CN103628630A - Comprehensive technology and construction method of planted roof engineering - Google Patents
Comprehensive technology and construction method of planted roof engineering Download PDFInfo
- Publication number
- CN103628630A CN103628630A CN201210298735.8A CN201210298735A CN103628630A CN 103628630 A CN103628630 A CN 103628630A CN 201210298735 A CN201210298735 A CN 201210298735A CN 103628630 A CN103628630 A CN 103628630A
- Authority
- CN
- China
- Prior art keywords
- band drain
- construction method
- fulcrum
- comprehensive technology
- planted roof
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Road Paving Structures (AREA)
Abstract
The invention provides a comprehensive technology and a construction method of planted roof engineering, and relates to single roof greening with the area being 100-5000 square meters and underground engineering square greening with the area being 10 000-100 000 square meters. Because the technical requirement that no water is accumulated on large-area square greening during a rainstorm is not distinguished in standards, many defects exist. According to the comprehensive technology and the construction method of the planted roof engineering, slope making is conducted on an underground engineering top plate with the area being 10 000-100 000 square meters; rainwater on an upper building roof, walls and road surfaces is distributed and recycled; as for drainage of greening percolating water, flat plastic plates are arranged on the upper portion of supporting points of edges, and water discharging smoothness is guaranteed; the left, right, front and back of each roll polyethylene or polypropylene drain plate are welded thermally or bond through adhesive tape to achieve root penetrating resistance and an auxiliary waterproof function; the self-adhesive plastic drain plates are used, the shapes of the supporting points are changed, compressive strength is enhanced, the drain plates adhere to the walls, and therefore one object has multiple functions, construction cost is reduced, and overall quality of the engineering is improved.
Description
Technical field
The invention belongs to building planted roof greening scope, relate generally to the underground construction square greening of the roof greening of 100~5000 squares of monomers and monomer 10,000~100,000 square, in this total invention of general designation planted roof, comprise that square looks for that slope, rainwater shunting recycle, delivery port is strengthened, band drain connects and reaches root-resistant puncturing and auxiliary waterproof action, on metope, turn over node, change fulcrum shape and improve the multinomial independent claims such as compressive strength.
Background technology
Current specifications has < < planted roof tecnical regulations > > JGJ155-2007; Root resistant waterproof roll > > JC/T1075-2008 for < < planted roof; < < Technical code for water proof in underground engineering > > GB50108-2008.These standards content related to the present invention be mainly summarized as following some:
1. the top board of GB50108 code requirement square greening is that structure is looked for slope 1%~2%, it is considered herein that this cannot implement, and proposes other technologies scheme.
2. JGJ155 rules do not propose the draining difference of square greening and roof greening, the present invention proposes that the rainwater of square greening shunt, recycled, during heavy rain without the technical scheme of ponding and delivery port reinforcement.
3. to require one deck be topmost root-resistant puncturing waterproofing course to rules, and the present invention connects the left-right and front-back of plastics web-like band drain to reach sealing firmly, has the waterproof action of root-resistant puncturing, can one-object-many-purposes way, reduce cost, and improve engineering total quality.
Summary of the invention
During my design of the underground construction top board square greening in many monomer area 1~100,000 square drainage grade, find that architect has no way of doing it, its reason is that < < Technical code for water proof in underground engineering > > claimed structure is looked for slope, and the gradient is preferably 1%~2%.I propose through case summary: basement structure top board is level, and with concrete etc., looking for slope material is 30~50cm scope in overall height, completes top board draining look for slope with part plan, the local gradient.More than look for slope way only to relate to square greening, do not relate to the roof greening of small size.
Many buildings and Large Square are arranged at underground construction top board top, can not ponding during heavy rain, and the draining of therefore classifying is very important theory, but in current specifications, there is no this idea.I go out by case summary: the rain water on roof of top board upper building, metope rainwater, road rain water are entered to pipeline tissue and discharge, can enter reservoir, by rainwater cycling and reutilization, solved the rainwater flow on 20%~60% square, also improved the ability of the anti-heavy rain in city simultaneously.Remaining rainwater is that top board top greening infiltration rainwater filters through geotextiles, from the surface of plastic draining board, discharge, be pooled to underground construction edge and enter underground water or urban drainage pipe network, the wide plastic board of sticky paving one deck 3~30cm on the fulcrum of edge band drain, cover again geotextiles, geotextiles is not sunk, guarantee that draining is forever unimpeded.
The pressure clause Shi“ the superiors of < < planted roof tecnical regulations > > must use root-resistant puncturing waterproofing materials " I have the plastic draining board of hollow fulcrum to have good water resistance with polyethylene or polyacrylic web-like, key is that the connection of left-right and front-back is reached to the examination criteria of root resistant waterproof roll > > for < < planted roof, can superimposed hot weld and normal temperature under butyl adhesive tape bonding.Heat weldable way is: during production, the left and right of band drain is stayed to the wide flat board of 50~150mm, during construction, with climbing welding machine by the superimposed hot weld of plastic board, weld seam has one or two; The front and back of band drain are fulcrums, superimposed 1~5 row's fulcrum, and with welding gun or customization special hot welding tool, by the flat limit hot weld between fulcrum, weld seam has one or two.
The bonding way of adhesive tape is: during production, in the left and right of band drain, squeeze into one to four adhesive tape, can also can have multiple combination mode at the right and left monolateral, become self-adhesion plastic draining board.Mutual plane cementation laminated or take fulcrum cementation laminated during construction; The self-adhesive coiled material of the multiple butyl rubber of the wide polyethylene sheets of 50~100mm for front and back, is bonded in the plane of band drain.For the fastness of seam before and after strengthening, then with the wide self-adhesive coiled material of 6~20mm, cover in seam on seam.Front and back are bonding, can also overlap row's fulcrum, then it are bonding to add adhesive tape.All adhesive tape add chemical root resistance agent when producing, and can improve root-resistant puncturing effect, and adhesive tape outside has release liners to cover.
Hot weld and splicing can also be combined: about when band drain is produced, stay 50~150mm dull and stereotyped, superimposed hot weld, weld seam has one or two; Front and back are bonded in the plane of band drain with the wide self-adhesive coiled material of 50~100mm, or overlap row's fulcrum, then it is bonding to add adhesive tape.
Because the plastic draining board of planted roof is on waterproofing course, when band drain reaches the quality specifications of root-resistant puncturing, just can protect waterproofing course, reduce engineering cost, improve the waterproof quality time limit.
Plastic draining board all around after sealed attachment, on band drain, turn over and lean against on metope, then be bonded at wall upper cover outside band drain fulcrum with the wide self-adhesive coiled material of 50~200mm, or band drain plane is pasted on the wall, then geotextiles is bonded to the top of band drain, then earthing.
In order to improve the compressive strength of band drain fulcrum, the present invention changes into square, polygon, prismatic by the fulcrum of garden frustum shape, and there is the shape of concavo-convex ribbed stiffener side.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, the present invention is further described.
Fig. 1 is that underground construction top board is looked for slope sectional view.
Fig. 2 is that underground construction top board top-out rain water on roof, metope rainwater, road rain water organize draining to enter reservoir sectional view.
Fig. 3 is that underground construction top board greening percolating water is discharged from band drain, the sectional view of sticky paving plastic board on the fulcrum at edge.
Fig. 4 a, Fig. 4 b are that left and right hot weld connects sectional view.
Fig. 5 a, Fig. 5 b are that front and back hot weld connects sectional view.
Fig. 6 a, Fig. 6 b, Fig. 6 c, Fig. 6 d are the bonding sectional views of self-adhesion plastic draining board left and right adhesive tape.
Fig. 7 a, Fig. 7 b are the bonding sectional views of front and back adhesive tape.
Fig. 8 a, Fig. 8 b overlap row's fulcrum before and after being, add the bonding sectional view of adhesive tape.
Fig. 9 a, Fig. 9 b are that band drain turns over node on wall limit.
Figure 10 a is band drain fulcrum top view, and Figure 10 b is fulcrum elevation.
The specific embodiment
Fig. 1 underground construction top board (1) structure roof is level, with concrete etc., looks for slope material in overall height is the scope of 30~50cm (2), and with part plan (4), the local gradient (3) completes top board draining and looks for slope.
Fig. 2 is that underground construction top board has top-out rain water on roof (5), and metope rainwater (6) road rain water (7) enters pipeline tissue and discharges, and can enter reservoir (8), by rainwater cycling and reutilization.
Fig. 3 is the draining of underground construction top board top greening infiltration rainwater, rainwater is through the filtration of geotextiles (11), from the surface of plastic draining board (9), discharge, be pooled to underground construction edge and enter underground water or urban drainage pipe network, on the fulcrum of edge band drain, the wide plastic board (10) of sticky paving one deck 3~30mm covers geotextiles (11) again, geotextiles is not sunk, guarantee that band drain is forever unimpeded.
Fig. 4 a, Fig. 4 b are that the left and right of band drain (9) leaves the wide flat board of 50~150mm, superimposed hot weld, and weld seam (12), weld seam has one or two.
Fig. 5 a, Fig. 5 b are that the front and back of band drain (9) are fulcrums, superimposed 1~5 row's fulcrum, and by the flat limit hot weld between fulcrum, weld seam (12), weld seam has one or two.
Fig. 6 a, Fig. 6 b, Fig. 6 c, Fig. 6 d squeeze into one to four adhesive tape (13) on the edge, left and right of band drain (9) while being production, Fig. 6 c is plane cementation laminated, Fig. 6 a, Fig. 6 b, Fig. 6 d are fulcrum cementation laminateds of overlap joint, can also there is different combined methods, become self-adhesion plastic draining board.
Fig. 7 a, Fig. 7 b connect before and after band drain (9), with the wide self-adhesive coiled material of 50~150mm (14), are bonded in the plane of (9), and Fig. 4 b uses the wide self-adhesive coiled material of 10~20mm (14) to cover in seam on connection seam again.
Fig. 8 a, Fig. 8 b take row's fulcrum before and after band drain (9), at plate, sew on and use adhesive tape (13) bonding, also have self-adhesive coiled material (14) to cover in seam in the plane of Fig. 8 a.
On Fig. 9 a band drain (9), turn over and lean on the wall, then use 50~200 wide self-adhesive coiled materials (14) to be bonded at wall upper cover outside band drain fulcrum, then geotextiles (11) is bonded to the top of band drain, then earthing.
On Fig. 9 b band drain, turn over by the wall, by band drain plane for adhesive tape (13) stickup on the wall, then geotextiles (11) is bonded to the top of band drain, then earthing.
Figure 10 a, Figure 10 b are band drain fulcrum profile, fulcrum flat-top (15), and fulcrum side is concavo-convex ribbed stiffener (16).
Claims (10)
1. the comprehensive technology of planted roof and construction method, the underground construction top board drainage grade that relates to more than 10,000~10 ten thousand squares of monomer areas, it is characterized in that: structure roof is level, with concrete etc., looking for slope material is within the scope of 30~50cm in overall height, with part plan, the local gradient, completes top board draining and looks for slope.
2. the comprehensive technology of planted roof and construction method, the Water in Rainwater Drainage that relates to underground construction top board upper building removes, it is characterized in that: rain water on roof, metope rainwater, road rain water enter pipeline tissue and discharge, and can enter reservoir, by rainwater cycling and reutilization.
3. the comprehensive technology of planted roof and construction method, relate to the discharge of underground construction top board top greening infiltration rainwater, it is characterized in that: greening infiltration rainwater filters through geotextiles, from the surface of plastic draining board, discharge, be pooled to underground construction edge and enter underground water or urban drainage pipe network, the wide plastic board of sticky paving one deck 3~30cm on the fulcrum of edge band drain, then cover geotextiles, geotextiles is not sunk, guarantee that draining is forever unimpeded.
4. the comprehensive technology of planted roof and construction method, relate to plastic draining board connection all around, it is characterized in that: about when web-like has the plastic draining board of hollow fulcrum to produce, stay the wide flat board of 50~150mm, and superimposed hot weld, weld seam has one or two; The front and back of band drain are fulcrums, superimposed 1~5 row's fulcrum, and by the flat limit hot weld between fulcrum, weld seam has one or two.
5. the comprehensive technology of planted roof and construction method, relate to plastic draining board connection all around, it is characterized in that: during production, in the left and right of band drain, squeeze into one~tetra-adhesive tape, can, monolateral, also can, at the right and left, become self-adhesion plastic draining board.
6. the comprehensive technology of planted roof according to claim 5 and construction method, is characterized in that: mutual plane cementation laminated during self-adhesion Plastic Drain Slab Construction; , with the wide self-adhesive coiled material of 50~100mm, is bonded in the plane of band drain, or overlaps row's fulcrum, then it is bonding to add adhesive tape in front and back.
7. the comprehensive technology of planted roof and construction method, relate to plastic draining board connection all around, it is characterized in that: about when band drain is produced, stay 50~150mm dull and stereotyped, and superimposed hot weld, weld seam has one or two; The self-adhesive coiled material of 50~100mm for front and back, is bonded in the plane of band drain, or overlaps row's fulcrum, then it is bonding to add adhesive tape.
8. according to comprehensive technology and the construction method of the planted roof described in claim 5.6.7, it is characterized in that: all adhesive tape add chemical root resistance agent when producing, and can improve root-resistant puncturing effect, adhesive tape outside has release liners to cover.
9. the comprehensive technology of planted roof and construction method, relate to band drain and receive connecting of limit with metope, it is characterized in that: plastic draining board all around after sealed attachment, on band drain, turn over and lean against on metope, with the wide self-adhesive coiled material of 50~200mm, be bonded at wall upper cover outside band drain fulcrum again, or band drain plane is pasted on the wall, then geotextiles is bonded to the top of band drain, then earthing.
10. the comprehensive technology of planted roof and construction method, relate to the compressive strength that improves band drain fulcrum, it is characterized in that: fulcrum is changed into square, polygon, prismatic, and there is the shape of concavo-convex ribbed stiffener side.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210298735.8A CN103628630A (en) | 2012-08-21 | 2012-08-21 | Comprehensive technology and construction method of planted roof engineering |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210298735.8A CN103628630A (en) | 2012-08-21 | 2012-08-21 | Comprehensive technology and construction method of planted roof engineering |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103628630A true CN103628630A (en) | 2014-03-12 |
Family
ID=50210052
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210298735.8A Pending CN103628630A (en) | 2012-08-21 | 2012-08-21 | Comprehensive technology and construction method of planted roof engineering |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103628630A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104278683A (en) * | 2014-09-29 | 2015-01-14 | 浙江普天园林建筑发展有限公司 | Basement roof greening slope filling method |
CN104805967A (en) * | 2015-05-21 | 2015-07-29 | 胡志强 | Roof comprehensive waterproof method |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002113437A (en) * | 2000-10-06 | 2002-04-16 | Ohbayashi Corp | Penetrating rain water adjustment method in waste disposal site |
CN2622270Y (en) * | 2002-11-27 | 2004-06-30 | 邹新建 | Water-drainage and water-proof combination plate product with its joint having glue and having supporting-point |
CN1607303A (en) * | 2003-10-13 | 2005-04-20 | 侯彩虹 | Multifunctional waterproof board |
CN101096850A (en) * | 2006-06-29 | 2008-01-02 | 邹新建 | Plastics water discharge plate application method for underground engineering wall surface, bottom plating and top board |
CN101109170A (en) * | 2007-08-15 | 2008-01-23 | 邹新建 | Plastics water discharging plate in greening building roof slat and constructing method thereof |
CN201485894U (en) * | 2009-09-07 | 2010-05-26 | 张俊杰 | Device for classifying, collecting and treating urban rainwater |
-
2012
- 2012-08-21 CN CN201210298735.8A patent/CN103628630A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002113437A (en) * | 2000-10-06 | 2002-04-16 | Ohbayashi Corp | Penetrating rain water adjustment method in waste disposal site |
CN2622270Y (en) * | 2002-11-27 | 2004-06-30 | 邹新建 | Water-drainage and water-proof combination plate product with its joint having glue and having supporting-point |
CN1607303A (en) * | 2003-10-13 | 2005-04-20 | 侯彩虹 | Multifunctional waterproof board |
CN101096850A (en) * | 2006-06-29 | 2008-01-02 | 邹新建 | Plastics water discharge plate application method for underground engineering wall surface, bottom plating and top board |
CN101109170A (en) * | 2007-08-15 | 2008-01-23 | 邹新建 | Plastics water discharging plate in greening building roof slat and constructing method thereof |
CN201485894U (en) * | 2009-09-07 | 2010-05-26 | 张俊杰 | Device for classifying, collecting and treating urban rainwater |
Non-Patent Citations (2)
Title |
---|
住房和城乡建设部工程质量安全监管司等: "《全国民用建筑工程设计技术措施 2009 规划•建筑•景观》", 28 February 2010, 中国计划出版社 * |
本社: "《现行防水材料标准及施工规范汇编 第2版》", 31 July 2002, 中国建筑工业出版社 * |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104278683A (en) * | 2014-09-29 | 2015-01-14 | 浙江普天园林建筑发展有限公司 | Basement roof greening slope filling method |
CN104278683B (en) * | 2014-09-29 | 2016-06-29 | 浙江普天园林建筑发展有限公司 | The method on top board greening heap slope, storehouse, a kind of ground |
CN104805967A (en) * | 2015-05-21 | 2015-07-29 | 胡志强 | Roof comprehensive waterproof method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207749543U (en) | A kind of composite waterproof system | |
CN103628502B (en) | The method for doing underground engineering bottom plate hollow floor with plastic draining board | |
CN101096850A (en) | Plastics water discharge plate application method for underground engineering wall surface, bottom plating and top board | |
CN203701446U (en) | Roof structure for garage roof planting | |
CN105904816A (en) | A waterproof system coating-coiled material composite plane and a constructing process | |
CN209760629U (en) | Just put local seepage maintenance structure in formula roofing pipe root position | |
CN103628630A (en) | Comprehensive technology and construction method of planted roof engineering | |
CN218814791U (en) | Assembled roofing system | |
CN206428900U (en) | From anti-skidding polymer membranes | |
CN201031472Y (en) | Rubber composite self-adhering water-proof coiled material | |
CN207403305U (en) | Certainly waterproof roll is filled in a kind of crack | |
CN202782045U (en) | High polymer self-adhesive waterproof coiled material | |
CN214531546U (en) | Novel structural composite waterproof and drainage opposite-shaped sheet for planted roof | |
CN205219923U (en) | High -efficient waterproofing membrane | |
CN205272768U (en) | Plant roofing and use compound root resistance waterproofing membrane | |
CN101353216B (en) | Drainage water diffluence method for dry red mud disposal and drainage water diffluence structure thereof | |
CN209081794U (en) | A kind of new type rubber composite of water-proof coiled material | |
CN206829513U (en) | A kind of roof covering water-proof structure | |
CN201649312U (en) | Waterproof water discharging and storing plate | |
CN202809661U (en) | Polyethylene waterproof roll with double-side self-adhesive layer | |
CN207117060U (en) | A kind of protection channel with protection cable | |
CN201292616Y (en) | Water drain water proof protective plate | |
CN206299087U (en) | NEW TYPE OF COMPOSITE waterproof roll and flooring structure | |
CN205875545U (en) | Drainage slope for roof waterproof | |
CN205134780U (en) | Flashing device with filtering capability |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20140312 |
|
RJ01 | Rejection of invention patent application after publication |