseed to form after the acrylates water-repellent paint injection Two waterproof layers 5.
Acrylates water-repellent paint is equably injected by slip casting nail 6 by 3 He of the first waterproof layer using constant pressure grouting equipment Between waterproof protective layer 2, enables acrylates water-repellent paint to be uniformly injected into form one layer of uniform second waterproof layer 5, reach Reproduce the waterproof effect of waterproof layer.
The grouting port end of the slip casting nail 6 is internally provided with sealing device 61;The grouting equipment connecting pin of the slip casting nail 6 It is provided with junction 62, the junction 62 is connect with constant pressure grouting equipment.
The grouting port end of slip casting nail 6, which is internally provided with sealing device 61, makes slip casting nail be not injected into the painting of acrylates waterproof It is sealed before material, plays the effect of waterproof;The setting of junction 62 infuses the grouting equipment connecting pin of slip casting nail 6 and constant pressure Slurry equipment is stably connected with, and avoids occurring during slip casting constant pressure grouting equipment and follow closely 6 with slip casting connecting the case where falling off.
Slip casting nail 6 pierces first waterproof layer 3 and described from the surface of the lateral wall substrate 4 using perforating devices Between waterproof protective layer 2.
The surface of the slip casting nail 6 is provided with scale 63;According to the lateral wall substrate 4 and the thickness of the first waterproof layer 3, institute It states perforating device and slip casting nail 6 is accurately pierced into first waterproof layer 3 and the waterproof according to the scale 63 on slip casting nail 6 Between protective layer 2.
Using the slip casting nail 6 with exact scale 63, enable perforating device according to the lateral wall substrate 4 and the first waterproof Accurately the depth that hammers into of slip casting nail 6 is arranged between the first waterproof layer 3 and waterproof protective layer 2 for the thickness of layer 3, is not in note Starch the too deep or excessively shallow situation of the depth of nail.
Spacing range between each slip casting nail 6 is 0.8m-1.2m.Spacing range between each slip casting nail 6 is 0.8m- 1.2m avoids repeating to be superimposed when the acrylates water-repellent paint diffusion of injection, forms non-uniform second waterproof layer.
The waterproof protective layer 2 is disposed with insulating layer 21, extruded sheet protective layer 22, separation layer 23 from outside to inside and prevents Water-base 24.
The material of the insulating layer 21 uses polyurethane rigid foam material, and the material of the separation layer 23 is anti-for polyethylene polypropylene Water sheet material;The material of the waterproof matrix 24 is uncured rubber asphalt waterproof coating.The waterproof protective layer 2 from outside to inside according to It is secondary to be provided with insulating layer 21, extruded sheet protective layer 22, separation layer 23 and waterproof matrix 24, improve the waterproof protective layer 2 Protecting effect and waterproof effect keep the waterproof effect of the reparation structure of entire basement side wall more stable.
According to the disclosure and teachings of the above specification, those skilled in the art of the present invention can also be to upper Embodiment is stated to change and modify.Therefore, protection scope is not limited to specific embodiment disclosed and described above, Some modifications and changes of claim should also be as falling into the protection scope of the utility model.In addition, although this specification In use some specific terms, these terms are merely for convenience of description, does not constitute any limit to the utility model System.

Claims (9)

1. a kind of basement side wall leakage repairs structure, the basement side wall leakage repair structure by outside wall to indoor direction according to It is secondary to be provided with back fill course, waterproof protective layer, the first waterproof layer and lateral wall substrate, which is characterized in that in the lateral wall substrate table Face is placed in several slip casting nails being uniformly arranged, and one end of the slip casting nail is exposed at the outer surface of lateral wall substrate, and other end setting exists Between the waterproof protective layer and the first waterproof layer;
One end that the slip casting nail is exposed at lateral wall substrate outer surface is grouting equipment connecting pin, and the slip casting nail setting is described anti- One end between water conservation layer and the first waterproof layer is grouting port end;The diameter of the grouting equipment connecting pin is greater than the slip casting The diameter at mouth end;
Spacing between each slip casting nail is identical, and it is identical to hammer into depth;The diameter of the grouting equipment connecting pin is 25-50mm, The diameter at the grouting port end is 15-25mm;
The second waterproof layer is additionally provided between first waterproof layer and waterproof protective layer, the material of second waterproof layer is third Olefin(e) acid salt water-repellent paint;The acrylates water-repellent paint is injected into first waterproof layer by slip casting nail and waterproof is protected The second waterproof layer is formed between sheath;
The lateral wall substrate surface is additionally provided with repair layer, and the slip casting is followed closely and covered by the repair layer;
The thickness of the waterproof protective layer is greater than the thickness of first waterproof layer, and the thickness of first waterproof layer is greater than described The thickness of second waterproof layer, the thickness of the lateral wall substrate are greater than the thickness of the waterproof protective layer, the thickness of the repair layer Less than the thickness of the lateral wall substrate.
2. a kind of basement side wall leakage according to claim 1 repairs structure, which is characterized in that second waterproof layer Acrylates water-repellent paint using constant pressure grouting equipment by the slip casting nail be injected into first waterproof layer and it is described prevent Between water conservation layer, the second waterproof layer is diffuseed to form after the acrylates water-repellent paint injection.
3. a kind of basement side wall leakage according to claim 1 repairs structure, which is characterized in that the note of the slip casting nail Slurry mouth end is internally provided with sealing device;The grouting equipment connecting pin of slip casting nail is provided with junction, the junction with The connection of constant pressure grouting equipment.
4. a kind of basement side wall leakage according to claim 3 repairs structure, which is characterized in that the slip casting nail uses Perforating device pierces between first waterproof layer and the waterproof protective layer from the surface of the lateral wall substrate.
5. a kind of basement side wall leakage according to claim 4 repairs structure, which is characterized in that the table of the slip casting nail Face is provided with scale;According to the lateral wall substrate and the thickness of the first waterproof layer, the quarter that the perforating device is nailed on according to slip casting Degree accurately pierces slip casting nail between first waterproof layer and the waterproof protective layer.
6. a kind of basement side wall leakage according to claim 1 repairs structure, which is characterized in that between each slip casting nail Spacing range be 0.8m-1.2m.
7. a kind of basement side wall leakage according to claim 1 repairs structure, which is characterized in that the waterproof protective layer Using rigid cement mortar waterproof material;First waterproof layer uses flexible web waterproof material;The material of the lateral wall substrate Matter is rigid reinforced concrete material.
8. a kind of basement side wall leakage according to claim 1 repairs structure, which is characterized in that the waterproof protective layer It is disposed with insulating layer, extruded sheet protective layer, separation layer and waterproof matrix from outside to inside.
9. a kind of basement side wall leakage according to claim 8 repairs structure, which is characterized in that the material of the insulating layer Matter uses polyurethane rigid foam material, and the material of the separation layer is polyethylene polypropylene waterproof sheet;The material of the waterproof matrix For uncured rubber asphalt waterproof coating.
CN201821401808.0U 2018-08-28 2018-08-28 Basement side wall leakage repairs structure Active CN208792809U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821401808.0U CN208792809U (en) 2018-08-28 2018-08-28 Basement side wall leakage repairs structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821401808.0U CN208792809U (en) 2018-08-28 2018-08-28 Basement side wall leakage repairs structure

Publications (1)

Publication Number Publication Date
CN208792809U true CN208792809U (en) 2019-04-26

Family

ID=66207393

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821401808.0U Active CN208792809U (en) 2018-08-28 2018-08-28 Basement side wall leakage repairs structure

Country Status (1)

Country Link
CN (1) CN208792809U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110424473A (en) * 2019-08-08 2019-11-08 威海楼医生防水工程有限公司 A kind of method for maintaining of bottom plate trapping structure and base plate leakage
CN110714483A (en) * 2019-10-28 2020-01-21 湖北建科国际工程有限公司 Assembled underground comprehensive pipe gallery and waterproof layer construction method thereof
CN111561174A (en) * 2020-06-13 2020-08-21 中国二十二冶集团有限公司 Construction method for roof waterproof repair and roof waterproof repair structure
CN113669509A (en) * 2021-09-02 2021-11-19 苏州佳固士新材料科技有限公司 Indoor wall-penetrating pipe leakage repairing method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110424473A (en) * 2019-08-08 2019-11-08 威海楼医生防水工程有限公司 A kind of method for maintaining of bottom plate trapping structure and base plate leakage
CN110714483A (en) * 2019-10-28 2020-01-21 湖北建科国际工程有限公司 Assembled underground comprehensive pipe gallery and waterproof layer construction method thereof
CN111561174A (en) * 2020-06-13 2020-08-21 中国二十二冶集团有限公司 Construction method for roof waterproof repair and roof waterproof repair structure
CN113669509A (en) * 2021-09-02 2021-11-19 苏州佳固士新材料科技有限公司 Indoor wall-penetrating pipe leakage repairing method

Similar Documents

Publication Publication Date Title
CN208792809U (en) Basement side wall leakage repairs structure
CN101096850B (en) Plastics water discharge plate application method for underground engineering wall surface
CN104100011A (en) Toilet floor heating waterproof construction method and toilet floor heating waterproof system
CN205804633U (en) A kind of basement bottom board waterproof construction
US20150197909A1 (en) Waterproofing and vapor barrier system
CN105201025A (en) Basement waterproof structure and construction method thereof
CN205688670U (en) A kind of roofworks system structure
CN209397798U (en) A kind of compound water-proof thermal-insulation curtain wall
CN103031887B (en) Construction method and water guide system of house bathroom water guide system
Chulkov et al. Innovative water proofing of exploitable roofs in high-rise construction
CN205502086U (en) Novel waterproof application system of basement bottom plate
CN208870199U (en) A kind of side wall waterproof structure for deformation seams
CN102155088A (en) Process for constructing and positioning wall surface of outer wall boss-type tri-proof decoration integrated plate
CN205975705U (en) Basement top board waterproof structure
US11427983B2 (en) Below grade, blind side, improved dual waterproofing membrane assembly incorporating a sheet membrane with adhesive to fully bond to concrete/shotcrete, and a method of making, and using same
CN206128315U (en) Basement outer wall prevention of seepage insulation construction
CN204419202U (en) A kind of tunnel slot repair structure
CN205046589U (en) Waterproof structure of basement
CN205975704U (en) Basement wall structure
CN208803496U (en) A kind of car ramp and basement main body handover seam node structure
CN205975949U (en) Basement top board waterproof structure
CN214329723U (en) Interior decoration waterproof construction
CN215106156U (en) Basement open water leaking stoppage and lasting waterproof mould-proof repair structure
CN206048902U (en) A kind of waterproof roll
CN105155590B (en) A kind of bentonite waterproof system and construction method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant