CN104805967A - Roof comprehensive waterproof method - Google Patents

Roof comprehensive waterproof method Download PDF

Info

Publication number
CN104805967A
CN104805967A CN201510260902.3A CN201510260902A CN104805967A CN 104805967 A CN104805967 A CN 104805967A CN 201510260902 A CN201510260902 A CN 201510260902A CN 104805967 A CN104805967 A CN 104805967A
Authority
CN
China
Prior art keywords
waterproof
roof
construction
water
quality
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510260902.3A
Other languages
Chinese (zh)
Inventor
胡志强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201510260902.3A priority Critical patent/CN104805967A/en
Publication of CN104805967A publication Critical patent/CN104805967A/en
Pending legal-status Critical Current

Links

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

The invention aims to prevent roof leakage and overcome the common quality defects in the construction industry, and provides a comprehensive method involving professional waterproof deepening design, composite waterproof construction (waterproof layer and protective layer), comprehensive construction management, namely a professional design-material compounding-construction comprehensive method for thoroughly eliminating the roof leakage. According to the comprehensive method provided by the invention, the roof waterproof quality is improved, the impact of the roof leakage on the use and structure of a building is reduced, the service life of a roof waterproof structure is prolonged, and the full-life construction investment of the building is reduced.

Description

Roof comprehensive waterproof method
[technical field]
The present invention relates to the realm of building construction, specifically, is the comprehensive waterproof method on roof.
[background technology]
China's recent two decades comes, and high level and super highrise building are as emerged rapidly in large numbersBamboo shoots after a spring rain, and roof leakage problems is more and more serious, is " water curtain cave " everywhere, comprises newly-built a lot of important buildings after heavy rain.According to authoritative department statistics, China's new building has 95% to there is roof Seepage, has a strong impact on use, and what have even affects structural safety.It is engineering people major issue anxious to be resolved.
Current roof leakage problems becomes Common Quality Fault In The Construction Project, and be known as building " cancer ", trace it to its cause, designing institute designs according to original standard collective drawings, the details imperfection that construction atlas has, and does not consider the concrete condition on project roof; The increase of domestic planted roof in addition, the cost control of construction bidding, adulterating of waterproofing materials, on-the-spot because condition restriction and construction period, be difficult to effectively long-term waterproof; Design defect, fault in material and constructional deficiency cause the reason of roof seepage.
[summary of the invention]
The object of the invention is to prevent roof seepage, overcome the common quality defect of this building trade.There is provided from professional waterproof Deepen Design, composite water-proof construction (waterproofing course+topping), integrated construction manages, and namely from Specialty Design, quality material to the integrated approach of scientific construction, thoroughly stops roof seepage.
The present invention is intended to improve roof water-proof quality, reduces roof seepage to the impact of building use and structure, extends roof water-proof adequate service life, saves building life-cycle construction investment.
[detailed description of the invention]
(1) professional waterproof Deepen Design
(1) emphasis of professional waterproof Deepen Design:
According to building and structure design, in conjunction with field condition, professional waterproof Deepen Design is carried out, mainly to the structure gradient to roof water-proof, the gutter gradient, drain hole, spillway hole, structural joint, give prominence to roof structure, equipment, pipeline etc., flange designs, fix, carry out checking computations and detail node design.Under ensureing limiting case, draining is unobstructed, and outfall does not block, and quality of waterproof layer is intact.Simultaneously to setting and the requirement of topping, shrinkage joint, settlement joint etc. stay connection details such as establishing position, anti-limit, corner, build-in to carry out secondary detailingi etc., really reach roof and do not stay water, do not seep water.
The design of the structure, the gradient, major groove, draining, overflow, anti-limit, corner, build-in etc. on each roof is not identical, and secondary detailingi just effectively can not ensure that roof drainage is smooth and easy, not ponding targetedly, and waterproofing course firmly, reliably.Just can not ensure that roof is non-leakage.Just can not ensure roof not ponding, non-leakage in waterproofing materials design period of validity.
(2) concrete measure of secondary detailingi:
1, roofing not ponding is ensured: the structure gradient on roof, the gradient in gutter, the size in gutter, the layout of drain hole and size, the layout of spillway hole etc. effectively can ensure roof not ponding.
2, waterproofing course is non-leakage: waterproofing course forms integral layer, and basic unit combines closely, has enough elasticity and toughness, durability.
3, topping is protected waterproofing course in time, and itself is also one waterproofing course, guarantees that waterproofing course is not damaged by construction, takes root in damage.
4, the Deepen Design of thin portion, node: structural joint, the structure of outstanding roofing, equipment, pipeline place, corner, anti-limit place, the design of node of reversed beam, post and masonry interface etc.
5, professional structure manufacture: the casting die on anti-limit, wears the clip of roof pipeline, the structure of outstanding aspect, the fixture on the anti-limit of equipment, necessary specialized designs, the making such as protective cap that prevent inlet for stom water from block.
6, use management measure: routine use sets up inspection system, a roof of monthly patrolling, roof of patrolling before and after heavy rain, Timeliness coverage problem, prevents roof ponding.
(2) waterproofing materials
Roof flashing material refers to the material that can effectively prevent moisture, steam etc. in rainwater and air from invading building.Desirable waterproofing materials effectively inside concrete steam can be volatilized; can be impervious and tolerate strong hydraulic pressure for a long time; energy and concrete base layer combine closely; overall without interface; life-span same with concrete; the protection such as root thorn concrete structure can be effectively prevented to have lasting water-proof function and better compactness and compressive strength, easy construction.Domestic at present also do not have this material.
Reach this waterproof effect, the waterproof composite material of (from wound) pure interior emulsion water-proof layer+pure-acrylic emulsion water-repellent paint topping should be adopted, be i.e. the waterproofing course of different proportion preparation and topping (waterproofing course+topping composite water-proof).
(1) this waterproof composite material characteristic and advantage:
1, strong with base material adhesion stress, without interface.
2, can be impervious and tolerate strong hydraulic pressure for a long time, there is not problem of aging, combine closely the same life-span with concrete, that is there is " forever " water proofing property.
3, the globality of energy available protecting waterproofing course, and top construction damage.
4, require low to construction environment, do not have open fire to construct.
5, speed of application is fast, and intensity is high, saves the duration.
(3) integrated construction management
Construction quality is the decision link determining end product quality.Must pay much attention to and scientific management.Conscientiously tell somebody what one's real intentions are system, operation handing-over system, on-the-spot other station system, system of accountability in the scene of implementing, and strict control stress point, difficult point and thin portion structure, ensure construction quality.
(1) construction quality priority control point:
1, base cleaning: base cleaning is the necessary preparation before construction, base cleaning can ensure that roof basic unit finds roof structure layer defects without sharp object, carries out repairing or rectify and improve before waterproof construction.
2, construct: job instruction construction strictly pressed by waterproofing materials, first local test, qualified large-area construction again.The first bottoming process of the waterproof weak location such as corner, structure lap position, scupper; then planned sequence of construction carries out construction of waterproof layer; carry out fish tail and waterproof layer construction in time after passed examination, the anti-limit of the construction 20mm lower than waterproofing course of topping, and the professional component of timely self-control is fixed.
3, check and carry out retaining experiment: topping has been constructed timely inspection, after qualified, have ready conditions and carry out retaining experiment at once.
4, in strict accordance with thin portion secondary detailingi drawing construction, ensure detail construction quality, everyone has responsibility.
5, keep in repair inspection system: after roof water-proof Practical Completion, monthly patrol once, once, set up item record of patrol registration form, ensure to pinpoint the problems process in time in each heavy rain inspection.

Claims (5)

1. roof comprehensive waterproof method, is characterized in that having carried out professional waterproof Deepen Design to roof water-proof, the comprehensive systems approach of waterproof composite material waterproof and integrated construction management; Emphasize that each roof should carry out professional waterproof Deepen Design in conjunction with on-site actual situations, form of structure etc.; adopt composite water-proof form and the integrated construction management of (from wound) pure-acrylic emulsion water-repellent paint+pure-acrylic emulsion water-repellent paint topping; oneself designs and produces some waterproof primary structural component, press strip, protective caps etc. according to building roof concrete condition; effectively can improve waterproof quality; reduce the impact of environment on construction, reduce building life-cycle construction investment.
2. professional waterproof Deepen Design according to claim 1, it is characterized in that the field condition according to roof, form of structure, detail treatment design is carried out in the thin portion such as gutter, drain gully, spout hole, wall pipe, reduce original building and design the waterproof defect that may occur, improve roof water-proof quality.
3. the composite water-proof of employing according to claim 1 (from wound) pure-acrylic emulsion water-repellent paint+pure-acrylic emulsion water-repellent paint topping, it is characterized in that summing up according to the practical experience in past, from a kind of waterproof material of wound after contrast test, improve the bonding of waterproofing materials, impervious, weather-proof ability and topping effect (cost slightly improves) with high-quality pure acrylic emulsion; Object is produced and uses the waterproofing materials of guaranteeing both quality and quantity, and ensures the application life of waterproofing materials, thus ensure roof water-proof total quality.Containing formula and the compound use method of this kind of material.
4. integrated construction management according to claim 1, its feature, to the system management of construction, comprises basic unit's inspection, repairing, construction, maintenance, inspection etc., ensures roof water-proof construction quality.
5. according to claim 1ly oneself design and produce some waterproof primary structural component, press strip, protective caps etc. according to building roof concrete condition; it is characterized in that oneself makes the auxiliary material of some waterproof constructions according to the concrete experience of waterproof construction; improve waterproof construction quality; make up the omission of current waterproof construction industry in this part, be made into standard component if desired and promote.
CN201510260902.3A 2015-05-21 2015-05-21 Roof comprehensive waterproof method Pending CN104805967A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510260902.3A CN104805967A (en) 2015-05-21 2015-05-21 Roof comprehensive waterproof method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510260902.3A CN104805967A (en) 2015-05-21 2015-05-21 Roof comprehensive waterproof method

Publications (1)

Publication Number Publication Date
CN104805967A true CN104805967A (en) 2015-07-29

Family

ID=53691131

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510260902.3A Pending CN104805967A (en) 2015-05-21 2015-05-21 Roof comprehensive waterproof method

Country Status (1)

Country Link
CN (1) CN104805967A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2007113562A1 (en) * 2006-04-04 2007-10-11 Ampteam Assets Limited Precipitation management system
CN102251629A (en) * 2011-04-13 2011-11-23 北京东方诚国际钢结构工程有限公司 Overall rigid waterproof system of building
CN102758504A (en) * 2012-07-12 2012-10-31 振华集团(昆山)建设工程有限公司 Method for constructing wet-operation details of completely-decorated housings
CN102912999A (en) * 2012-10-29 2013-02-06 上海建为建筑修缮工程有限公司 Waterproof structure, repairing method and leakage detecting method for traditional grey tile roof
CN103628630A (en) * 2012-08-21 2014-03-12 邹新建 Comprehensive technology and construction method of planted roof engineering

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2007113562A1 (en) * 2006-04-04 2007-10-11 Ampteam Assets Limited Precipitation management system
CN102251629A (en) * 2011-04-13 2011-11-23 北京东方诚国际钢结构工程有限公司 Overall rigid waterproof system of building
CN102758504A (en) * 2012-07-12 2012-10-31 振华集团(昆山)建设工程有限公司 Method for constructing wet-operation details of completely-decorated housings
CN103628630A (en) * 2012-08-21 2014-03-12 邹新建 Comprehensive technology and construction method of planted roof engineering
CN102912999A (en) * 2012-10-29 2013-02-06 上海建为建筑修缮工程有限公司 Waterproof structure, repairing method and leakage detecting method for traditional grey tile roof

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
孙揭阳等: "纯丙弹性乳液的合成、应用及性能", 《中国涂料》 *
邓力中: "建筑物屋面防水设计与施工技术分析探讨", 《四川建材》 *

Similar Documents

Publication Publication Date Title
CN101994399B (en) Method for repairing leaked coiled-material water-proof roof
CN206128430U (en) Prefabricated heat preservation wallboard structure of integration and wallboard bolted connection subassembly
CN211472893U (en) Parapet department movement joint structure
CN103321434A (en) Arc surface unit type curtain wall construction method and structure
CN100577936C (en) Building external wall waterproof and anticracking construction method
CN106939671B (en) Metal sandwich roof plate construction method
CN104805967A (en) Roof comprehensive waterproof method
CN208396162U (en) A kind of thermal isolation by water storage roofing
CN205857494U (en) Metal roof ridge waterproof construction
CN204728498U (en) A kind of building deformation joint leak-proof device
CN203613698U (en) Roof for mobile house
CN204024326U (en) A kind of structure preventing outer eaves door and window mouth seepage from intaking
CN105019570A (en) Comprehensive water-proof method of building external wall
CN104893581A (en) Waterproof coating
CN206128323U (en) Coupling assembling is tied to prefabricated heat preservation wallboard structure of integration and wallboard back of body
CN205259472U (en) Roofing structure of in -band eaves gutter
CN216475959U (en) High-rise residence pitched roof eave drainage structure
CN204401906U (en) A kind of roof structure with penetration piece
CN205476120U (en) House roof guiding device with triangular support frame
CN211143536U (en) Metal roof gutter waterproof construction
CN205024946U (en) Collect drainage and protect side fascia as an organic whole
CN110886437B (en) Gutter connecting system and application and construction method thereof
CN107401216A (en) A kind of housing basement's waterproof construction method
CN202810015U (en) Anti-flooding gutter for steel structural roof
CN207553641U (en) A kind of gutter waterproof repair system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20160324

Address after: 410007 Hunan province Changsha Chengnan Road No. 232 building 2905 room 2 Jin Fu Yuan

Applicant after: Changsha 98 new Mstar Technology Ltd

Address before: 410007 Hunan province Changsha Yuhua District Chigang road light No. 14, building 608 room 7

Applicant before: Hu Zhiqiang

WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20150729