CN110144857A - A kind of method of panel concrete rock-fill dams toe board anticracking - Google Patents

A kind of method of panel concrete rock-fill dams toe board anticracking Download PDF

Info

Publication number
CN110144857A
CN110144857A CN201910444861.1A CN201910444861A CN110144857A CN 110144857 A CN110144857 A CN 110144857A CN 201910444861 A CN201910444861 A CN 201910444861A CN 110144857 A CN110144857 A CN 110144857A
Authority
CN
China
Prior art keywords
toe board
concrete
anticracking
rock
thickness
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910444861.1A
Other languages
Chinese (zh)
Inventor
王立成
张博
赵东亮
田野
孔西康
张东
翟政
衣德武
马果
赵倩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Water Resources Beifang Investigation Design and Research Co Ltd
Original Assignee
China Water Resources Beifang Investigation Design and Research Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Water Resources Beifang Investigation Design and Research Co Ltd filed Critical China Water Resources Beifang Investigation Design and Research Co Ltd
Priority to CN201910444861.1A priority Critical patent/CN110144857A/en
Publication of CN110144857A publication Critical patent/CN110144857A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/16Sealings or joints
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B7/00Barrages or weirs; Layout, construction, methods of, or devices for, making same
    • E02B7/02Fixed barrages
    • E02B7/04Dams across valleys
    • E02B7/06Earth-fill dams; Rock-fill dams

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Foundations (AREA)

Abstract

The invention discloses a kind of methods of panel concrete rock-fill dams toe board anticracking, first basic leveling concrete is poured in the plinth foundation after excavation, then the brushing pitch grease on basic leveling concrete, toe board is poured again, then the anchor pole of connection toe board, basic leveling concrete and plinth foundation is inserted on toe board, the seepage proof curtain constructed under toe board again, finally the spray coating heat preservation moisturizing polyurethane on the outside of toe board, entire construction are completed.The method effectively avoids the crack generated when toe board pours due to plinth foundation constraint, ensure that toe board structure meets antiseepage and the requirement of safety and stability.

Description

A kind of method of panel concrete rock-fill dams toe board anticracking
Technical field
The present invention relates to panel concrete rock-fill dams, especially prevent the panel for generating crack in toe board concrete construction mixed The method of solidifying mound masonry dam toe board anticracking.
Background technique
Toe board is the concrete structure for being arranged in panel periphery in concrete face rockfill dam, being seated on ground, is passed through Periphery fissure equipped with sealing is linked together with panel, forms the impervious body of the dam foundation or more, while being linked again with basement rock, and ground is closed Leakage passage below, so that upper and lower leakage preventing structure be made to be linked as entirety.
The compression strength of toe board concrete is higher, and elasticity modulus is big, and Poisson ratio is small, and concrete own vol is restricted; More cement consumption generates the higher heat of hydration in toe board work progress, especially in the proportion of early application, accordingly Biggish drying shrinkage is generated, at this time by the constraint of basic rock mass, temperature change, causes to crack in addition.And basic scar integrality Difference, the difference that rises and falls is big, and concrete thickness is uneven, and the reason of generation crack.
Summary of the invention
The technical problem to be solved by the invention is to provide a kind of methods of panel concrete rock-fill dams toe board anticracking, protect Card toe board structure meets antiseepage and the requirement of safety and stability.
The technical solution adopted by the present invention is that: a kind of method of panel concrete rock-fill dams toe board anticracking, first after excavation Plinth foundation on pour basic leveling concrete, the then brushing pitch grease on basic leveling concrete, then pour toe board, Then the anchor pole of connection toe board, basic leveling concrete and plinth foundation, then the antiseepage curtain under toe board of constructing are inserted on toe board Curtain, finally the spray coating heat preservation moisturizing polyurethane on the outside of toe board, entire construction are completed.
The basis leveling concrete avoids the uneven generation crack of toe board concrete thickness with a thickness of 30~50cm.
The heat and moisture preserving polyurethane avoids internal-external temperature difference variation that toe board is caused to crack with a thickness of 5~8cm.
The pitch grease avoids toe board from being constrained when pouring by basic leveling concrete and generates crack with a thickness of 2~3mm.
The beneficial effects of the present invention are: avoiding the principal element for generating crack in toe board construction from influencing, so as to avoid toe Plank split generates, and enables the operation that toe board is safe and reliable.The method simple economy, and improve the safety of toe board structure Property.
Detailed description of the invention
Fig. 1 is the structure chart of panel concrete rock-fill dams toe board anticracking of the invention.
Specific embodiment
Invention is further described in detail with reference to the accompanying drawings and detailed description:
As shown in Figure 1, the method for panel concrete rock-fill dams toe board anticracking of the invention, the first plinth foundation after excavation Basic leveling concrete 1 is poured on 6, then the brushing pitch grease 2 on basic leveling concrete 1, then pour toe board 3, then The anchor pole 5 of insertion connection toe board 3, basic leveling concrete 1 and plinth foundation 6 on toe board 3, then the antiseepage under toe board 3 of constructing Curtain 7, finally in 3 outside spray coating heat preservation moisturizing polyurethane 4 of toe board, entire construction is completed.
The basis leveling concrete 1 avoids unevenly being also easy to produce for toe board concrete thickness from splitting with a thickness of 30~50cm Seam.
The heat and moisture preserving polyurethane 4 avoids internal-external temperature difference variation that toe board 3 is caused to crack with a thickness of 5~8cm.
The pitch grease 2 avoids toe board 3 from being generated when pouring by the constraint of basic leveling concrete 1 and splits with a thickness of 2~3mm Seam.
Specifically, comprising the following steps:
1, basic leveling concrete 1 first is poured in the plinth foundation 6 after excavation, is poured after avoiding excessive fluctuating difference from causing Toe board 3 cracks;
2, the brushing pitch grease 2 on basic leveling concrete 1, to reduce basic leveling concrete 1 to the strong about of toe board 3 Shu Zuoyong;
3, the anchor pole 5 for connection toe board 3, basis leveling concrete 1 and the plinth foundation 6 of constructing on toe board 3, to guarantee to apply Enough lid weight power is provided when seepage proof curtain 7 under work toe board 3;
4, in 3 outside spray coating heat preservation moisturizing polyurethane 4 of toe board, so that toe board 3 obtains heat and moisture preserving, to avoid generating temperature Spend crack.
The heat and moisture preserving polyurethane 4 is to be mixed with diisocyanate resin and end hydroxy polyether by 1:1.
For example, certain engineering, basic leveling concrete 1 is first poured in the plinth foundation 6 after excavation, 30~50cm of thickness, The cracking of toe board 3 is poured after avoiding excessive fluctuating difference from causing;Then 2mm thickness pitch grease 2 is brushed on basic leveling concrete 1, It is acted on reducing basic leveling concrete 1 to the strong constraint of toe board 3;It is poured the toe board 3 with a thickness of 1.5m, is constructed on toe board 3 The anchor pole 5 of toe board 3, basic leveling concrete 1 and plinth foundation 6 is connected, length 9m enters rock 7.5m;The antiseepage constructed under toe board 3 Curtain 7;In toe board 3 outside spray coating heat preservation moisturizing polyurethane 4, thickness 5cm, so that toe board 3 obtains heat and moisture preserving, to avoid producing Raw thermal cracking.It is good using operational effect after engineering construction, crack is not found.
Example described above is merely to illustrate technical idea and feature of the invention, and its object is to those skilled in the art Member only cannot limit the scope of the patents of the invention with this example it will be appreciated that the contents of the present invention and implement accordingly, i.e., and all Same changes or modifications made by revealed spirit are invented, are still fallen within the scope of the present invention.

Claims (4)

1. a kind of method of panel concrete rock-fill dams toe board anticracking, which is characterized in that first in the plinth foundation (6) after excavation Basic leveling concrete (1) is poured, then the brushing pitch grease (2) on basic leveling concrete (1), then pours toe board (3), Then insertion connects the anchor pole (5) of toe board (3), basic leveling concrete (1) and plinth foundation (6) on toe board (3), then constructs Seepage proof curtain (7) under toe board (3), finally the spray coating heat preservation moisturizing polyurethane (4) on the outside of toe board (3), entire construction are completed.
2. the method for panel concrete rock-fill dams toe board anticracking according to claim 1, which is characterized in that the basis is levelling Concrete (1) avoids the uneven generation crack of toe board concrete thickness with a thickness of 30~50cm.
3. the method for panel concrete rock-fill dams toe board anticracking according to claim 1, which is characterized in that the heat and moisture preserving Polyurethane (4) avoids internal-external temperature difference variation that toe board (3) is caused to crack with a thickness of 5~8cm.
4. the method for panel concrete rock-fill dams toe board anticracking according to claim 1, which is characterized in that the pitch grease (2) it with a thickness of 2~3mm, avoids toe board (3) from being constrained when pouring by basic leveling concrete (1) and generates crack.
CN201910444861.1A 2019-05-24 2019-05-24 A kind of method of panel concrete rock-fill dams toe board anticracking Pending CN110144857A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910444861.1A CN110144857A (en) 2019-05-24 2019-05-24 A kind of method of panel concrete rock-fill dams toe board anticracking

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910444861.1A CN110144857A (en) 2019-05-24 2019-05-24 A kind of method of panel concrete rock-fill dams toe board anticracking

Publications (1)

Publication Number Publication Date
CN110144857A true CN110144857A (en) 2019-08-20

Family

ID=67592114

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910444861.1A Pending CN110144857A (en) 2019-05-24 2019-05-24 A kind of method of panel concrete rock-fill dams toe board anticracking

Country Status (1)

Country Link
CN (1) CN110144857A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5595457A (en) * 1995-03-14 1997-01-21 Stucks; Mark A. Storm drainage underflow dam unit
CN101644041A (en) * 2009-08-27 2010-02-10 中国水电顾问集团华东勘测设计研究院 Face rockfill dam toe board structure constructed on completely weathered bed rock and construction method thereof
CN101906768A (en) * 2010-08-19 2010-12-08 中国水电建设集团十五工程局有限公司 Panel construction method of concrete faced rock-fill dam
KR101455186B1 (en) * 2014-07-18 2014-10-28 주식회사 삼안 A waterproof plate for flooding prevention
CN108316251A (en) * 2018-02-06 2018-07-24 浙江大学 A method of Face Slab of Concrete of Rock-fill Dam is reinforced using superhigh tenacity cement-base composite material

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5595457A (en) * 1995-03-14 1997-01-21 Stucks; Mark A. Storm drainage underflow dam unit
CN101644041A (en) * 2009-08-27 2010-02-10 中国水电顾问集团华东勘测设计研究院 Face rockfill dam toe board structure constructed on completely weathered bed rock and construction method thereof
CN101906768A (en) * 2010-08-19 2010-12-08 中国水电建设集团十五工程局有限公司 Panel construction method of concrete faced rock-fill dam
KR101455186B1 (en) * 2014-07-18 2014-10-28 주식회사 삼안 A waterproof plate for flooding prevention
CN108316251A (en) * 2018-02-06 2018-07-24 浙江大学 A method of Face Slab of Concrete of Rock-fill Dam is reinforced using superhigh tenacity cement-base composite material

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
《中国水力发电年鉴》编辑部: "《中国水力发电年鉴,2004年》", 31 December 2005, 中国电力出版社 *
孙惠兰: "松塔水库可行性设计中坝型的选择", 《山西水利科技》 *

Similar Documents

Publication Publication Date Title
CN103088834B (en) Method for improving slope stability of expansive soil and controlling structural damage of expansive soil
CN107060116B (en) A kind of high-pressure slip-casting blocking method for building settlement seam
CN109336531A (en) A kind of two-component penetrant crystalline distress in concrete waterproof repair liquid and construction method
Thagunna Building cracks–causes and remedies
CN101845830B (en) Open caisson deviation rectification construction method
CN102852332A (en) Casting type fireproof external wall insulation system and construction method thereof
CN104652371B (en) The glue of crossing set up based on old dam coagulates rock-fill dams and construction method thereof
CN109208631A (en) A kind of gravity retaining wall inclination deviation rectification and reinforcement means
CN103046513A (en) Method for coating and sealing fracture of bed rock in uncovered heavy consolidation grouting
CN105780940B (en) building expansion joint anti-leakage structure
CN206971247U (en) A kind of concrete plinth foundation ruggedized construction being placed on Unloading Rock
CN203716410U (en) Novel roof grid seam
CN110144857A (en) A kind of method of panel concrete rock-fill dams toe board anticracking
CN108385612A (en) A kind of construction method of the good concrete protecting face plate of stability
CN103061352A (en) Salt lake region bridge foundation concrete anticorrosion structure and construction method
CN208830256U (en) A kind of concrete dam grout curtain arragement construction
CN206941513U (en) A kind of structure for New-old concrete layer adhesion
CN109487790A (en) A kind of concrete heat-insulating method suitable for the big temperature difference area of High aititude
CN209369067U (en) Deformation joint structure at the ramp Di Ku and communication port
CN106522385A (en) Basement waterproof structure construction method and basement waterproof structure
CN105735366B (en) Waterproof construction method based on concrete
Groot et al. Water permeance problems in single wythe masonry walls: the case of wind mills
CN206829165U (en) Caved in the composite foundation with sapping area for arid biogeographic zone earthen ruins
CN207296076U (en) A kind of gap interstitital texture at the top of masonry wall between agent structure
RU2380482C1 (en) Foundation preparation method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190820