CN110145091A - A kind of method for paving on floor - Google Patents
A kind of method for paving on floor Download PDFInfo
- Publication number
- CN110145091A CN110145091A CN201910482769.4A CN201910482769A CN110145091A CN 110145091 A CN110145091 A CN 110145091A CN 201910482769 A CN201910482769 A CN 201910482769A CN 110145091 A CN110145091 A CN 110145091A
- Authority
- CN
- China
- Prior art keywords
- floor
- floorboard
- row
- paving
- fastener
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F15/00—Flooring
- E04F15/02—Flooring or floor layers composed of a number of similar elements
- E04F15/02038—Flooring or floor layers composed of a number of similar elements characterised by tongue and groove connections between neighbouring flooring elements
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Floor Finish (AREA)
Abstract
The invention discloses a kind of method for paving on floor, belong to floor mounting technique field, it specifically includes and checks ground, the splicing that is laid with ground cushion and floorboard, it is wherein that fixation is attached by plastic rubber lock catch between floorboard, two pieces of adjacent floors alignment that needs to be staggered fits together, and then break away floorboard therein, passes through the position-limiting action of plastic rubber lock catch, their assembly can be got up, wherein floorboard and last floorboard need to carry out specially treated.The method for paving is simple to operation, and the time of mating formation is obviously shortened, and saves a large amount of human cost and time cost.
Description
Technical field
The present invention relates to technical field of floor, and in particular to a kind of method for paving on floor.
Background technique
Conventional wooden floor, fiber gluing splicing floors are all in the surrounding on floor and bottom by being machined into wooden tenon
Earth plate, wooden planar ground, wooden locking flooring and flush ground with the wooden joggle felder of aluminium wire and gummed paper or glue net
Plate, wood floors, the fiber plywood floor of this method processing not only waste timber, but also the mechanical equipment investment processed is big,
It is required that mechanical precision is high, and the bottom plate precision processed is not high, point for being assemblied with batch of floor, be easy to appear difference of height,
Length, the size of width are poor.Additionally due to drying shrinkage bulking, floor backing layer difference of height, tenon that the inherent characteristic of floor base material generates
Slot cooperates the reasons such as deviation, ground line gradient and flatness, easily cause floor junction tongue-and-groove and joint tongue friction or extruding and
Sound is issued, daily life is affected.In addition, the installation on routine floor at present usually requires professional and spreads
Dress, cost of labor is higher, and some floors need to beat keel, need to expend a large amount of auxiliary material, and the clear height that will reduce house.
Summary of the invention
In order to overcome the above technical defects, the present invention provides a kind of method for paving on floor, which utilizes lock
The connection between the plastic rubber lock catch realization floorboard around floor is detained, method for paving is simple and fast, it is only necessary to which simple tool is just
Fast Installation can be achieved, save a large amount of human cost and time cost.
In order to reach above-mentioned technical effect, the present invention adopts the following technical scheme:
A kind of method for paving on floor, floor is spliced by the floorboard with plastic rubber lock catch, between adjacent floorboard
It is connected by plastic rubber lock catch, specific method for paving includes the following steps: that (1) carries out the paving on first row floor close to wall side
Dress removes lock by the long side and cross-peen tongue-and-groove of wall, and second piece of floor cross-peen of first row should be inserted into first with 0~30 ° of angle
The tongue-and-groove on block floor simultaneously pushes inward, and in place, other floors of first row are successively spelled in the method for confirmation cross-peen tongue and groove fit
It connects;(2) long side first button is close with second button of first row long side when second row floor is installed, and is inserted into 0~45 ° of angle
Blank space between first row floor long side tongue-and-groove two is detained makes itself and first row floor by flat and flat-pushing forward, then by percussion cross-peen
It fastens completely;Other floors of second row are successively spliced in the method, until second from the bottom piece of floor splicing of second row is complete
At;(3) floor long side after size is cut, is inserted into front row with 0~30 ° of angle by the installation of the last floorboard of second row
In the tongue-and-groove of floor stealth, the spacing of the reserved lock of cross-peen, long side presses downwards simultaneously, keeps its smooth, finally tap cross-peen, make it
It is completely steady to close;(4) installation on remaining floor is sequentially completed according to the method for step (2) and (3);(5) last row floor of long side
Installation, after floor is cut according to remaining floor measurements, it is hidden that front-seat floor with 0~30 ° of angle is inserted into long side floor
In the tongue-and-groove of shape, make lock is completely steady to close.
Further technical solution is the structure of the floorboard with plastic rubber lock catch specifically: including plate body and packet
It is wrapped in the plastic cement frame on the periphery of plate body, the plastic cement frame is equipped with multiple groups limit connector, and adjacent two boards body passes through
Corresponding limit connector cooperates and is positioned on the plastic cement frame on the periphery of plate body, and the plastic cement frame includes bottom frame
Be arranged on the inside of the bottom frame and with the integrally formed side frame of bottom frame, limit connector described in each group includes adjacent first
Fastener and the second fastener, first fastener are protruded from the side plate of side frame, and the first fastener is connected with the bottom surface of bottom frame, and described the
The bottom surface of two fasteners from the bottom frame is downwardly protrude to form, and the first fastener of side frame two sides and the dislocation arrangement of the second fastener.
Further technical solution is, the length of the floorboard is the integral multiple of width, on the floorboard cross-peen
The number at least two of plastic rubber lock catch, the number of the plastic rubber lock catch in floorboard long side are the number of the plastic rubber lock catch on cross-peen
Integral multiple, and the distance between adjacent lock on the cross-peen of the distance between adjacent lock is identical in long side.
When the length of floorboard be width integral multiple and long side on the number that latches be the whole of the number latched on cross-peen
When several times, the connecting method on the floor is then not limited to the successively splicing between conventional long side and long side, can be by short side and length
While being spliced, the splicing of different pattern is realized by multiple combinations mode, realizes the freedom and diversity of Floor Covering.
Further technical solution is that timber wedge is placed between first row floor and wall side, second row and remaining row floor
Cross-peen and wall side between do not need place timber wedge.
The movement that timber wedge is floor location in installation process in order to prevent is placed between first row floor and wall side, is played solid
The effect of initial position is determined, to guarantee floorboard and reserve certain expansion joint between the walls, when first row Floor Covering is good
Afterwards, second row floor is when mating formation, and since plastic rubber lock catch has position-limiting action, therefore, there is no need in second row and remaining row
Cross-peen and wall side between place timber wedge, can directly carry out assembly, embody convenience of the floor when mating formation.
Further technical solution is that the first row floor needs to check ground before mating formation, specially to be laid
Ground carries out moisture and flat conditions inspection, and for the moisture content on ground less than 10%, irregularity degree is less than 3mm/2m.
If ground moisture content is higher than 10%, the steam of earth's surface can be evaporated as temperature increases, and steam diffuses up, can
Floor can be penetrated into, therefore damp-proof layer construction should be carried out or dehumidifying measure is taken to make to mat formation again after ground moisture content is qualified.
Further technical solution is that ground cushion of mating formation, the length and width of ground cushion are needed before the first row Floor Covering
Greater than the length and width on be laid with ground, ground cushion includes punching foaming base-material elasticity IXPE film and PE waterproof membrane double-layer structure,
The ground cushion need to be higher than 50~80mm of wall side.
Further technical solution is, the big 8cm or more of width ratio IXPE film width of the PE film and above and below IXPE film
Each attached one layer of formation bilayer PE film.
Be laid with ground cushion on floor and between floor and ground, can be formed between the two a good buffer strip be isolated
Layer, therefore have the characteristics that sound insulation, moisture-proof, insect prevention, comfortable foot feeling.Wherein IXPE film thickness >=2.0mm, width >=100cm, PE
Film thickness >=0.04mm, width >=108cm, PE film must be than IXPE film width >=8cm and in IXPE film each attached one layer of (shape up and down
At the double-deck PE film) attached double faced adhesive tape at PE film short side, the lap-joint between ground cushion is attached by bonding.
Mat formation ground cushion when, will with double-sided adhesive one upwardly carry out ground cushion mat formation, wall side must be rolled when mating formation, height
It for 50~80mm, wants smooth between film and film and docks, cannot be overlapped, joint upper layer and lower layer film separates, and joint is placed on two
Between tunic, surface is glued with double-sided adhesive or is glued with adhesive tape, if there is breakage to glue using adhesive tape.
Further technical solution is that the floorboard of each row is cut, and the method cut is two
/ mono- method or 246 eight treating observances.
Further technical solution is that the half trimming processes are to carry out cutting at the half of floorboard
To two blocks of identical half plates, two and half plates can be used as floorboard progress opposite joint and mat formation.
Further technical solution is, 2468 trimming processes be respectively at the half on floor and four/
It is cut at one, obtains the floorboard of 1/4,1/2,3/4 and 4/4 4 kind of length, successively made the floorboard of these four length
Mat formation for floorboard, opposite joint is to be aligned every four rows, and seam is integrally stepped.
Further technical solution is that small range examination paving is carried out before step (1) Floor Covering, to guarantee floor installation
Pattern proportion, and determine floor trend.
Its pilot scale paving is specially to remove floor to pack, and checks difference in appearance after laying flat certain area.
Further technical solution is that the cut surface of the floorboard carries out sealing wax processing.
Wherein the raw material of sealing wax is sealing wax material commonly used in the art, and effect is closed to cut surface, exclusion of water
Divide intrusion.
Further technical solution is that the expansion joint 18~25mm is reserved between the floorboard and room surroundings wall.
Compared with prior art, the invention has the following beneficial effects: the method for paving is simple to operation, it is only necessary to simple
Tool can be completed, it might even be possible to do not need profession installation personnel, can be installed by consumer oneself, and due to this
Floor is the connection that adjacent floor is realized by plastic rubber lock catch, and therefore, which, can be with during installation without point of left and right directions
It realizes any spelling, enriches the diversity and freedom of Floor Covering shape, and mat formation time and conventional floor are mated formation the time
Compared to being obviously shortened, a large amount of cost of labor and time cost have been saved, installation keel are not furthermore needed when the Floor Covering, it can
To reduce the layer height loss in room, increase interior net storey height.
Detailed description of the invention
Fig. 1 is the front partial schematic diagram on floor of the present invention;
Fig. 2 is the section structure diagram of Fig. 1;
Fig. 3 is the backside structure figure of Fig. 1;
Fig. 4 is floor splicing structure schematic diagram of the present invention;
Fig. 5 is the scheme of installation on first row floor of the present invention;
Fig. 6 is another scheme of installation on first row floor of the present invention;
Fig. 7 is the schematic diagram shown in fig. 6 mutually spelled with angle;
Fig. 8 is the scheme of installation on secondary series floor of the present invention;
Fig. 9 is the scheme of installation of the last floorboard in secondary series floor of the present invention;
Figure 10 is the schematic diagram that the present invention is cut using one-half method;
Figure 11 is the effect picture that the present invention is mated formation using half trimming processes;
Figure 12 is the schematic diagram 1 that the present invention is cut using 246 eight treating observances;
Figure 13 is the schematic diagram 2 that the present invention is cut using 246 eight treating observances;
Figure 14 is the effect picture that the present invention is mated formation using 2468 trimming processes;
Figure 15 is the schematic diagram of the first flooring mode of the invention;
Figure 16 is the schematic diagram of second of flooring mode of the invention;
Figure 17 is the schematic diagram of the third flooring mode of the invention;
Figure 18 is the effect picture 1 that floor of the present invention is arbitrarily spelled;
Figure 19 is the effect picture 2 that floor of the present invention is arbitrarily spelled;
Figure 20 is the effect picture 3 that floor of the present invention is arbitrarily spelled;
Figure 21 is the effect picture 4 that floor of the present invention is arbitrarily spelled;
Marked in the figure: 1- plate body, 11- dash board, 12- backboard, 100- floorboard, 2- plastic cement frame, 21- bottom frame, 22-
Side frame, the second piece of floor 200-, the first side plate of 221-, the second side plate of 222-, 223- third side plate, the 4th side plate of 224-, 3- limit
Position connector, the first fastener of 31-, the second fastener of 32-, the second limiting slot of 33-, the first limiting slot of 34-, the first buckling parts of 310-.
Specific embodiment
The present invention will be further described with reference to the examples below, and described embodiment is only present invention a part
Embodiment is not whole embodiment.Based on the embodiments of the present invention, those skilled in the art are not making
Other embodiments used obtained, belong to protection scope of the present invention under the premise of creative work.
Embodiment 1
As shown in Figure 1 to 4, the structure on the floor specifically: the plastic cement side including plate body 1 He the periphery for being wrapped in plate body
Frame 2, the plastic cement frame are equipped with multiple groups limit connector 3, the plastic cement frame 2 that adjacent two boards body passes through the periphery of plate body
Upper corresponding limit connector 3 cooperates and is positioned, and the plastic cement frame 2 includes bottom frame 21 and is arranged in the bottom frame
On the inside of 21 and with the integrally formed side frame 22 of bottom frame 21, limit connector 3 described in each group includes adjacent 31 He of the first fastener
Second fastener 32, first fastener 31 is protruded from the side plate of side frame 22, and the first fastener 31 is connected with the bottom surface of bottom frame 21, institute
The bottom surface for stating the second fastener 32 from the bottom frame 21 is downwardly protrude to form, and the first fastener 31 and the second fastener of 22 two sides of side frame
32 dislocation arrangements.
Side frame 22 includes the first side plate 221, the second side plate 222, third side plate 223 and the 4th side plate 224, in transverse direction
Upper (i.e. in the X-direction of Fig. 3), the first fastener 31 of 22 two sides of side frame and the dislocation arrangement of the second fastener 32, i.e. the first side plate 221
First fastener 31 in outside is corresponding with second fastener 32 in 223 outside of third side plate, second fastener 32 in 221 outside of the first side plate
It is corresponding with first fastener 31 in 223 outside of third side plate;In a longitudinal direction (i.e. in the Y direction of Fig. 3), 22 two sides of side frame
First fastener 31 and the dislocation arrangement of the second fastener 32, i.e. 224 outside of the first fastener 31 and the 4th side plate in 222 outside of the second side plate
The second fastener 32 it is corresponding, second fastener 32 in 222 outside of the second side plate and the first fastener 31 on the outside of the 4th side plate 224 are right
It answers, in this application, when " correspondence " refers to being spliced on two pieces of floors, 221 outside of the first side plate of floorboard 100
The first buckling parts 310 and second fastener 32 in the outside of third side plate 223 on second piece of floor 200 be mutually interlocked, first piece of ground
The first of 223 outside of third side plate of second fastener 32 and second piece of floor 200 in 221 outside of the first side plate of plate 100 fastens
Portion 310 is mutually interlocked.
Wherein, the first fastener 31 in one group of limit connector 3 and the second fastener 32 in adjacent one group of limit connector 3
The distance between be greater than the first fastener 31 length.By the way that the first fastener 31 of 22 two sides of side frame and the dislocation of the second fastener 32 are arranged
Cloth, so that the first fastener 31 and the second fastener 32 between two pieces of adjacent floors fasten each other, as long as by phase when installation
The alignment that is staggered of first fastener 31 and the second fastener 32 on two pieces of adjacent floors fits together, and then break away one piece of ground therein
Their assembly can be got up by the position-limiting action between the first fastener 31 and the second fastener 32, prevent them from moving by plate
Position, installation process very simple can reuse, and the limit connector on floor further improves installation regardless of left and right
Efficiency reduces installation difficulty.
The upper surface of the protrusion part of first fastener 31 is provided with the first buckling parts 310 protruding upward, and described
The cross section of one buckling parts 310 is semicircle or square bar blocks, and is provided with chamfering at the both ends of bar blocks.First
The both ends of buckling parts 310 are provided with chamfering convenient for mutually fastening in assembly.The side wall of first buckling parts 310 and bottom frame 21
Between form the first limiting slot 34, form the second limiting slot 33 between second fastener 32 and the side wall of side frame 22, described
The cross section of two fasteners 32 is semicircle or square bar blocks, and is provided with chamfering at the both ends of bar blocks.Second button
The both ends of part 32 are provided with chamfering convenient for mutually fastening in assembly.The first buckling parts 310 slides into therewith mutually assembledly when splicing
The second limiting slot 33 and the second fastener 32 of plate slide into therewith cooperation positioning in first limiting slot 34 on the mutually floor of assembly.At this
In embodiment, two pieces of floors 180 ° are overturn, when actual installation, the upper surface on floor is installed upward.By two pieces of floors
When alignment splicing, the first buckling parts 310 (invisible in Fig. 4) of the first fastener 31 of floorboard 100 is fastened on second piece
In second limiting slot 33 (invisible in Fig. 4) on floor 200, the button (invisible in Fig. 4) of the second fastener 32 of floorboard 100
It closes in first limiting slot 34 (in Fig. 4 invisible) on second piece of floor 200;The of first fastener 31 on second piece of floor 200
One buckling parts 310 (invisible in Fig. 4) is fastened in the second limiting slot 33 (invisible in Fig. 4) of floorboard 100, and second
The first limiting slot 34 that second fastener 32 (invisible in Fig. 6) on block floor 200 is fastened on floorboard 100 (can not in Fig. 4
See) in.Pass through the limit of the first buckling parts 310 and the second limiting slot 33 and the second fastener 32 and the first limiting slot 34 to each other
Effect, so that the relative position between floorboard 100 and second piece of floor 200 is fixed, and simple installation, it can be secondary
It utilizes.
The specific method for paving in the floor the following steps are included:
(1) it checks ground, moisture and flat conditions inspection is carried out to ground to be laid, it is desirable that the moisture content on ground is less than
10%, irregularity degree is less than 3mm/2m;
(2) be laid with ground cushion, ground cushion be laid on the ground, the length and width of ground cushion be greater than the length on be laid with ground with
Width;Ground cushion includes punching foaming base-material elasticity IXPE film and PE waterproof membrane double-layer structure, the ground cushion need to be higher than wall side 50~
80mm.The big 8cm or more of width ratio IXPE film width of the PE film and in IXPE film each attached one layer of formation bilayer PE film up and down.
Be laid with ground cushion on floor and between floor and ground, can be formed between the two a good buffer strip be isolated
Layer, therefore have the characteristics that sound insulation, moisture-proof, insect prevention, comfortable foot feeling.Wherein IXPE film thickness >=2.0mm, width >=100cm, PE
Film thickness >=0.04mm, width >=108cm, PE film must be than IXPE film width >=8cm and in IXPE film each attached one layer of (shape up and down
At the double-deck PE film) attached double faced adhesive tape at PE film short side, the lap-joint between ground cushion is attached by bonding.
Mat formation ground cushion when, will with double-sided adhesive one upwardly carry out ground cushion mat formation, wall side must be rolled when mating formation, height
It for 50~80mm, wants smooth between film and film and docks, cannot be overlapped, joint upper layer and lower layer film separates, and joint is placed on two
Between tunic, surface is glued with double-sided adhesive or is glued with adhesive tape, if there is breakage to glue using adhesive tape.
(3) selection floor first carries out small range examination paving, determines the consistent of floor pattern in the laying direction in room and starting point
Property, and determine floor trend, to reach optimal mat formation effect and aesthetics;
(4) as shown in Figure 5 and Figure 6, after the direction and the starting point that determine laying, start to carry out first row floor close to wall side
Mat formation, need to place timber wedge between first row floor and wall side, remove plastic rubber lock catch by the long side and cross-peen tongue-and-groove of wall, the
One, which arranges the 2nd piece of floor cross-peen, should be inserted into the tongue-and-groove of floorboard and be pushed inward with 0~30 ° of angle, and confirmation cross-peen tongue-and-groove is matched
It closes in place, other floors of first row is successively spliced in the method;It is that second piece of floor cross-peen tilts 30 ° shown in Fig. 7
It is inserted into the schematic diagram of the position of the tongue-and-groove of floorboard;
(5) as shown in figure 8, long side first button is close with second button of first row long side when second row floor is installed, with 0
Blank space between~45 ° of angle insertion first row floor long side tongue-and-groove two is detained by flat and flat-pushing forward, then makes it with first row
Plate fastens completely;Other floors of second row are successively spliced in the method, until second from the bottom piece of floor splicing of second row
It completes;
(6) as shown in figure 9, the installation of the last floorboard of second row, after size is cut, by floor long side with 0~30 °
Angle be inserted into the tongue-and-groove of front-seat floor stealth, the reserved spacing latched of cross-peen, long side is pressed downwards simultaneously, keeps its smooth, most
After tap cross-peen, close its completely steady;
(7) installation on remaining floor is sequentially completed according to the method for step (5) and (6);
(8) long side last row floor installation, after floor is cut according to remaining floor measurements, by long side floor with
0~30 ° of angle is inserted into the tongue-and-groove of front-seat floor stealth, makes lock is completely steady to close.
In above steps, the cut surface of all floorboards carries out sealing wax, the floorboard and room four of all close walls
Week reserves the expansion joint 18~25mm between the walls.
Embodiment 2
Mated formation when floor is installed using fissure of displacement method, floorboard is cut, and the length on floor is in the present embodiment
915mm, long side have 8 locks, and cross-peen has 2 locks, and both ends latch regardless of male and female groove, can choose not according to the difference in room
Same cuts mode, which cuts there are two types of modes, and one kind is 1/2 (one-half method), and another kind is 2468 (2 46
Eight treating observances).The size cut is the long ratio of pressing board to calculate.
As shown in Figure 10, one-half method be whole plate length half cut half plate of 457mm, two and half plates are equal
It can be used as floorboard, carry out opposite joint and mat formation, half is mated formation i.e. I-shaped paving, and opposite joint is all that interlacing is aligned, it appears whole
Together, symmetrically, and three-dimensional sense is stronger, and the effect after mating formation is as shown in figure 11.
As shown in Figure 12 and Figure 13,246 eight treating observances need to cut two pieces of floors, and one of floor is half-and-half cut
Half plate of 457mm, long side have 4 locks, and both ends can be used as floorboard, mat formation;Another floorboard four/
It is cut at one, is 228,686mm by floor cutter size, long side has 2,6 locks respectively, and both ends can be used as first
Block floor, mats formation, and is gradually used as floorboard according to 2,4,6,8 ratio, and opposite joint is to be aligned every four rows after mating formation, and connects
Seam is whole stepped, and the effect after mating formation is as shown in figure 14.
Embodiment 3
For conventional regular square building structure, there are two types of the positions of starting that can select, the first is such as Figure 15
It is shown, select the length direction close to the side of door to start mating formation for first row floor, the position of starting of floorboard is remote
Then one end from door successively carries out mating formation for vertical and horizontal floor in sequence;Second as shown in figure 16, selects separate
The length direction of the side of door starts mating formation for first row floor, and the position of starting of floorboard is in one end close to door, so
Successively carry out mating formation for vertical and horizontal floor in sequence afterwards.
For irregular building structure, need to select suitably to start according to the actual situation position and direction of mating formation, under
Face is by taking the room shape in Figure 17 as an example, in this structure, can choose intermediate angled place as position of starting, then
Successively mat formation to two sides.
Embodiment 4
When the length of floorboard is the integral multiple of width, and the number of the plastic rubber lock catch in long side is the plastic cement on short side
The long side of the integral multiple of the number of lock, the floor can carry out any splicing with short side, to realize the spelling of various shapes
Pattern is filled, the connecting method between adjacent two floor panels is in the same manner as in Example 1, using length as the 6 of width in the present embodiment
For times, wherein the lock number on short side is 2, and the lock quantity of long side is 12.Figure 18~Figure 21 lists four respectively
Kind long side and short side carry out effect picture obtained from any mutually spelling.Specific connecting method can carry out certainly according to the hobby of user
By playing and select, be not limited to the present embodiment in several connecting methods for enumerating.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all in essence of the invention
Made any modifications, equivalent replacements, and improvements etc., should all be included in the protection scope of the present invention within mind and principle.
Claims (13)
1. a kind of method for paving on floor, which is characterized in that floor is spliced by the floorboard with plastic rubber lock catch, is adjacent to
It is connected between plate by plastic rubber lock catch, specific method for paving includes the following steps: (1) close to wall side with carrying out first row
Plate is mated formation, and removes lock by the long side and cross-peen tongue-and-groove of wall, second piece of floor cross-peen of first row should be inserted with 0~30 ° of angle
Enter the tongue-and-groove of floorboard and push inward, confirms cross-peen tongue and groove fit in place, in the method by other floors of first row
Successively splice;(2) long side first button is close with second button of first row long side when second row floor is installed, with 0~45 ° of angle
Blank space between degree insertion first row floor long side tongue-and-groove two is detained makes itself and first by flat and flat-pushing forward, then by percussion cross-peen
Row floor fastens completely;Other floors of second row are successively spliced in the method, until second from the bottom piece of floor of second row
Splicing is completed;(3) after size is cut, floor long side is inserted with 0~30 ° of angle for the installation of the last floorboard of second row
In the tongue-and-groove for entering front-seat floor stealth, the spacing of the reserved lock of cross-peen, long side is pressed downwards simultaneously, keeps its smooth, is finally tapped horizontal
Head makes its completely steady conjunction;(4) installation on remaining floor is sequentially completed according to the method for step (2) and (3);(5) long side last
Front row after cutting on floor according to remaining floor measurements, is inserted into 0~30 ° of angle in long side floor by the installation for arranging floor
In the tongue-and-groove of floor stealth, make lock is completely steady to close.
2. the method for paving on floor according to claim 1, which is characterized in that the floorboard with plastic rubber lock catch
Structure specifically: the plastic cement frame including plate body He the periphery for being wrapped in plate body, the plastic cement frame are equipped with multiple groups limit and connect
Fitting, corresponding limit connector mutual cooperation is determined on the plastic cement frame that adjacent two boards body passes through the periphery of plate body
Position, the plastic cement frame include bottom frame and setting on the inside of the bottom frame and with the integrally formed side frame of bottom frame, described in each group
Limit connector includes adjacent the first fastener and the second fastener, and first fastener is protruded from the side plate of side frame, and the first button
Part is connected with the bottom surface of bottom frame, and the bottom surface of the second fastener from the bottom frame is downwardly protrude to form, and the first of side frame two sides
Fastener and the dislocation arrangement of the second fastener.
3. the method for paving on floor according to claim 1, which is characterized in that the length of the floorboard is the whole of width
Several times, the number at least two of the plastic rubber lock catch on the floorboard cross-peen, the number of the plastic rubber lock catch in floorboard long side
For the integral multiple of the number of the plastic rubber lock catch on cross-peen, and the distance between adjacent lock is adjacent on the cross-peen in long side
The distance between lock is identical.
4. the method for paving on floor according to claim 1, which is characterized in that be placed between first row floor and wall side
It does not need to place timber wedge between the cross-peen and wall side on timber wedge, second row and remaining row floor.
5. the method for paving on floor according to claim 1, which is characterized in that the first row floor needs before mating formation
It checks ground, moisture and flat conditions inspection specially is carried out to ground to be laid, the moisture content on ground is less than 10%, out-of-flatness
Degree is less than 3mm/2m.
6. the method for paving on floor according to claim 1, which is characterized in that need to spread before the first row Floor Covering
Ground cushion is filled, the length and width of ground cushion is greater than the length and width on be laid with ground, and ground cushion includes punching foaming base-material elasticity
IXPE film and PE waterproof membrane double-layer structure, the ground cushion need to be higher than 50~80mm of wall side.
7. the method for paving on floor according to claim 6, which is characterized in that the width ratio IXPE film width of the PE film
Big 8cm or more and in IXPE film each attached one layer of formation bilayer PE film up and down.
8. the method for paving on floor according to claim 1, which is characterized in that the floorboard of each row needs to carry out
It cuts, the method cut is one-half method or 246 eight treating observances.
9. the method for paving on floor according to claim 8, which is characterized in that the half trimming processes are on floor
It is cut to obtain two blocks of identical half plates at the half of block, two and half plates can be used as first piece of progress opposite joint and mat formation.
10. the method for paving on floor according to claim 8, which is characterized in that 2468 trimming processes are difference
It is cut at the half on floor and at a quarter, obtains the floorboard of 1/4,1/2,3/4 and 4/4 4 kind of length,
Successively the floorboard of these four length is mated formation as floorboard, opposite joint is to be aligned every four rows, and seam is integrally in rank
Scalariform.
11. the method for paving on floor according to claim 1, which is characterized in that carried out before step (1) Floor Covering small
Range examination paving to guarantee the pattern proportion of floor installation, and determines floor trend.
12. the method for paving on floor according to claim 1, which is characterized in that the cut surface of the floorboard is sealed
Lasaxing Oilfield.
13. the method for paving on floor according to claim 1, which is characterized in that the floorboard and room surroundings wall
Between reserve the expansion joint 18~25mm.
Priority Applications (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910482769.4A CN110145091A (en) | 2019-06-04 | 2019-06-04 | A kind of method for paving on floor |
CN201910865548.5A CN111005523A (en) | 2019-06-04 | 2019-09-12 | Paving method of floor |
PCT/CN2019/106373 WO2020244092A1 (en) | 2019-06-04 | 2019-09-18 | Floorboard laying method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910482769.4A CN110145091A (en) | 2019-06-04 | 2019-06-04 | A kind of method for paving on floor |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110145091A true CN110145091A (en) | 2019-08-20 |
Family
ID=67590566
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910482769.4A Withdrawn CN110145091A (en) | 2019-06-04 | 2019-06-04 | A kind of method for paving on floor |
CN201910865548.5A Pending CN111005523A (en) | 2019-06-04 | 2019-09-12 | Paving method of floor |
Family Applications After (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910865548.5A Pending CN111005523A (en) | 2019-06-04 | 2019-09-12 | Paving method of floor |
Country Status (2)
Country | Link |
---|---|
CN (2) | CN110145091A (en) |
WO (1) | WO2020244092A1 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2020244092A1 (en) * | 2019-06-04 | 2020-12-10 | 安徽扬子地板股份有限公司 | Floorboard laying method |
CN113235862A (en) * | 2021-05-31 | 2021-08-10 | 浙江奕科新材料股份有限公司 | Plastic floor easy to decontaminate and processing method thereof |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114961162A (en) * | 2021-02-24 | 2022-08-30 | 广东博智林机器人有限公司 | Floor installation method |
Family Cites Families (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3018325B2 (en) * | 1995-05-08 | 2000-03-13 | 株式会社エービーシー商会 | Construction method of deck panel floor |
CN101280620B (en) * | 2008-03-28 | 2010-06-02 | 罗生权 | Floor plastic rubber lock catch convenient for connecting and positioning |
KR101117681B1 (en) * | 2009-04-09 | 2012-02-29 | 엔보디자인 주식회사 | Prefabricated Flooring Materials |
CN102108778A (en) * | 2009-12-29 | 2011-06-29 | 卡尔玛地板(苏州)有限公司 | Plastic lock catch used for assembling floor board |
CN201671035U (en) * | 2010-06-02 | 2010-12-15 | 马准安 | Quick-drain opened grid floor |
CN117661809A (en) * | 2015-07-06 | 2024-03-08 | 塔吉特Gdl公司 | Chiral flexible rectangular floor covering element |
CN104989110B (en) * | 2015-07-22 | 2017-03-01 | 兰强 | A kind of installation method of electric heating floor |
CN205348664U (en) * | 2015-12-17 | 2016-06-29 | 薛小民 | A ground plate for forming floor have a hasp connection structure |
CN106906981A (en) * | 2017-04-12 | 2017-06-30 | 福州亿利达木业有限公司 | Can the diversified framework Wooden decoration board for splicing |
CN206903139U (en) * | 2017-07-13 | 2018-01-19 | 安徽扬子地板股份有限公司 | Water-proof floor |
CN207314744U (en) * | 2017-10-25 | 2018-05-04 | 安徽扬子地板股份有限公司 | A kind of Double-layer wood composite floor simply installed |
CN208088767U (en) * | 2018-02-28 | 2018-11-13 | 安徽扬子地板股份有限公司 | Plastic packaging floor |
CN110145091A (en) * | 2019-06-04 | 2019-08-20 | 安徽扬子地板股份有限公司 | A kind of method for paving on floor |
-
2019
- 2019-06-04 CN CN201910482769.4A patent/CN110145091A/en not_active Withdrawn
- 2019-09-12 CN CN201910865548.5A patent/CN111005523A/en active Pending
- 2019-09-18 WO PCT/CN2019/106373 patent/WO2020244092A1/en active Application Filing
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2020244092A1 (en) * | 2019-06-04 | 2020-12-10 | 安徽扬子地板股份有限公司 | Floorboard laying method |
CN113235862A (en) * | 2021-05-31 | 2021-08-10 | 浙江奕科新材料股份有限公司 | Plastic floor easy to decontaminate and processing method thereof |
Also Published As
Publication number | Publication date |
---|---|
WO2020244092A1 (en) | 2020-12-10 |
CN111005523A (en) | 2020-04-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US10612249B2 (en) | Floor panel for forming a floor covering, floor covering formed from such floor panels and method for manufacturing such floor panels | |
CN110145091A (en) | A kind of method for paving on floor | |
CN100334309C (en) | System used for connecting building boards | |
KR100935067B1 (en) | Flooring material, manufacturing and arrangement method | |
AU661295B2 (en) | Building element | |
US3619964A (en) | Flooring panels | |
KR102083655B1 (en) | Mechanical locking system for floor panels | |
JPH07300979A (en) | Floor material | |
RU2021124548A (en) | FLOOR PANEL FOR FLOORING | |
EP3239423A1 (en) | Fire resistant construction panel element system | |
EP0236283A2 (en) | A manufactured product for flooring, made up of wood elements having fibre pattern orthogonal to the viewable face and assembled with a plywood support | |
CA2628801A1 (en) | Panelling system primarily for decking | |
GB2136471A (en) | Thermal-insulating covering element for walls and ceiling | |
WO2020105035A2 (en) | Composite inner wall panel | |
CN210828165U (en) | Multilayer composite floor | |
JP2006233638A (en) | Woody floor material and its laying method | |
KR200497821Y1 (en) | Interior molding for architectural purposes | |
CN103485510A (en) | Restructured bamboo splicing structure | |
JP2001090326A (en) | Decorative plate for building use | |
CN2464519Y (en) | Improved clamping quick laying floor | |
CA2545937A1 (en) | Flooring and method of manufacturing flooring | |
JP3147166U (en) | Panel plate fitted to the horizontal end and provided with joints | |
JPH0421376Y2 (en) | ||
JP2724168B2 (en) | Siding board | |
KR102180904B1 (en) | Mechanical locking system for floor panels |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20190820 |
|
WW01 | Invention patent application withdrawn after publication |