CN110158395A - A kind of polyurethane broken stone water permeability pavement construction method - Google Patents

A kind of polyurethane broken stone water permeability pavement construction method Download PDF

Info

Publication number
CN110158395A
CN110158395A CN201910473451.XA CN201910473451A CN110158395A CN 110158395 A CN110158395 A CN 110158395A CN 201910473451 A CN201910473451 A CN 201910473451A CN 110158395 A CN110158395 A CN 110158395A
Authority
CN
China
Prior art keywords
mixture
pavement
rubble
water permeability
construction method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910473451.XA
Other languages
Chinese (zh)
Inventor
宋建新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Zhongda Great Wall Municipal Engineering Co Ltd
Original Assignee
Chengdu Zhongda Great Wall Municipal Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Zhongda Great Wall Municipal Engineering Co Ltd filed Critical Chengdu Zhongda Great Wall Municipal Engineering Co Ltd
Priority to CN201910473451.XA priority Critical patent/CN110158395A/en
Publication of CN110158395A publication Critical patent/CN110158395A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/22Gutters; Kerbs ; Surface drainage of streets, roads or like traffic areas
    • E01C11/224Surface drainage of streets
    • E01C11/225Paving specially adapted for through-the-surfacing drainage, e.g. perforated, porous; Preformed paving elements comprising, or adapted to form, passageways for carrying off drainage
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C7/00Coherent pavings made in situ
    • E01C7/08Coherent pavings made in situ made of road-metal and binders
    • E01C7/30Coherent pavings made in situ made of road-metal and binders of road-metal and other binders, e.g. synthetic material, i.e. resin

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)

Abstract

The invention discloses a kind of polyurethane broken stone water permeability pavement construction methods, comprising the following steps: carries out preparing mixture with when stirring with adhesive to rubble;Mixture is paved, road surface is formed;Before the mixture after paving is fully cured, road pavement is compacted and is polished;After mixture is fully cured, road pavement carries out anti-skidding processing.The construction method of the invention road pavement before mixture is fully cured is compacted and is polished, the extra polyurethane adhesive on mixture surface layer can be destroyed during polishing, it is able to ascend the finish and flatness on road surface, after mixture is fully cured, road pavement carries out anti-skidding processing, enhances the antiskid effect on road surface.

Description

A kind of polyurethane broken stone water permeability pavement construction method
Technical field
The present invention relates to pavement construction technical fields, more particularly to a kind of polyurethane broken stone water permeability pavement construction method.
Background technique
The polyurethane broken stone water permeability pavement environment protection type water permeable road surface novel as one kind, have good permeable and absorb heat, Anti-acoustic capability can mitigate urban waterlogging, alleviate city " tropical island effect " to avoid surface gathered water, effective recharge of groundwater source, drop Low city noise;The road surface porosity that polyurethane rubble is laid with is direct with rainfall up to air pollutants such as 30% or so, PM10 Permeate the ground and permanently seal up for safekeeping, thus will not reentrainment of dust, effectively control dustiness dye the problem of;Polyurethane macadam pavement makes full use of respectively The true qualities of kind lithotome, can keep for a long time color constant, convenient for moulding coloury road surface pattern.This is a kind of ideal Road surface landscape pavement material can be widely used in the facilities such as town road, town and country Lv Dao, park plaza, station terminal, have wide Wealthy application prospect is of great significance to the improvement of urban ecological environment.But the country is on the permeable road of polyurethane rubble at present Corresponding professional standard not yet in terms of face design and construction, when pavement construction, rely on the experience of construction company to carry out mostly, lead Porous pavement is caused to there is more hidden danger of quality in the construction process.
Summary of the invention
To solve problems of the prior art, the present invention provides a kind of polyurethane broken stone water permeability pavement construction parties Method, the construction method of the invention compacting machine road pavement before mixture is fully cured are compacted, are polished, and road surface is able to ascend Finish and flatness;After mixture is fully cured, the extra polyurethane adhesive on abrasive disk road pavement surface layer is used Stick carries out polishing except glue, while road pavement has also carried out anti-skidding processing, enhances the antiskid effect on road surface.
To achieve the above object, the present invention adopts the following technical scheme:
A kind of polyurethane broken stone water permeability pavement construction method, comprising the following steps:
S1, rubble and adhesive are carried out to prepare mixture with when stirring;
S2, the mixture prepared in step S1 is paved, forms road surface;
S3, before the mixture after paving is fully cured, road pavement is compacted and is polished;
S4, after mixture is fully cured, road pavement carries out anti-skidding processing.
Preferably, further comprising the steps of before the step S1:
Selection partial size is 3mm-5mm, dust content accounts for the rubble below of total weight 0.4 ‰.
Preferably, further comprising the steps of before the step S1:
Selection partial size is 4mm-6mm, dust content accounts for the rubble below of total weight 0.4 ‰.
Preferably, further comprising the steps of before the step S1:
Rubble is dried.
Preferably, further comprising the steps of before the step S1:
It polishes rubble.
Preferably, in the step S1, the dosage of adhesive accounts for the 2.8%-6.6% of metaling quality.
Preferably, further comprising the steps of in the step S3:
It is compacted and polishes using the mill road pavement of nylon material.
Preferably, further comprising the steps of in the step S4:
Polishing is carried out except glue using abrasive disk road pavement.
Beneficial effect is:
1, the construction method of the invention compacting machine road pavement before mixture is fully cured is compacted, is polished, can Promote the finish and flatness on road surface;After mixture is fully cured, the extra of abrasive disk road pavement surface layer is used Polyurethane adhesive carries out polishing except glue, while road pavement has also carried out anti-skidding processing, enhances the antiskid effect on road surface, this hair The bright road surface constructed out can be widely applied to residential area road, large-scale square, park cell road, shopping mall, pavement, non- The pavement engineerings such as car lane and parking lot.The service life of existing polyurethane porous pavement is most less than 5 years on the market, The service life of porous pavement of the invention was at 10 years or more, and with continuous further investigation, application prospect can be broader;
2, selecting partial size is the rubble of 3mm-5mm (or 4mm-6mm), and dust content accounts for the rubble below of total weight 0.4 ‰, The dust content of rubble is controlled, water permeability is stronger, while grieshoch being avoided to waste polyurethane adhesive;
3, to rubble carry out drying degree of making it dry it is high, have great promotion to the quality on road surface after molding because When mixture has moisture content in the curing process, polyurethane adhesive can foam, and will lead to pavement cracking, fragmentation;It is stirred in proportion Live drying is carried out to rubble before mixing, the moisture content avoided in mixture influences pavement quality;
4, it polishes rubble, the rubble of irregular shape is polished into the higher rubble of round and smooth degree, the road laid out Face is more neat, beautiful;
5, the dosage of adhesive is matched according to rubble specific gravity in mixture, and when pavement construction is more convenient, while energy The dosage of adhesive is enough controlled, the pavement quality mated formation is more stable, more evenly;
6, it is compacted and polishes using the mill road pavement of nylon material, the mill of nylon material, which has, is not easy the excellent of adhesion Point, and the mill of metal material can remain in metal polishing scratch on the road surface after polishing during being compacted and polishing, on road surface Upper formed has metal polishing scratch, influences overall image, and the mill of metal material be easy in the mixture that is not fully cured Adhesive is sticked together;
7, abrasive disk road pavement, which carries out polishing, can effectively improve the coefficient of friction on road surface, improve the safety on road surface Property.
Specific embodiment
The present invention will be further explained below with reference to the attached drawings:
Embodiment 1:
A kind of polyurethane broken stone water permeability pavement construction method, includes the following steps:
S1, metaling and polyurethane adhesive are prepared, wherein the ballast grain sizes selected are 3mm-5mm (specific ballast grain sizes It can be its within the scope of 3mm, 3.25mm, 3.5mm, 3.75mm, 4mm, 4.25mm, 4.5mm, 4.75mm, 5mm or 3mm-5mm His partial size) all can, dust content account for the griotte below of total weight 0.4 ‰ because the ballast grain sizes that can be bought on the market be by Particle size range classification, be not by grain size grading, it is impossible to buy the rubble that partial size is entirely 3mm or 5mm, what is bought is exactly One particle size range, and it is suitable for the present embodiment in this particle size range, therefore in embodiment not with specific partial size Numerical value is defined.
Live drying is carried out to rubble before proportion stirring, it is high to carry out drying degree of making it dry to rubble, has used The rubble of white drying has great promotion to the quality on road surface after molding, because mixture has moisture content in the curing process When, polyurethane adhesive can foam, and will lead to pavement cracking, fragmentation, and the moisture content avoided in mixture influences pavement quality, gather Urethane adhesive uses common xanthochromia glue or color inhibition glue, and polyurethane adhesive divides component A and B component, common xanthochromia glue The mass ratio of component A and B component (6551 C-B of Elastopave C 6551/202 C-A and Elastopave C) is in water 100:65, component A and B component (6550/100 C-A of Elastopave C and Elastopave C 6550/ in color inhibition glue 100 C-B) mass ratio be 40:100.).In the present embodiment, using common xanthochromia glue, mixing time 45S, after stirring Standing setting time is 25min, and selecting partial size is the rubble of 3mm-5mm, and water permeability is stronger, while convenient for metaling and poly- ammonia The mixing of ester gum stick and paving for mixture, within the dosage control 15kg of each polyurethane adhesive, with being accurate to The electronics Libra of 0.01g weighs, and when mixing first pours into load weighted B component in the container of dried and clean, then by suitable A group It is sufficiently stirred after pouring in separately container with stirring electric drill;Forbid not carrying out ingredient to scale.
S2, the metaling and polyurethane adhesive that prepare in step S1 are matched, stirred, preparing mixture;Gluing Agent dosage accounts for the 2.8% of metaling quality, and using mechanical stirring, mixing time 3min, to guarantee construction quality, scene is set specially People is responsible for material proportion weighing, and the weight error of polyurethane adhesive controls in 1%, and the weight error control of metaling exists In 2%, the dosage of adhesive is matched according to rubble specific gravity and functional performance attribute in mixture, when pavement construction more Add conveniently, while the dosage of adhesive can be controlled, the pavement quality mated formation is more stable, more evenly.
S3, the mixture prepared in step S2 is transported at pavement construction using means of transport;
S4, by mixture laying in the base completed in advance, uniformly pave, according to functional performance attribute be laid with;? In the present embodiment, laying is pavement, and carrying pressure is small, therefore is laid with 2cm, and when construction ensures the intact material phenomenon of edge, By mixture laying in the base completed in advance, the paving thickness of mixture is 1.1 calculating, the horizontal slope of base according to coefficient of loose laying Degree is 2%;The calculating of coefficient of loose laying K is as follows: base with a thickness of h1, paved mixture measures loose laying depth h2 later, finally The thickness h 3 after being compacted is measured, then coefficient of loose laying K=(h2-h1)/(h3-h1).
S5, before the mixture after paving is fully cured, double plate machine power sanding machine using driving-type is to paving Road surface afterwards is compacted and is polished, and sanding machine is self-possessed one ton, is selected the mill of nylon material, is used the mill pair of nylon material It pavement compaction and polishes, the mill of nylon material has the advantages that be not easy adhesion, and the mill of metal material is being compacted and is polishing Metal polishing scratch can be remained on the road surface after polishing in the process, being formed on road surface has metal polishing scratch, overall image is influenced, And the mill of metal material is easy to be sticked together with the adhesive in the mixture that is not fully cured, when work, sanding machine Speed of grinding plate is controlled at 1000 turns or more, so that the compactness of mixture reaches 99% or so, flatness reaches 95% left side for compacting It is right.
S6, it is fully cured and then the road surface after compacting is carried out using grinding machine anti-skidding in the mixture after paving Processing, grinding machine use abrasive disk, improve the coefficient of friction on road surface, enhance the antiskid effect on road surface, safety is more Height is not easy to slip.
The construction method of the invention compacting machine road pavement before mixture is fully cured is compacted, is polished, Neng Gouti Rise the finish and flatness on road surface;After mixture is fully cured, the extra poly- of abrasive disk road pavement surface layer is used Urethane adhesive carries out polishing except glue, while road pavement has also carried out anti-skidding processing, enhances the antiskid effect on road surface.The present invention The road surface constructed out can be widely applied to residential area road, large-scale square, park cell road, shopping mall, pavement, non-machine The pavement engineerings such as motor-car road and parking lot.The service life of existing polyurethane porous pavement is most less than 5 years on the market, this The service life of the porous pavement of invention was at 10 years or more, and with continuous further investigation, application prospect can be broader.
Embodiment 2:
A kind of polyurethane broken stone water permeability pavement construction method, includes the following steps:
S1, metaling and polyurethane adhesive are prepared, wherein the ballast grain sizes selected are 4mm-6mm (specific ballast grain sizes It can be its within the scope of 4mm, 4.25mm, 4.5mm, 4.75mm, 5mm, 5.25mm, 5.5mm, 5.75mm, 6mm or 4mm-6mm His partial size) all can, dust content account for the granite below of total weight 0.4 ‰ because the ballast grain sizes that can be bought on the market be by Particle size range classification, be not by grain size grading, it is impossible to buy the rubble that partial size is entirely 4mm or 6mm, what is bought is exactly One particle size range, and it is suitable for the present embodiment in this particle size range, therefore in embodiment not with specific partial size Numerical value is defined.
Live drying is carried out to rubble before proportion stirring, it is high to carry out drying degree of making it dry to rubble, has used The rubble of white drying has great promotion to the quality on road surface after molding, because mixture has moisture content in the curing process Words, will lead to pavement cracking, fragmentation, and avoiding the moisture content in mixture influences pavement quality, and polyurethane adhesive uses common Xanthochromia glue or color inhibition glue, polyurethane adhesive divide component A and B component, component A and B component in common xanthochromia glue The mass ratio of (6551/202 C-A of Elastopave C and 6551 C-B of Elastopave C) is 100:65, color inhibition glue The mass ratio of middle component A and B component (6550/100 C-A of Elastopave C and 6550/100 C-B of Elastopave C) For 40:100.).In the present embodiment, using color inhibition glue.Mixing time is 45S, after stirring stand setting time be 25min, selecting partial size is the rubble of 4mm-6mm, and water permeability is stronger, while convenient for the mixed of metaling and polyurethane adhesive It closes and mixture paves, within the dosage control 15kg of each polyurethane adhesive, with the electronics for being accurate to 0.01g Libra weighs, and when mixing first pours into load weighted B component in the container of dried and clean, then suitable component A is poured into container It is sufficiently stirred afterwards with stirring electric drill;Forbid not carrying out ingredient to scale.
S2, the metaling and polyurethane adhesive that prepare in step S1 are matched, stirred, preparing mixture;Gluing Agent dosage accounts for the 6.6% of metaling quality, and using mechanical stirring, mixing time 3min, to guarantee construction quality, scene is set specially People is responsible for material proportion weighing, and the weight error of polyurethane adhesive controls in 1%, and the weight error control of metaling exists In 2%, the dosage of adhesive is matched according to crushed stone specification in mixture, and when pavement construction is more convenient, while can control The dosage of preparing adhesive, the pavement quality mated formation is more stable, more evenly.
S3, the mixture prepared in step S2 is transported at pavement construction using means of transport;
S4, by mixture laying in the base completed in advance, manually uniformly pave, find flatness and drainage grade accurately, mix The paving thickness for closing material is calculated according to coefficient of loose laying for 1.1, and the transverse slope of base is 2%;Ensure edge intact material when construction The calculating of phenomenon, coefficient of loose laying K is as follows: base with a thickness of h1, paved mixture measures loose laying depth h2 later, finally measures Thickness h 3 after compacting, then coefficient of loose laying K=(h2-h1)/(h3-h1).
S5, before the mixture after paving is fully cured, double plate machine power sanding machine using driving-type is to paving Road surface afterwards is compacted and is polished, and sanding machine is self-possessed 500 kilograms, is selected the mill of nylon material, is used the mill of nylon material Disk road pavement is compacted and polishes, and the mill of nylon material has the advantages that be not easy adhesion, and the mill of metal material being compacted and Metal polishing scratch can be remained on the road surface after polishing during polishing, form the polishing scratch with metallic luster, shadow on road surface Overall image is rung, and the easy adhesive with the mixture not being fully cured of mill of metal material is sticked together, and is compacted So that the compactness of mixture reaches 99%.Flatness reaches 95%.
S6, after the mixture after paving is fully cured, anti-skidding place is carried out to the road surface after compacting using grinding machine Reason, grinding machine use abrasive disk, improve the coefficient of friction on road surface, enhance the antiskid effect on road surface, and safety is higher, It is not easy to slip.
Embodiment 3:
A kind of polyurethane broken stone water permeability pavement construction method, includes the following steps:
S1, metaling and polyurethane adhesive are prepared, wherein the ballast grain sizes selected are 3mm-5mm (specific ballast grain sizes It can be its within the scope of 3mm, 3.25mm, 3.5mm, 3.75mm, 4mm, 4.25mm, 4.5mm, 4.75mm, 5mm or 3mm-5mm His partial size) all can, dust content account for the griotte below of total weight 0.4 ‰ because the ballast grain sizes that can be bought on the market be by Particle size range classification, be not by grain size grading, it is impossible to buy the rubble that partial size is entirely 3mm or 5mm, what is bought is exactly One particle size range, and it is suitable for the present embodiment in this particle size range, therefore in embodiment not with specific partial size Numerical value is defined.
Live drying is carried out to rubble before proportion stirring, it is high to carry out drying degree of making it dry to rubble, has used The rubble of white drying has great promotion to the quality on road surface after molding, because mixture has moisture content in the curing process Words, will lead to pavement cracking, fragmentation, and avoiding the moisture content in mixture influences pavement quality, and polyurethane adhesive uses common Xanthochromia glue or color inhibition glue, polyurethane adhesive divide component A and B component, component A and B component in common xanthochromia glue The mass ratio of (6551/202 C-A of Elastopave C and 6551 C-B of Elastopave C) is 100:65, color inhibition glue The mass ratio of middle component A and B component (6550/100 C-A of Elastopave C and 6550/100 C-B of Elastopave C) For 40:100.).In the present embodiment, using common xanthochromia glue.Mixing time is 45S, after stirring stand setting time be 25min, selecting partial size is the rubble of 3mm-5mm, and water permeability is stronger, while convenient for the mixed of metaling and polyurethane adhesive It closes and mixture paves, within the dosage control 15kg of each polyurethane adhesive, with the electronics for being accurate to 0.01g Libra weighs, and when mixing first pours into load weighted B component in the container of dried and clean, then suitable component A is poured into container It is sufficiently stirred afterwards with stirring electric drill;The filling sequence of strict control adhesive components, forbids not carrying out ingredient to scale.
S2, the metaling and polyurethane adhesive that prepare in step S1 are matched, stirred, preparing mixture;Gluing Agent dosage accounts for the 4% of metaling quality, and using mechanical stirring, mixing time 3min, to guarantee construction quality, scene sets special messenger It is responsible for material proportion to weigh, the weight error of polyurethane adhesive controls in 1%, and the weight error of metaling is controlled 2% Interior, the dosage of adhesive is matched according to crushed stone specification in mixture, and when pavement construction is more convenient, while can control glue The dosage of stick, the pavement quality mated formation is more stable, more evenly.
S3, the mixture prepared in step S2 is transported at pavement construction using means of transport;
S4, by mixture laying in the base completed in advance, manually uniformly pave, find flatness and drainage grade accurately, mix The paving thickness for closing material is calculated according to coefficient of loose laying for 1.1, and the transverse slope of base is 2%;Ensure edge intact material when construction The calculating of phenomenon, coefficient of loose laying K is as follows: base with a thickness of h1, paved mixture measures loose laying depth h2 later, finally measures Thickness h 3 after compacting, then coefficient of loose laying K=(h2-h1)/(h3-h1).
S5, before the mixture after paving is fully cured, double plate machine power sanding machine using driving-type is to paving Road surface afterwards is compacted and is polished, and sanding machine is self-possessed 400 kilograms, is selected the mill of nylon material, is used the mill of nylon material Disk road pavement is compacted and polishes, and the mill of nylon material has the advantages that be not easy adhesion, and the mill of metal material being compacted and Metal polishing scratch can be remained on the road surface after polishing during polishing, form the polishing scratch with metallic luster, shadow on road surface Overall image is rung, and the easy adhesive with the mixture not being fully cured of mill of metal material is sticked together, and is compacted So that the compactness of mixture reaches 99%.Flatness reaches 95%.
S6, after the mixture after paving is fully cured, anti-skidding place is carried out to the road surface after compacting using grinding machine Reason, grinding machine use abrasive disk, improve the coefficient of friction on road surface, enhance the antiskid effect on road surface, and safety is higher, It is not easy to slip.
Embodiment 4:
A kind of polyurethane broken stone water permeability pavement construction method, includes the following steps:
S1, metaling and polyurethane adhesive are prepared, wherein the ballast grain sizes selected are 3mm-5mm (specific ballast grain sizes It can be its within the scope of 3mm, 3.25mm, 3.5mm, 3.75mm, 4mm, 4.25mm, 4.5mm, 4.75mm, 5mm or 3mm-5mm His partial size) all can, dust content account for the griotte below of total weight 0.4 ‰ because the ballast grain sizes that can be bought on the market be by Particle size range classification, be not by grain size grading, it is impossible to buy the rubble that partial size is entirely 3mm or 5mm, what is bought is exactly One particle size range, and it is suitable for the present embodiment in this particle size range, therefore in embodiment not with specific partial size Numerical value is defined.
Live drying is carried out to rubble before proportion stirring, it is high to carry out drying degree of making it dry to rubble, has used The rubble of white drying has great promotion to the quality on road surface after molding, because mixture has moisture content in the curing process Words, will lead to pavement cracking, fragmentation, and the moisture content avoided in mixture influences pavement quality, in the present embodiment, mixed in proportion It polishes before conjunction rubble, polyurethane adhesive divides A using common xanthochromia glue or color inhibition glue, polyurethane adhesive Component and B component, component A and B component (Elastopave C 6551/202 C-A and Elastopave in common xanthochromia glue 6551 C-B of C) mass ratio be 100:65, component A and B component (6550/100 C- of Elastopave C in color inhibition glue The mass ratio of A and 6550/100 C-B of Elastopave C) is 40:100.).In the present embodiment, using color inhibition glue. Mixing time is 45S, and it is 25min that setting time is stood after stirring, and selecting partial size is the rubble of 3mm-5mm, and water permeability is stronger, Simultaneously convenient for metaling and the mixing of polyurethane adhesive and paving for mixture, the dosage of each polyurethane adhesive It controls within 15kg, is weighed with the electronics Libra for being accurate to 0.01g, load weighted B component is first poured into dried and clean by when mixing Container in, then suitable component A is poured into after container and is sufficiently stirred with stirring electric drill;Forbid not matched to scale Material.
S2, the metaling and polyurethane adhesive that prepare in step S1 are matched, stirred, preparing mixture;Gluing Agent dosage accounts for the 4% of metaling quality, and using mechanical stirring, mixing time 3min, to guarantee construction quality, scene sets special messenger It is responsible for material proportion to weigh, the weight error of polyurethane adhesive controls in 1%, and the weight error of metaling is controlled 2% Interior, the dosage of adhesive is matched according to crushed stone specification in mixture, and when pavement construction is more convenient, while can control glue The dosage of stick, the pavement quality mated formation is more stable, more evenly.
S3, the mixture prepared in step S2 is transported at pavement construction using means of transport;
S4, by mixture laying in the base completed in advance, manually uniformly pave, find flatness and drainage grade accurately, mix The paving thickness for closing material is calculated according to coefficient of loose laying for 1.1, and the transverse slope of base is 2%;Ensure edge intact material when construction The calculating of phenomenon, coefficient of loose laying K is as follows: base with a thickness of h1, paved mixture measures loose laying depth h2 later, finally measures Thickness h 3 after compacting, then coefficient of loose laying K=(h2-h1)/(h3-h1).
S5, before the mixture after paving is fully cured, double plate machine power sanding machine using driving-type is to paving Road surface afterwards is compacted and is polished, and sanding machine is self-possessed 800 kilograms, is selected the mill of nylon material, is used the mill of nylon material Disk road pavement is compacted and polishes, and the mill of nylon material has the advantages that be not easy adhesion, and the mill of metal material being compacted and Metal polishing scratch can be remained on the road surface after polishing during polishing, form the polishing scratch with metallic luster, shadow on road surface Overall image is rung, and the easy adhesive with the mixture not being fully cured of mill of metal material is sticked together, and is compacted So that the compactness of mixture reaches 99%.Flatness reaches 95%.
S6, after the mixture after paving is fully cured, anti-skidding place is carried out to the road surface after compacting using grinding machine Reason, grinding machine use abrasive disk, improve the coefficient of friction on road surface, enhance the antiskid effect on road surface, and safety is higher, It is not easy to slip.
In the present embodiment, the rubble of selection have passed through polishing, polish rubble, and the rubble of irregular shape is beaten Wear into the higher rubble of round and smooth degree, the road surface laid out is more neat, beautiful, but the rubble after polishing is led since shape is round and smooth Causing the frictional force on road surface has certain reduction, while while constructing is not very convenient.
The basic principles, main features and advantages of the invention have been shown and described above.The technical staff of the industry should Understand, the present invention is not limited to the above embodiments, and the above embodiments and description only describe originals of the invention Reason, without departing from the spirit and scope of the present invention, various changes and improvements may be made to the invention, these changes and improvements It all fall within the protetion scope of the claimed invention.

Claims (8)

1. a kind of polyurethane broken stone water permeability pavement construction method, which comprises the following steps:
S1, rubble and adhesive are carried out to prepare mixture with when stirring;
S2, the mixture prepared in step S1 is paved, forms road surface;
S3, before the mixture after paving is fully cured, road pavement is compacted and is polished;
S4, after mixture is fully cured, road pavement carries out anti-skidding processing.
2. polyurethane broken stone water permeability pavement construction method according to claim 1, which is characterized in that the step S1 it Before, it is further comprising the steps of:
Selection partial size is 3mm-5mm, dust content accounts for the rubble below of total weight 0.4 ‰.
3. polyurethane broken stone water permeability pavement construction method according to claim 1, which is characterized in that the step S1 it Before, it is further comprising the steps of:
Selection partial size is 4mm-6mm, dust content accounts for the rubble below of total weight 0.4 ‰.
4. polyurethane broken stone water permeability pavement construction method according to claim 1, which is characterized in that the step S1 it Before, it is further comprising the steps of:
Rubble is dried.
5. polyurethane broken stone water permeability pavement construction method according to claim 1, which is characterized in that the step S1 it Before, it is further comprising the steps of:
It polishes rubble.
6. polyurethane broken stone water permeability pavement construction method according to claim 1, which is characterized in that in the step S1, The dosage of adhesive accounts for the 2.8%-6.6% of metaling quality.
7. polyurethane broken stone water permeability pavement construction method according to claim 1, which is characterized in that in the step S3, It is further comprising the steps of:
It is compacted and polishes using the mill road pavement of nylon material.
8. polyurethane broken stone water permeability pavement construction method according to claim 1, which is characterized in that in the step S4, It is further comprising the steps of:
Polishing is carried out except glue using abrasive disk road pavement.
CN201910473451.XA 2019-05-31 2019-05-31 A kind of polyurethane broken stone water permeability pavement construction method Pending CN110158395A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910473451.XA CN110158395A (en) 2019-05-31 2019-05-31 A kind of polyurethane broken stone water permeability pavement construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910473451.XA CN110158395A (en) 2019-05-31 2019-05-31 A kind of polyurethane broken stone water permeability pavement construction method

Publications (1)

Publication Number Publication Date
CN110158395A true CN110158395A (en) 2019-08-23

Family

ID=67630777

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910473451.XA Pending CN110158395A (en) 2019-05-31 2019-05-31 A kind of polyurethane broken stone water permeability pavement construction method

Country Status (1)

Country Link
CN (1) CN110158395A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114960333A (en) * 2021-02-26 2022-08-30 南亚塑胶工业股份有限公司 Method for laying road surface and polyurethane road surface coating

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001241005A (en) * 2000-03-01 2001-09-04 Toray Ind Inc Resin pavement material, resin pavement method, surface treatment method for asphalt pavement, and civil engineering and construction material
JP2013147888A (en) * 2012-01-20 2013-08-01 Watanabe Sato Co Ltd Freeze-suppressing pavement and construction method thereof
CN105777179A (en) * 2016-02-03 2016-07-20 招商局重庆交通科研设计院有限公司 Macroporous polyurethane macadam mixture and manufacturing method thereof
CN107406614A (en) * 2015-03-13 2017-11-28 巴斯夫欧洲公司 The method for preparing the particle foam based on thermoplastic elastomer (TPE) is thermally bonded using microwave
CN107428984A (en) * 2015-03-13 2017-12-01 巴斯夫欧洲公司 Conductive particle foam based on thermoplastic elastomer (TPE)

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001241005A (en) * 2000-03-01 2001-09-04 Toray Ind Inc Resin pavement material, resin pavement method, surface treatment method for asphalt pavement, and civil engineering and construction material
JP2013147888A (en) * 2012-01-20 2013-08-01 Watanabe Sato Co Ltd Freeze-suppressing pavement and construction method thereof
CN107406614A (en) * 2015-03-13 2017-11-28 巴斯夫欧洲公司 The method for preparing the particle foam based on thermoplastic elastomer (TPE) is thermally bonded using microwave
CN107428984A (en) * 2015-03-13 2017-12-01 巴斯夫欧洲公司 Conductive particle foam based on thermoplastic elastomer (TPE)
CN105777179A (en) * 2016-02-03 2016-07-20 招商局重庆交通科研设计院有限公司 Macroporous polyurethane macadam mixture and manufacturing method thereof

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
徐周聪等: "《聚氨酯碎石混合料透水路面施工工艺与质量控制》", 《公路交通技术》 *
无: "《易耐透透水道路施工工艺》", 《HTTPS://WENKU.BAIDU.COM/VIEW/16C47E2358FB770BF78A5597.HTML》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114960333A (en) * 2021-02-26 2022-08-30 南亚塑胶工业股份有限公司 Method for laying road surface and polyurethane road surface coating

Similar Documents

Publication Publication Date Title
KR100689183B1 (en) Method for preparing water penetrating concrete block, and water penetrating concrete block prepared thereby
CN107226648B (en) Diamond dust tailing composite sand-based ecological water permeable brick and preparation method thereof
CN105801050A (en) Dual-layered iron tailing sand-based water permeable brick and preparation method thereof
CN201080587Y (en) High loading water-permeable concrete floor
US20060201396A1 (en) Dry tinted cement mixture
CN105777179A (en) Macroporous polyurethane macadam mixture and manufacturing method thereof
CN105541373A (en) High-strength and permeable concrete brick
CN106431145B (en) cement stable macadam mixture design method
CN101016713A (en) Color pavement formed by spraying on porous polymer concrete facing and construction method therefor
CN110158395A (en) A kind of polyurethane broken stone water permeability pavement construction method
KR100950058B1 (en) Block to have artificial-granite surface layer and manufacture method thereof
KR20030047938A (en) Paving Method For High Elasticity Road
CN113754461B (en) Composite construction recycled aggregate sintering brick that permeates water
CN210194383U (en) Road surface structure of colored runway
KR100243568B1 (en) A method for preparing water-permeable pavement with a thin and permeable top layer
CN214169786U (en) Terrazzo floor used in shopping center
CN115233933A (en) Color sand grinding stone terrace material and construction process thereof
KR102266604B1 (en) High Performance Asphalt Mixture
KR0134989B1 (en) Paving method for water permeable concrete with granule type aggregate
CN116046538A (en) Performance test method of pavement material
KR200385757Y1 (en) A new epoxy resin pavement system and porous solid tile using basaltic screenings
KR101032041B1 (en) Road paving materials using bottom ash
CN217556596U (en) Novel epoxy Tao Jingjing color permeable pavement system
CN114753206A (en) Colored ceramic particle pavement construction method
KR101007065B1 (en) Construction method of elastic pedestrian passage

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190823