CN110144904A - It is a kind of to face upward inclined discharge structure and its construction method with anchoring function certainly - Google Patents

It is a kind of to face upward inclined discharge structure and its construction method with anchoring function certainly Download PDF

Info

Publication number
CN110144904A
CN110144904A CN201910490634.2A CN201910490634A CN110144904A CN 110144904 A CN110144904 A CN 110144904A CN 201910490634 A CN201910490634 A CN 201910490634A CN 110144904 A CN110144904 A CN 110144904A
Authority
CN
China
Prior art keywords
section
water
anchoring
stop body
draining
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910490634.2A
Other languages
Chinese (zh)
Inventor
柴贺军
冯彦铭
李海平
唐胜传
阎宗岭
贾学明
单荣相
徐建强
苟栋元
徐峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Merchants Chongqing Communications Research and Design Institute Co Ltd
Original Assignee
China Merchants Chongqing Communications Research and Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Merchants Chongqing Communications Research and Design Institute Co Ltd filed Critical China Merchants Chongqing Communications Research and Design Institute Co Ltd
Priority to CN201910490634.2A priority Critical patent/CN110144904A/en
Publication of CN110144904A publication Critical patent/CN110144904A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • E02D17/207Securing of slopes or inclines with means incorporating sheet piles or piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/06Restraining of underground water

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Hydrology & Water Resources (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

Inclined discharge structure is faced upward with anchoring function certainly the invention discloses a kind of, it include: anchor tube main body, anchor tube main body includes: steel tube body, spiral cutting edge, steel tube body is divided into axial sequentially connected draining section, sealing section, anchoring section and pile top, it drains and offers multiple drainage holes on the tube wall of section, drain and dispose drainage body in section lumen, offer multiple slurry outlets on the tube wall of anchoring section, spiral cutting edge helically banding ring on the outer tube wall for being set to anchoring section;Water-stop body, comprising: interior water-stop body and outer water-stop body, interior water-stop body are arranged in the lumen of sealing section, and outer water-stop body is annularly arranged on the outer tube wall of sealing section;And Grouting Pipe, it is arranged in the lumen of steel tube body, one end of Grouting Pipe is located in anchoring section, and the other end passes through interior water-stop body and extends to except the end face of draining section.And matched construction method is provided simultaneously, and to simplify draining and the anchoring operation in side slope protection, facilitates construction, shorten the construction period, save the cost.

Description

It is a kind of to face upward inclined discharge structure and its construction method with anchoring function certainly
Technical field
The present invention relates to side slope protection, crag punishment, deep foundation pit support, tunnels and underground engineering draining support technology necks Domain, and in particular to a kind of to face upward inclined discharge structure and its construction method with anchoring function certainly.
Background technique
In side slope protection, crag punishment, deep foundation pit support, tunnels and underground engineering draining Bracing Process, need to cunning Rock And Soil near dynamic face or the plane of fracture, unfavorable structural plane carries out draining respectively and handles with anchoring, to avoid or reduce Rock And Soil Appearance slides, falls, toppling over, geological problems or the disease such as chip off-falling.Existing Treatment Methods are usually reinforced on Rock And Soil quasi- It is drilled with the drainage hole for facing upward inclined respectively and is used for the anchor hole of support reinforcement anchor pole (rope), drilling operation repeats, and subsequent also wants The operations such as lower bolt (rope), casting anchoring are carried out, construction technology is cumbersome, and the duration is longer, at high cost.
Summary of the invention
Have between this, the present invention propose it is a kind of with facing upward inclined discharge structure and its construction method from anchoring function, with Simplify the draining in side slope protection and anchoring operation, facilitates construction, shorten the construction period, save the cost.
To reach above-mentioned technical effect, on the one hand, the present invention provide it is a kind of with from anchoring function face upward inclined draining tie Structure, comprising:
Anchor tube main body, comprising: steel tube body and spiral cutting edge, the steel tube body be divided into axial sequentially connected draining section, Sealing section, anchoring section and pile top, it is described draining section tube wall on offer multiple drainage holes, opened up on the tube wall of the anchoring section Have multiple slurry outlets, the spiral cutting edge helically banding ring on the outer tube wall for being set to the anchoring section;
Water-stop body is water-swellable sealing material, and the water-stop body includes: interior water-stop body and outer water-stop body, it is described in only Water body is arranged in the lumen of the sealing section, and the outer water-stop body is annularly arranged on the outer tube wall of sealing section;
Grouting Pipe is arranged in the lumen of the steel tube body, and one end of the Grouting Pipe is located in the anchoring section, another It holds across the interior water-stop body and extends to except the end face of the draining section;And
Drainage body: it is filled in the lumen of the draining section.
Preferably, the outer water-stop body is fixed on the sealing section outer tube wall, and before non-water swelling, the outer sealing The outer rim of body is less than the outer rim of the spiral cutting edge, and after water swelling, the outer rim of the outer water-stop body is not less than the circular knife The outer rim of sword.
Preferably, the interior water-stop body is fixed on the outer tube wall of the Grouting Pipe, and before non-water swelling, it is described in only The outer rim of water body is less than the inner tubal wall of the Grouting Pipe, after water swelling, outer rim and the Grouting Pipe of the interior water-stop body Inner tubal wall is in close contact.
Preferably, the drainage body is detachable prefabricated water permeable member, alternatively, to load the bag weaved of gravel.
Preferably, the position by close end of the draining section is provided with externally reinforced component.
On the other hand, the present invention, which goes back while providing, faces upward applying for inclined discharge structure with anchoring function certainly using above-mentioned Work method, comprising the following steps:
S1, the fixed outer water-stop body on the outer tube wall of sealing section;
S2, will the acclivitous drilling of anchor tube main body in stratum;
S3, the fixed interior water-stop body on the outer tube wall of Grouting Pipe;
S4, Grouting Pipe is inserted into the lumen of anchor tube main body steel tube body, is located at interior water-stop body in the sealing section of steel tube body, And the inner end of Grouting Pipe is located in the anchoring section of steel tube body;
S5, the infiltration expansion of water-stop body water-filling, close the lumen in sealing section and the hole outside sealing section;
S6, mortar is injected to anchoring section by Grouting Pipe, makes mortar full of the lumen in anchoring section and the hole outside anchor section;
S7, drainage body is disposed into the lumen of draining section.
Preferably, the draining section of the steel tube body, the length of sealing section and anchoring section are selected according to the case where formation at target locations.
Preferably, when the stratum of rich groundwater is constructed, swollen measure is delayed in the outer peripheral surface setting of the water-stop body, alternatively, Water-stop body uses slow expansion type sealing material.
Preferably, it during or before above-mentioned work is implemented, completes the prefabricated water permeable member of drainage body or works out bagged sand gravel Production.
Preferably, the hole on the outside of the draining section is collapsed filling automatically by the ground layer soil body around hole.
Preferably, after completing step S7, externally reinforced component is connected at the position on the exposing stratum of draining section.
Compared with prior art, the beneficial effects of the present invention are as follows:
1, it is directly used using anchor tube main body as drilling tool, anchor tube main body is placed to the mesh on stratum by a drilling operation Cursor position anchors stratum with anchoring section, to drain section alternative drain hole, by drainage hole in the prior art and anchor hole It is combined as a whole, anchoring and draining are realized in once-through operation, and simple process is easy for construction, effectively shorten the construction period, save construction Cost;
2, the draining section of steel tube body, the length of sealing section and anchoring section, can be adjusted according to the actual needs of Different Strata It is whole, different operating conditions is adapted to, it is adaptable;
3, spiral cutting edge can expand the aperture of drilling, and have the characteristics that one-way, and drilling can be real after reaching predetermined position Now from anchoring, withdrawal resistance is effectively improved;
4, it drains in the steel tube body of section and is filled with drainage body, prevent in the larger situation of hydraulic pressure, groundwater velocity is too fast to lead The loss of fine aggregate in the soil body is caused, and can be replaced, the later period maintenance and maintenance of side slope protection are convenient to;
5, it can be used for side slope, Landslide, Dangerous Rock Body draining improvement and rapid reinforcement, it can also be used to tunnel and underground work Journey, water drainage of deep foundation pit and consolidation process etc., it is applied widely.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of inventive embodiments;
Fig. 2 is the schematic cross-sectional view of A-A section in Fig. 1;
Fig. 3 is the schematic cross-sectional view of B-B section in Fig. 1;
Fig. 4 is the schematic cross-sectional view of C-C section in Fig. 1;
Fig. 5 is the use state diagram of the embodiment of the present invention;
Appended drawing reference: 100-, which has from anchoring function, faces upward inclined discharge structure, 1- anchor tube main body, 11- steel tube body, 111- Draining section, 112- sealing section, 113- anchoring section, 114- pile top, 115- drainage hole, 116- slurry outlet, 12- spiral cutting edge, 2- stop Water body, water-stop body in 21-, the outer water-stop body of 22-, 3- Grouting Pipe, 4- drainage body, the externally reinforced component of 5-.
Specific embodiment
It is described in detail below in conjunction with embodiment of the attached drawing to technical solution of the present invention.Following embodiment is only used for Clearly illustrate technical solution of the present invention, therefore be only used as example, and cannot be used as a limitation and limit protection model of the invention It encloses.In the description of the present patent application, it is to be understood that term " on ", "lower", "front", "rear", "left", "right" etc., instruction Orientation or positional relationship be based on the orientation or positional relationship shown in the drawings, be merely for convenience of description the present invention and simplification retouch It states, rather than the component of indication or suggestion meaning or structure must have a particular orientation, be constructed and operated in a specific orientation, Therefore it is not considered as limiting the invention.
As shown in Figures 1 to 4, provided in this embodiment with inclined discharge structure 100 is faced upward from anchoring function, mainly Structure includes: anchor tube main body 1, water-stop body 2, Grouting Pipe 3 and drainage body 4.
Referring to Fig. 1, anchor tube main body 1 includes: steel tube body 11 and spiral cutting edge 12, and steel tube body 11 divides to be sequentially connected in axial direction Draining section 111, sealing section 112, anchoring section 113 and pile top 114, drain section 111 tube wall on offer multiple drainage holes 115, multiple slurry outlets 116 are offered on the tube wall of anchoring section 113, and the slurry outlet 116 in the present embodiment is staggered, a sand Slurry is uniformly entered in the hole outside steel tube body 11 out of steel tube body 11 by slurry outlet 116, realizes uniformly filling;Spiral cutting edge 12 helically banding ring form drill bit knot together with anchoring section 113 and pile top 114 on the outer tube wall for being set to anchoring section 113 Structure is crept into directly to pass through anchor tube main body 1.Because spiral cutting edge 12 can expand the aperture of drilling, and have one-way special Point, drilling can be realized after reaching predetermined position from anchoring, and effectively improve withdrawal resistance.
Referring to Fig. 1 and Fig. 3, water-stop body 2 includes: interior water-stop body 21 and outer water-stop body 22, and interior water-stop body 21 is arranged in sealing In the lumen of section 112, outer water-stop body 22 is annularly arranged on the outer tube wall of sealing section 112, with partition draining section 111 and anchoring Hydraulic connection between section 113 plays the role of preventing cement mortar from flowing back.Water-stop body 2 in the present embodiment uses water-swellable Sealing material, such as hydro-expansive rubber, dry kelp, drying regime lower volume reduce, and contact water water swelling.
Specifically, outer water-stop body 22 is fixed in advance on 112 outer tube wall of sealing section for convenience of the construction of anchor tube main body 1, And before non-water swelling, the outer rim of outer water-stop body 22 is less than the outer rim of spiral cutting edge 12, after water swelling, outside outer water-stop body 22 Edge is not less than the outer rim of spiral cutting edge 12, goes on smoothly in order to creep into, and water swelling blocks outgoing gap.It meanwhile being anti- Only outer water-stop body 22 is destroyed in drilling process or position is mobile, and limit measure can also be arranged outside the pipe of sealing section 112, Such as steel loop of the welding two at the outer both ends of outer water-stop body 22, the expansion after not influencing its water suction, and it can be carried out effectively Protection.Similarly, interior water-stop body 21 is fixed on the outer tube wall of Grouting Pipe 3, likewise, before non-water swelling, interior water-stop body 21 outer rim is less than the inner tubal wall of Grouting Pipe 3, so as in Grouting Pipe 3 smoothly insertion anchor tube main body 1;After water swelling, interior sealing The outer rim of body 21 and the inner tubal wall of Grouting Pipe 3 are in close contact, and seal the pore of steel tube body 11.
Referring to Fig. 1 and Fig. 4, Grouting Pipe 3 is arranged in the lumen of steel tube body 11, and one end of Grouting Pipe 3 is located at anchoring section 113 Interior, the other end passes through interior water-stop body 21 and extends to except the end face of draining section 111, to infuse from outer end into anchoring section 113 Enter cement mortar, the lumen of full anchoring section 113 is filled, and enter in the outgoing hole of anchoring section 113 from slurry outlet 116, by anchor Gu section 113, spiral cutting edge 12 are integrated with good ground solidification, guarantee the stability that anchor tube main body 1 anchors in stratum.
Referring to Fig. 1 and Fig. 2, after the casting for completing cement mortar, drainage body 4 is disposed in the lumen of draining section 111.Filter Water body 4 makes using outside hole, and postposition mode is placed in the lumen of draining section 111, specifically can be used in the present embodiment detachable Prefabricated water permeable member, alternatively, prefabricated components are fabricated to by the way of the seepy material of establishment bagged sand gravel etc, it can be convenient It is placed into inside draining section 111, can prevent in the larger situation of hydraulic pressure, the too fast stream for leading to fine aggregate in the soil body of groundwater velocity It loses, and can be replaced, be convenient to the later period maintenance and maintenance of side slope protection.
Finally, externally reinforced component 5, the externally reinforced structure can also be connected at the position on the exposing stratum of draining section 111 The structures such as common end frame, panel on existing friction pile can be used in part 5, realize the anchoring function of entire anchor tube main body 1.
Referring to Fig. 5, inclined discharge structure 100 is faced upward in above-mentioned having from anchoring function, and anchor tube main body 1 is used as simultaneously and is had There are the drilling tool of drill bit and the drainpipe of drainage, the position being arranged using water-stop body 2 divides steel tube body 11 for draining as separation Section 111, sealing section 112 and anchoring section 113, each section of specific length can be protected according to using the actual environment on stratum to be adjusted Card draining section 111 is located within the scope of sliding surface, and anchoring section 113 is located at the good ground under sliding surface, adapts to different works Condition, it is adaptable.The drill bit structure being made up of spiral cutting edge 12 and anchoring section 113, the drilling that anchor tube main body 1 faces upward inclined is set Enter into formation at target locations, the anchoring section 113 in 112 inside stratum of sealing section, by the fixed line of cement mortar, by entire anchor tube master Body 1 is stably fixed on good ground, plays the effect of anchoring;Draining section 111 in 112 outside stratum of sealing section, can lead to The underground water that drainage hole 115 collects neighbouring stratum is crossed, is finally discharged from nozzle, anchoring and draining are realized in once-through operation.
It is above-mentioned have from anchoring function face upward inclined discharge structure 100, construction method the following steps are included:
The first step chooses anchor tube main body 1, the fixed outer water-stop body 22 on the outer tube wall of its 11 sealing section 112 of steel tube body;This The selection of anchor tube main body 1 in step, should be according to draining section 111,112 and of sealing section for selecting steel tube body 11 the case where formation at target locations The length of anchoring section 113, to guarantee that the anchoring section 113 after the completion of drilling is located at sliding surface good ground below, and sliding surface Positioned at draining section 111 in the range of, guarantee anchoring stabilization and draining it is effective.
Second step is drilling tool with anchor tube main body 1 with drilling equipment, and the acclivitous drilling of anchor tube main body 1 is arrived stratum It is interior;Final position should make anchoring section 113 be located at sliding surface good ground below, and sliding surface is located at the range of draining section 111 It is interior.
Third step, the fixed interior water-stop body 21 on the outer tube wall of Grouting Pipe 3, fixed specific location is because comparing steel tube body 11 Each section of specific length setting, when making the inner end of Grouting Pipe 3 close to pile top 14, interior water-stop body 21 is placed exactly in sealing section 112 It is interior.
Grouting Pipe 3 equipped with interior water-stop body 21 is inserted into the lumen of 1 steel tube body 11 of anchor tube main body by the 4th step, makes interior stop Water body 21 is located in the sealing section 112 of steel tube body 11, and the inner end of Grouting Pipe 3 is located in the anchoring section 113 of steel tube body 11;
5th step after Grouting Pipe 3 is installed in place, expands water-stop body 2 sufficiently by water infiltration by the water filling of Grouting Pipe 3, To close the lumen in sealing section 112 and the hole outside sealing section 112;Certainly, if constructing on the stratum of rich groundwater When, then it does not need to fill the water by Grouting Pipe 3, needs to delay swollen measure in the outer peripheral surface setting of water-stop body 2 instead, alternatively, directly making Water-stop body 2 is made with slow expansion type sealing material, avoids too fast water swelling in the environment of rich groundwater of water-stop body 2, it is ensured that Anchor tube main body 1 and Grouting Pipe 3 just complete expansion and closing function after reaching scheduled position.
6th step injects mortar to anchoring section 113 by Grouting Pipe 3, makes mortar full of the lumen and anchor in anchoring section 113 Hole outside section.
7th step disposes drainage body 4 into the lumen of draining section 111;Drainage body 4 in the present embodiment specifically can be used can Prefabricated water permeable member is dismantled, alternatively, the prefabricated components for loading the bag weaved support of gravel are selected, before carrying out above-mentioned construction procedure Or in the process, the production of drainage body 4 is completed, directly loads later, saves the time.
Under the disturbance of work progress, the ground layer soil body around hole can collapse automatically, the hole in 111 outside of filling draining section Gap stablizes entire anchor tube main body 1 in stratum.
Finally, connecting externally reinforced component 5 at the position on the exposing stratum of draining section 111, entire anchor tube main body 1 is realized Anchor function;The structures such as common end frame, panel on existing friction pile can be used in the externally reinforced component 5.
Using above-mentioned structure and construction method, anchor tube main body 1 is used as drilling tool directly, passes through a drilling operation Anchor tube main body 1 is placed to the target position on stratum, stratum is anchored with anchoring section 113, to drain 111 alternative drain of section Drainage hole 115 in the prior art and anchor hole are combined as a whole by hole 115, and anchoring and draining, technique letter are realized in once-through operation It is single, it is easy for construction, it effectively shortens the construction period, saves construction cost;It can be used for side slope, Landslide, draining administer with it is fast Speed is reinforced, it can also be used to which tunnel and landform engineering, deep basal pit pore gas flow consolidation process and Dangerous Rock Body reinforce punishment etc., fit With in extensive range.
It should be noted that preferred embodiment above is merely illustrative of the technical solution of the present invention, rather than its limitations;To the greatest extent Present invention has been described in detail with reference to the aforementioned embodiments for pipe, those skilled in the art should understand that: it is still Can modify to technical solution documented by previous embodiment, or some or all of the technical features are carried out etc. With replacement;And these are modified or replaceed, technical solution of the embodiment of the present invention that it does not separate the essence of the corresponding technical solution Range should all cover within the scope of the claims and the description of the invention.

Claims (10)

1. a kind of face upward inclined discharge structure with anchoring function certainly characterized by comprising
Anchor tube main body, comprising: steel tube body and spiral cutting edge, the steel tube body are divided into axial sequentially connected draining section, sealing Section, anchoring section and pile top offer multiple drainage holes on the tube wall of the draining section, offer on the tube wall of the anchoring section more A slurry outlet, the spiral cutting edge helically banding ring on the outer tube wall for being set to the anchoring section;
Water-stop body is water-swellable sealing material, and the water-stop body includes: interior water-stop body and outer water-stop body, the interior water-stop body It is arranged in the lumen of the sealing section, the outer water-stop body is annularly arranged on the outer tube wall of sealing section;
Grouting Pipe is arranged in the lumen of the steel tube body, and one end of the Grouting Pipe is located in the anchoring section, and the other end is worn It crosses the interior water-stop body and extends to except the end face of the draining section;And
Drainage body: it is filled in the lumen of the draining section.
2. according to claim 1 face upward inclined discharge structure with anchoring function certainly, which is characterized in that
The outer water-stop body is fixed on the sealing section outer tube wall, and before non-water swelling, and the outer rim of the outer water-stop body is small In the outer rim of the spiral cutting edge, after water swelling, the outer rim of the outer water-stop body is not less than the outer rim of the spiral cutting edge.
3. according to claim 1 face upward inclined discharge structure with anchoring function certainly, which is characterized in that
The interior water-stop body is fixed on the outer tube wall of the Grouting Pipe, and before non-water swelling, the outer rim of the interior water-stop body Less than the inner tubal wall of the Grouting Pipe, after water swelling, the inner tubal wall of the outer rim and the Grouting Pipe of the interior water-stop body is close Contact.
4. according to claim 1 face upward inclined discharge structure with anchoring function certainly, which is characterized in that the drainage body For detachable prefabricated water permeable member, alternatively, to load the bag weaved of gravel.
5. according to claim 1 face upward inclined discharge structure with anchoring function certainly, which is characterized in that
The position by close end of the draining section is provided with externally reinforced component.
6. a kind of construction method for facing upward inclined discharge structure with from anchoring function, which is characterized in that use claim 1-5 It is described in any item to face upward inclined discharge structure with anchoring function certainly, comprising the following steps:
S1, the fixed outer water-stop body on the outer tube wall of sealing section;
S2, will the acclivitous drilling of anchor tube main body in stratum;
S3, the fixed interior water-stop body on the outer tube wall of Grouting Pipe;
S4, Grouting Pipe is inserted into the lumen of anchor tube main body steel tube body, is located at interior water-stop body in the sealing section of steel tube body, and infused The inner end of slurry pipe is located in the anchoring section of steel tube body;
S5, the infiltration expansion of water-stop body water-filling, close the lumen in sealing section and the hole outside sealing section;
S6, mortar is injected to anchoring section by Grouting Pipe, makes mortar full of the lumen in anchoring section and the hole outside anchor section;
S7, drainage body is filled into the lumen of draining section.
7. according to claim 6 have from the construction method for facing upward inclined discharge structure for anchoring function, which is characterized in that The draining section of the steel tube body, the length of sealing section and anchoring section are selected according to the case where formation at target locations.
8. according to claim 6 have from the construction method for facing upward inclined discharge structure for anchoring function, which is characterized in that When the stratum of rich groundwater is constructed, swollen measure is delayed in the outer peripheral surface setting of the water-stop body, alternatively, water-stop body uses slow expansion type Sealing material.
9. according to claim 6 have from the construction method for facing upward inclined discharge structure for anchoring function, which is characterized in that Hole on the outside of the draining section is collapsed filling automatically by the ground layer soil body around hole.
10. according to claim 6 have from the construction method for facing upward inclined discharge structure for anchoring function, feature exists In after completing step S7, in the externally reinforced component of position connection for exposing stratum of draining section.
CN201910490634.2A 2019-06-06 2019-06-06 It is a kind of to face upward inclined discharge structure and its construction method with anchoring function certainly Pending CN110144904A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910490634.2A CN110144904A (en) 2019-06-06 2019-06-06 It is a kind of to face upward inclined discharge structure and its construction method with anchoring function certainly

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910490634.2A CN110144904A (en) 2019-06-06 2019-06-06 It is a kind of to face upward inclined discharge structure and its construction method with anchoring function certainly

Publications (1)

Publication Number Publication Date
CN110144904A true CN110144904A (en) 2019-08-20

Family

ID=67590695

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910490634.2A Pending CN110144904A (en) 2019-06-06 2019-06-06 It is a kind of to face upward inclined discharge structure and its construction method with anchoring function certainly

Country Status (1)

Country Link
CN (1) CN110144904A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111945757A (en) * 2020-08-14 2020-11-17 中国电建集团贵阳勘测设计研究院有限公司 Upward-inclined self-advancing type slope drainage steel pipe structure and construction method
CN115217124A (en) * 2021-04-16 2022-10-21 河北省交通规划设计研究院有限公司 In-situ retaining structure for slope expanding excavation and construction method

Citations (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3646770A (en) * 1970-06-05 1972-03-07 Shell Oil Co Method and apparatus for stabilizing an offshore drilling platform structure
EP0979899A1 (en) * 1998-08-12 2000-02-16 Dyckerhoff & Widmann Aktiengesellschaft Corrosion-protected load-bearing element for an earth or rock anchor, a pressure pile or the like
CN2568815Y (en) * 2002-05-31 2003-08-27 刘维杰 Strengthening slip casting anchor stock
CN1587646A (en) * 2004-09-24 2005-03-02 同济大学 Quick water blocking device and its water blocking method in anchor cable hole
CN101761345A (en) * 2010-01-12 2010-06-30 中国建筑西南勘察设计研究院有限公司 Reinforcement device for tunnel top soil and construction method thereof
CN102155016A (en) * 2011-05-10 2011-08-17 中铁二院工程集团有限责任公司 Drainage anchor rod, side slope protection engineering repairing and reinforcing structure and construction method
CN202882966U (en) * 2012-10-24 2013-04-17 西安科技大学 Recoverable soft rock self-tapping anchor rod
CN103410167A (en) * 2013-08-29 2013-11-27 深圳市福田建安建设集团有限公司 Three-dimensional reinforced rigid-soft composite ecological retaining wall and construction method
CN103437354A (en) * 2013-08-29 2013-12-11 湖南城市学院 Water drainage anchor rod and construction method
CN104179170A (en) * 2014-07-10 2014-12-03 大连大金马基础建设有限公司 Supporting and protecting double-convex and single-concave occluded water stopping pile
CN104594348A (en) * 2015-01-27 2015-05-06 安徽同济建设集团有限责任公司 Expanded head capsule type anchor rod and construction method thereof
CN105569049A (en) * 2015-12-18 2016-05-11 深圳市福田建安建设集团有限公司 Construction method of high-pressure-bearing water-depth foundation pit supporting anchor rod
CN205422775U (en) * 2016-03-21 2016-08-03 江西工程学院 Anchor rod device
CN106284339A (en) * 2016-08-11 2017-01-04 重庆大学 A kind of sleeve valve barrel grouting draining soil nailing props up latch device and construction method thereof
CN106894423A (en) * 2017-02-28 2017-06-27 中交天津港湾工程研究院有限公司 From draining string data enlarging anchor rod supporting construction and construction method
CN107246008A (en) * 2017-06-30 2017-10-13 浙江大学 A kind of side slope protection from draining anchor cable system and its construction method
CN107905224A (en) * 2017-11-19 2018-04-13 三峡大学 It is a kind of to expand head in perforate steel pipe to improve the anchor structure of anti-pulling of anchor bar and construction method using expanding cement
CN109083668A (en) * 2018-08-20 2018-12-25 中钢集团马鞍山矿山研究院有限公司 A kind of grouting and reinforcing anchor pole suitable for high stress breaking surrounding rock supporting
CN109236338A (en) * 2018-11-09 2019-01-18 石家庄铁道大学 Slip casting type self-expanding anchor structure
CN208518690U (en) * 2018-05-02 2019-02-19 阳泉煤业(集团)有限责任公司 A kind of weak cementing rich water top plate anchor cable hole grouting for water blocking device
CN109629566A (en) * 2019-01-16 2019-04-16 宁夏大学 A kind of vacuum drainage anchor pole and its construction method
CN210104764U (en) * 2019-06-06 2020-02-21 招商局重庆交通科研设计院有限公司 Upward inclined drainage structure with self-anchoring function

Patent Citations (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3646770A (en) * 1970-06-05 1972-03-07 Shell Oil Co Method and apparatus for stabilizing an offshore drilling platform structure
EP0979899A1 (en) * 1998-08-12 2000-02-16 Dyckerhoff & Widmann Aktiengesellschaft Corrosion-protected load-bearing element for an earth or rock anchor, a pressure pile or the like
CN2568815Y (en) * 2002-05-31 2003-08-27 刘维杰 Strengthening slip casting anchor stock
CN1587646A (en) * 2004-09-24 2005-03-02 同济大学 Quick water blocking device and its water blocking method in anchor cable hole
CN101761345A (en) * 2010-01-12 2010-06-30 中国建筑西南勘察设计研究院有限公司 Reinforcement device for tunnel top soil and construction method thereof
CN102155016A (en) * 2011-05-10 2011-08-17 中铁二院工程集团有限责任公司 Drainage anchor rod, side slope protection engineering repairing and reinforcing structure and construction method
CN202882966U (en) * 2012-10-24 2013-04-17 西安科技大学 Recoverable soft rock self-tapping anchor rod
CN103410167A (en) * 2013-08-29 2013-11-27 深圳市福田建安建设集团有限公司 Three-dimensional reinforced rigid-soft composite ecological retaining wall and construction method
CN103437354A (en) * 2013-08-29 2013-12-11 湖南城市学院 Water drainage anchor rod and construction method
CN104179170A (en) * 2014-07-10 2014-12-03 大连大金马基础建设有限公司 Supporting and protecting double-convex and single-concave occluded water stopping pile
CN104594348A (en) * 2015-01-27 2015-05-06 安徽同济建设集团有限责任公司 Expanded head capsule type anchor rod and construction method thereof
CN105569049A (en) * 2015-12-18 2016-05-11 深圳市福田建安建设集团有限公司 Construction method of high-pressure-bearing water-depth foundation pit supporting anchor rod
CN205422775U (en) * 2016-03-21 2016-08-03 江西工程学院 Anchor rod device
CN106284339A (en) * 2016-08-11 2017-01-04 重庆大学 A kind of sleeve valve barrel grouting draining soil nailing props up latch device and construction method thereof
CN106894423A (en) * 2017-02-28 2017-06-27 中交天津港湾工程研究院有限公司 From draining string data enlarging anchor rod supporting construction and construction method
CN107246008A (en) * 2017-06-30 2017-10-13 浙江大学 A kind of side slope protection from draining anchor cable system and its construction method
US20190153697A1 (en) * 2017-06-30 2019-05-23 Zhejiang University Self-drainage anchor cable system for slope protection and construction method thereof
CN107905224A (en) * 2017-11-19 2018-04-13 三峡大学 It is a kind of to expand head in perforate steel pipe to improve the anchor structure of anti-pulling of anchor bar and construction method using expanding cement
CN208518690U (en) * 2018-05-02 2019-02-19 阳泉煤业(集团)有限责任公司 A kind of weak cementing rich water top plate anchor cable hole grouting for water blocking device
CN109083668A (en) * 2018-08-20 2018-12-25 中钢集团马鞍山矿山研究院有限公司 A kind of grouting and reinforcing anchor pole suitable for high stress breaking surrounding rock supporting
CN109236338A (en) * 2018-11-09 2019-01-18 石家庄铁道大学 Slip casting type self-expanding anchor structure
CN109629566A (en) * 2019-01-16 2019-04-16 宁夏大学 A kind of vacuum drainage anchor pole and its construction method
CN210104764U (en) * 2019-06-06 2020-02-21 招商局重庆交通科研设计院有限公司 Upward inclined drainage structure with self-anchoring function

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
孙延宗: "《岩巷工程施工 支护工程》", 31 July 2011, 北京冶金工业出版社, pages: 384 *
邹俊: "三峡船闸高边坡预应力锚固施工技术", 中国地质灾害与防治学报, no. 02, pages 101 - 106 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111945757A (en) * 2020-08-14 2020-11-17 中国电建集团贵阳勘测设计研究院有限公司 Upward-inclined self-advancing type slope drainage steel pipe structure and construction method
CN111945757B (en) * 2020-08-14 2022-03-11 中国电建集团贵阳勘测设计研究院有限公司 Upward-inclined self-advancing type slope drainage steel pipe structure and construction method
CN115217124A (en) * 2021-04-16 2022-10-21 河北省交通规划设计研究院有限公司 In-situ retaining structure for slope expanding excavation and construction method
CN115217124B (en) * 2021-04-16 2024-02-13 河北省交通规划设计研究院有限公司 In-situ retaining structure for slope expansion and excavation and construction method

Similar Documents

Publication Publication Date Title
CN105927231B (en) Inclined shaft passes through rich water densification drifting sand layer circulation-induced curtain-grouting method
CN104131575B (en) A kind of karst height grows the leak stopping water discharge method of the stratum dam foundation
CN105201518B (en) Disassembling method is received in a kind of major diameter slurry balance shield hole
CN101525881B (en) Structure of karst strata pile holes protecting wall and method for constructing pile holes
JP2000257057A (en) Ground injection device for ground and injection method
CN105525619B (en) A kind of water rich strata bored tunnel occlusion pipe curtain
CN108678772A (en) A kind of multilevel hierarchy suspension device and its construction method for rich water sandy gravel stratum tunnel
CN208106440U (en) Consolidated structures suitable for rich water collapsible loess tunnel
CN105908744A (en) Pore pressure counterforce construction method, construction device and soil clearing device
CN107747312A (en) A kind of method of sand and gravel stratum well cementing construction
CN108708743A (en) A method of using grouting treatment Tunnel Collapse
CN107513995A (en) A kind of bridge struction pile post grouting construction method
CN108951648A (en) Open trench tunnel layer of sand Sand foundation ditch strengthening method
CN110318410A (en) A kind of deep basal pit chance artesian water is prominent to gush decompression drought stress construction method
CN110144904A (en) It is a kind of to face upward inclined discharge structure and its construction method with anchoring function certainly
CN210104764U (en) Upward inclined drainage structure with self-anchoring function
KR100437910B1 (en) grouting apparatus for earth anchor using compound packer and earth anchor construction method using the same
CN105421475B (en) Air bag type curtain leakage blocking device and method
CN107060779A (en) A kind of anti-cut construction method of narrow regions ultra-deep passage inclined shaft
CN107542469A (en) A kind of underground mould bag stake method for protecting support
CN208201874U (en) A kind of open-cell cloth bag grouting structure
CN107587502A (en) A kind of spiral-digging pore pressure pour water soil occlusion curtain pile construction method
CN109826635A (en) Reinforce the construction method for the shield reception space periphery soil body that subsurface excavation method applies
CN110778332B (en) Reducing self-adaptive expansion grouting device for cracked and damaged part of secondary lining of tunnel and reinforcing method
CN108277815A (en) The cofferdam structure and its construction method constructed for water intaking header structure in river

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination